CN102505864A - Method for assembling fixed ends of scaffold of large-volume triangular variable-section tubular truss structure - Google Patents

Method for assembling fixed ends of scaffold of large-volume triangular variable-section tubular truss structure Download PDF

Info

Publication number
CN102505864A
CN102505864A CN2011104489206A CN201110448920A CN102505864A CN 102505864 A CN102505864 A CN 102505864A CN 2011104489206 A CN2011104489206 A CN 2011104489206A CN 201110448920 A CN201110448920 A CN 201110448920A CN 102505864 A CN102505864 A CN 102505864A
Authority
CN
China
Prior art keywords
section
assembly unit
moulding bed
fixed end
triangular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104489206A
Other languages
Chinese (zh)
Other versions
CN102505864B (en
Inventor
吴欣之
许海峰
樊金梁
曹辉
胡诗珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN201110448920.6A priority Critical patent/CN102505864B/en
Publication of CN102505864A publication Critical patent/CN102505864A/en
Application granted granted Critical
Publication of CN102505864B publication Critical patent/CN102505864B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for assembling fixed ends of a scaffold of a large-volume triangular variable-section tubular truss structure. The method is characterized in that: a concrete base is poured on the ground; a large tubular truss, of which two ends are provided with triangular sections, is horizontally assembled above the concrete base; after finishing the assembly, the whole is pulled by a hoisting mechanism, and a rod piece between the two sections is assembled above a scaffold supporting system at a certain angle; and after finishing the assembly, tail sections of the fixed end sections on two sides are dismounted, and are mounted to the start sections of the next section of assembled structural member. The method has the advantages that: under the condition that pre-assembly cannot be performed on the construction site, the assembly precision is guaranteed as much as possible; furthermore, the two fixed end sections are positioned, and the rod piece between the two sections is used as a pivot, so that the manufacturing material of the scaffold is saved.

Description

Big volume triangularity cross section pipe trussed construction moulding bed fixed end assembly unit method
Technical field
The present invention relates to a kind of big volume triangularity cross section pipe trussed construction moulding bed fixed end assembly unit method.
Background technology
Present especially big triangularity cross section steel building has been increasing to have obtained application; And mostly existing job practices is ground falsework bulk technique, and the reliable supporting system is set, the loose mail lifting; Install in the high-altitude; Progressively accomplish the method for building, claim for eot, and also work high above the ground is abnormally dangerous and efficient is very low.Also useful in recent years ground moulding bed assembly unit triangle varying cross-section duct truss carries out integral installation, and is regular little but present big triangle varying cross-section duct truss ground moulding bed assembly unit exists, the characteristics of moulding bed quantity and the many cases of specification.The engineering urgent for the duration and the place is limited, the big segmented assembly in ground, the method for integral lifting exists some insoluble problems, as in limited construction plant, being difficult to arrange assembly unit moulding bed various and that kind is various.Therefore demand developing novel big volume triangularity cross section pipe trussed construction moulding bed fixed end assembly unit method urgently and existing problem is installed to solve present big triangularity cross section steel building.
Summary of the invention
The objective of the invention is to solve big triangularity cross section steel building installation employing loose mail lifting in the prior art, existing the problems referred to above are installed in the high-altitude, and pipe trussed construction moulding bed fixed end assembly unit method in a kind of big volume triangularity cross section is provided.The present invention designs big volume triangular-section pipe trussed construction moulding bed fixed end assembly unit method, it is characterized in that: build the concrete basis on ground, crouch above it and piece together triangular-section, large-scale pipe truss two ends.After assembly unit finishes, rise with lifting appliance and to pull and be positioned at the moulding bed support system top rod member between two cross sections of assembly unit again by certain angle.After assembly unit finishes the concluding paragraph in fixed end cross section, both sides is removed the The initial segment of getting off to be mounted to next section assembling members.It is characterized in that: concrete basis, described ground is a triangle concrete bar, and its maximal side is greater than the variable cross-section triangle maximal side that needs assembly unit.It is characterized in that: described moulding bed support system be the assembled support system of i iron comprising the Chain block hitch point, the jack strong point.Advantage of the present invention be restricted at the construction field (site) can't preframed situation under, must guarantee splicing accuracy as far as possible, because locate in fixed end cross section, two ends, middle rod member assembly unit can rely on it save the moulding bed manufacturing materials as the strong point simultaneously.
Description of drawings
Fig. 1 is a triangle tube truss typical section form sketch map.
Fig. 2 is a H shaped steel support system sketch map.
Fig. 3 is pipe trussed construction assembly unit schematic flow sheet.
Fig. 4 removes the local reinforcement sketch map for the triangular-section.
The specific embodiment
Build the concrete basis on ground among the figure, crouch above it and piece together triangular-section, large-scale pipe truss two ends.After assembly unit finishes, rise with lifting appliance and to pull and be positioned at the moulding bed support system top rod member between two cross sections of assembly unit again by certain angle.After assembly unit finishes the concluding paragraph in fixed end cross section, both sides is removed the The initial segment of getting off to be mounted to next section assembling members.It is characterized in that: concrete basis, described ground is a triangle concrete bar, and its maximal side is greater than the variable cross-section triangle maximal side that needs assembly unit.It is characterized in that: described moulding bed support system be the assembled support system of i iron comprising the Chain block hitch point, the jack strong point.
Among Fig. 1,2,3,4 above triangle concrete basis 1 assembly unit all size pipe diameter be 1 meter triangle typical section member 2.After assembly unit finishes; Pull 2 of triangular-section members to certain angle and utilize in the H shaped steel support system of every main chord 3 belows Chain block 4 to proofread and correct the back and fix with crane with diagonal brace with jack 5, whether consistent with the coordinate figure of apparatus measures both sides each end points of typical section with theoretical value.After treating triangle tube truss cross section, two ends positioned, assembly unit horizon bar 6 and brace 7 after integral assembling finishes, are removed the triangular-section 8 of an end successively, and use the end that is put in next Pin pipe truss, and the like finish until assembly unit.Such method can not have the whole preframed job site of condition to guarantee the precision of assembly unit.Before removing, the triangular-section root of dismounting need be done local reinforcement 9 to guarantee safety.Can avoid a large amount of moulding beds of producing owing to erratic behavior that variable cross-section causes in the whole process, thereby the typical moulding bed system simultaneously among Fig. 1 can effectively be practiced thrift moulding bed quantity and reached the purpose of having saved construction cost and having reduced the construction plant demand.Especially as far as the narrow and small engineering in construction plant, when having solved the place problem especially, also guaranteed this patent the precision of assembly unit.

Claims (3)

1. big volume triangular-section pipe trussed construction moulding bed fixed end assembly unit method is characterized in that: build the concrete basis on ground, crouch above it and piece together triangular-section, large-scale pipe truss two ends.After assembly unit finishes, rise with lifting appliance and to pull and be positioned at the moulding bed support system top rod member between two cross sections of assembly unit again by certain angle.After assembly unit finishes the concluding paragraph in fixed end cross section, both sides is removed the The initial segment of getting off to be mounted to next section assembling members.
2. by the described big volume of claim 1 triangular-section pipe trussed construction moulding bed fixed end assembly unit method, it is characterized in that: concrete basis, described ground is a triangle concrete bar, and its maximal side is greater than the variable cross-section triangle maximal side that needs assembly unit.
3. by the described big volume of claim 1 triangular-section pipe trussed construction moulding bed fixed end assembly unit method, it is characterized in that: described moulding bed support system be the assembled support system of i iron comprising the Chain block hitch point, the jack strong point.
CN201110448920.6A 2011-12-29 2011-12-29 The assembled method of large volume triangularity variable-section tubular truss structure moulding bed fixed end Expired - Fee Related CN102505864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110448920.6A CN102505864B (en) 2011-12-29 2011-12-29 The assembled method of large volume triangularity variable-section tubular truss structure moulding bed fixed end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110448920.6A CN102505864B (en) 2011-12-29 2011-12-29 The assembled method of large volume triangularity variable-section tubular truss structure moulding bed fixed end

Publications (2)

Publication Number Publication Date
CN102505864A true CN102505864A (en) 2012-06-20
CN102505864B CN102505864B (en) 2015-10-28

Family

ID=46217992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110448920.6A Expired - Fee Related CN102505864B (en) 2011-12-29 2011-12-29 The assembled method of large volume triangularity variable-section tubular truss structure moulding bed fixed end

Country Status (1)

Country Link
CN (1) CN102505864B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777050A (en) * 2012-08-22 2012-11-14 河北二十冶工程技术有限公司 Assembly type jig frame for longspan pipe truss roof girder
CN104790674A (en) * 2015-02-12 2015-07-22 中国五冶集团有限公司 Assembling method for pipe truss
CN105822066A (en) * 2016-04-07 2016-08-03 中建六局第三建筑工程有限公司 Construction method for underground large-span large-space ultrahigh non-column steel structural tube truss
CN109750845A (en) * 2017-11-08 2019-05-14 上海宝冶集团有限公司 Installation on ground method for open-type plane girder
CN113202313A (en) * 2021-03-30 2021-08-03 中交第四公路工程局有限公司 Novel horizontal assembly type jig frame structure and construction method thereof
CN115162823A (en) * 2022-07-29 2022-10-11 中交路桥建设有限公司 Method for assembling steeple steel member

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3424746A1 (en) * 1984-07-05 1986-01-16 Hans Heinrich Dipl.-Ing. 5100 Aachen Beenken Mobile unit for producing and installing large-format elements for housing construction
JP2006348692A (en) * 2005-06-20 2006-12-28 Shimizu Corp Material conveyance system for construction of exterior wall part of building
CN101451397A (en) * 2007-12-05 2009-06-10 中冶天工建设有限公司 Steel structure modularization construction process

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3424746A1 (en) * 1984-07-05 1986-01-16 Hans Heinrich Dipl.-Ing. 5100 Aachen Beenken Mobile unit for producing and installing large-format elements for housing construction
JP2006348692A (en) * 2005-06-20 2006-12-28 Shimizu Corp Material conveyance system for construction of exterior wall part of building
CN101451397A (en) * 2007-12-05 2009-06-10 中冶天工建设有限公司 Steel structure modularization construction process

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
朱易举 等: "复杂空间管桁架结构现场拼装及吊装施工技术", 《建筑结构》 *
李久清 等: "大跨度钢结构管桁架的施工安装技术", 《科技与经济》 *
程勤功 等: "大跨度变截面拱形立体管桁架施工技术", 《建筑科技》 *
陈会荣 等: "宁夏亲水体育中心大跨度管桁架施工技术", 《建筑科技》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777050A (en) * 2012-08-22 2012-11-14 河北二十冶工程技术有限公司 Assembly type jig frame for longspan pipe truss roof girder
CN102777050B (en) * 2012-08-22 2015-03-25 河北二十冶工程技术有限公司 Assembly type jig frame for longspan pipe truss roof girder
CN104790674A (en) * 2015-02-12 2015-07-22 中国五冶集团有限公司 Assembling method for pipe truss
CN105822066A (en) * 2016-04-07 2016-08-03 中建六局第三建筑工程有限公司 Construction method for underground large-span large-space ultrahigh non-column steel structural tube truss
CN105822066B (en) * 2016-04-07 2017-11-24 中建六局第三建筑工程有限公司 Underground large span large space superelevation is without post steel-structure tube truss construction engineering method
CN109750845A (en) * 2017-11-08 2019-05-14 上海宝冶集团有限公司 Installation on ground method for open-type plane girder
CN113202313A (en) * 2021-03-30 2021-08-03 中交第四公路工程局有限公司 Novel horizontal assembly type jig frame structure and construction method thereof
CN113202313B (en) * 2021-03-30 2022-08-30 中交第四公路工程局有限公司 Novel horizontal assembly type jig frame structure and construction method thereof
CN115162823A (en) * 2022-07-29 2022-10-11 中交路桥建设有限公司 Method for assembling steeple steel member
CN115162823B (en) * 2022-07-29 2024-02-23 中交路桥建设有限公司 Assembling method of pinnacle steel member

Also Published As

Publication number Publication date
CN102505864B (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN102505864A (en) Method for assembling fixed ends of scaffold of large-volume triangular variable-section tubular truss structure
CN103866986B (en) Long span variable cross-section bolted spherical node net shell mounting method
CN105604334A (en) Rapid-construction method used for overall installation of large-span steel truss
CN103643637B (en) Original position construction method for lifting whole after the first vertical transfer of Long-Span Concrete Filled Steel Tubular Arch Bridges
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN104032678A (en) H-shaped tower column inner force adjustable temporary cross supporting structure and construction method thereof
CN104088467A (en) High-altitude construction deformation monitoring method of large-cantilever steel truss structure
CN101333869A (en) Construction method for integrally hoisting steel platform and integrally traversing girders layer
CN102061668A (en) Vertical swiveling construction method of dual-steel-arch tower
CN105401527B (en) Construction method for anchoring catwalk and catwalk anchoring device
CN102486051A (en) Manual demolishing method of large-area spherical net rack
CN202430994U (en) Template limiting clamp
CN103343639A (en) Efficiently-adjusting module sliding system
CN204401995U (en) Encorbelment support system in a kind of center of installing for dome structure
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN109736352B (en) Beret beam fixing device and method for suspension pipeline
CN109441101B (en) Construction platform for high-altitude operation concrete circular roof
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN203200719U (en) Hanging type slope pouring template device
CN203497150U (en) Scaffold for hatch coaming of ship
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN103774554A (en) Main tower traction erecting method of self-anchored suspension bridge box girder
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN202055550U (en) Span adjusting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 201802 Jiading District Shunda Road, Shanghai, No. 615

Applicant after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 201802 Jiading District Shunda Road, Shanghai, No. 615

Applicant before: Shanghai Mechanized Construction Co., Ltd.

CB03 Change of inventor or designer information

Inventor after: Chen Xiaoming

Inventor after: Jia Baorong

Inventor after: Hu Shizhu

Inventor after: Zheng Jun

Inventor after: Li Jiqing

Inventor after: Wu Xinzhi

Inventor after: Xia Liangfeng

Inventor after: Jin Weifeng

Inventor after: Xu Haifeng

Inventor after: Cao Hui

Inventor after: Yuan Ding

Inventor after: Yu Aiyan

Inventor after: Fan Jinliang

Inventor before: Wu Xinzhi

Inventor before: Xu Haifeng

Inventor before: Fan Jinliang

Inventor before: Cao Hui

Inventor before: Hu Shizhu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD. TO: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: CORRECT: INVENTOR; FROM: WU XINZHI XU HAIFENG FAN JINLIANG CAO HUI HU SHIZHU TO: CHEN XIAOMING WU XINZHI XIA LIANGFENG JIN WEIFENG XU HAIFENG CAO HUI YUAN DING YU AIYAN FAN JINLIANG JIA BAORONG HU SHIZHU ZHENG JUN LI JIQING

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028