CN102587286A CN2012100866429A CN201210086642A CN102587286A CN 102587286 A CN102587286 A CN 102587286A CN 2012100866429 A CN2012100866429 A CN 2012100866429A CN 201210086642 A CN201210086642 A CN 201210086642A CN 102587286 A CN102587286 A CN 102587286A
Authority
CN
China
Prior art keywords
supported
freely
steel
simply supported
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100866429A
Other languages
Chinese (zh)
Inventor
干华铭
张寅�
钱寒军
朱伟
王东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai City No4 Building Co Ltd
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai City No4 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City No4 Building Co Ltd filed Critical Shanghai City No4 Building Co Ltd
Priority to CN2012100866429A priority Critical patent/CN102587286A/en
Publication of CN102587286A publication Critical patent/CN102587286A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a simply supported-continuous construction method for a bridge superstructure, The method comprises the following steps: firstly, prefabricating standard simply supported small box girders in batch; installing temporary steel brackets at two sides of a bracket steel tube column that is erected on each cushion cap, installing a temporary support with adjustable elevation at the tops of the steel brackets, and lifting the prefabricated simply supported small box girders on the temporary supports arranged on the steel brackets; after that, arranging a transverse prestressed reinforcing steel at the cross beam position between the simply supported small box girders, arranging longitudinal hogging moment bundles through reserved holes arranged at the top surfaces of the simply supported small box girders; pouring concrete into cross beams; and stretching and drawing by use of prestress after the concrete reaches the designed strength to form a two-way prestress continuous beam system. The simply supported-continuous construction method provided by the invention has the characteristics that the simply supported box girder has low manufacturing cost and a simple structure and facilitates industrialized production and lifting work, and a continuous bridge is good in integrity and reasonable in stress, so that the disadvantages that inclined section cracks occur at ends of the simply supported box girders, the bridge surface continuation is liable to damage, and the continuous bridge has high requirement on a foundation and supports and has a complex structure and long construction period can be avoided.

Description

The bridge superstructure freely-supported becomes continuous job practices
Technical field
The present invention relates to a kind of job practices of bridge superstructure, the job practices of especially a kind of bridge top concrete continuous beam.
Technical background
Along with the fast development of China's speedway, particularly more and more general for the speedway of building with overhead form in the city scope, therefore to the also corresponding raising of the bridge construction quality requirement of speedway, bridge Construction Technology more and more receives publicity.And at present; What bridge on highway generally adopted is the form of prefabricated PC concrete plate beam, T beam; This technology has the advantage that the lifting duration is short, cheap, be convenient to batch production production, but simple beam structure is prone to produce crack, sloping section, bridge floor destructible; And adopt balanced cantilever casting method, support cast-in-place method for the bridge of large span; This technology has the advantage of continuous beam good integrity, reasonable stress; But receive ground, ambient influnence big, long in time limit, therefore, in conjunction with above advantage; Explore a kind of not only had the simply supported beam construction period short, but also can combine the method for the advantage of continuous beam good integrity, the permanent of concrete continuous girder construction better guaranteed.
Summary of the invention
The present invention will provide a kind of bridge superstructure freely-supported to become continuous job practices; Main through combining the advantage of simply supported beam duration weak point, beam structure good integrity; Be continuous job practices behind the first freely-supported, guarantee the bridge construction quality, guarantee the permanent of beam structure.
Technical scheme of the present invention is that a kind of bridge superstructure freely-supported becomes continuous job practices, earlier the little case beam of the batch prefabricated freely-supported of standardization; In the carriage steel pipe post both sides of standing on the cushion cap temporary steel carriage is installed then, the temporary support of scalable absolute altitude is installed at steel carriage top, and the little case beam of prefabricated freely-supported is lifted on the temporary support to the steel carriage; Crossbeam location arrangements transverse prestress muscle between the little case beam of freely-supported then; And arrange vertical hogging moment bundle through the little case top surface of the beam of freely-supported preformed hole, and build the crossbeam concrete, treat that concrete reaches design strength after; Carry out prestressed stretch-draw, form two dimension prestressing continuous beam system.
1. the little case beam of prefabricated freely-supported
Adopt the standardization precasting process to come the little case beam of prefabricated freely-supported, comprise the employing set shaped steel formwork; Adopt numerically controlled processing equipment to concentrate the semiproduct reinforcing bar of the little case beam of the prefabricated freely-supported of processing in processing plant; Adopt the auxiliary precast beam cage of reinforcement of making of typing moulding bed;
2. the temporary steel carriage is installed
The carriage steel pipe post on standing on cushion cap, interim portable steel pipe post basis is set in the original ground scope of cushion cap both sides, the temporary steel carriage is installed on portable steel pipe post basis.
3. the steel carriage is made
The steel carriage adopts Φ 580mm steel pipe as the load-bearing steel pipe, arranges laterally and vertically that simultaneously the scissors i iron is as connecting between steel pipe column.
The invention has the beneficial effects as follows:
Job practices of the present invention both had simply supported beam cheap, simple structure, be easy to batch production production, be convenient to the characteristics of lifting operation; The characteristics that have continuous fine strain of millet bridge good integrity, reasonable stress have again overcome the simply supported beam beam-ends and be prone to have produced crack, sloping section, the continuous destructible of bridge floor and continuous girder bridge ground and support requirement height, complex structure, duration such as are grown at shortcoming.
Description of drawings
Fig. 1 is a construction and installation sketch map of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is a steel carrier structure sketch map;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is interim portable steel pipe post basic schematic;
Fig. 6 is that little case beam lifts to temporary steel carriage sketch map;
Fig. 7 is the vertical view of Fig. 6;
Fig. 8 is horizontal longitudinal prestressing strands scheme of installation;
Fig. 9 is a crossbeam concreting sketch map;
Figure 10 be indulge, horizontal prestressed stretch-draw, freely-supported become the continuous structure sketch map.
The specific embodiment
To shown in Figure 10, a kind of bridge superstructure freely-supported becomes continuous job practices like Fig. 1, earlier the little case beam 1 of the prefabricated freely-supported of batch; In carriage steel pipe post 3 both sides of standing on the cushion cap 2 temporary steel carriage 4 is installed then, the temporary support 5 of scalable absolute altitude is installed at temporary steel carriage 4 tops, and the little case beam 1 of prefabricated freely-supported is lifted on the temporary support 5 to the temporary steel carriage 4; Crossbeam location arrangements transverse prestress muscle 8 between the little case beam 1 of freely-supported then; And arrange vertical hogging moment bundle through the little case beam 1 end face preformed hole of freely-supported, and build the crossbeam concrete eight, treat that concrete eight reaches design strength after; Carry out prestressed stretch-draw, form two dimension prestressing continuous beam system.
It is following that bridge superstructure adopts first freely-supported to become the main construction sequence of continuous construction technology:
1. little case beam 1 standardization of freely-supported is prefabricated
On precasting process, require to reach standardization, comprise that little case beam 1 template of freely-supported adopts set shaped steel formwork; Precast beam semiproduct reinforcing bar adopts numerically controlled processing equipment to concentrate processing in processing plant; The precast beam cage of reinforcement adopts the auxiliary making of typing moulding bed; Adopt the special hanger integral hoisting in place after the moulding of the little case beam steel of freely-supported cage to contents such as beam making bench.
2. temporary steel carriage ground 7 (Fig. 5) is handled
The carriage steel pipe post 3 on standing on cushion cap 2, interim portable steel pipe post basis is set in cushion cap 2 both sides original ground scopes, mentality of designing is similar expansion basis, through the bearing capacity of foundation soil test, guarantees that bearing capacity of foundation soil satisfies the load-bearing requirement.
3. temporary steel carriage 4 designs, processing, installation (Fig. 3,4)
Main Φ 580 steel pipes that adopt of temporary steel carriage 4 designs are as the load-bearing steel pipe; Arrange laterally and vertically that simultaneously scissors i iron 6 is as connecting between steel pipe column; 4 processing of temporary steel carriage are carried out in strict accordance with the structure steel fabrication relevant specification, and on-the-spot the installation mainly arranges the 25t mobile crane to carry out.
4. little case beam 1 lifts to temporary steel carriage 4 (Fig. 6,7)
5. crossbeam reinforcing bar, transverse prestress steel bundle, vertically hogging moment bundle 8 installations (Fig. 8), concrete 9 is built (Fig. 9).
6. prestressed stretch-draw, system conversion, the frame that falls (Figure 10).
Bridge superstructure adopt continuous construction technology behind the first freely-supported both had simply supported beam cheap, simple structure, be easy to batch production production, be convenient to the characteristics of lifting operation; The characteristics that have continuous fine strain of millet bridge good integrity, reasonable stress have again overcome the simply supported beam beam-ends and be prone to have produced crack, sloping section, the continuous destructible of bridge floor and continuous girder bridge ground and support requirement height, complex structure, duration such as are grown at shortcoming.

Claims (4)

1. a bridge superstructure freely-supported becomes continuous job practices; It is characterized in that: elder generation is the standardization little case beam of prefabricated freely-supported (1) in batches; In carriage steel pipe post (3) both sides of standing on the cushion cap (2) temporary steel carriage (4) is installed then, the temporary support (5) of scalable absolute altitude is installed at steel carriage (4) top, and the little case beam of prefabricated freely-supported (1) is lifted on the temporary support (5) to the steel carriage; Crossbeam location arrangements transverse prestress muscle (7) between the little case beam of freely-supported (1) then; And arrange vertical hogging moment bundle through the little case top surface of the beam of freely-supported preformed hole, and build crossbeam concrete (8), treat that concrete (8) reaches design strength after; Carry out prestressed stretch-draw, form two dimension prestressing continuous beam system.
2. bridge superstructure freely-supported according to claim 1 becomes continuous job practices, it is characterized in that: the little case beam of said prefabricated freely-supported, and adopt the standardization precasting process to come the little case beam of prefabricated freely-supported, comprise the employing set shaped steel formwork; Adopt numerically controlled processing equipment to concentrate the semiproduct reinforcing bar of the little case beam of the prefabricated freely-supported of processing in processing plant; Adopt the auxiliary precast beam cage of reinforcement of making of typing moulding bed.
3. bridge superstructure freely-supported according to claim 1 becomes continuous job practices; It is characterized in that: said installation temporary steel carriage (4); The carriage steel pipe post (3) on standing on cushion cap (2); Interim portable steel pipe post basis (7) is set in the original ground scope of cushion cap (2) both sides, goes up on portable steel pipe post basis (7) temporary steel carriage (4) is installed.
4. bridge superstructure freely-supported according to claim 1 becomes continuous job practices; It is characterized in that: said steel carriage (4) is made: steel carriage (4) adopts Φ 580mm steel pipe as the load-bearing steel pipe, arranges laterally and vertically that simultaneously scissors i iron (6) is as connecting between steel pipe column.
CN2012100866429A 2012-03-28 2012-03-28 Simply supported-continuous construction method for bridge superstructure Pending CN102587286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100866429A CN102587286A (en) 2012-03-28 2012-03-28 Simply supported-continuous construction method for bridge superstructure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100866429A CN102587286A (en) 2012-03-28 2012-03-28 Simply supported-continuous construction method for bridge superstructure

Publications (1)

Publication Number Publication Date
CN102587286A true CN102587286A (en) 2012-07-18

Family

ID=46476480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100866429A Pending CN102587286A (en) 2012-03-28 2012-03-28 Simply supported-continuous construction method for bridge superstructure

Country Status (1)

Country Link
CN (1) CN102587286A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808371A (en) * 2012-08-20 2012-12-05 杨众 Simply-supported-to-continuous prefabricated integrally-cast superposed continuous bridge and construction method
CN102817325A (en) * 2012-09-13 2012-12-12 永升建设集团有限公司 Construction method of simply supported-continuous switching system of negative moment beam prestressed precast box beam
CN103015329A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 I-section steel girder reinforcement small box girder structure
CN103437561A (en) * 2013-07-18 2013-12-11 杭州博数土木工程技术有限公司 Simply-supported to continuously-crossly-connected box girder structure
CN103586978A (en) * 2013-09-24 2014-02-19 沈阳建筑大学 Steel tube and concrete composite box girder and processing method thereof
CN103882813A (en) * 2014-04-10 2014-06-25 中铁二局股份有限公司 Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN103882808A (en) * 2013-12-26 2014-06-25 浙江金筑交通建设有限公司 Ramp bridge and main bridge connecting and erecting prefabricated beam supply system and construction method thereof
CN104612050A (en) * 2015-02-09 2015-05-13 福州大学 Simply supported girder bridge floor continuous new construction and construction method
CN104631301A (en) * 2015-02-12 2015-05-20 北京地圣科创建设工程有限公司 PSC U-type beam bridge and construction method of PSC U-type beam bridge
CN105780665A (en) * 2016-05-06 2016-07-20 中铁大桥局集团第八工程有限公司 Two-way adjustable connecting device and construction method thereof
CN106012847A (en) * 2016-05-27 2016-10-12 中交四公局第二工程有限公司 Bailey frame support precast hollow slab process
CN109911756A (en) * 2019-04-19 2019-06-21 福州大学 The experimental rig and method for transporting and lifting convenient for bridge floor continuous structure test component
CN110373970A (en) * 2019-07-29 2019-10-25 湖北工业大学 A kind of overhead road surface underground heat ice-melting structure and its construction method
CN111041989A (en) * 2019-12-12 2020-04-21 上海市基础工程集团有限公司 Rapid installation method of prefabricated assembled bridge
CN111593675A (en) * 2020-06-12 2020-08-28 重庆渝高科技产业(集团)股份有限公司 Supporting assembly of box girder and construction method of box girder
CN112813836A (en) * 2020-12-31 2021-05-18 中铁二十局集团第六工程有限公司 Cast-in-place box girder construction method
CN114016423A (en) * 2021-11-25 2022-02-08 上海市政工程设计研究总院(集团)有限公司 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam
CN114214955A (en) * 2021-12-28 2022-03-22 武船重型工程股份有限公司 Method for erecting bridge-spanning steel plate girder

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225639A (en) * 2008-01-28 2008-07-23 上海市城市建设设计研究院 Construction technology for freely-supported variable continuous box-beam structure and freely-supported variable continuous box-beam structure thereof
CN101942808A (en) * 2010-09-30 2011-01-12 长沙理工大学 Construction technology for simply supported and continuously supported external prestressed continuous beam bridge T-shaped section
CN201770943U (en) * 2010-07-16 2011-03-23 武汉一冶钢结构有限责任公司 Temporary support device used for installing steel structural bridge

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225639A (en) * 2008-01-28 2008-07-23 上海市城市建设设计研究院 Construction technology for freely-supported variable continuous box-beam structure and freely-supported variable continuous box-beam structure thereof
CN201770943U (en) * 2010-07-16 2011-03-23 武汉一冶钢结构有限责任公司 Temporary support device used for installing steel structural bridge
CN101942808A (en) * 2010-09-30 2011-01-12 长沙理工大学 Construction technology for simply supported and continuously supported external prestressed continuous beam bridge T-shaped section

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴楠等: "5×70m连续刚构箱梁短线匹配法预制施工技术", 《桥梁建设》 *
曾剑: "先简支后连续梁的结构特性及施工研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808371B (en) * 2012-08-20 2016-10-05 杨众 The integral precast overlapping Continuous Bridge of a kind of simple-supported thencontinuous and construction method
CN102808371A (en) * 2012-08-20 2012-12-05 杨众 Simply-supported-to-continuous prefabricated integrally-cast superposed continuous bridge and construction method
CN102817325A (en) * 2012-09-13 2012-12-12 永升建设集团有限公司 Construction method of simply supported-continuous switching system of negative moment beam prestressed precast box beam
CN102817325B (en) * 2012-09-13 2015-05-13 永升建设集团有限公司 Construction method of simply supported-continuous switching system of negative moment beam prestressed precast box beam
CN103015329A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 I-section steel girder reinforcement small box girder structure
CN103437561A (en) * 2013-07-18 2013-12-11 杭州博数土木工程技术有限公司 Simply-supported to continuously-crossly-connected box girder structure
CN103437561B (en) * 2013-07-18 2015-10-14 浙江中隧桥波形钢腹板有限公司 Freely-supported turns continuous interconnection box-beam structure
CN103586978B (en) * 2013-09-24 2015-11-25 沈阳建筑大学 Steel pipe and concrete folding case beam and processing method thereof
CN103586978A (en) * 2013-09-24 2014-02-19 沈阳建筑大学 Steel tube and concrete composite box girder and processing method thereof
CN103882808A (en) * 2013-12-26 2014-06-25 浙江金筑交通建设有限公司 Ramp bridge and main bridge connecting and erecting prefabricated beam supply system and construction method thereof
CN103882808B (en) * 2013-12-26 2016-03-09 浙江金筑交通建设有限公司 Ramp bridge and main line bridge join the construction method across erecting beam support system
CN103882813B (en) * 2014-04-10 2016-02-03 中铁二局工程有限公司 For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN103882813A (en) * 2014-04-10 2014-06-25 中铁二局股份有限公司 Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN104612050A (en) * 2015-02-09 2015-05-13 福州大学 Simply supported girder bridge floor continuous new construction and construction method
CN104631301A (en) * 2015-02-12 2015-05-20 北京地圣科创建设工程有限公司 PSC U-type beam bridge and construction method of PSC U-type beam bridge
CN105780665B (en) * 2016-05-06 2017-10-27 中铁大桥局集团第八工程有限公司 Two-way adjustable connector and its construction method
CN105780665A (en) * 2016-05-06 2016-07-20 中铁大桥局集团第八工程有限公司 Two-way adjustable connecting device and construction method thereof
CN106012847B (en) * 2016-05-27 2018-01-02 中交四公局第二工程有限公司 Bailey bracket supports precast hollow slab technique
CN106012847A (en) * 2016-05-27 2016-10-12 中交四公局第二工程有限公司 Bailey frame support precast hollow slab process
CN109911756A (en) * 2019-04-19 2019-06-21 福州大学 The experimental rig and method for transporting and lifting convenient for bridge floor continuous structure test component
CN110373970A (en) * 2019-07-29 2019-10-25 湖北工业大学 A kind of overhead road surface underground heat ice-melting structure and its construction method
CN111041989A (en) * 2019-12-12 2020-04-21 上海市基础工程集团有限公司 Rapid installation method of prefabricated assembled bridge
CN111593675A (en) * 2020-06-12 2020-08-28 重庆渝高科技产业(集团)股份有限公司 Supporting assembly of box girder and construction method of box girder
CN112813836A (en) * 2020-12-31 2021-05-18 中铁二十局集团第六工程有限公司 Cast-in-place box girder construction method
CN114016423A (en) * 2021-11-25 2022-02-08 上海市政工程设计研究总院(集团)有限公司 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam
CN114214955A (en) * 2021-12-28 2022-03-22 武船重型工程股份有限公司 Method for erecting bridge-spanning steel plate girder
CN114214955B (en) * 2021-12-28 2024-03-22 武船重型工程股份有限公司 Method for erecting bridge-crossing steel plate girder

Similar Documents

Publication Publication Date Title
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN110331668B (en) Construction method of bidirectional inclined V-shaped bridge tower of cable-stayed bridge without back cables
CN107090932B (en) Construction method of large-span thin-wall plane arch truss based on stiff ring beam
CN101775775B (en) Combined bridge with self-anti-cracking function and construction method thereof
CN101659082A (en) System for integral binding and integral hoisting of steel bar framework of box beam and construction method thereof
CN102704406A (en) Roadbed slab non-tensile stress construction method based on combined channel girder
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN202219536U (en) Die holder for assembling steel reinforcement cage of prefabricated box girder
CN206512581U (en) Transverse prestress overall with reinforced concrete bridge deck slab plate combination beam
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN203640061U (en) Node connecting structure of reinforced concrete column of basement
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN201511439U (en) System for integrally binding and hoisting box girder steel reinforcement framework
CN210288124U (en) Prefabricated ligature mould of cast-in-place box girder bottom web reinforcing bar segmentation
CN210880205U (en) Movable common steel bar positioning device for prefabricated T-shaped beam and small box girder
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN203603542U (en) Fabricated electronic workshop
CN202347846U (en) Simple lifting setting stair steel moulding plate
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN211769949U (en) Movable arm type tower crane underframe ballast type foundation
CN210289267U (en) Assembled platform canopy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718