CN203439948U CN201320457144.0U CN201320457144U CN203439948U CN 203439948 U CN203439948 U CN 203439948U CN 201320457144 U CN201320457144 U CN 201320457144U CN 203439948 U CN203439948 U CN 203439948U
Authority
CN
China
Prior art keywords
gantry
cableway
support tube
upending frame
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320457144.0U
Other languages
Chinese (zh)
Inventor
张卫民
刘春云
廖志强
卢斌
李安江
朱亚友
邓建华
陈启宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd
Original Assignee
Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd filed Critical Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd
Priority to CN201320457144.0U priority Critical patent/CN203439948U/en
Application granted granted Critical
Publication of CN203439948U publication Critical patent/CN203439948U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a gantry lifting frame for a cableway. The gantry lifting frame comprises a lifting beam, at least one supporting tube and at least one inclined strut, wherein the supporting tubes are arranged in parallel; the lifting beam is connected to one end of each supporting tube; the inclined struts are crosswise arranged between the supporting tubes; the end parts of the inclined struts are connected with the end parts of the supporting tubes respectively. According to the gantry lifting frame for the cableway, the problem of unreasonable design of a conventional gantry lifting frame for the cableway is solved; the gantry lifting frame is strong in strength, difficult to bend and deform and high in working efficiency, and can be well matched with a winch, and a pulley block can be conveniently hung.

Description

Cableway gantry upending frame
Technical field
The utility model relates to a kind of cableway ropeway carrying-rope lifting appliance, be particularly related to a kind of cableway gantry upending frame, while changing for cableway ropeway carrying-rope, old ropeway carrying-rope is hung on the ground from the saddle that waves of ropeway supporting trestle, then new bearer rope is hung to waving on saddle of ropeway supporting trestle.
Background technology
Cableway system comprises the ropeway supporting trestle being set up in parallel and is arranged on the load-bearing wires rope on ropeway supporting trestle, and ropeway supporting trestle loading, unloading have certain horizontal throw between two stations.Load-bearing wires rope adopts locked coil wire, comprises head-rope and underloading rope, the about 14.4Kg/m of head-rope unit weight, approximately 20.5 tons of gross weights; The about 6.06Kg/m of underloading rope unit weight, approximately 8.6 tons of gross weights.Head-rope tensioning weight weighs 65 tons, and underloading rope tensioning weight weighs 23 tons, and hauling rope tensioning weight weighs 13 tons.When expanding production, need to change old head-rope, general cableway gantry upending frame that adopts, cableway gantry upending frame is when changing head-rope, insufficient strength, produce crooked, distortion, the intensity of suspension ring is also inadequate, can not use, and be not specifically designed to the device of hanging winch fag end, brought very large trouble to the replacing of head-rope, lifting once afterwards this upending frame substantially scrap, particularly the old head-rope of last support is hung to lower time, load large especially, do not lift by crane at all, must use crane, this has had a strong impact on the replacing progress of cableway head-rope, and to spend a large amount of manpower and materials, affect the fortune ore deposit task of cableway.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of cableway gantry upending frame, overcome former cableway gantry upending frame and designed irrational problem, intensity is large, is difficult for flexural deformation, and can be so fine that to be used in conjunction with winch, the convenient assembly pulley of hanging, work efficiency is high, simple in structure, and tooling cost is low, cost performance is high, high safety.
For solving above technical matters, the utility model has adopted following technical scheme:
A kind of cableway gantry upending frame, comprise lifting beam, at least one support tube and at least one diagonal brace, described support tube is set up in parallel, and described lifting beam is connected to described support tube one end, described diagonal brace is arranged in a crossed manner between support tube, and the end of described diagonal brace is connected with the end of support tube respectively.
Further, between described support tube and lifting beam, be provided with tilt prop, tilt prop plays booster action, prevents the stressed bending of lifting beam.
Further, on described lifting beam, be provided with for hanging the first hole of fixed pulley, on described lifting beam, be provided with the second hole for wire rope hoist cable wire end, make whole upending frame and winch so fine that to be used in conjunction with, the convenient assembly pulley of hanging.
Further, described support tube two ends are provided with reinforcement gusset, and the infall of described diagonal brace is provided with reinforcement gusset.Further play booster action.
Further, described support tube, diagonal brace and lifting beam are sheet material or section bar, convenient processing, and tooling cost is low.
Adopt above technical scheme, the obtained beneficial effect of the utility model is:
1, hang assembly pulley conveniently, and winch fag end is convenient fixing, the potential safety hazard that can not exist fag end impact lifting to bring;
2, intensity is high, and in the process of lifting head-rope, gantry upending frame there will not be bending, distortion;
3, alleviated labour intensity, do not needed crane to lift by crane, guaranteed the smooth and easy of cableway replacing ropeway carrying-rope, work efficiency is high.
4, simple in structure, tooling cost is low, and cost performance is high.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, technology of the present utility model is described in further detail:
Fig. 1 is the constructional drawing of the utility model cableway gantry upending frame;
Fig. 2 is the work schematic diagram of the utility model cableway gantry upending frame.
The specific embodiment
As shown in Figure 1, gantry upending frame, is arranged on ropeway supporting trestle and waves on saddle platform 5, lifts by crane ropeway carrying-rope while changing for ropeway carrying-rope, it comprises lifting beam 1, support tube 3, diagonal brace 4, support tube 3 is at least one, and diagonal brace 4 is at least one, and the present embodiment is provided with two support tubes 3 and two diagonal braces 4, support tube 3 is set up in parallel, lifting beam 1 is connected to support tube 3 one end, and diagonal brace 4 is arranged in a crossed manner between support tube 3, and diagonal brace 4 two ends are connected with support tube 3 ends respectively.
Above structure, has overcome former cableway gantry upending frame and has designed irrational problem, and intensity is large, is difficult for flexural deformation, also unstable phenomenon can not occur, and the weight of carrying is larger.
Between support tube 3 and lifting beam 1, be provided with tilt prop 2, support tube 3 two ends are provided with reinforcement gusset, the infall of diagonal brace 4 is also provided with reinforcement gusset, strengthen gusset and further strengthen the intensity of gantry upending frame, one end on lifting beam 1 is provided with the first hole 6 and the second hole 7, replacing for head-rope, the other end correspondence of lifting beam 1 is provided with the first hole 6 ' and the second hole 7 ', replacing for underloading rope, by shackle, fixed pulley is hung over to the first hole 6, by shackle, steel wire rope of windlass fag end is hung over to the second hole 7, weld together between support tube 3 and lifting beam 1, also weld together between diagonal brace 4 and support tube 3.
When actual fabrication, whole gantry upending frame is installed after making at the scene, install rear use crane the whole ropeway supporting trestle that hangs of gantry upending frame of making is waved on saddle platform 5, and cableway gantry upending frame and support are waved to saddle platform 5 and weld.Whole gantry upending frame is simple in structure, and cost of manufacture is very low, all adopts sheet material or section bar, and processing is simple.
As shown in Figure 2, work schematic diagram for cableway gantry upending frame lifting head-rope, cableway gantry upending frame of the Renewal process of underloading rope and head-rope and use is the same, upending frame whole support that is welded on ropeway supporting trestle 11 in described gantry waves on saddle platform 5, support waves and on saddle platform 5, is provided with heavy road and waves saddle He Qing road and wave saddle, described heavy road waves saddle He Qing road and waves the both sides that saddle is separately positioned on described cableway gantry upending frame, each ropeway supporting trestle 11 side arranges an electric winch 9, between described cableway gantry upending frame and ground, be provided with assembly pulley 16, the steel wire rope of windlass 10 of electric winch 9 twined on assembly pulley 16 other end was fixed on the second hole 7 by shackle 8, the middle part of described ropeway supporting trestle 11 is provided with butterfly platform 14, on butterfly platform 14, be provided with butterfly 15.
Lifting process is as follows:
1,, before changing head-rope, first ropeway supporting trestle 11 other electric winchs 9 are checked;
2, start cableway main frame, utilize hauling rope that new head-rope 13 is fixed, new head-rope 13 drops on butterfly platform 14;
3, on the upending frame of gantry, hang up properly shackle 8 and hang up properly assembly pulley 16, then steel wire rope of windlass 10 being wound on assembly pulley 16, one end of steel wire rope of windlass 10 is connected on the second hole 7 by shackle 8;
4, the butterfly 15 of removing outside, starts electric winch 9, and old head-rope 12 is hung out and is put into ground from waving saddle;
5, new head-rope 13 is hung oneself to and waved in the groove of saddle from butterfly platform 14;
6, the butterfly 15 of removing is installed, remove shackle, assembly pulley, whole lifting process completes.
Above-mentioned cableway gantry upending frame is reasonable in design, and intensity is large, is difficult for flexural deformation, can repeatedly use, and can be so fine that to be used in conjunction with winch, the convenient assembly pulley of hanging, work efficiency is high.
Finally it should be noted that: these are only preferred embodiment of the present utility model; be not limited to the utility model; although the utility model is had been described in detail with reference to embodiment; for a person skilled in the art; its technical scheme that still can record aforementioned each embodiment is modified; or part technical characterictic is wherein equal to replacement; but all within spirit of the present utility model and principle; any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (7)

1. cableway gantry upending frame, it is characterized in that: comprise lifting beam, at least one support tube and at least one diagonal brace, described support tube is set up in parallel, described lifting beam is connected to described support tube one end, described diagonal brace is arranged in a crossed manner between support tube, and the end of described diagonal brace is connected with the end of support tube respectively.
2. cableway according to claim 1 gantry upending frame, is characterized in that: between described support tube and lifting beam, be provided with tilt prop.
3. cableway according to claim 1 gantry upending frame, is characterized in that: on described lifting beam, be provided with for hanging the first hole of fixed pulley.
4. cableway according to claim 1 gantry upending frame, is characterized in that: on described lifting beam, be provided with the second hole for wire rope hoist cable wire end.
5. cableway according to claim 1 gantry upending frame, is characterized in that: described support tube two ends are provided with reinforcement gusset.
6. cableway according to claim 1 gantry upending frame, is characterized in that: the infall of described diagonal brace is provided with reinforcement gusset.
7. cableway according to claim 1 gantry upending frame, is characterized in that: described support tube, diagonal brace and lifting beam adopt sheet material or section bar.
CN201320457144.0U 2013-07-29 2013-07-29 Gantry lifting frame for cableway Expired - Lifetime CN203439948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320457144.0U CN203439948U (en) 2013-07-29 2013-07-29 Gantry lifting frame for cableway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320457144.0U CN203439948U (en) 2013-07-29 2013-07-29 Gantry lifting frame for cableway

Publications (1)

Publication Number Publication Date
CN203439948U true CN203439948U (en) 2014-02-19

Family

ID=50091016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320457144.0U Expired - Lifetime CN203439948U (en) 2013-07-29 2013-07-29 Gantry lifting frame for cableway

Country Status (1)

Country Link
CN (1) CN203439948U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108163705A (en) * 2016-12-07 2018-06-15 中电普瑞电力工程有限公司 A kind of portal frame
CN113003436A (en) * 2021-02-26 2021-06-22 泉州芸台科技有限公司 Prevent electric hoist of girder deformation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108163705A (en) * 2016-12-07 2018-06-15 中电普瑞电力工程有限公司 A kind of portal frame
CN113003436A (en) * 2021-02-26 2021-06-22 泉州芸台科技有限公司 Prevent electric hoist of girder deformation
CN113003436B (en) * 2021-02-26 2023-04-07 泉州芸台科技有限公司 Prevent electric hoist of girder deformation

Similar Documents

Publication Publication Date Title
CN105621280B (en) The apparatus and method for mounting and dismounting crane arm
CN205934747U (en) A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN205011284U (en) A simple and easy hoisting apparatus for rack high altitude is in bulk
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN202848940U (en) Chamber roof truss overall declining removal device of large gas chamber
CN203439948U (en) Gantry lifting frame for cableway
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN205527435U (en) Installation and device of dismantling jib loading boom
CN206065298U (en) A kind of suspension type reinforcement cage processing device
CN203795311U (en) Multi-leg high pier and slip form construction device
CN103072513A (en) Multifunctional construction vehicle for high-tension line construction
CN202643090U (en) Aluminium profile hanging basket
CN208869199U (en) A kind of overturning Lift-on/Lift-off System for horizontal equipment
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN211169652U (en) Portable small-size concrete pipe transportation and hoist device
CN202865749U (en) Installation equipment of bridge guardrail framework
CN206142648U (en) Supplementary support body of heavy panel hoist and mount
CN205590207U (en) Hoisting device who uses during drop test
CN103498965B (en) Overturning and supporting device of jacket stand sheet
CN209702095U (en) A kind of wire rod lifting device
CN206735623U (en) Framework of steel reinforcement hanging apparatus
CN206156546U (en) Ore hoisting device is used in mine
CN205500638U (en) Simply hoist transportation equipment
CN216583764U (en) Steel reinforcement framework integral hoisting auxiliary device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140219