CN101775876A - Spacial steel roof truss - Google Patents
Spacial steel roof truss Download PDFInfo
- Publication number
- CN101775876A CN101775876A CN201010101926A CN201010101926A CN101775876A CN 101775876 A CN101775876 A CN 101775876A CN 201010101926 A CN201010101926 A CN 201010101926A CN 201010101926 A CN201010101926 A CN 201010101926A CN 101775876 A CN101775876 A CN 101775876A
- Authority
- CN
- China
- Prior art keywords
- roof truss
- steel
- spacial
- truss
- plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种建筑结构屋架形式,尤其涉及一种在铜冶炼行业的空间钢桁架屋架。The invention relates to a building structure roof truss form, in particular to a space steel truss roof truss used in the copper smelting industry.
背景技术Background technique
目前,铜电解车间基本上都是采用平面梯形钢管屋架,屋面采用预制钢筋砼板,这种屋面结构体系屋面自重荷载大,屋架支撑体系复杂,结构用钢量大,施工周期长。At present, the copper electrolysis workshop basically adopts flat trapezoidal steel pipe roof truss, and the roof adopts prefabricated reinforced concrete slabs. This roof structure system has a large roof self-weight load, a complex roof truss support system, a large amount of structural steel, and a long construction period.
发明内容Contents of the invention
本发明的目的在于提供一种三角形截面空间钢桁架屋架,该屋架可以降低屋面高度,缩短施工周期,降低造价,节约能源,克服了原屋架屋面自重大,施工周期长,结构造价高的缺点。The purpose of the present invention is to provide a space steel truss roof truss with a triangular cross-section, which can reduce the roof height, shorten the construction period, reduce the cost, save energy, and overcome the shortcomings of the original truss roof, long construction period and high structural cost.
一种空间钢桁架屋架,其特征在于:屋架采用截面三角形,屋架的上下弦不在同一平面上,通过腹杆对屋架上下弦杆形成稳定支撑,从而屋架自身形成一个稳定的空间结构体系,与平面屋架相比可以大大减少屋架的支撑体系,稳定性能远优于平面屋架体系。A space steel truss roof truss, characterized in that: the roof truss adopts a triangular cross-section, the upper and lower chords of the roof truss are not on the same plane, and the upper and lower chords of the roof truss are stably supported by the web members, so that the roof truss itself forms a stable space structure system, which is consistent with the plane Compared with the roof truss, the support system of the roof truss can be greatly reduced, and the stability performance is far better than that of the flat roof truss system.
一种空间钢桁架屋架,其特征在于:三角形空间屋架上弦采用H型钢,腹杆及下弦杆采用钢管,H型钢具有良好的承受轴压力和弯矩的性能,钢管具有良好的承受轴向力的性能,电解屋架上弦承受轴压力和弯矩,腹杆及下弦杆承受轴向力,充分发挥了杆件的良好受力性能,结构经济合理,安全可靠。与传统屋架相比可节约大量投资。A space steel truss roof truss, characterized in that: the upper chord of the triangular space truss is made of H-shaped steel, the web and the lower chord are made of steel pipes, the H-shaped steel has good performance of bearing axial pressure and bending moment, and the steel pipe has good performance of bearing axial force Performance, the upper chord of the electrolytic roof truss bears the axial pressure and bending moment, the web and the lower chord bear the axial force, fully exerting the good mechanical performance of the rods, the structure is economical and reasonable, safe and reliable. Compared with traditional roof truss, it can save a lot of investment.
本发明的积极效果在于:1、缩短现场施工工期,降低综合成本,原平面屋架稳定性差,支撑多,施工周期长。而本发明的屋架自身是一个稳定的空间结构体系,支撑少,施工周期短。2、安全性能好,原平面屋架纵向系杆间距一般在6m左右,稳定性差,而采用本发明,屋面弦杆节点间距在3m左右,稳定性大大提高,材料强度得到充分利用,结构安全性能得到提高,3、结构经济效果明显,降低了屋架用钢量,降低了屋架高度,电解厂房为保温厂房,由于屋架高度的降低,从而可以降低厂房高度,减小了厂房的体积,厂房投入生产使用后可以节约能源。The positive effects of the present invention are: 1. Shorten the on-site construction period, reduce the comprehensive cost, the original plane roof truss has poor stability, many supports and long construction period. However, the roof truss of the present invention itself is a stable spatial structure system with few supports and short construction period. 2. Good safety performance. The original planar roof truss longitudinal tie bar spacing is generally about 6m, and the stability is poor. However, with the present invention, the roof chord bar node spacing is about 3m, the stability is greatly improved, the material strength is fully utilized, and the structural safety performance is improved. 3. The structural economic effect is obvious, the amount of steel used for the roof truss is reduced, and the height of the roof truss is reduced. The electrolysis plant is a thermal insulation plant. Due to the reduction of the height of the roof truss, the height of the plant can be reduced, and the volume of the plant can be reduced. The plant is put into production and use energy can be saved afterwards.
附图说明Description of drawings
图1为本发明的空间钢桁架屋架结构主视图Fig. 1 is the front view of the space steel truss roof truss structure of the present invention
图2为本发明的空间钢桁架屋架结构侧视图Fig. 2 is a side view of the space steel truss roof truss structure of the present invention
图3为本发明的空间钢桁架屋架结构俯视图Fig. 3 is the top view of the space steel truss roof truss structure of the present invention
具体实施方式Detailed ways
下面结合附图详细说明本发明的实施方式:Embodiments of the present invention are described in detail below in conjunction with accompanying drawings:
本发明的具体实施应由有相应施工资质的建筑钢结构施工、安装单位完成,具体实施主要分工厂加工制作和现场安装两阶段。The specific implementation of the present invention should be completed by the building steel structure construction and installation units with corresponding construction qualifications. The specific implementation is mainly divided into two stages: factory processing and on-site installation.
钢桁架屋架的加工采用在工厂加工制作,首先采购原材料和焊接材料,准备好焊接设备。上弦杆2为焊接H型钢,腹杆4和下弦杆3均为成品高频焊接管,焊接H型钢的加工制作过程为:先按截面要求切割钢板,然后将钢板之间先用点焊固定,再采用埋弧焊机对整个构件焊缝进行施焊,腹杆4下弦杆3购设计所需的成品钢管,根据设计要求将钢管进行相关性切割;根据设计要求加工好节点板。上弦杆2、腹杆4、下弦杆3、节点板准备好后就是拼装焊接,焊接时先采用局部电焊定位,然后采用自动埋弧焊将各条焊缝焊好。加工过程中应反复校对外型尺寸,避免产生过大偏差。本发明的钢桁架屋架屋面弦杆节点间距在3m左右,稳定性大大提高,材料强度得到充分利用,结构安全性能得到提高,屋面斜度1∶10,方便屋面排水。焊接完成后进行喷砂或抛丸除锈,最后是喷涂二遍底漆。现场安装施工前应复核土建柱1顶预埋螺栓定位,确认无误后开始钢桁架吊装,吊装时采用两点对称绑扎起吊就位安装。钢桁架起吊后距柱基准面100mm时徐徐就位,待钢桁架吊装就位后进行对接调整校正,然后固定连接。钢桁架吊装时随吊随用经纬仪校正,有偏差随时纠正。相邻桁架吊装完成后马上安装支撑,最后吊装屋面檩条、屋面板体系。The processing of the steel truss roof truss is processed in the factory. Firstly, the raw materials and welding materials are purchased, and the welding equipment is prepared. The
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本发明由所提交的权利要求书确定的保护范围。The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be assumed that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field to which the present invention belongs, several equivalent substitutions or obvious modifications can be made without departing from the concept of the present invention, and the performance or use is the same, then it should be regarded as belonging to the present invention by the submitted claims The scope of protection determined by the book.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010101926A CN101775876A (en) | 2010-01-28 | 2010-01-28 | Spacial steel roof truss |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010101926A CN101775876A (en) | 2010-01-28 | 2010-01-28 | Spacial steel roof truss |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101775876A true CN101775876A (en) | 2010-07-14 |
Family
ID=42512447
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201010101926A Pending CN101775876A (en) | 2010-01-28 | 2010-01-28 | Spacial steel roof truss |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101775876A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102061807A (en) * | 2010-11-29 | 2011-05-18 | 中冶建工有限公司 | Method for assembling large-span H-shaped steel truss beam |
| CN103348066A (en) * | 2011-02-07 | 2013-10-09 | 正八技术有限公司 | Mechanical joints for grid support beams |
| CN110145069A (en) * | 2019-05-30 | 2019-08-20 | 攀枝花攀钢集团设计研究院有限公司 | Self Stabilizing Purlin Components |
| CN113389318A (en) * | 2021-04-14 | 2021-09-14 | 机械工业第九设计研究院有限公司 | Novel assembly type steel truss purline system |
-
2010
- 2010-01-28 CN CN201010101926A patent/CN101775876A/en active Pending
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102061807A (en) * | 2010-11-29 | 2011-05-18 | 中冶建工有限公司 | Method for assembling large-span H-shaped steel truss beam |
| CN102061807B (en) * | 2010-11-29 | 2012-01-04 | 中冶建工有限公司 | Method for assembling large-span H-shaped steel truss beam |
| CN103348066A (en) * | 2011-02-07 | 2013-10-09 | 正八技术有限公司 | Mechanical joints for grid support beams |
| CN103348066B (en) * | 2011-02-07 | 2016-03-23 | 正八技术有限公司 | Mechanical joint device for grid support beam |
| CN110145069A (en) * | 2019-05-30 | 2019-08-20 | 攀枝花攀钢集团设计研究院有限公司 | Self Stabilizing Purlin Components |
| CN113389318A (en) * | 2021-04-14 | 2021-09-14 | 机械工业第九设计研究院有限公司 | Novel assembly type steel truss purline system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102877582B (en) | Composite floor with steel bar trusses, profiled steel plate and regenerated concrete, and manufacturing method for composite floor | |
| CN102121274B (en) | Section steel concrete column-steel girder node | |
| CN103410081B (en) | Steel box type composite beam forming method | |
| CN205077687U (en) | Steel bar truss floor bearing plate | |
| CN103352563B (en) | The board-like bar frame gang form of self-supporting and construction method thereof | |
| CN204040464U (en) | A kind of slab form supporting construction | |
| CN107143034A (en) | A kind of assembly concrete frame structure beam column rigid connection node | |
| CN209260922U (en) | Band girder rib laminated floor slab pre-tensioning system connecting joint structure | |
| CN107989447A (en) | A kind of large-scale earthing concrete tank dome steel support structure and installation method | |
| CN103266720A (en) | Combination beam with steel beam and belly poured with concrete | |
| CN111962949A (en) | A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined middle column middle node and method | |
| CN111962952A (en) | A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined middle column bottom node and method | |
| CN103410101A (en) | Tower crane conversion method for construction of parabola-shaped ultrahigh pier | |
| CN113605602A (en) | Construction process for dry-type fully-assembled industrialized concrete column joint | |
| CN111962948A (en) | A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined side column bottom node and method | |
| CN106760117A (en) | Steel bar truss floor support plate and its production technology | |
| CN108755962A (en) | A kind of partial precast assembly hollow profile steel concrete hollow column and construction method | |
| CN110005109A (en) | A kind of open flume type prestressed concrete overlapped slab | |
| CN102926504A (en) | Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof | |
| CN101435237A (en) | Novel hollow combined board | |
| CN108331164A (en) | A kind of attachment device and installation method of Steel Truss Beam and lattice type steel column node | |
| CN101775876A (en) | Spacial steel roof truss | |
| CN111648512A (en) | A kind of assembly tool type truss laminated board and construction method thereof | |
| CN111962953A (en) | Steel tube concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined side column middle node and manufacturing method | |
| CN202626998U (en) | Square steel tube lightweight concrete purlin for foundation pit protection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |