CN215629452U - Pull rod-free mobile trolley construction device for frame bridge - Google Patents

Pull rod-free mobile trolley construction device for frame bridge Download PDF

Info

Publication number
CN215629452U
CN215629452U CN202122129837.4U CN202122129837U CN215629452U CN 215629452 U CN215629452 U CN 215629452U CN 202122129837 U CN202122129837 U CN 202122129837U CN 215629452 U CN215629452 U CN 215629452U
Authority
CN
China
Prior art keywords
trolley
support
rod
frame bridge
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122129837.4U
Other languages
Chinese (zh)
Inventor
饶坤荣
韦权
李育林
袁静
柯利英
蒋昌盛
何磊祖
何石峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Navigation Construction Engineering Co ltd
Original Assignee
Guangxi Navigation Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Navigation Construction Engineering Co ltd filed Critical Guangxi Navigation Construction Engineering Co ltd
Priority to CN202122129837.4U priority Critical patent/CN215629452U/en
Application granted granted Critical
Publication of CN215629452U publication Critical patent/CN215629452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The pull rod-free mobile trolley construction device for the frame bridge is characterized in that an outer mold support is arranged on the outer side of a wall body of the frame bridge and fixedly connected with an outer template; the inner side of the wall body is provided with a movable trolley, and a trolley bracket is fixedly connected with the inner template; the bottom of the trolley support is provided with a plurality of adjustable screws; the top of the trolley support is also fixedly connected with the top template. The movable trolley can drive the inner formwork and the top formwork to move in the framework bridge cavity, replaces a construction method that a pull rod is needed to connect and anchor the inner formwork and the outer formwork in the traditional framework bridge construction, and has the advantages of being fast and convenient to operate and good in positioning effect.

Description

Pull rod-free mobile trolley construction device for frame bridge
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a frame bridge pull-rod-free mobile trolley construction device.
Background
With the progress of modern society, traffic pressure is getting bigger and bigger. Road traffic lines are mutually staggered, ground traffic cannot completely meet the requirements, and various bridges need to be erected to realize the longitudinal and transverse crossing of vehicles such as trains or automobiles. Compared with bridge types such as an arch bridge, a truss bridge and the like, the frame bridge has the characteristics of simple structure, good integrity, low manufacturing cost and easiness in construction, the section of the frame bridge is of a frame box structure, the top surface of the frame bridge bears vehicles to run, the bottom surface of the frame bridge is paved, and vehicles in the other direction run through the bottom surface.
The frame bridge forms for reinforced concrete monolithic pouring usually, at first carries out the basis excavation and lays the terrace, then carries out the prefabrication of box on the terrace: binding the reinforcing steel bars of the bottom plate template, supporting and reinforcing the bottom plate template, and pouring a bottom plate of the box body; binding the reinforcing steel bars of the wall body and supporting the wall body by using a template, and pouring the wall body; and finally, binding steel bars of the top plate and supporting a template, and pouring the top plate. In the prefabrication process of the box body, a full support is usually required to be built inside the box body, and an outer side formwork support is built on the outer side surface of the box body. When the wall body is poured, the outer side wall template is fixed on the outer side template support, the inner side wall template is fixed on the full hall support in the box body, in order to keep the highly uniform of interval between the inner and outer templates, generally, an anchor pull rod is penetrated between the inner side template and the outer side template, the interval between the inner and outer side templates is anchored, the thickness of the wall body finally poured can be accurately leveled, and the concrete finally solidifies the pull rod package into a whole. However, the tie-rod anchor bolt inside and outside template also has the following disadvantages: 1. the work of installing the anchor bolt pull rod is labor-consuming and time-consuming, and a large amount of labor cost is consumed; 2. the use of a large number of pull rods improves the cost of the building materials of the whole project; 3. the pull rod can be retained in concrete sometimes, under the condition, the pull rod head is exposed on the surface of a concrete structure after the concrete is poured finally, the flatness of the surface of the frame bridge is influenced, the aesthetic degree of a building is reduced, the pull rod head needs to be manually cut off in serious cases, and certain labor cost is consumed; after a long time, the tie rod head is corroded to influence the steel bars in the building structure, so that the building safety is influenced; 4, if the pull rod is pulled out after the concrete pouring is finished, a hole is left in the concrete structure, and the water seepage and the water prevention of the building are not facilitated.
Disclosure of Invention
The utility model aims to provide a construction device of a pull-rod-free mobile trolley for a frame bridge, wherein the mobile trolley can drive an inner formwork and a top formwork to move in a frame bridge cavity, so that the weight of wall concrete pouring is effectively supported, a construction method that the inner formwork and the outer formwork are connected and anchored by a pull rod in the traditional frame bridge construction is replaced, and the construction device has the advantages of rapidness and convenience in operation and good positioning effect.
In order to achieve the purpose, the technical scheme of the utility model is as follows:
the pull rod-free mobile trolley construction device for the frame bridge is characterized in that an outer mold support is arranged on the outer side of a wall body of the frame bridge and fixedly connected with an outer template; the inner side of the wall body is provided with a movable trolley, and a trolley bracket is fixedly connected with the inner template; the bottom of the trolley support is provided with a plurality of adjustable screws; the top of the trolley support is also fixedly connected with the top template. The screw rod part of the adjustable screw rod is in threaded connection with the bottom beam of the support, and the whole trolley support is lifted by twisting the screw rod.
The trolley support main body is of a truss structure formed by cross beams, longitudinal beams and inclined supporting beams, and the bottom support is of a trapezoidal stable structure with a large bottom and a small top. The truss structure is high in rigidity, and stable support is provided for the horizontal direction of the template, so that the effect of free-tie pouring is achieved.
The lower part of the trolley support can be connected with the embedded bolt B through a joint B, the other end of the joint B is connected with a screw rod, the screw rod penetrates through the oblique beam and the left-hand back rib, and the end part of the screw rod is tightly riveted by a nut. The embedded bolt B is fixedly welded with the steel bar in the bottom plate and embedded in concrete, and the joint B is connected with the embedded bolt and the screw rod through internal threads of the joint B; the left-hand thread back rib is the channel-section steel that is fixed together back to back, and the gap in the middle of two channel-section steels passes the lead screw, screws up the back through the nut of lead screw tip, compresses tightly the left-hand thread back rib and hugs closely with the sloping.
The lower part of the outer mold support is connected with the embedded bolt A through a connector A, the other end of the connector A is connected with an outer connecting rod, the outer connecting rod penetrates through the vertical beam, and the end part of the outer connecting rod is tightly riveted through a nut and a gasket. The joint A is a conical joint, and the end part of the embedded bolt A is positioned in the plane of the outer wall and does not expose out of concrete.
And angle irons or cushion beams are arranged at corresponding positions below the adjustable screw rods. The angle iron and the pad beam respectively provide a bottom supporting plane for the torsion screw rod so as to prevent the supporting plane from slipping and being uneven.
The construction method of the frame bridge pull-rod-free mobile trolley comprises the following steps:
(1) embedding an embedded bolt A and an embedded bolt B on a steel bar of the bottom plate, and pouring bottom plate concrete;
(2) after the concrete of the bottom plate is hardened, installing an outer mold support, fixedly connecting the outer mold support with the embedded bolt A, and installing an outer template on the outer mold support;
(3) assembling a trolley on the bottom plate, fixing angle iron or a pad beam at a preset position on the bottom plate, moving the trolley to a position corresponding to the outer mold support, adjusting an adjustable screw rod, lifting the trolley support in place, then fixedly connecting the trolley support with the embedded bolt A, and installing an inner template on the trolley support;
(4) pouring concrete between the inner mold and the outer mold to form a wall body;
(5) after the wall body is hardened, continuously adding top formworks at the top of the outer formwork support and the top of the trolley support, and pouring concrete of the top plate after connecting the top formworks at the top of the full formwork support;
(6) and (5) after the top plate concrete is hardened, removing the connection between the outer mold support and the embedded bolt A and the connection between the trolley support and the embedded bolt B, moving the outer mold support and the trolley to the next construction section, and repeating the steps (3) to (5) until the construction of all the frame bridges is completed.
The utility model has the advantages that:
1. the movable trolley is adopted to support and fix the inner formwork, the weight of wall concrete pouring is effectively supported, the construction mode that the outer formwork is connected with the inner formwork through the pull rod in the traditional frame bridge construction is replaced, the construction efficiency is improved, the construction cost is saved, and the appearance effect of the frame bridge is improved.
2. The utility model has convenient operation, does not need external power and can manually complete the operation of equipment.
3. The device can keep the whole bracket stable, does not shift or deform and has better structural rigidity in the concrete pouring process.
Description of the drawings:
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is an enlarged view of the structure at I in FIG. 1;
FIG. 3 is an enlarged view of the structure at II in FIG. 1;
FIG. 4 is an enlarged view of FIG. 1 at III;
FIG. 5 is a schematic cross-sectional view A-A of FIG. 1;
the serial numbers and component names in the figures are: 1. a main rib; 2. an elevation positioning device; 21. a shoulder pole beam; 22. connecting blocks; 23. a base plate; 24. hanging the ribs; 25. a connector; 251. a conical anchor; 26. hanging the plate; 3. a central positioning device; 31. steel rings; 32. a steel pipe; 33. a nut; 34. positioning a rod; 341. marking the center; 35. reinforcing ribs; 4. and (5) a steel casing.
Detailed Description
Example 1
A pull rod-free mobile trolley construction device for a frame bridge is characterized in that an outer mold support 2 is arranged on the outer side of a wall body 12 of the frame bridge, and the outer mold support 2 is fixedly connected with an outer mold plate 21; the inner side of the wall body 12 is provided with a movable trolley, and the trolley bracket 3 is fixedly connected with the inner template 33; the bottom of the trolley support 3 is provided with a 34, and the bottom of the trolley support 3 is also provided with a plurality of adjustable screw rods 35; the top of the trolley bracket 3 is also fixedly connected with a top template;
the trolley support 3 is mainly of a truss structure formed by cross beams, longitudinal beams and inclined supporting beams, and the bottom support is of a trapezoidal stable structure with a large lower part and a small upper part;
the lower part of the trolley bracket 3 can be connected with an embedded bolt B31 through a joint B32, the other end of a joint B32 is connected with a lead screw 38, the lead screw 38 penetrates through the oblique beam and the back-off rib 37, and the end part of the lead screw is tightly riveted by a nut;
the lower part of the outer mold support 2 is connected with an embedded bolt A23 through a joint A24, the other end of the joint A24 is connected with an outer connecting rod 25, the outer connecting rod 25 penetrates through a vertical beam, and the end part of the outer connecting rod is tightly riveted by a nut and a gasket;
and an angle iron 36 or a pad beam 39 is arranged at a corresponding position below the adjustable screw 35.

Claims (5)

1. Pull rod mobile trolley construction equipment is exempted from to frame bridge, its characterized in that: an outer mold support (2) is arranged on the outer side of a wall body (12) of the frame bridge, and the outer mold support (2) is fixedly connected with an outer template (21); the inner side of the wall body (12) is provided with a movable trolley, and a trolley bracket (3) is fixedly connected with the inner template (33); the bottom of the trolley support (3) is provided with a screw rod (34), and the bottom of the trolley support (3) is also provided with a plurality of adjustable screw rods (35); the top of the trolley bracket (3) is also fixedly connected with the top template.
2. The frame bridge pull-rod-free mobile trolley construction device according to claim 1, characterized in that: the trolley support (3) is mainly of a truss structure formed by cross beams, longitudinal beams and inclined supporting beams, and the bottom support is of a trapezoidal stable structure with a large bottom and a small top.
3. The frame bridge pull-rod-free mobile trolley construction device according to claim 1, characterized in that: the lower part of the trolley bracket (3) can be connected with an embedded bolt B (31) through a joint B (32), the other end of the joint B (32) is connected with a screw rod (38), the screw rod (38) penetrates through the oblique beam and the back rib (37) of the left-hand thread and the right-hand thread, and the end part of the screw rod is tightly riveted by a nut.
4. The frame bridge pull-rod-free mobile trolley construction device according to claim 1, characterized in that: the lower part of the outer die support (2) is connected with an embedded bolt A (23) through a connector A (24), the other end of the connector A (24) is connected with an outer connecting rod (25), the outer connecting rod (25) penetrates through the vertical beam, and the end part of the outer connecting rod is tightly riveted by a nut and a gasket.
5. The frame bridge pull-rod-free mobile trolley construction device according to claim 1, characterized in that: and angle irons (36) or cushion beams (39) are arranged at corresponding positions below the adjustable screw rods (35).
CN202122129837.4U 2021-09-06 2021-09-06 Pull rod-free mobile trolley construction device for frame bridge Active CN215629452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122129837.4U CN215629452U (en) 2021-09-06 2021-09-06 Pull rod-free mobile trolley construction device for frame bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122129837.4U CN215629452U (en) 2021-09-06 2021-09-06 Pull rod-free mobile trolley construction device for frame bridge

Publications (1)

Publication Number Publication Date
CN215629452U true CN215629452U (en) 2022-01-25

Family

ID=79910071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122129837.4U Active CN215629452U (en) 2021-09-06 2021-09-06 Pull rod-free mobile trolley construction device for frame bridge

Country Status (1)

Country Link
CN (1) CN215629452U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117572878A (en) * 2024-01-17 2024-02-20 四川省铁路建设有限公司 Full-automatic frame bridge construction integrated intelligent trolley control method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117572878A (en) * 2024-01-17 2024-02-20 四川省铁路建设有限公司 Full-automatic frame bridge construction integrated intelligent trolley control method and system
CN117572878B (en) * 2024-01-17 2024-03-19 四川省铁路建设有限公司 Full-automatic frame bridge construction integrated intelligent trolley control method and system

Similar Documents

Publication Publication Date Title
CN108437158B (en) Construction method of precast concrete box girder
JP5045214B2 (en) Column head construction method
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN102127966A (en) Fixing device for template of cast-in-place reinforced concrete column
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN112832137A (en) Steel box-concrete combined beam bridge deck formwork system and construction method
CN206512581U (en) Transverse prestress overall with reinforced concrete bridge deck slab plate combination beam
CN111456256A (en) Reinforced concrete prefabricated column type steel connecting joint and connecting method
CN112227218A (en) Stainless steel-wood combined template applied to bare concrete and manufacturing method thereof
CN215629452U (en) Pull rod-free mobile trolley construction device for frame bridge
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN107100322B (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN210421568U (en) Assembled beam and plate structure
CN111441513A (en) Cast-in-place concrete wall body combining truss reinforcing steel bars and steel plates and construction method
CN106013200A (en) Prefabricated assembly type strip foundation and construction technology
KR20100121865A (en) Method for constructing building using prc integrating method
CN114561873A (en) Bridge high pier construction method
CN211947965U (en) Cast-in-situ continuous box girder internal mold
CN209971052U (en) Two T roof beam nomadic formula apparatus for producing of prestressing force
CN202007527U (en) Cast-in-place steel reinforcing bar concrete column template fixing device
CN109736415A (en) Pulley yoke for improving construction efficiency of open side ditch and process thereof
CN214939289U (en) Steel case-concrete combination beam decking formwork system
CN218479548U (en) Assembled side form reinforcing fastener

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant