CN205046843U - Reinforcing apparatus's stair template of marking time in middle of installation - Google Patents
Reinforcing apparatus's stair template of marking time in middle of installation Download PDFInfo
- Publication number
- CN205046843U CN205046843U CN201520400906.2U CN201520400906U CN205046843U CN 205046843 U CN205046843 U CN 205046843U CN 201520400906 U CN201520400906 U CN 201520400906U CN 205046843 U CN205046843 U CN 205046843U
- Authority
- CN
- China
- Prior art keywords
- riser
- formwork
- pole
- template
- stair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域technical field
本实用新型属于电力施工领域,尤其是一种安装中间加固装置的楼梯踏步模板。The utility model belongs to the field of electric power construction, in particular to a stair step formwork with an intermediate reinforcement device installed.
背景技术Background technique
传统的木模板楼梯施工方法是通过铁钉、铁丝等对楼梯踏板进行固定,安装、拆除工序繁琐,周转次数少;混凝土截面尺寸不易保证;木方、模板损耗较大;定型钢模楼梯模板,采用型钢、钢板焊接加工成楼梯模板,能有效保证楼梯的截面尺寸;施工时需塔吊配合吊装,使用部位具有局限性;一次性投入型钢、钢板量较大,成本较高。The traditional construction method of wooden formwork stairs is to fix the stair treads with iron nails and iron wires. The installation and removal procedures are cumbersome and the number of turnovers is small; the size of the concrete section is not easy to guarantee; the loss of wood and formwork is large; the shaped steel formwork stair formwork, The stair formwork is welded and processed by section steel and steel plate, which can effectively ensure the cross-sectional size of the staircase; the tower crane is required for hoisting during construction, and the use position is limited; the amount of section steel and steel plate invested at one time is large, and the cost is high.
发明内容Contents of the invention
本实用新型的目的在于克服现有技术的不足之处,提供一种结构简单、设计合理、使用方便、可靠耐用的安装中间加固装置的楼梯踏步模板。The purpose of the utility model is to overcome the deficiencies of the prior art, and provide a stair step formwork with simple structure, reasonable design, convenient use, reliability and durability, which is installed with an intermediate reinforcing device.
本实用新型解决其技术问题是采取以下技术方案实现的:The utility model solves its technical problem and realizes by taking the following technical solutions:
一种安装中间加固装置的楼梯踏步模板,楼梯楼梯踏步模板包括踢面模板和侧支架,在两侧的侧支架之间间隔均布固装多个踢面模板,其特征在于:踢面模板横向间隔均布;在两侧的侧支架之间的多个踢面模板中部纵向安装两根相对间隔设置的角钢龙骨,该多个踢面模板外侧对应的两根角钢龙骨上均安装有一个加固装置;A stair step formwork installed with an intermediate reinforcement device, the stair step formwork includes a riser formwork and side brackets, a plurality of riser formworks are evenly distributed and fixed between the side supports on both sides, and the feature is that: the riser formwork is horizontal The intervals are evenly distributed; two angle steel keels are installed at intervals in the middle of the multiple riser formworks between the side supports on both sides, and a reinforcement device is installed on the two angle steel keels corresponding to the outside of the multiple riser formworks ;
加固装置具体结构包括支撑角铁、托架、上调节杆、螺帽以及下调节杆,支撑角铁接触踢面模板下部,在支撑角铁上端垂直固装有一托架,在托架上端竖直焊接固装有一上调节杆,该上调节杆制有外螺纹,上调节杆向上穿过角钢龙骨之间的间隙,并且在上调节杆上啮合安装有螺帽;在支撑角铁下部横向穿装有一下调节杆。The specific structure of the reinforcement device includes support angle irons, brackets, upper adjustment rods, nuts and lower adjustment rods. The support angle irons contact the lower part of the riser formwork. An upper adjustment rod is welded and fixed. The upper adjustment rod is made with external threads. The upper adjustment rod passes through the gap between the angle steel keels upwards, and a nut is engaged and installed on the upper adjustment rod; There is an adjustment lever.
而且,在侧支架上对应踢面模板的安装位置均制有嵌装槽。Moreover, embedded grooves are formed on the side brackets corresponding to the installation positions of the kick surface templates.
而且,上调节杆上串联安装有两个螺帽。Moreover, two nuts are installed in series on the upper adjusting rod.
而且,侧支架为木质龙骨和剪力墙龙骨支架。Moreover, the side supports are wooden keel and shear wall keel supports.
本实用新型的优点和积极效果是:Advantage and positive effect of the present utility model are:
1、本实用新型中的角钢龙骨是中间固定装置的主要受力部件,通过调节杆传递,承受了来自浇筑时踢面模板膨胀的水平力,进而提高模板刚度。1. The angle steel keel in the utility model is the main stress-bearing part of the intermediate fixing device. It is transmitted through the adjustment rod and bears the horizontal force from the expansion of the kick surface formwork during pouring, thereby improving the rigidity of the formwork.
2、本实用新型采用钢木结合的形式,有效节约材料成本;安装拆除方便,缩短工期;模板可重复使用;模板刚度好,安装精度高,可有效保证楼梯成型后效果。2. The utility model adopts the combination of steel and wood, which effectively saves material costs; the installation and disassembly is convenient, and the construction period is shortened; the template can be used repeatedly; the template has good rigidity and high installation accuracy, which can effectively ensure the effect of the staircase after forming.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;
图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;
图3为单个加固装置的结构放大图。Figure 3 is an enlarged view of the structure of a single reinforcing device.
具体实施方式detailed description
下面结合附图并通过具体实施例对本实用新型作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本实用新型的保护范围。The utility model will be further described in detail below in conjunction with the accompanying drawings and through specific embodiments. The following embodiments are only descriptive, not restrictive, and cannot limit the protection scope of the utility model.
一种安装中间加固装置的楼梯踏步模板,楼梯楼梯踏步模板包括踢面模板3和侧支架4,侧支架为木质龙骨和剪力墙龙骨支架,两根侧支架倾斜固定在施工位置,在两侧的侧支架之间间隔均布固装多个踢面模板,该多个踢面模板用于在施工时定位楼梯的台阶侧踢面。A stair step formwork with an intermediate reinforcement device. The stair step formwork includes a riser formwork 3 and side supports 4. The side supports are wooden keels and shear wall keel supports. The two side supports are obliquely fixed at the construction position. A plurality of riser formworks are evenly distributed and fixed at intervals between the side supports of the side brackets, and the plurality of riser formworks are used for positioning the step side risers of the stairs during construction.
为了固定踢面模板,在侧支架上对应踢面模板的安装位置均制有嵌装槽。In order to fix the riser formwork, embedded grooves are formed on the side brackets corresponding to the installation positions of the riser formwork.
本实用新型的创新点在于:The innovation of the utility model is:
为了加强控制楼梯模板的垂直度和刚度,以附图2所示方向进行说明,踢面模板纵向的长板结构,踢面模板横向间隔均布;在两侧的侧支架之间的多个踢面模板中部纵向安装两根相对间隔设置的角钢龙骨1,该两根角钢龙骨上间隔均布安装有多个加固装置2,该多个加固装置分别贴紧一个踢面模板外侧;In order to strengthen and control the verticality and rigidity of the stair formwork, it is explained in the direction shown in Figure 2, the long plate structure of the riser formwork in the longitudinal direction, and the transverse intervals of the riser formwork are uniform; Two angle steel keels 1 arranged at intervals are installed longitudinally in the middle of the face formwork, and a plurality of reinforcement devices 2 are evenly distributed on the two angle steel keels, and the plurality of reinforcement devices are respectively attached to the outside of a kick surface formwork;
加固装置具体结构参见附图3所示,包括支撑角铁24、托架23、上调节杆21、螺帽22以及下调节杆25,支撑角铁接触踢面模板下部,在支撑角铁上端垂直固装有一托架,在托架上端竖直焊接固装有一上调节杆,该上调节杆制有外螺纹,上调节杆向上穿过角钢龙骨之间的间隙,并且在上调节杆上啮合安装有螺帽;为了增强紧固力上调节杆上串联安装有两个螺帽,螺帽与托架夹紧角钢龙骨从而使加固装置与角钢龙骨固定;The specific structure of the reinforcing device is shown in Figure 3, which includes a support angle iron 24, a bracket 23, an upper adjustment rod 21, a nut 22 and a lower adjustment rod 25. A bracket is fixed, and an upper adjustment rod is welded and fixed vertically on the upper end of the bracket. The upper adjustment rod is made with external threads. The upper adjustment rod passes through the gap between the angle steel keels upwards, and is engaged and installed on the upper adjustment rod. There are nuts; in order to enhance the fastening force, two nuts are installed in series on the adjusting rod, and the nuts and the bracket clamp the angle steel keel so that the reinforcement device and the angle steel keel are fixed;
为了增强对踢面模板下部的支撑力防止变形,在支撑角铁下部横向穿装有一下调节杆25,该下调节杆为Φ14通丝螺杆,转动下调节杆可以增强对踢面模板牢固压紧力。In order to enhance the supporting force of the lower part of the kick surface formwork and prevent deformation, a lower adjustment rod 25 is installed horizontally on the lower part of the support angle iron. The lower adjustment rod is a Φ14 through-thread screw. Turning the lower adjustment rod can enhance the firm compression of the kick surface formwork. force.
本实施例的踢面模板安装精度±2mm。The installation precision of the face plate of this embodiment is ±2mm.
尽管为说明目的公开了本实用新型的实施例和附图,但是本领域的技术人员可以理解:在不脱离本实用新型及所附权利要求的精神和范围内,各种替换、变化和修改都是可能的,因此,本实用新型的范围不局限于实施例和附图所公开的内容。Although the embodiments and accompanying drawings of the utility model are disclosed for the purpose of illustration, those skilled in the art can understand that various replacements, changes and modifications can be made without departing from the spirit and scope of the utility model and the appended claims. It is possible, therefore, the scope of the present invention is not limited to the contents disclosed in the embodiments and drawings.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520400906.2U CN205046843U (en) | 2015-06-11 | 2015-06-11 | Reinforcing apparatus's stair template of marking time in middle of installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520400906.2U CN205046843U (en) | 2015-06-11 | 2015-06-11 | Reinforcing apparatus's stair template of marking time in middle of installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205046843U true CN205046843U (en) | 2016-02-24 |
Family
ID=55340437
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520400906.2U Expired - Fee Related CN205046843U (en) | 2015-06-11 | 2015-06-11 | Reinforcing apparatus's stair template of marking time in middle of installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205046843U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109025276A (en) * | 2018-08-29 | 2018-12-18 | 中国建筑第七工程局有限公司 | A kind of stair riser formwork reinforcement structure and its installation method |
| CN109457960A (en) * | 2018-11-20 | 2019-03-12 | 中铁十六局集团城市建设发展有限公司 | One kind is marked time overall assembled adjustable universal mold for cast-in-situ stair |
-
2015
- 2015-06-11 CN CN201520400906.2U patent/CN205046843U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109025276A (en) * | 2018-08-29 | 2018-12-18 | 中国建筑第七工程局有限公司 | A kind of stair riser formwork reinforcement structure and its installation method |
| CN109025276B (en) * | 2018-08-29 | 2024-03-08 | 中国建筑第七工程局有限公司 | A stair riser template reinforcement structure and its installation method |
| CN109457960A (en) * | 2018-11-20 | 2019-03-12 | 中铁十六局集团城市建设发展有限公司 | One kind is marked time overall assembled adjustable universal mold for cast-in-situ stair |
| CN109457960B (en) * | 2018-11-20 | 2024-03-22 | 中铁十六局集团城市建设发展有限公司 | Adjustable universal mold for integrally assembling cast-in-situ stair steps |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
| CN108839211B (en) | General prefabricated staircase template with adjustable | |
| CN203603452U (en) | Folded plate small space formwork assembly | |
| CN201826511U (en) | Elevation control system for pouring construction of concrete floors | |
| CN209723607U (en) | Adjustable entirety stair tread formwork | |
| CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
| CN205591586U (en) | Can finely tune bracing piece for building of a tie distance | |
| CN202090932U (en) | Universal template device for tunnel construction | |
| CN211922298U (en) | Recyclable tunnel anchor cable strand embedded pipe fine adjustment device | |
| CN206091303U (en) | Oblique strutting arrangement of aluminum alloy template boundary beam | |
| CN202559236U (en) | Arch rib limited and fixed steel support | |
| CN105401719A (en) | Aluminum alloy stair step template | |
| CN214459711U (en) | A straddle-type monorail steel-concrete combined girder deck concrete formwork reinforcement device | |
| CN206000028U (en) | A kind of combination built-in fitting of steel building | |
| CN204492183U (en) | Adjustable type stairway is marked time support for shuttering | |
| CN205243530U (en) | Light -section tunnel concrete lining platform truck | |
| CN201292663Y (en) | Stereotype stairway steel formwork | |
| CN110670873B (en) | A kind of support system and construction method of steel formwork for ultra-high-section concrete column | |
| CN206784918U (en) | A kind of local stiffening back cord for being used to build novel aluminum-wood composite shuttering system | |
| CN104405417A (en) | Inverted arch construction trolley for self-propelled tunnel | |
| CN220036105U (en) | A formwork device for sealing reserved holes in floor slabs | |
| CN208052217U (en) | Stair tread pours mold | |
| CN204456166U (en) | A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases | |
| CN204983635U (en) | AP1000 nuclear island barrier shield template adjusting device | |
| CN204715629U (en) | A kind of concrete floor negative bending moment rib stopping means |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160224 Termination date: 20210611 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |