CN108661301A - Derrick stand modularization assembling platform and application method - Google Patents

Derrick stand modularization assembling platform and application method Download PDF

Info

Publication number
CN108661301A
CN108661301A CN201810651472.1A CN201810651472A CN108661301A CN 108661301 A CN108661301 A CN 108661301A CN 201810651472 A CN201810651472 A CN 201810651472A CN 108661301 A CN108661301 A CN 108661301A
Authority
CN
China
Prior art keywords
stand
derrick
platform
basis
modularization assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810651472.1A
Other languages
Chinese (zh)
Other versions
CN108661301B (en
Inventor
谌喜华
马智民
杨凤生
钟习九
刘强
孙正祥
石世荣
王艳霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 5 Construction Co Ltd
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN201810651472.1A priority Critical patent/CN108661301B/en
Publication of CN108661301A publication Critical patent/CN108661301A/en
Application granted granted Critical
Publication of CN108661301B publication Critical patent/CN108661301B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/17Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

Derrick stand modularization assembling platform and application method, including basis, the basis are made of concrete connection built-in fitting, and the basis is connected with platform by built-in fitting, and the platform includes Vierendeel girder, supporting beam and fixed beam.The present invention derrick stand modularization assembling platform and application method can be rapidly and efficiently progress derrick stand modularization assembling centering, accelerate the speed of derrick stand assembling centering, improve the quality and working efficiency of derrick stand assembling centering, the labor intensity of construction personnel is reduced, construction cost is saved.

Description

Derrick stand modularization assembling platform and application method
Technical field
The present invention relates to a kind of operation platform of derrick of copper-mine stand modularization assembling, specifically a kind of derrick stand moulds Block assembly platform and application method.
Technical background
Traditional derrick stand construction laterally assembling, hangs into vertical and then is attached with crane.I.e. first by two root posts It is laterally placed, connects horizontal gird and support and centering between column, then right angle setting column top tie-beam and support, most It is transversely mounted crossbeam and support between two root posts and column again afterwards, forms it into frame structure, crane lifting is used after adjusting centering To installation site.The drawbacks of this installation is:1, it needs repeatedly to measure adjustment, size Control difficulty is big, while in frame More tubing is needed to be supported before centering fastening.2, after the completion of overall package centering, lifting stand is laterally turned into vertically When easily there is malformation.
Invention content
Technical problem to be solved by the present invention lies in the deficiency for overcoming the above-mentioned prior art, provide it is a kind of it is simple in structure, The derrick stand modularization assembling platform and application method to work well.
The present invention is realized with following technical solution:A kind of derrick stand modularization assembling platform, including basis, it is described Basis is made of concrete connection built-in fitting, and the basis is connected with platform by built-in fitting, and the platform includes Vierendeel girder, branch Support beam and fixed beam.
It is further:The concrete on the basis is embedded in underground and the 100mm that bassets, the concrete on the basis Size is 3066mm × 3066mm × 600mm.
The basis uses C25 concrete.
The built-in fitting is made of steel plate and several spirals, the vertical welding of the spiral on the steel plate, phase The adjacent spiral interval is identical.
The size of the steel plate is 2066mm × 2066mm × 20mm, and the length and diameter of the spiral is respectively 360mm and 25mm is divided into 415mm between the spiral.
The platform surrounds frame by several Vierendeel girders, and supporting beam is connected between the Vierendeel girder, the Vierendeel girder Junction is equipped with fixed beam, and the fixed beam lower part welds together with built-in fitting, and the fixed beam top is equipped with and stand connects The bolt hole that fishplate bar is used cooperatively.
The material model of the Vierendeel girder, supporting beam and fixed beam is HW309 × 306 × 10 × 14.
The fixed beam includes outer grid beam and inner beam, and the outer grid beam surrounds rectangular, and the inner beam connects opposite outline border Beam.
A kind of application method of derrick stand modularization assembling platform as described in claim 1,
Include the following steps:
A, it before derrick stand modularization assembling platform makes, is made in platform according to stand installation site and crane radius of turn The heart carries out the datum line construction of derrick stand modularization assembling platform using theodolite according to the appearance and size of stand.
B, 4 bases of construction determine that the location and shape on basis, casting concrete are put down on the basis of making according to drawing size Face levelness and absolute altitude meet assembly platform arrangement and require, and built-in fitting are placed in above the concrete after pouring, spiral is inserted Enter in concrete.
Four Vierendeel girders, two supporting beams and four fixed beams are formed the general frame of platform, and made by c, assembly platform With high-strength bolt connect fasten, on the basis of carry out Leveling and centering after with basic embedded board weld.
Derrick second layer column lower end is attached tightly by d, assembling stand using mounting hole on bolt and fixed beam position Whether measuring center line and Diagonal Dimension meet the requirements after Gu, then install connecting cross beam, direct centering the upper end of the column ruler Very little and verticality of stand column after the completion of centering, carries out whole fastening, and be fixed using steel pipe, shaped steel.
E, on the stand column crane lifting to derrick installation position of derrick bottommost, bottom stage crossbeam is installed after centering And bearing diagonal.
F, directly the second layer stand of derrick is lifted to pithead position and bottom abutting joint, then in group using crane It closes and continues assembling stand third layer and above section on platform, one section of often assembling stand is just lifted into well head and derrick installation centering Good hypomere is attached centering.
The present invention has the following advantages:The derrick stand modularization assembling platform and application method of the present invention can be rapidly and efficiently Progress derrick stand modularization assembling centering, accelerate derrick stand assembling centering speed, improve derrick stand assembling looks for Positive quality and working efficiency reduces the labor intensity of construction personnel, saves construction cost.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the front view of assembly platform of the present invention;
Fig. 3 is the upward view of assembly platform of the present invention;
Fig. 4 is the front view of built-in fitting of the present invention;
Fig. 5 is the left view of built-in fitting of the present invention;
Fig. 6 is construction location schematic diagram of the present invention;
In figure:1, platform, 2, basis, 3, built-in fitting, 4, crane, 5, pit shaft, 6, stand, 7, derrick, 11, Vierendeel girder, 12, support Beam, 13, fixed beam, 14, outer grid beam, 15, inner beam, 31, steel plate, 32, spiral.
Specific implementation mode
A kind of derrick stand modularization assembling platform as shown in Figures 1 to 6, including basis 2, described basic 2 is by coagulation Soil connection built-in fitting 3 forms, and described basic 2 are connected with platform 1 by built-in fitting 3, and the platform 1 includes Vierendeel girder 11, support Beam 12 and fixed beam 13.The platform 1 surrounds frame by several Vierendeel girders 11, and supporting beam is connected between the Vierendeel girder 11 12, the junction of the Vierendeel girder 11 is equipped with fixed beam 13, and 13 lower part of the fixed beam welds together with built-in fitting 3, described The bolt hole that 13 top of fixed beam is equipped with and stand connecting plate is used cooperatively.The assembly platform of the present invention consists of two parts, and one Be it is buried under basis, second is that with basis connect the platform being placed on ground, basic body is concrete, is fixedly arranged above pre-buried Part, by built-in fitting, basis and platform weld together, and basic quantity is not unique, simultaneously because the setting on basis is in underground, Therefore the stability and intensity for strengthening platform, conducive to the accuracy of the stand size and structure that process is improved;Platform master It to be made of Vierendeel girder, supporting beam and fixed beam, Vierendeel girder forms the integral outer frame structure of platform, and inside passes through supporting beam Connection adds the stiff stability of general frame, while adjacent Vierendeel girder junction is equipped with fixed beam, and Vierendeel girder and supporting beam are steady Gu the position of fixed beam play the role of it is vital, the downward both ends of fixed beam be connected separately with basis and stand, lower end pass through Welding is connect with built-in fitting, and upper end is connect by bolt hole with stand connecting plate, for realizing the connection of platform and stand, is realized The function of console module assembling stand.
A kind of derrick stand modularization assembling platform as shown in Figures 1 to 6, basic 2 concrete are embedded in underground And the 100mm that bassets, the size of basic 2 concrete is 3066mm × 3066mm × 600mm.Described basic 2 use C25 concrete.The basic body of the present invention is formed by concreting, and meets plane levelness and absolute altitude symbol on platform base It is combined assembling platform arrangement to require, while basis is basseted 100mm, and pours be fixed with built-in fitting above, pass through built-in fitting With the welding of fixed beam, greatly improve the stability of platform, specifically set there are four basis, and with four angle phases of the stand of derrick It is corresponding, play the role of reinforcing stability when forming stand.
A kind of derrick stand modularization assembling platform as shown in Figures 1 to 6, the built-in fitting 3 is by steel plate 31 and several Spiral 32 forms, and the spiral 32 is vertical to be welded on steel plate 31, and the adjacent spiral 32 is spaced phase Together.The size of the steel plate 31 is 2066mm × 2066mm × 20mm, and the length and diameter of the spiral 32 is respectively 360mm and 25mm is divided into 415mm between the spiral 32.The built-in fitting of the present invention is by steel plate and welds on the steel plate Spiral forms, and spiral is uniformly welded on the same side of steel plate, and spiral is towards concreting when use Entire built-in fitting is firmly fixed together with concreting part by square part.
A kind of derrick stand modularization assembling platform as shown in Figures 1 to 6, the Vierendeel girder 11, supporting beam 12 and solid The material model for determining beam 13 is HW309 × 306 × 10 × 14.The fixed beam 13 includes outer grid beam 14 and inner beam 15, described outer Grid beam 14 surrounds rectangular, and the inner beam 15 connects opposite outer grid beam 14.The fixed beam of the present invention plays connection basis and stand Effect, therefore the stability of fixed beam is most important, and the structure of fixed beam is made of four outer grid beams for forming lateral frame, Outer grid beam composition is rectangular, intermediate to connect opposite outer grid beam by inner beam and reinforce stability, and the lower part of fixed beam is and built-in fitting Weld together, the bolt hole that top is arranged on inner beam and stand connecting plate is used cooperatively, the stand for being assembled with needs Connection, is bolted convenient for stand installation and removal when assembled, while can guarantee strength and stability when assembled.
A kind of application method of derrick stand modularization assembling platform as described in claim 1,
Include the following steps:
A, before derrick stand modularization assembling platform makes, platform 1 is made according to 6 installation site of stand and 4 radius of turn of crane Center carry out the datum line construction of derrick stand modularization assembling platform using theodolite according to the appearance and size of stand 6.
B, 4 bases 2 of construction determine that the location and shape on basis 2, casting concrete make on basis 2 according to drawing size Plane levelness and absolute altitude meet assembly platform arrangement and require, and built-in fitting are placed in above the concrete after pouring, spiral It is inserted into concrete.
Four Vierendeel girders, 11, two supporting beams 12 and four fixed beams 13 are formed the entirety of platform 1 by assembly platform 1 c, Frame, and using high-strength bolt connection fastening, welded with basic embedded board after Leveling and centering is carried out on basis 2.
D, assembling stand 6 connects 7 second layer column lower end of derrick using bolt and mounting hole on 13 position of fixed beam Whether measuring center line and Diagonal Dimension meet the requirements after connecing fastening, then install connecting cross beam, on direct centering column It holds size and verticality of stand column, after the completion of centering, carries out whole fastening, and be fixed using steel pipe, shaped steel.
Bottom stage is installed horizontal e, on the stand column crane lifting to derrick installation position of 7 bottommost of derrick, after centering Beam and bearing diagonal.
F, directly the second layer stand 6 of derrick 7 is lifted to pithead position and bottom abutting joint using crane, is then existed Continue assembling stand third layer and above section on combined platform, one section of often assembling stand is just lifted into well head and is installed with derrick 7 The good hypomere of centering is attached centering.

Claims (9)

1. a kind of derrick stand modularization assembling platform, it is characterised in that:Including basis(2), the basis(2)Connected by concrete Connect built-in fitting(3)Composition, the basis(2)Pass through built-in fitting(3)It is connected with platform(1), the platform(1)Including Vierendeel girder (11), supporting beam(12)And fixed beam(13).
2. a kind of derrick stand modularization assembling platform as described in claim 1, it is characterised in that:The basis(2)It is mixed Solidifying soil is embedded in underground and the 100mm that bassets, the basis(2)Concrete size be 3066mm × 3066mm × 600mm.
3. a kind of derrick stand modularization assembling platform as claimed in claim 2, it is characterised in that:The basis(2)Using C25 concrete.
4. a kind of derrick stand modularization assembling platform as described in claim 1, it is characterised in that:The built-in fitting(3)By Steel plate(31)With several spirals(32)Composition, the spiral(32)Vertical is welded on steel plate(31)On, it is adjacent The spiral(32)It is spaced identical.
5. a kind of derrick stand modularization assembling platform as claimed in claim 4, it is characterised in that:The steel plate(31)Ruler Very little is 2066mm × 2066mm × 20mm, the spiral(32)Length and diameter be respectively 360mm and 25mm, the spiral shell Line reinforcing bar(32)Between be divided into 415mm.
6. a kind of derrick stand modularization assembling platform as described in claim 1, it is characterised in that:The platform(1)If by Dry Vierendeel girder(11)Surround frame, the Vierendeel girder(11)Between be connected with supporting beam(12), the Vierendeel girder(11)Connection Place is equipped with fixed beam(13), the fixed beam(13)Lower part and built-in fitting(3)Weld together, the fixed beam(13)Top is set There is the bolt hole being used cooperatively with stand connecting plate.
7. a kind of derrick stand modularization assembling platform as described in claim 1, it is characterised in that:The Vierendeel girder(11)、 Supporting beam(12)And fixed beam(13)Material model be HW309 × 306 × 10 × 14.
8. a kind of derrick stand modularization assembling platform as described in claim 1, it is characterised in that:The fixed beam(13)Packet Include outer grid beam(14)And inner beam(15), the outer grid beam(14)Surround rectangular, the inner beam(15)Connect opposite outer grid beam (14).
9. a kind of application method of derrick stand modularization assembling platform as described in claim 1, it is characterised in that:
Include the following steps:
A, before derrick stand modularization assembling platform makes, according to stand(6)Installation site and crane(4)Radius of turn is made flat Platform(1)Center, using theodolite according to stand(6)Appearance and size, carry out derrick stand modularization assembling platform benchmark Line is constructed;
B, 4 bases of construction(2), basis is determined according to drawing size(2)Location and shape, casting concrete makes basis(2) Upper plane levelness and absolute altitude meet assembly platform arrangement and require, and built-in fitting are placed in above the concrete after pouring, screw-thread steel Muscle is inserted into concrete;
C, assembly platform(1), by four Vierendeel girders(11), two pieces supporting beams(12)With four fixed beams(13)Form platform(1) General frame, and using high-strength bolt connection fastening, on basis(2)It is welded with basic embedded board after upper carry out Leveling and centering;
D, assembling stand(6), by derrick(7)Second layer column lower end uses bolt and fixed beam(13)Mounting hole carries out on position Whether measuring center line and Diagonal Dimension meet the requirements after connection fastening, then install connecting cross beam, direct centering column Upper end size and verticality of stand column after the completion of centering, carry out whole fastening, and be fixed using steel pipe, shaped steel;
E, derrick(7)On the stand column crane lifting to derrick installation position of bottommost, bottom stage crossbeam is installed after centering And bearing diagonal;
F, using crane directly by derrick(7)Second layer stand(6)Then lifting exists to pithead position and bottom abutting joint Continue assembling stand third layer and above section on combined platform, one section of often assembling stand is just lifted into well head and derrick(7)Peace The good hypomere of dress centering is attached centering.
CN201810651472.1A 2018-06-22 2018-06-22 Modular assembly platform for vertical frames of well frames and use method Active CN108661301B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810651472.1A CN108661301B (en) 2018-06-22 2018-06-22 Modular assembly platform for vertical frames of well frames and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810651472.1A CN108661301B (en) 2018-06-22 2018-06-22 Modular assembly platform for vertical frames of well frames and use method

Publications (2)

Publication Number Publication Date
CN108661301A true CN108661301A (en) 2018-10-16
CN108661301B CN108661301B (en) 2024-06-07

Family

ID=63772916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810651472.1A Active CN108661301B (en) 2018-06-22 2018-06-22 Modular assembly platform for vertical frames of well frames and use method

Country Status (1)

Country Link
CN (1) CN108661301B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594753A (en) * 2018-12-05 2019-04-09 江苏春都钢结构工程有限公司 A kind of new steel structure engineering rack
CN114961291A (en) * 2022-05-23 2022-08-30 中国十七冶集团有限公司 Modularized installation method for dust removal ventilation shaft in steelmaking environment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203296361U (en) * 2013-06-14 2013-11-20 江西建工第一建筑有限责任公司 Long-span steel structure cross assembling hoisting platform
KR101363795B1 (en) * 2012-12-10 2014-02-20 한국건설기술연구원 Joint construction of modular unit structure and foundation concrete
CN205444851U (en) * 2015-12-28 2016-08-10 美联钢结构建筑系统(上海)股份有限公司 Construction platform device
CN107419802A (en) * 2017-08-10 2017-12-01 中冶天工集团天津有限公司 A prefabricated concrete frame structure and its construction method
CN208618771U (en) * 2018-06-22 2019-03-19 中煤第五建设有限公司 A kind of derrick stand modularization assembling platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101363795B1 (en) * 2012-12-10 2014-02-20 한국건설기술연구원 Joint construction of modular unit structure and foundation concrete
CN203296361U (en) * 2013-06-14 2013-11-20 江西建工第一建筑有限责任公司 Long-span steel structure cross assembling hoisting platform
CN205444851U (en) * 2015-12-28 2016-08-10 美联钢结构建筑系统(上海)股份有限公司 Construction platform device
CN107419802A (en) * 2017-08-10 2017-12-01 中冶天工集团天津有限公司 A prefabricated concrete frame structure and its construction method
CN208618771U (en) * 2018-06-22 2019-03-19 中煤第五建设有限公司 A kind of derrick stand modularization assembling platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594753A (en) * 2018-12-05 2019-04-09 江苏春都钢结构工程有限公司 A kind of new steel structure engineering rack
CN114961291A (en) * 2022-05-23 2022-08-30 中国十七冶集团有限公司 Modularized installation method for dust removal ventilation shaft in steelmaking environment

Also Published As

Publication number Publication date
CN108661301B (en) 2024-06-07

Similar Documents

Publication Publication Date Title
CN102561712B (en) Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN104674945A (en) Tree-shaped steel pipe column structure and construction method thereof
CN106346596A (en) Precast stair template matching system
CN108411790A (en) A kind of adjustable installing bracket of prefabricated assembled segmentation bent cap
CN109235280A (en) The operation platform and construction method of bridge coping
CN109853365A (en) A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method
CN104500106B (en) A kind of tunnel inverted arch construction mould bases and tunnel inverted arch construction technology
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN109267493A (en) Construction method for installing steel cover beam across river course
CN109469094A (en) Super High bottom plate interpolation fashioned iron column construction method and fixed structure
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN209114333U (en) A kind of combined steel structural unit block
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN208618771U (en) A kind of derrick stand modularization assembling platform
CN206189607U (en) Rag bolt location structure
CN214498388U (en) Assembled overhanging formwork support bent
CN110258294A (en) Steel truss arch bridge installs system and its construction method
CN105821770B (en) Connecting and locating method for multiple tower roots and large-size concrete bearing platform foundation of steel structure main tower
CN220035215U (en) A hang mould support that is used for bridge main tower mound top to pour
CN107938854A (en) A kind of steel girder erection method using built-in fitting
CN219604164U (en) Variable cross-section special-shaped steel tower crown mounting device
CN111648611A (en) Embedded part support device and embedded part installation method using the embedded part support device
CN208379444U (en) A kind of adjustable installing bracket of prefabricated assembled segmentation bent cap
CN100362195C (en) A method of processing and installing pre-embedded anchor bolts at the foot of a leaning tower
CN106930406B (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant