CN114016423A - Construction method for simply supporting hidden cover beam and then continuously constructing small box beam - Google Patents

Construction method for simply supporting hidden cover beam and then continuously constructing small box beam Download PDF

Info

Publication number
CN114016423A
CN114016423A CN202111415254.6A CN202111415254A CN114016423A CN 114016423 A CN114016423 A CN 114016423A CN 202111415254 A CN202111415254 A CN 202111415254A CN 114016423 A CN114016423 A CN 114016423A
Authority
CN
China
Prior art keywords
small box
hidden
construction
construction method
box girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111415254.6A
Other languages
Chinese (zh)
Inventor
顾赛辉
卢永成
齐新
娄凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN202111415254.6A priority Critical patent/CN114016423A/en
Publication of CN114016423A publication Critical patent/CN114016423A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A construction method for simply supporting a hidden cover beam and then continuously constructing small box beams relates to the field of bridges and comprises the steps of preparing pile foundations, bearing platforms and pier columns; setting up a temporary support on the top of the bearing platform; erecting the small box girder onto the temporary support; hoisting hidden bent cap steel bars in place, lengthening longitudinal steel bars at the end part of the small box girder, installing steel bundles, pouring concrete and tensioning prestressed steel bundles; and (5) dismantling the temporary supports, and constructing a bridge deck system to finish the bridge construction. The construction method for the hidden bent cap after simply supporting and then continuously constructing the small box girder provided by the embodiment can optimize the connection structure of the hidden bent cap, the reinforcing steel bar and the steel beam, improve the construction conditions of the hidden bent cap, improve the factory rate construction and improve the construction quality.

Description

Construction method for simply supporting hidden cover beam and then continuously constructing small box beam
Technical Field
The invention relates to the field of bridges, in particular to a construction method for simply supporting a hidden cover beam and then continuously constructing small box beams.
Background
The hidden type bent cap is a novel bridge structure form with the advantages that the structure height is low, a beam body can be prefabricated in an industrial mode, the structural integrity is good, and a stress system is close to that of a cast-in-place box beam, so that the hidden type bent cap is worthy of popularization in modern urban bridge construction with high landscape requirements. The invention aims to provide a novel structure of a hidden bent cap of a simply-supported and continuous small box girder so as to improve a construction method and improve construction quality.
Disclosure of Invention
The invention aims to provide a construction method for simply supporting and then continuously constructing small box girders by using hidden cover girders, which aims to solve the problems.
The embodiment of the invention is realized by the following steps:
in one aspect of the embodiments of the present invention, a method for constructing a hidden cover beam simply supported and then continuously constructed into a small box beam is provided, which includes the following steps:
preparing a pile foundation, a bearing platform and a pier stud;
setting up a temporary support on the top of the bearing platform;
erecting the small box girder onto the temporary support;
hoisting hidden bent cap steel bars in place, lengthening longitudinal steel bars at the end part of the small box girder, installing steel bundles, pouring concrete and tensioning prestressed steel bundles;
and (5) dismantling the temporary supports, and constructing a bridge deck system to finish the bridge construction.
Optionally, the pile foundation, the bearing platform and the pier stud are all prepared by field construction.
Optionally, the box girders are prepared by a prefabrication plant.
Optionally, the preparation of the small box girder by a prefabrication factory is performed in synchronization with the preparation of the pile foundation, the bearing platform and the pier stud.
Optionally, the box girders are transported to the site while temporary supports are set up on top of the cap.
Optionally, joints for mechanical connection are reserved at the end parts of the precast beams of the small box girders. The construction method for the hidden bent cap after simply supporting and then continuously constructing the small box girder provided by the embodiment can optimize the connection structure of the hidden bent cap, the reinforcing steel bar and the steel beam, improve the construction conditions of the hidden bent cap, improve the factory rate construction and improve the construction quality.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic view of the components of the first-connected 3X 30m hidden bent cap of the present invention, which is simply supported and then connected with the main components of the small box girder;
FIG. 2 is a schematic view of a construction process of a hidden bent cap after simply supporting and then continuously forming a small box girder according to an embodiment of the invention;
FIG. 3 is a schematic diagram of erecting a prefabricated small box girder on a temporary buttress according to an embodiment of the invention;
FIG. 4 is a schematic diagram of a reinforcement cage with a hidden bent cap being installed in place on site according to an embodiment of the present invention;
FIG. 5 is a schematic view of the embodiment of the present invention illustrating the installation of hogging moment steel bundles and hidden bent cap steel bundles in the elongated precast beam end reinforcing steel bars;
FIG. 6 is a schematic diagram of the method for pouring hidden cover beam concrete and tensioning longitudinal and transverse steel bundles in batches according to the embodiment of the invention;
fig. 7 is a schematic view of the main structure after the support is removed according to the embodiment of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings or the orientations or positional relationships that the products of the present invention are conventionally placed in use, and are only used for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance.
Furthermore, the terms "horizontal", "vertical" and the like do not imply that the components are required to be absolutely horizontal or pendant, but rather may be slightly inclined. For example, "horizontal" merely means that the direction is more horizontal than "vertical" and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 7, the present embodiment provides a construction method for simply supporting a hidden canopy beam and then continuously constructing small box beams, including the following steps:
preparing a pile foundation, a bearing platform and a pier stud;
setting up a temporary support on the top of the bearing platform;
erecting the small box girder onto the temporary support;
hoisting hidden bent cap steel bars in place, lengthening longitudinal steel bars at the end part of the small box girder, installing steel bundles, pouring concrete and tensioning prestressed steel bundles;
and (5) dismantling the temporary supports, and constructing a bridge deck system to finish the bridge construction. Wherein, the pile foundation, the bearing platform and the pier stud are all prepared by field construction. Wherein the small box girder is prepared by a prefabrication plant. The small box girders are prepared by a prefabricating factory and are synchronously prepared with the pile foundation, the bearing platform and the pier stud. And when a temporary support is erected on the top of the bearing platform, the small box girder is transported to the site. And joints for mechanical connection are reserved at the end parts of the precast beams of the small box girders.
Referring to fig. 3 to fig. 7 in detail, the method for implementing the hidden bent cap of the present invention is further described by taking the middle pier as an example:
and (4) erecting a temporary buttress, installing a beam template, and erecting the prefabricated small box beam on the temporary buttress.
And (4) processing a reinforcement cage of the hidden bent cap, and installing in place on site.
And (3) lengthening the reinforcing steel bars at the end parts of the precast beams through mechanical connection (straight thread sleeves), and installing the hogging moment steel bundles and the hidden bent cap beam steel bundles.
And (4) pouring hidden cover beam concrete, and tensioning longitudinal and transverse steel bundles in batches.
And (5) dismantling the support, and finishing construction of the main body structure.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A construction method for simply supporting a hidden cover beam and then continuously constructing small box beams is characterized by comprising the following steps:
preparing a pile foundation, a bearing platform and a pier stud;
setting up a temporary support on the top of the bearing platform;
erecting the small box girder onto the temporary support;
hoisting hidden bent cap steel bars in place, lengthening longitudinal steel bars at the end part of the small box girder, installing steel bundles, pouring concrete and tensioning prestressed steel bundles;
and (5) dismantling the temporary supports, and constructing a bridge deck system to finish the bridge construction.
2. The construction method of the hidden canopy beam simply supported and then continuously provided with the small box girders according to claim 1, wherein the pile foundation, the bearing platform and the pier stud are all prepared by field construction.
3. The method for constructing a simply supported and then continuous box girder of a hidden canopy according to claim 1, wherein the box girder is prepared by a prefabrication factory.
4. The construction method of the hidden canopy beam of claim 3, wherein the fabrication of the small box beam from a prefabrication plant is performed simultaneously with the fabrication of the pile foundation, the cap and the pier stud.
5. The construction method of the hidden canopy beam of claim 3, wherein the small box beam is transported to the site when the temporary support is built on top of the bearing platform.
6. The construction method of the hidden cover beam simply supported and then continuously connected small box beams as claimed in claim 4 or 5, wherein joints for mechanical connection are reserved at the end parts of the precast beams of the small box beams.
CN202111415254.6A 2021-11-25 2021-11-25 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam Pending CN114016423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111415254.6A CN114016423A (en) 2021-11-25 2021-11-25 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111415254.6A CN114016423A (en) 2021-11-25 2021-11-25 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam

Publications (1)

Publication Number Publication Date
CN114016423A true CN114016423A (en) 2022-02-08

Family

ID=80066727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111415254.6A Pending CN114016423A (en) 2021-11-25 2021-11-25 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam

Country Status (1)

Country Link
CN (1) CN114016423A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090116606A (en) * 2008-12-04 2009-11-11 주식회사 인터컨스텍 A method of making the simple bridge composed of girders with concrete slab deck continuous
CN102086630A (en) * 2010-10-14 2011-06-08 东南大学 Method for constructing continuous U-shaped beams
CN102587286A (en) * 2012-03-28 2012-07-18 上海市第四建筑有限公司 Simply supported-continuous construction method for bridge superstructure
CN202787046U (en) * 2012-09-14 2013-03-13 永升建设集团有限公司 Negative moment beam pre-stressed precast box girder connecting structure
CN103938546A (en) * 2013-01-23 2014-07-23 上海市城市建设设计研究总院 Simple-supported continuous construction method and structure thereof
CN208088108U (en) * 2018-01-23 2018-11-13 上海市政工程设计研究总院(集团)有限公司 A kind of Simply supported non-uniform bridge structure construction
CN109989330A (en) * 2017-12-29 2019-07-09 比亚迪股份有限公司 Continous way track and its erection method
CN110485278A (en) * 2019-08-29 2019-11-22 上海市政工程设计研究总院(集团)有限公司 A kind of half stealth of falling T bent cap construction
CN110747761A (en) * 2019-10-21 2020-02-04 宁波市政工程建设集团股份有限公司 Dismantling construction method and tool for temporary supporting system of small box girder type hidden cover beam of road and bridge prefabricated
CN110747746A (en) * 2019-10-21 2020-02-04 宁波市政工程建设集团股份有限公司 Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof
CN110939051A (en) * 2019-12-12 2020-03-31 成都轨道建设管理有限公司 Subway hidden cover beam construction method
CN113652966A (en) * 2021-07-13 2021-11-16 宁波市政工程建设集团股份有限公司 Construction method of full-prefabricated assembly type concrete beam type bridge structure system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090116606A (en) * 2008-12-04 2009-11-11 주식회사 인터컨스텍 A method of making the simple bridge composed of girders with concrete slab deck continuous
CN102086630A (en) * 2010-10-14 2011-06-08 东南大学 Method for constructing continuous U-shaped beams
CN102587286A (en) * 2012-03-28 2012-07-18 上海市第四建筑有限公司 Simply supported-continuous construction method for bridge superstructure
CN202787046U (en) * 2012-09-14 2013-03-13 永升建设集团有限公司 Negative moment beam pre-stressed precast box girder connecting structure
CN103938546A (en) * 2013-01-23 2014-07-23 上海市城市建设设计研究总院 Simple-supported continuous construction method and structure thereof
CN109989330A (en) * 2017-12-29 2019-07-09 比亚迪股份有限公司 Continous way track and its erection method
CN208088108U (en) * 2018-01-23 2018-11-13 上海市政工程设计研究总院(集团)有限公司 A kind of Simply supported non-uniform bridge structure construction
CN110485278A (en) * 2019-08-29 2019-11-22 上海市政工程设计研究总院(集团)有限公司 A kind of half stealth of falling T bent cap construction
CN110747761A (en) * 2019-10-21 2020-02-04 宁波市政工程建设集团股份有限公司 Dismantling construction method and tool for temporary supporting system of small box girder type hidden cover beam of road and bridge prefabricated
CN110747746A (en) * 2019-10-21 2020-02-04 宁波市政工程建设集团股份有限公司 Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof
CN110939051A (en) * 2019-12-12 2020-03-31 成都轨道建设管理有限公司 Subway hidden cover beam construction method
CN113652966A (en) * 2021-07-13 2021-11-16 宁波市政工程建设集团股份有限公司 Construction method of full-prefabricated assembly type concrete beam type bridge structure system

Similar Documents

Publication Publication Date Title
CN101538831B (en) Post-poured hidden coping construction method for converting simply supported beams into continuous beams
CN111622116A (en) Asymmetric installation construction method for steel box short-tower cable-stayed bridge special for straddle type light rail
CN108385904B (en) Roofing parapet wall and construction method thereof
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
US7296349B2 (en) Method to assemble a steam generator
KR20100003791A (en) A precast type pre-stress box girder bridge excution method
JP4336659B2 (en) Construction method of upper-floor type suspension floor slab bridge
CN114016423A (en) Construction method for simply supporting hidden cover beam and then continuously constructing small box beam
CN112144412A (en) Construction method of prefabricated assembled intercolumnar tie beam
US4154029A (en) Steel concrete container and a process for erecting the same
CN212316706U (en) Bridge erecting machine
JP2000045229A (en) Constructing method of bridge
CN114263114A (en) Construction system and construction method of large-section steel box girder
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN112227216A (en) Triangular area cable buckling and sling combined construction method for steel diagonal bracing continuous rigid frame bridge
CN221760438U (en) Longitudinal and transverse connection structure of hidden cap beam small box beam
CN111851725A (en) Sequential construction method of super-long stiff suspension multilayer structure
CN217352141U (en) Construction system of large-section steel box girder
CN217026690U (en) Assembled steel channel beam formwork support frame
CN111236963B (en) Open cut tunnel structure and construction method thereof
CN220686501U (en) Huge blossoming form steel column of segmentation assembly construction
CN217352174U (en) Pier edge side span cast-in-place support
CN220504665U (en) Ectopic assembled H-shaped steel tower
CN220746604U (en) Cast-in-situ bracket for two-way transverse slope concrete bent cap
CN218667867U (en) Prefabricated balcony of assembled steel construction light-duty

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination