CN202482767U CN 201120560638 CN201120560638U CN202482767U CN 202482767 U CN202482767 U CN 202482767U CN 201120560638 CN201120560638 CN 201120560638 CN 201120560638 U CN201120560638 U CN 201120560638U CN 202482767 U CN202482767 U CN 202482767U
Authority
CN
China
Prior art keywords
steel pipe
shellfish
pier
steel
thunder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120560638
Other languages
Chinese (zh)
Inventor
王伟
陈涛
张华�
武建亮
魏喜超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN 201120560638 priority Critical patent/CN202482767U/en
Application granted granted Critical
Publication of CN202482767U publication Critical patent/CN202482767U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a steel tube bailey beam column type support mainly comprising a pier body (1), temporary buttresses (2) arranged at two sides of the pier body (1), and a bailey beam support (3), wherein the temporary buttresses (2) and the pier body (1) are connected through channel steel I (4) arranged on the pier body (1); and the bailey beam support (3) is arranged on the temporary buttresses (2). The steel tube bailey beam column type support has the advantages that the pier body (1) is used as a firm supporting point, the temporary buttresses (2) are arranged at the two sides of the pier body (1), and therefore, the steel tube bailey beam-column support with the structure is suitable for various complex terrains and complex beam types and has the effects of solving the problem of complexity in a processes of building and dismantling a large number of section steel put into the conversional support construction, effectively accelerating the construction progress, greatly reducing the workload of constructors, increasing the work efficiency and reducing the cost.

Description

A kind of steel pipe shellfish thunder post and beam support
Technical field
The utility model relates to a kind of design of supporting structure, is specifically related to a kind of steel pipe shellfish thunder post and beam support.
Background technology
In view of high-speed railway to quality, needs safe and attractive in appearance; When carrying out the cast-in-situ box girder construction, general job practices is that ground is carried out consolidation process, sets up full framing then; But for the relatively poor cast-in-situ prestressed concrete case beam of bearing capacity of foundation soil and this complex beam type of track switch continuous beam; Not only the ground intractability is bigger to adopt full framing to construct, and safety reduces, and material, personnel drop into also bigger; The utility model provides a kind of steel pipe shellfish thunder post and beam support especially; Can in the cast-in-situ box girder work progress, use; The location that is particularly useful for the geological conditions difference, and along with the fast development of China's high ferro, the widespread of overhead station; Stride the general continuous beam of high-grade highway for the more and more and railway of the complicated case beam of beam types such as track switch, branch-cut bridge, adopt steel pipe shellfish thunder post and beam support economy, science, feasible especially.
The utility model content
The utility model technical problem to be solved provides a kind of support that is applicable to various complex-terrains and complex beam type; Overcome the input of a large amount of shaped steel in the existing conventional bracket construction and set up with demolishing process in complexity; Improve construction speed; Reduce constructor's workload, increase work efficiency, practice thrift cost.
The said technical scheme that is adopted that solves the problems of the technologies described above of the utility model is a steel pipe shellfish thunder post and beam support; Mainly comprise pier shaft (1), place temporary rest pier (2), the shellfish thunder boom support (3) of pier shaft (1) both sides, temporary rest pier (2) is connected through the channel-section steel I (4) that is arranged on the pier shaft (1) with pier shaft (1), and shellfish thunder boom support (3) places on the temporary rest pier (2); Steel pipe shellfish thunder post and beam support is to do the firm strong point with existing cushion cap (12); And in pier shaft (1) both sides temporary rest pier (2) is set, this structure is applicable to various complex-terrains and complex beam type, the input that has solved a large amount of shaped steel in the existing conventional bracket construction set up with demolishing process in complexity; Effectively raise the progress of construction; Greatly reduce constructor's workload, improved operating efficiency, practiced thrift cost.
The said steel pipe shellfish of the utility model thunder post and beam support, wherein, said channel-section steel I (4) is passed pier shaft (1) through the split bolt hole on the pier shaft (1), and the two ends of channel-section steel I (4) are connected with the temporary rest pier (2) that places pier shaft (1) both sides respectively.
The said steel pipe shellfish of the utility model thunder post and beam support; Wherein, Said temporary rest pier (2) mainly comprises pile foundation (5), bar shaped reinforced concrete foundation (6), steel pipe column (7), i iron (8), and wherein, i iron (8) places on the steel pipe column (7); Steel pipe column (7) places on the bar shaped reinforced concrete foundation (6), and bar shaped reinforced concrete foundation (6) places on the pile foundation (5).
The said steel pipe shellfish of the utility model thunder post and beam support, wherein, said shellfish thunder boom support (3) places on the i iron (8).
The said steel pipe shellfish of the utility model thunder post and beam support, wherein, said steel pipe column (7) is that the steel pipe different length is formed by connecting through anchor ear (9), can make the steel pipe column (7) of differing heights as required, saves cost, the scope of application is wider.
The said steel pipe shellfish of the utility model thunder post and beam support wherein, is provided with 3 row temporary rest piers (2) between the said adjacent pier shaft (1).
The said steel pipe shellfish of the utility model thunder post and beam support wherein, used the angle steel II to connect between the steel pipe column (7) on the said different lines temporary rest pier (2), can realize the reinforcing between the steel pipe column (7).
The said steel pipe shellfish of the utility model thunder post and beam support, wherein, on the said same row temporary rest pier (2) adjacent steel tubing string (7) between be connected through angle steel III (10), can realize the reinforcing between the steel pipe column (7).
The said steel pipe shellfish of the utility model thunder post and beam support, wherein, said pier shaft (1) is through effective being connected of channel-section steel I (4) realization with steel pipe column (7); Being provided with channel-section steel (11) up and down between the channel-section steel I (4) reinforces; Substitute the method that adopts large size shaped steel to reinforce in the conventional bracket construction, effectively raised the progress of construction, greatly reduced constructor's workload; Improve operating efficiency, practiced thrift cost simultaneously.
Description of drawings
Fig. 1 is a steel pipe shellfish thunder beam type support;
Fig. 2 is the temporary rest pier structural representation;
Fig. 3 is existing suspended deck structure sketch map.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done further detailed explanation:
The said steel pipe shellfish of present embodiment thunder post and beam support; Mainly comprise pier shaft (1), place temporary rest pier (2), the shellfish thunder boom support (3) of pier shaft (1) both sides, temporary rest pier (2) is connected through the channel-section steel I (4) that is arranged on the pier shaft (1) with pier shaft (1), and shellfish thunder boom support (3) places on the temporary rest pier (2); Steel pipe shellfish thunder post and beam support is to do the firm strong point with existing cushion cap (11); And in pier shaft (1) both sides temporary rest pier (2) is set, this structure is applicable to various complex-terrains and complex beam type, the input that has solved a large amount of shaped steel in the existing conventional bracket construction set up with demolishing process in complexity; Effectively raise the progress of construction; Greatly reduce constructor's workload, improved operating efficiency, practiced thrift cost.
The said steel pipe shellfish of present embodiment thunder post and beam support, wherein, said channel-section steel I (4) is passed pier shaft (1) through the split bolt hole on the pier shaft (1), and the two ends of channel-section steel I (4) are connected with the temporary rest pier (2) that places pier shaft (1) both sides respectively.
The said steel pipe shellfish of present embodiment thunder post and beam support; Wherein, Said temporary rest pier (2) mainly comprises pile foundation (5), bar shaped reinforced concrete foundation (6), steel pipe column (7), i iron (8), and wherein, i iron (8) places on the steel pipe column (7); Steel pipe column (7) places on the bar shaped reinforced concrete foundation (6), and bar shaped reinforced concrete foundation (6) places on the pile foundation (5).
The said steel pipe shellfish of present embodiment thunder post and beam support, wherein, said shellfish thunder boom support (3) places on the i iron (8).
The said steel pipe shellfish of present embodiment thunder post and beam support, wherein, said steel pipe column (7) is that the steel pipe different length is formed by connecting through anchor ear (9), can make the steel pipe column (7) of differing heights as required, saves cost, the scope of application is wider.
The said steel pipe shellfish of present embodiment thunder post and beam support wherein, is provided with 3 row temporary rest piers (2) between the said adjacent pier shaft (1).
The said steel pipe shellfish of present embodiment thunder post and beam support wherein, used the angle steel II to connect between the steel pipe column (7) on the said different lines temporary rest pier (2), can realize the reinforcing between the steel pipe column (7).
The said steel pipe shellfish of present embodiment thunder post and beam support, wherein, on the said same row temporary rest pier (2) adjacent steel tubing string (7) between be connected through angle steel III (10), can realize the reinforcing between the steel pipe column (7).
The said steel pipe shellfish of present embodiment thunder post and beam support; Wherein, said pier shaft (1) is realized and effective connection of steel pipe column (7) through channel-section steel I (4), has been substituted the method that adopts large size shaped steel to reinforce in the conventional bracket construction; Effectively raise the progress of construction; Greatly reduce constructor's workload, improved operating efficiency, practiced thrift cost simultaneously.
The above is merely the preferable embodiment of the utility model, any modification of being made within all spirit and principles at the utility model, is equal to replacement and improvement etc., all should be included within the protection domain of the utility model.

Claims (8)

1. steel pipe shellfish thunder post and beam support; It is characterized in that: said steel pipe shellfish thunder post and beam support mainly comprises pier shaft (1), places temporary rest pier (2), the shellfish thunder boom support (3) of pier shaft (1) both sides; Temporary rest pier (2) is connected through the channel-section steel I (4) that is arranged on the pier shaft (1) with pier shaft (1), and shellfish thunder boom support (3) places on the temporary rest pier (2).
2. according to the said steel pipe shellfish of claim 1 thunder post and beam support; It is characterized in that: said channel-section steel I (4) is passed pier shaft (1) through the split bolt hole on the pier shaft (1), and the two ends of channel-section steel I (4) are connected with the temporary rest pier (2) that places pier shaft (1) both sides respectively.
3. according to the said steel pipe shellfish of claim 1 thunder post and beam support; It is characterized in that: said temporary rest pier (2) mainly comprises pile foundation (5), bar shaped reinforced concrete foundation (6), steel pipe column (7), i iron (8); Wherein, I iron (8) places on the steel pipe column (7), and steel pipe column (7) places on the bar shaped reinforced concrete foundation (6), and bar shaped reinforced concrete foundation (6) places on the pile foundation (5).
4. according to claim 1 or 3 said steel pipe shellfish thunder post and beam supports, it is characterized in that: said shellfish thunder boom support (3) places on the i iron (8).
5. according to the said steel pipe shellfish of claim 3 thunder post and beam support, it is characterized in that: said steel pipe column (7) is that the steel pipe different length is formed by connecting through anchor ear (9).
6. according to the said steel pipe shellfish of claim 1 thunder post and beam support, it is characterized in that: be provided with 3 row temporary rest piers (2) between the said adjacent pier shaft (1).
7. according to the said steel pipe shellfish of claim 6 thunder post and beam support, it is characterized in that: used the angle steel II to connect between the steel pipe column (7) on the said different lines temporary rest pier (2).
8. according to the said steel pipe shellfish of claim 1 thunder post and beam support, it is characterized in that: on the said same row temporary rest pier (2) adjacent steel tubing string (7) between be connected through angle steel III (10).
CN 201120560638 2011-12-29 2011-12-29 Steel tube bailey beam column type support Expired - Fee Related CN202482767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120560638 CN202482767U (en) 2011-12-29 2011-12-29 Steel tube bailey beam column type support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120560638 CN202482767U (en) 2011-12-29 2011-12-29 Steel tube bailey beam column type support

Publications (1)

Publication Number Publication Date
CN202482767U true CN202482767U (en) 2012-10-10

Family

ID=46957197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120560638 Expired - Fee Related CN202482767U (en) 2011-12-29 2011-12-29 Steel tube bailey beam column type support

Country Status (1)

Country Link
CN (1) CN202482767U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233426A (en) * 2013-04-27 2013-08-07 中国建筑第六工程局有限公司 Bailey beam support free of buttress in soft foundation and supporting method thereof
CN106522107A (en) * 2016-12-23 2017-03-22 中国水利水电第五工程局有限公司 Variable-arc bridge floor support device
CN113832865A (en) * 2021-10-29 2021-12-24 中铁一局集团有限公司 Construction method for single-column pier capping beam cast-in-place

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233426A (en) * 2013-04-27 2013-08-07 中国建筑第六工程局有限公司 Bailey beam support free of buttress in soft foundation and supporting method thereof
CN106522107A (en) * 2016-12-23 2017-03-22 中国水利水电第五工程局有限公司 Variable-arc bridge floor support device
CN106522107B (en) * 2016-12-23 2018-07-20 中国水利水电第五工程局有限公司 A kind of variable arc bridge floor stand device
CN113832865A (en) * 2021-10-29 2021-12-24 中铁一局集团有限公司 Construction method for single-column pier capping beam cast-in-place

Similar Documents

Publication Publication Date Title
CN2835351Y (en) Horizontal supporting structure for reinforced concrete loop truss in deep foundation pit
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN105256812B (en) Foundation ditch prefabricated assembled concrete supporting construction and its construction method
CN110424411A (en) A kind of irregular foundation pit assembled steel support device and its construction and application method
CN105178206B (en) Spliced-type shed tunnel
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN202273169U (en) Trestle
CN202482767U (en) Steel tube bailey beam column type support
CN202148907U (en) Non-isoparametric initial-stage supporting structure of four-lane large-span tunnel
CN103628416A (en) Stiffening girder counter-straining near-pier bracket of suspension bridge
CN103233753A (en) Pipe curtain shed frame method used for full-face excavation of construction of shallow-buried large-scale subsurface structure
CN215580291U (en) Large-span ultrahigh-voltage power pipe trench suspension device in foundation pit
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN206828906U (en) A kind of temporary pavement bedding structure for Metro Deep Excavation
CN203383520U (en) Deep foundation pit canopy
CN206233656U (en) Steel frame mill building structure
CN103981799B (en) A kind of concrete filled steel tube opens string stiff beam and construction method thereof
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN203022409U (en) Iron tower support assembly
CN214456325U (en) Gantry crane beam lifting machine with high legs and low legs
CN114134801A (en) Main beam dismantling structure and dismantling construction method for overwater large-span tied arch bridge
CN205115988U (en) Part earth anchor height tower cable -stay bridge structure
CN201169781Y (en) Cap digging pit structure
CN203922510U (en) A kind of simple and easy cable machine that is arranged in slope
CN203822326U (en) Reinforcing system for single-arch and large-span type shallowly buried and darkly excavated tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121010

Termination date: 20131229