Anti-pulling embedded fixed column base for portal-rigid frame Download PDF

Info

Publication number
CN202324198U
CN202324198U CN2011205076583U CN201120507658U CN202324198U CN 202324198 U CN202324198 U CN 202324198U CN 2011205076583 U CN2011205076583 U CN 2011205076583U CN 201120507658 U CN201120507658 U CN 201120507658U CN 202324198 U CN202324198 U CN 202324198U
Authority
CN
China
Prior art keywords
column
steel column
steel
foundation
short column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205076583U
Other languages
Chinese (zh)
Inventor
肖思奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2011205076583U priority Critical patent/CN202324198U/en
Application granted granted Critical
Publication of CN202324198U publication Critical patent/CN202324198U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an anti-pulling embedded fixed column base for a portal-rigid frame. The anti-pulling embedded fixed column base is characterized in that: a foundation short column (1) is formed by pouring concrete, wherein a local pressure resistant steel bar net piece (2) is arranged on the top of the foundation short column (1); a reverse foundation cup hole (3) is formed in the foundation short column (1); a lower section of a steel column (8) is inserted into the reverse foundation cup hole (3); a steel column bottom plate (4) is welded at the bottom of the steel column (8); steel column studs (5) are welded within a height range of the lower section of the steel column (8); a horizontal stiffening plate (6) is welded on the lower section of the steel column (8) 100mm away from the top of the foundation short column (1); and the foundation short column (1) is combined with the steel column (8) by pouring cement mortar (7) in the reverse foundation cup hole (3). By the anti-pulling embedded fixed column base, a foundation bolt is not required, the foundation short column has relatively small dimensions, the anti-pulling embedded fixed column base has a simple structure and is safe and reliable, and steel is saved.

Description

Resistance to plucking flush type portal-rigid frames rigidly connect suspension column
Technical field
The utility model relates to a kind of resistance to plucking flush type portal-rigid frames and rigidly connects suspension column.
Background technology
Portal frame structure is used for individual layer industry or civilian construction such as factory building, warehouse, station, supermarket more, its characteristics be from heavy and light, construction is simple, anti-seismic performance is good, therefore be used widely.The general employing of the suspension column of portal-rigid frames is articulated and connected, and be big when the rigid frame span, then adopt when load is big and rigidly connect suspension column, can make rigit-frame beam post reasonable stress like this, reaches the purpose of saving steel.The rigid frame of the band stiffening rib of using always at present rigidly connects suspension column and is made up of stone bolt, shearing resistance part, bottom plate of steel column foot, suspension column stiffener; This suspension column needs backup land foot bolt on basic short column; Because the suspension column moment of flexure is big; Diameter through calculating stone bolt is done also very greatly usually, and the bolt center is to the distance on the basic short column limit times diameter of bolt at least >=4, and therefore the size of basic short column is also done greatlyyer; Because the bottom plate of steel column foot bore size is limited, the embedding precision of stone bolt requires very high, if construction error is bigger, the installation meeting of portal-rigid frames is difficulty very; Because the suspension column horizontal force is bigger, independent shearing resistance part need be set resist horizontal force.The rigid frame of the band stiffening rib of therefore, using always at present rigidly connects suspension column and has the deficiencies such as difficult installation that basic short column size is big, the embedding precision of stone bolt requires height and portal-rigid frames.
Summary of the invention
The technical problem that the utility model will solve is, provides a kind of resistance to plucking flush type portal-rigid frames to rigidly connect suspension column, requires the deficiencies such as difficult installation of height and portal-rigid frames to overcome the basic short column size embedding precision big, stone bolt that prior art exists.
Resistance to plucking flush type portal-rigid frames rigidly connect suspension column and take following technical scheme: basic short column is made of the perfusion concrete; Anti-office wherein is set at basic short column top presses reinforced mesh; Reverse cup hole, basis is set in basic short column; The hypomere of steel column is inserted in the reverse cup hole, basis; The weldable steel column base plate in the bottom of steel column; Welding steel column peg in the hypomere altitude range of steel column is apart from downward 100mm place, basic short column top, at the hypomere weld horizontal stiffener of steel column; The basis short column combines with steel column by cement injection mortar in reverse cup hole, basis.
Resistance to plucking flush type portal-rigid frames rigidly connect the job practices of suspension column and take following technical scheme: it comprises following process: one, and the concrete pouring construction of basic short column is provided with anti-office at basic short column top and presses reinforced mesh, stays in basic short column inside and establishes reverse cup hole, basis; Two, make steel column, weldable steel column base plate in the bottom of steel column; Welding steel column peg in the hypomere altitude range of steel column; At the hypomere weld horizontal stiffener of steel column, the welding position of horizontal stiffener is reference with basic short column top, at distance downward 100mm place, basic short column top; Three, treat after basic short column concrete strength meets the demands steel column to be installed, the steel column hypomere is inserted in the reverse glass hole, basis; Four, perfusion secondary cement mortar in reverse cup hole, basis, cement mortar fills up reverse cup hole, basis, and steel column combines with basic short column.
Can find out from above technical scheme; Through perfusion secondary cement mortar in reverse cup hole, basis; By reverse cup hole, basis and the cement mortar that wherein solidifies etc., then form a reverse taper, after cement mortar reaches intensity; Basis short column and reverse taper co-operation wherein form integral body, and basic short column forms the effect of hoop.Anti-office presses the existence of reinforced mesh, can guarantee at steel column foot stressedly when very big, is not crushed by the part in the top of basic short column.The existence of steel column base plate can guarantee to convert the frictional force between steel column and the concrete into pressure.The existence of steel column peg can guarantee that basic short column, reverse taper and steel column have firm combination, and can share the part shearing between steel column and the concrete.The existence of horizontal stiffener can help steel column opposing horizontal shear.Realized rigidly connecting of portal-rigid frames suspension columns through said structure.
The structure of the utility model need not be provided with stone bolt, and basic short column size is less relatively, simple installation between suspension column and the basis, and construction is simple, does not need to be provided with separately the shearing resistance part.On the whole resistance to plucking flush type suspension column simple structure, save steel, safe and reliable, for large span, have factory building than gross ton position crane to use greater advantage is arranged.
Description of drawings
Fig. 1 rigidly connects suspension column structural representation, vertical view for the rigid frame of the band stiffening rib of prior art.
Fig. 2 is the generalized section of Fig. 1.
Fig. 3 is structural representation, the vertical view of the utility model, illustrates among the figure that basic short column 1, anti-office press a reinforced mesh 2.
Fig. 4 is the generalized section of Fig. 3.
Fig. 5 is structural representation, the vertical view of the utility model.
Fig. 6 is the generalized section of Fig. 5.
The specific embodiment
The embodiment of the utility model: basic short column 1 is made of the perfusion concrete; Anti-office wherein is set at basic short column 1 top presses reinforced mesh 2; Reverse cup hole 3, basis is set in basic short column 1; The hypomere of steel column 8 is inserted in the reverse cup hole 3, basis; The weldable steel column base plate 4 in the bottom of steel column 8; Welding steel column peg 5 in the hypomere altitude range of steel column 8 is apart from downward 100mm place, basic short column 1 top, at the hypomere weld horizontal stiffener 6 of steel column 8; Basis short column 1 combines with steel column 8 by cement injection mortar 7 in reverse cup hole 3, basis.
The job practices that resistance to plucking flush type portal-rigid frames rigidly connect suspension column is following: it comprises following process: one, and the concrete pouring construction of basic short column 1 is provided with anti-office at basic short column 1 top and presses reinforced mesh 2, stays in basic short column 1 inside and establishes reverse cup hole 3, basis; Two; Make steel column 8; The weldable steel column base plate 4 in the bottom of steel column 8, and welding steel column peg 5 in the hypomere altitude range of steel column 8 is at the hypomere weld horizontal stiffener 6 of steel column 8; The welding position of horizontal stiffener 6 is reference with basic short column 1 top, and promptly the hypomere of steel column 8 welding position that is inserted in back, horizontal stiffener 6 in the reverse cup hole 3, basis is apart from downward 100mm place, basic short column 1 top; Three, treat after basic short column 1 concrete strength meets the demands steel column 8 to be installed, steel column 8 hypomeres are inserted in the reverse glass hole 3, basis; Four, perfusion secondary cement mortar 7 in reverse cup hole 3, basis, cement mortar fills up reverse cup hole 3, basis, and steel column 8 combines with basic short column 1.

Claims (1)

1. resistance to plucking flush type portal-rigid frames rigidly connect suspension column; It is characterized in that: basic short column (1) is made up of the perfusion concrete; Anti-office wherein is set at basic short column (1) top presses reinforced mesh (2); Reverse cup hole (3), basis is set in basic short column (1), and the hypomere of steel column (8) is inserted in the reverse cup hole, basis (3), at the bottom of steel column (8) weldable steel column base plate (4); Welding steel column peg (5) in the hypomere altitude range of steel column (8) is apart from downward 100mm place, basic short column (1) top, at the hypomere weld horizontal stiffener (6) of steel column (8); Basis short column (1) combines with steel column (8) through cement injection mortar (7) in reverse cup hole, basis (3).
CN2011205076583U 2011-12-08 2011-12-08 Anti-pulling embedded fixed column base for portal-rigid frame Expired - Fee Related CN202324198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205076583U CN202324198U (en) 2011-12-08 2011-12-08 Anti-pulling embedded fixed column base for portal-rigid frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205076583U CN202324198U (en) 2011-12-08 2011-12-08 Anti-pulling embedded fixed column base for portal-rigid frame

Publications (1)

Publication Number Publication Date
CN202324198U true CN202324198U (en) 2012-07-11

Family

ID=46436181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205076583U Expired - Fee Related CN202324198U (en) 2011-12-08 2011-12-08 Anti-pulling embedded fixed column base for portal-rigid frame

Country Status (1)

Country Link
CN (1) CN202324198U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161223A (en) * 2011-12-08 2013-06-19 贵阳铝镁设计研究院有限公司 Anti-pulling embedded-type gate-type steel frame steel-joint column foot and construction method thereof
CN105672489A (en) * 2016-01-14 2016-06-15 辽宁工业大学 Semi-rigid connection structure of steel roof truss and precast reinforced concrete columns and construction method
CN108643355A (en) * 2018-03-19 2018-10-12 北京工业大学 Assembled H profile steel column-isolated footing-concrete collar tie beam T shape connecting nodes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161223A (en) * 2011-12-08 2013-06-19 贵阳铝镁设计研究院有限公司 Anti-pulling embedded-type gate-type steel frame steel-joint column foot and construction method thereof
CN105672489A (en) * 2016-01-14 2016-06-15 辽宁工业大学 Semi-rigid connection structure of steel roof truss and precast reinforced concrete columns and construction method
CN105672489B (en) * 2016-01-14 2018-02-13 辽宁工业大学 Steel roof truss and prefabricated reinforced concrete column semi-rigid connection structure and construction method
CN108643355A (en) * 2018-03-19 2018-10-12 北京工业大学 Assembled H profile steel column-isolated footing-concrete collar tie beam T shape connecting nodes

Similar Documents

Publication Publication Date Title
CN103161223A (en) Anti-pulling embedded-type gate-type steel frame steel-joint column foot and construction method thereof
CN205776734U (en) A kind of assembly concrete connecting structure of beam column nodes
CN201292573Y (en) Local sleeve steel tube reinforced concrete prefabricated column for IMS system
CN102995756B (en) Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method
CN103255841A (en) Assembly-type concrete column-steel beam overhanging end plate type node connecting device
CN104251038A (en) Encased steel plate-concrete composite coupling beam and construction method thereof
CN103883029A (en) Assembling type reinforcing steel plate shear wall
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN105735541A (en) Steel structure girderless floor slab column structure
CN105155687A (en) H-shaped steel column flange plate side prefabricated double-groove profile steel combined rigid connecting node
CN202324203U (en) Connecting node structure for existing concrete column and new steel column
CN102966113A (en) Shallow buried steel column base and construction method thereof
CN212128825U (en) Assembled integrated pier column and bent cap combined structure
CN202324198U (en) Anti-pulling embedded fixed column base for portal-rigid frame
CN205475929U (en) Steel construction arch without beam plate -column structure
CN103334495A (en) Prefabricated balcony connecting structure with steel trusses
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN208981567U (en) A kind of assembly concrete shear wall connecting joint structure
CN204040214U (en) Compound concrete filled steel tube outer ring plate beam-column connection
RU154791U1 (en) REINFORCED CONSTRUCTION COMPONENT OF BUILDING FROM CONTAINER MODULES
CN202627212U (en) Steel structure joint assembly
CN212927241U (en) Steel pipe concrete column-H steel beam-support-Pi-shaped combined corner column middle node
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN113737966A (en) Assembled RCS lotus root beam column connecting node and application thereof
CN204212261U (en) Post and curved beam horizontal flexibility connection space structural system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20141208