CN203755173U - Formwork device used for hydraulic climbing of bridge high pier - Google Patents
Formwork device used for hydraulic climbing of bridge high pier Download PDFInfo
- Publication number
- CN203755173U CN203755173U CN201420102829.8U CN201420102829U CN203755173U CN 203755173 U CN203755173 U CN 203755173U CN 201420102829 U CN201420102829 U CN 201420102829U CN 203755173 U CN203755173 U CN 203755173U
- Authority
- CN
- China
- Prior art keywords
- hydraulic
- climbing
- external mold
- formwork
- dies
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 40
- 238000009415 formwork Methods 0.000 title abstract description 17
- 241000357293 Leptobrama muelleri Species 0.000 claims description 5
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 10
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000002457 bidirectional effect Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 239000011230 binding agent Substances 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Abstract
The utility model belongs to the technical field of bridge construction, and particularly relates to a formwork device used for hydraulic climbing of a bridge high pier. The formwork device is particularly suitable for V-shaped pier structures on the two sides of a main bridge body of a cable-stayed bridge. The formwork device comprises a climbing formwork system and a hydraulic formwork jacking device. The climbing formwork system comprises face-up outer dies, face-down outer dies, outer dies on the two sides and inner dies. Climbing frames are arranged on the face-up outer dies and the face-down outer dies respectively, the inner dies are of an integrated structure, the outer dies are of a split structure, cylindrical structures are formed between the inner dies and the outer dies, bidirectional pull rods are arranged between the inner dies and the outer dies and a formwork lifting device serves as the hydraulic outer formwork jacking device. The formwork device used for hydraulic climbing of the bridge high pier is simple in structure, reasonable in design, convenient and fast to install, high in operability, high in safety coefficient, beneficial for improving the construction quality and convenient to popularize and implement.
Description
Technical field
The utility model belongs to technical field of bridge construction, particularly relates to a kind of plate device for Bridge High-pier hydraulic climbing, is particularly useful for the V-type pier structure of the dual-side of the main bridge of cable stayed bridge.
Background technology
Because shaped pier physical dimension is very large, dimension of platform is limited, cannot use full hall or steel pipe support to carry out the construction of battered leg.If use the popular balanced trestle of domestic contrast, must build 1 up to 32m, the huge del support of wide 30m, and need repeatedly build, difficulty is also quite large.Through after repeatedly after scheme comparison, final decision is used creeping formwork to carry out supporting leg construction, founds vertical steel pipe support and carry out box girder construction on cushion cap and pier base, cantilever binder uses pre-buried bracket to build.Between two supporting legs with pull bar directly to drawing, not with steel pipe support produce be connected.
Summary of the invention
The technical problems to be solved in the utility model overcomes above-mentioned the deficiencies in the prior art exactly, and provides a kind of simple and reasonable for structure, installation, easy to operate, and climbing speed is fast, the plate device for Bridge High-pier hydraulic climbing that safety factor is high.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of plate device for Bridge High-pier hydraulic climbing, comprise climbing form system and template hydraulic jacking device, described climbing form system comprises the external mold of facing upward, overlooking surface external mold and both sides external mold, and internal mold, wherein on external mold and overlooking surface external mold, being respectively equipped with climbing frame facing upward, described internal mold is structure as a whole, external mold is Split type structure, between internal mold and external mold, form tubular structure, and be provided with pull bar between interior external mold, described template hoisting device is exterior sheathing hydraulic jacking device.
Described exterior sheathing hydraulic jacking device comprises hydraulic jack and upper and lower Commutating box, and lift rail, and wherein the contained cylinder bottom of hydraulic jack portion installs on the ground, and its tailpiece of the piston rod and exterior sheathing are hinged.
Described internal mold adopts wooden model and shaped steel back cord.
Described pull bar adopts finish rolling deformed bar to make.
The beneficial effect of technical solutions of the utility model is:
1, structurally, the utility model comprises climbing form system and template hoisting device for the plate device of Bridge High-pier hydraulic climbing, described climbing form system comprises the external mold of facing upward, overlooking surface external mold and both sides external mold, and internal mold, wherein on external mold and overlooking surface external mold, be respectively equipped with climbing frame facing upward, simple and reasonable for structure; Face upward with the climbing frame of overlooking surface as major bearing structures, bear the deadweight of newly placed concrete, reasonable in design; Interior external mold except with pull bar to drawing, also require every one deck internal mold for entirety, a whole set of internal mold and external mold form tubular entirety, jointly stressed, thereby control the deflection that reduces each concrete-pouring template, raising construction quality; Described external mold is Split type structure, easy for installation, workable.
2, structurally, the power resources of the utility model hydraulic self-creeping formwork are the hydraulic jacking systems itself carrying, hydraulic jacking system comprises hydraulic jack and upper and lower Commutating box, Commutating box can be controlled lift rail or lifting frame body, can make to form and climb mutually between template support body and guide rail by hydraulic system, thereby hydraulic self-creeping formwork is upwards climbed steadily, hydraulic self-creeping formwork in work progress without other crane gear, easy to operate, climbing speed is fast, safety factor is high, the first-selected template system while being high-rise structures construction.
3, structurally, the contained cylinder bottom of hydraulic jack described in the utility model portion installs on the ground, and the hydraulic jack that its tailpiece of the piston rod and exterior sheathing are hinged is simple in structure, easy to implement; Described internal mold adopts wooden model and shaped steel back cord, and structure stress is reasonable, workable, is conducive to promotion and implementation.
4, to sum up, the utility model is simple in structure, reasonable in design, easy for installation, quick, workable for the plate device of Bridge High-pier hydraulic climbing, and safety factor is high, contributes to improve construction quality, therefore, is very suitable for promotion and implementation.
Brief description of the drawings
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail, wherein:
Fig. 1 is the structural representation of the utility model for the plate device of Bridge High-pier hydraulic climbing;
Sequence number in figure: 1, the external mold of facing upward, 2, overlooking surface external mold, 3, internal mold, 4, climbing frame, 5, pull bar.
detailed description of the invention
Embodiment mono-:
Referring to Fig. 1, in figure, the utility model is for the plate device of Bridge High-pier hydraulic climbing, comprise climbing form system and template hydraulic jacking device, described climbing form system comprises the external mold 1 of facing upward, overlooking surface external mold 2 and both sides external mold (not shown), and internal mold 3, wherein on external mold and overlooking surface external mold, be respectively equipped with climbing frame 4 facing upward, described internal mold is structure as a whole, external mold is Split type structure, between internal mold and external mold, form tubular structure, and between interior external mold, be provided with pull bar 5, described template hydraulic jacking device is exterior sheathing hydraulic jacking device.
Described exterior sheathing hydraulic jacking device (not shown) comprises hydraulic jack and upper and lower Commutating box, and lift rail, and wherein the contained cylinder bottom of hydraulic jack portion installs on the ground, and its tailpiece of the piston rod and exterior sheathing are hinged.
Described internal mold adopts wooden model and shaped steel back cord.
Described pull bar adopts finish rolling deformed bar to make.
The course of work of the present utility model is as follows:
Climbing form system uses Zhuo Liang climbing form system, and climbing frame is being faced upward and each 4 Pin of installation of overlooking surface, and both sides external mold is not established climbing frame, utilizes hydraulic jack directly to promote.Face upward with the climbing frame of overlooking surface as major bearing structures, bear the deadweight of newly placed concrete.Internal mold adopts wooden model and shaped steel back cord.Interior external mold except with pull bar to drawing, also require that every one deck inner model steel backing is stupefied is welded into entirety with pendulum, a whole set of internal mold and external mold formation tubular entirety, jointly stressed.The deflection that control reduces each concrete-pouring template is crucial.
The power resources of hydraulic self-creeping formwork are the hydraulic jacking systems itself carrying, hydraulic jacking system comprises hydraulic jack and upper and lower Commutating box, Commutating box can be controlled lift rail or lifting frame body, can make between template support body and guide rail to form by hydraulic system and climb mutually, thereby hydraulic self-creeping formwork is upwards climbed steadily, hydraulic self-creeping formwork in work progress without other crane gear, easy to operate, climbing speed is fast, and safety factor is high, the first-selected template system while being high-rise structures construction.
Each time concrete reach form removal strong after, first tear external mold next sections that climbs open, then assembling reinforcement is hung Chain block internal mold is slided into this sections after reinforcing bar binding on external mold.When concreting, it is impartial that both sides battered leg inner concrete speed of perfusion is wanted, and the concrete surface discrepancy in elevation can not exceed 1m, avoids disequilibrium, and one-sided battered leg is stressed excessive.
The foregoing is only the schematic detailed description of the invention of the utility model; not in order to limit scope of the present utility model; any those skilled in the art is not departing from equivalent variations and the amendment under the prerequisite of the utility model design and principle, made, all should belong to the scope of the utility model protection.
Claims (4)
1. the plate device for Bridge High-pier hydraulic climbing, it is characterized in that: comprise climbing form system and template hydraulic jacking device, described climbing form system comprises the external mold of facing upward, overlooking surface external mold and both sides external mold, and internal mold, wherein on external mold and overlooking surface external mold, be respectively equipped with climbing frame facing upward, described internal mold is structure as a whole, external mold is Split type structure, between internal mold and external mold, form tubular structure, and between interior external mold, be provided with pull bar, described template hydraulic jacking device is exterior sheathing hydraulic jacking device.
2. the plate device for Bridge High-pier hydraulic climbing according to claim 1, it is characterized in that: described exterior sheathing hydraulic jacking device comprises hydraulic jack and upper and lower Commutating box, and lift rail, wherein the contained cylinder bottom of hydraulic jack portion installs on the ground, and its tailpiece of the piston rod and exterior sheathing are hinged.
3. the plate device for Bridge High-pier hydraulic climbing according to claim 1 and 2, is characterized in that: described internal mold adopts wooden model and shaped steel back cord.
4. the plate device for Bridge High-pier hydraulic climbing according to claim 1 and 2, is characterized in that: described pull bar adopts finish rolling deformed bar to make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420102829.8U CN203755173U (en) | 2014-03-08 | 2014-03-08 | Formwork device used for hydraulic climbing of bridge high pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420102829.8U CN203755173U (en) | 2014-03-08 | 2014-03-08 | Formwork device used for hydraulic climbing of bridge high pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203755173U true CN203755173U (en) | 2014-08-06 |
Family
ID=51250470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420102829.8U Expired - Lifetime CN203755173U (en) | 2014-03-08 | 2014-03-08 | Formwork device used for hydraulic climbing of bridge high pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203755173U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544397A (en) * | 2015-12-14 | 2016-05-04 | 中交一公局第三工程有限公司 | High concrete pier construction formwork device |
CN107386114A (en) * | 2017-07-17 | 2017-11-24 | 中交路桥华南工程有限公司 | Tilting pier shaft casting system |
CN108487069A (en) * | 2018-03-30 | 2018-09-04 | 中国十九冶集团有限公司 | It turns over clambing shuttering system and realizes the method that Commutating box slides up and down |
-
2014
- 2014-03-08 CN CN201420102829.8U patent/CN203755173U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544397A (en) * | 2015-12-14 | 2016-05-04 | 中交一公局第三工程有限公司 | High concrete pier construction formwork device |
CN107386114A (en) * | 2017-07-17 | 2017-11-24 | 中交路桥华南工程有限公司 | Tilting pier shaft casting system |
CN108487069A (en) * | 2018-03-30 | 2018-09-04 | 中国十九冶集团有限公司 | It turns over clambing shuttering system and realizes the method that Commutating box slides up and down |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN105908777A (en) | Comprehensive pipe gallery sliding mold and application method thereof | |
CN103643800B (en) | The erection & lift system of buckling-restrained bracing member and construction method thereof | |
CN102587286A (en) | Simply supported-continuous construction method for bridge superstructure | |
CN105201195A (en) | Liftable supporting leg type elevator shaft construction platform and method | |
CN102505636A (en) | Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier | |
CN201416148Y (en) | Symmetrical anchoring rope pull rod shuttering for oblique post | |
CN101845882B (en) | Combined device of a mould frame for hanging and casting cement for high-rise buildings and handling and hanging box for building materials | |
CN102251483A (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN102900024A (en) | Overturning die plate for large-scale concrete structure and using method for overturning die plate | |
CN202055516U (en) | Integral mold board elevating system of vertical shaft | |
CN107419746A (en) | A kind of mobile formwork system and its construction method | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN109252656B (en) | High-rise building climbing template and assembling, pouring and lifting method | |
CN205382488U (en) | Water conservancy project concrete dam body job -specific formwork | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN201972095U (en) | Chain block lifting platform for thin-walled hollow piers of bridges | |
CN104499706A (en) | Elevator well template platform and construction method thereof | |
CN203715115U (en) | Supporting point structure for self-hoisting system of portal crane | |
CN202689498U (en) | Liftable scaffold for simple and easy building outer wall | |
CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
CN102720360B (en) | Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140806 |
|
CX01 | Expiry of patent term |