CN202849941U - Pier stud hoop - Google Patents

Pier stud hoop Download PDF

Info

Publication number
CN202849941U
CN202849941U CN 201220277906 CN201220277906U CN202849941U CN 202849941 U CN202849941 U CN 202849941U CN 201220277906 CN201220277906 CN 201220277906 CN 201220277906 U CN201220277906 U CN 201220277906U CN 202849941 U CN202849941 U CN 202849941U
Authority
CN
China
Prior art keywords
pier stud
hoop body
hoop
anchor ear
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220277906
Other languages
Chinese (zh)
Inventor
李建虎
赵文兴
孙贵华
牛国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN 201220277906 priority Critical patent/CN202849941U/en
Application granted granted Critical
Publication of CN202849941U publication Critical patent/CN202849941U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to an overcome load supporting component of upper portion pier stud template and interim facility weight, the specially adapted pier stud is higher, and the template can not satisfy the pier stud of disposable pouring. The structure of the utility model consists of a hoop body, a connecting plate, a bolt and a stiffening plate. The hoop body is composed of four semi-annular steel structures and a flexible hoop body without hoop stiffening. The connecting plate and the hoop body are in the vertical direction, and the hoop body is connected together by vertically distributed bolts. The utility model discloses can adjust mounted position in a flexible way, realize reuse, have the characteristics that the load is big moreover.

Description

A kind of pier stud anchor ear
Technical field
The utility model relates to a kind of load support component that overcomes top Pier Formwork and temporory structure weight, is specially adapted to pier stud higher, and template can not satisfy the pier stud of disposal pouring.
Technical background
Before the applying date, when pier stud intermediate demand supporting axial force, its bearing method generally has two kinds, a kind of be boring on the pier stud, insert pin or the fitting key that splines, utilize pin or key to transmit load as supporting member.In case but the position that pin or key are installed is fixed then can not be moved.Another kind method is that this method also location can not change at pier stud welding or bonding support unit, the problem that parts can't be dismantled, and also its supporting force is little, can not satisfy high load requirement.
The utility model content
Can not adjust position and the little deficiency of supporting force in order to overcome in the existing pier stud bearing method, the utility model provides a kind of pier stud anchor ear, and this anchor ear can be adjusted the installation site flexibly, realizes recycling, and has the large characteristics of load.
Technical scheme is as follows: a kind of pier stud anchor ear, it is characterized in that: formed by hoop body, junction plate, bolt and four parts of stiffener, the hoop body of described anchor ear is comprised of the flexible band body that hoop puts more energy into of not establishing that four semi-circular steel work form, the junction plate of described anchor ear and hoop body are in vertical direction, to bind round body by the bolt of vertical distribution and link together, described anchor ear arranges a stiffener every row's bolt in the junction plate vertical direction.
Description of drawings
Fig. 1 is top view of the present utility model.
Fig. 2 is vertical section of the present utility model constructional drawing.
Among the figure: 1 is the hoop body, and 2 is junction plate, and 3 is bolt, and 4 is stiffener.
The specific embodiment
This pier stud anchor ear, formed by hoop body 1, junction plate 2, bolt 3 and 4 four parts of stiffener, the hoop body 1 of described anchor ear is comprised of the flexible band body that hoop puts more energy into of not establishing that four semi-circular steel work form, the junction plate 2 of described anchor ear and hoop body are in vertical direction, to bind round body by the bolt 3 of vertical distribution and link together, described anchor ear arranges a stiffener 4 every row's bolt in the junction plate vertical direction.

Claims (1)

1. pier stud anchor ear, it is characterized in that: formed by hoop body, junction plate, bolt and four parts of stiffener, the hoop body of described anchor ear is comprised of the flexible band body that hoop puts more energy into of not establishing that four semi-circular steel work form, the junction plate of described anchor ear and hoop body are in vertical direction, to bind round body by the bolt of vertical distribution and link together, described anchor ear arranges a stiffener every row's bolt in the junction plate vertical direction.
CN 201220277906 2012-06-13 2012-06-13 Pier stud hoop Expired - Fee Related CN202849941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220277906 CN202849941U (en) 2012-06-13 2012-06-13 Pier stud hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220277906 CN202849941U (en) 2012-06-13 2012-06-13 Pier stud hoop

Publications (1)

Publication Number Publication Date
CN202849941U true CN202849941U (en) 2013-04-03

Family

ID=47981157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220277906 Expired - Fee Related CN202849941U (en) 2012-06-13 2012-06-13 Pier stud hoop

Country Status (1)

Country Link
CN (1) CN202849941U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867399A (en) * 2018-08-24 2018-11-23 中国建筑土木建设有限公司 Anchoring ring, pier body hoop unloading system and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867399A (en) * 2018-08-24 2018-11-23 中国建筑土木建设有限公司 Anchoring ring, pier body hoop unloading system and construction method thereof

Similar Documents

Publication Publication Date Title
CN107059880B (en) Reinforcing structure of concrete-fabricated section steel mixed support system of ultra-large deep foundation pit and construction method thereof
CN202138969U (en) Tower crane wall-attaching device used in cast-in-place concrete structure
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN202849941U (en) Pier stud hoop
CN203411903U (en) Cable saddle structure of horizontal drawing rope bridge
CN202577331U (en) Assembly-type concrete foundation of color plate simply building on construction site
CN203593526U (en) Movable type hoisting device
CN203847334U (en) Built-in fitting
CN204126294U (en) The back ruggedized construction that a kind of steel plate combines with reinforcing bar
CN202324198U (en) Anti-pulling embedded fixed column base for portal-rigid frame
CN203159027U (en) A prefabricated iron tower foundation spreader
CN202323727U (en) Device for adjusting horizontal position of steel box girder
CN207144953U (en) The pre-buried channel flow that a kind of high ferro uses
CN104265005A (en) Steel plate and steel bar combined beam top reinforced structure
CN201089882Y (en) Pot rubber bearing
CN203008479U (en) Temporary standing platform for iron tower assembly
CN203684694U (en) Connection device for installing distributor into elevator shaft
CN206267536U (en) A kind of steel column material distributing machine
CN202577156U (en) Device used to temporarily fix ball support and corresponding bearing carrier
CN202346553U (en) Counterweight framework of elevator
CN202252802U (en) Fan-shaped supporting forging
CN208055895U (en) External prestressing strengthening structure
CN205617827U (en) Exempt from supporting steel plate and consolidate adjustable compressing device
CN203034381U (en) Steel shotcrete hoop
CN204003293U (en) The flange arrangement that a kind of anti-piling is impacted

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: CHINA CONSTRUCTION CIVIL CONSTRUCTION CORP.

Effective date: 20141209

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100070 FENGTAI, BEIJING TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20141209

Address after: 200122 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Address before: 100070 Beijing city Fengtai District Fengmao Road No. 20 building 16 district headquarters base

Patentee before: CHINA CONSTRUCTION CIVIL ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20190613

CF01 Termination of patent right due to non-payment of annual fee