CN203128099U - Slipping type pipeline lifting device - Google Patents

Slipping type pipeline lifting device Download PDF

Info

Publication number
CN203128099U
CN203128099U CN 201320115666 CN201320115666U CN203128099U CN 203128099 U CN203128099 U CN 203128099U CN 201320115666 CN201320115666 CN 201320115666 CN 201320115666 U CN201320115666 U CN 201320115666U CN 203128099 U CN203128099 U CN 203128099U
Authority
CN
China
Prior art keywords
arm
lifting
lashing
pulley
walking bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320115666
Other languages
Chinese (zh)
Inventor
卢启东
贾德祥
刘智敏
张安学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Changda Construction Group Ltd
Original Assignee
Weifang Changda Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Changda Construction Group Ltd filed Critical Weifang Changda Construction Group Ltd
Priority to CN 201320115666 priority Critical patent/CN203128099U/en
Application granted granted Critical
Publication of CN203128099U publication Critical patent/CN203128099U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a slipping type pipeline lifting device which comprises a bottom running support, a lifting component and a traction device. The lifting component and the traction device are arranged on the bottom running support. The lifting component comprises a lifting arm, the bottom of the lifting arm is hinged with the bottom running support, pulleys are arranged at the top of the lifting arm, and a sealing rope is arranged between the lifting arm and the bottom running support. The traction device comprises a winch, a lifting steel wire rope and a lifting hook, the winch is arranged on the rear side of the bottom running support, one end of the lifting steel wire rope is wound on the winch and connected with the lifting hook through one pulley, and the lifting arm is hinged with the bottom running support. A rear sealing rope of the lifting arm is released through a turn buckle, and then the lifting arm can incline forwards by 90 degrees to the bottom running support, so that the whole device can pass through narrow spaces such as gateways. Balancing weights are arranged on two rear sides of the bottom running support, so that the center of gravity of the slipping type pipeline lifting device is maintained conveniently during pipeline lifting. By the aid of the traction device, pipeline lifting is facilitated, and labor intensity is reduced.

Description

Sliding pipeline hanging apparatus
Technical field
The utility model relates to a kind of engineering construction apparatus, specifically, relates to a kind of sliding pipeline hanging apparatus, belongs to construction engineering technical field.
Background technology
Built on stilts, the lifting of carrying out intensive pipeline in small spaces such as the corridor of skyscraper, equipment room are the work of hardships and dangers.At present, normally need several lifting personnel in advance the ceiling directly over the pipeline of needs liftings small-sized lift heavy equipment such as jack are installed, pipeline is fixed on the coupled chain sling lifts again.Every lifting finishes a pipe joint road, all will repeat to install jack, restrained line, complicated operations steps such as careful lifting.This hoisting technology is time-consuming taking a lot of work, and inefficiency, poor stability.Simultaneously, pipeline is at the construction field (site) repeatedly carried equally can waste lot of manpower and material resources, the progress of influence construction.
The utility model content
The technical problems to be solved in the utility model is at above deficiency, and a kind of sliding pipeline overhead hoist that is used for the camp site of simple in structure, easy to use, high efficiency is provided.
For solving above technical matters, the technical solution adopted in the utility model is as follows: sliding pipeline hanging apparatus is characterized in that: described sliding pipeline hanging apparatus comprises bottom walking bearing and is arranged on lifting assembly, draw gear on the bottom walking bearing;
Described lifting assembly comprises arm, and the bottom of arm and bottom walking bearing are hinged;
The top of described arm is equipped with pulley;
Be provided with lashing between described arm and the bottom walking bearing;
Described draw gear comprises winch, lifting steel rope and suspension hook, and winch is arranged on the rear side of bottom walking bearing, and an end of lifting steel rope is wrapped on the winch, and is connected with suspension hook by pulley.
A kind of prioritization scheme, described pulley comprises first pulley, described first pulley is installed in the top of arm;
Second pulley, described second pulley is installed in the middle part of arm;
The 3rd pulley, the top of described arm is provided with strut, and the 3rd pulley is installed in the end of strut.
Described arm is provided with to climb and pedals.
Another kind of prioritization scheme, described bottom walking bearing is provided with arm location bearing regulating control, and the arm below is provided with the base combined hole, and arm is hinged by arm location bearing regulating control, base combined hole and bottom walking bearing.
Another prioritization scheme, the both sides at described bottom walking bearing rear portion are respectively arranged with clump weight.
Further prioritization scheme, lashing and back lashing before described lashing comprises.
Further prioritization scheme again, the front side of described arm is provided with arm lashing set collar, lashing set collar before the front side of bottom walking bearing is provided with, preceding lashing is arranged between arm lashing set collar and the preceding lashing set collar.
Prioritization scheme further, the rear side of described arm is provided with the flower basket bolt link, and the rear side of bottom walking bearing is provided with back lashing set collar, and back lashing is arranged between flower basket bolt link and the back lashing set collar.
A kind of concrete prioritization scheme, the bottom of described bottom walking bearing is provided with cardan wheel.
The utility model adopts above technical scheme, compared with prior art, have the following advantages: arm is hinged by arm location bearing regulating control, base combined hole and bottom walking bearing, discharge the back lashing of arm by flower basket bolt, arm just can turn forward 90 degree to bottom walking bearing, is convenient to whole device by small spaces such as doorways; Settle clump weight in walking both sides, bearing rear portion, bottom, be convenient to keep the center of gravity of sliding pipeline hanging apparatus when the lifting pipeline; Draw gear is convenient to lift pipeline and is reduced labour intensity; Be provided with to climb in the arm left and right sides and pedal, be convenient to adjust angle and the ascend operation that will lift pipeline.
Below in conjunction with drawings and Examples the utility model is described further.
Description of drawings
Accompanying drawing 1 is the structural representation of sliding pipeline hanging apparatus among the utility model embodiment;
Accompanying drawing 2 is right elevations of accompanying drawing 1;
Accompanying drawing 3 is structural representations of walking bearing in bottom among the utility model embodiment;
Accompanying drawing 4 is structural representations of arm among the utility model embodiment;
Among the figure,
1-the 3rd pulley, 3-first pulley, 7-second pulley, 2-lifts steel rope, 4-flower basket bolt link, 5-arm, the 6-flower basket bolt, lashing before the lashing behind the 8-, 12-, 9,10,13-climbs and pedals, 11-arm lashing set collar, 14-winch, 15-arm location bearing regulating control, the 16-clump weight, 17-bottom walking bearing, 18-cardan wheel, 19-base combined hole, 20-winch fixed orifice, 21, lashing set collar before the 25-, 26, lashing set collar behind the 27-, 22,23,24-bottom walking bearing girt strip, the 28-suspension hook, 29-steel rope set collar.
The specific embodiment
Embodiment, as Fig. 1, Fig. 2, shown in Figure 3, sliding pipeline hanging apparatus, lifting assembly, draw gear on the bearing 17 of walking by bottom walking bearing 17 and bottom being arranged on constitute.
Four jiaos of walking bearing 17 bottoms, bottom respectively are provided with a cardan wheel 18, lashing set collar 21 and preceding lashing set collar 25 before the front side of bottom walking bearing 17 is provided with, and the rear side of bottom walking bearing 17 is provided with back lashing set collar 26 and back lashing set collar 27.
In order to connect arm 5 and bottom walking bearing 17, be provided with arm location bearing regulating control 15 at described bottom walking bearing 17, in order to keep the center of gravity of sliding pipeline hanging apparatus when lifting pipeline, settle clump weight 16 in walking both sides, bearing 17 rear portion, bottom, for winch 14 is installed, rear side at described bottom walking bearing 17 is provided with four winch fixed orifices 20, in order to guarantee the structural strength of described bottom walking bearing 17, in described bottom walking bearing 17, be provided with bottom walking bearing girt strip 22, bottom walking bearing girt strip 23, bottom walking bearing girt strip 24, bottom walking bearing 17 and bottom walking bearing girt strip 22, bottom walking bearing girt strip 23, bottom walking bearing girt strip 24 adopts the 12# channel-section steel to make.
For the ease of lifting pipeline and reduction labour intensity, described draw gear is made of winch 14, lifting steel rope 2, suspension hook 28.Winch 14 is fixed on the bottom walking bearing 17 by winch fixed orifice 20, one end of lifting steel rope 2 is wrapped on the winch 14, and be connected with suspension hook 28 by second pulley 7, first pulley 3, the 3rd pulley 1 successively, the other end of lifting steel rope 2 is fixing with the steel rope set collar 29 that is arranged on the strut 30.
As shown in Figure 4, the lifting assembly comprises arm 5, the bottom of arm 5 is fixed on the bottom walking bearing 17, the top of arm 5 is equipped with first pulley 3, the top of arm 5 is provided with strut 30, the end of strut 30 is provided with the 3rd pulley 1, the middle part of arm 5 is equipped with second pulley 7, arm 5 adopts steel pipe to make, be provided with arm lashing set collar 11 in arm 5 front sides, arm lashing set collar 11 and preceding lashing set collar 21, be respectively equipped with a preceding lashing 12 between the preceding lashing set collar 25, be provided with flower basket bolt link 4 at arm 5 rear sides, flower basket bolt link 4 is by flower basket bolt 6 and back lashing set collar 26, lashing 8 after being respectively equipped with one between the back lashing set collar 27, preceding lashing 12, back lashing 8 is made by safe steel rope.Arm lashing set collar 11 and flower basket bolt link 4 adopt the metallic material of identical material to make, and are solidified as a whole with arm 5.For the ease of adjusting angle and the ascend operation will lift pipeline, be provided with in arm 5 left and right sides to climb and pedal 9, climb and pedal 10 and climb and pedal 13, described climbing pedaled the employing angle bar and made.In order to connect arm 5 and bottom walking bearing 17, below described arm 5, be provided with base combined hole 19, arm 5 is hinged with bottom walking bearing 17 by arm location bearing regulating control 15, base combined hole 19.
The work progress of the sliding pipeline hanging apparatus of the utility model is as follows:
Earlier pipeline 31 is hung on the suspension hook 28 during lifting, slowly starts winch 14 then, make pipeline 31 slowly put down rising, need examine whether run-off the straight phenomenon of gig this moment, and in time the manual synchronizing clump weight prevents the gig unstability.After pipeline 31 rose to design height, slow mobile gig penetrated pipeline 31 in the suspension and support.When laying pipeline 31, positions such as each pulley of scrutiny, steel rope, winch, suspension centre and crossbeam are confirmed can formally lift behind the trouble free again.Slowly lifting of formal lifting, lifting speed must not be too fast.The people that stands is forbidden in pipeline below during lifting, avoid because may become flexible during the pipeline lifting, the personnel that cause such as landing injure.When the pipeline prosopyle passes through suspension and support, according to circumstances in time adjust pipeline location, prevent that cement concrete, the sleeve pipe of pipeline and suspension and support and periphery from colliding with.
This device pedestal has cardan wheel, the work progress conveniently moving, and when passing through small spaces such as doorway, can discharge the back lashing of arm rear side by flower basket bolt, it is separated with arm; Vertical arm just can turn forward 90 degree to bottom walking bearing.But whole device and safe and free pass through small space such as doorway.
It should be noted that at last: the above only is the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment the present invention is had been described in detail, for a person skilled in the art, it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. sliding pipeline hanging apparatus is characterized in that: described sliding pipeline hanging apparatus comprises bottom walking bearing (17) and is arranged on lifting assembly, draw gear on the bottom walking bearing (17);
Described lifting assembly comprises arm (5), and the bottom of arm (5) and bottom walking bearing (17) are hinged;
The top of described arm (5) is equipped with pulley;
Be provided with lashing between described arm (5) and the bottom walking bearing (17);
Described draw gear comprises winch (14), lifting steel rope (2) and suspension hook (28), winch (14) is arranged on the rear side of bottom walking bearing (17), one end of lifting steel rope (2) is wrapped on the winch (14), and is connected with suspension hook (28) by pulley.
2. sliding pipeline hanging apparatus as claimed in claim 1, it is characterized in that: described pulley comprises first pulley (3), described first pulley (3) is installed in the top of arm (5);
Second pulley (7), described second pulley (7) is installed in the middle part of arm (5);
The 3rd pulley (1), the top of described arm (5) is provided with strut (30), and the 3rd pulley (1) is installed in the end of strut (30).
3. sliding pipeline hanging apparatus as claimed in claim 1 or 2, it is characterized in that: described arm (5) is provided with to climb pedals (9,10,13).
4. sliding pipeline hanging apparatus as claimed in claim 1 or 2, it is characterized in that: described bottom walking bearing (17) is provided with arm location bearing regulating control (15), arm (5) below is provided with base combined hole (19), and arm (5) is hinged with bottom walking bearing (17) by arm location bearing regulating control (15), base combined hole (19).
5. sliding pipeline hanging apparatus as claimed in claim 1 or 2 is characterized in that: the both sides at described bottom walking bearing (17) rear portion are respectively arranged with clump weight (16).
6. sliding pipeline hanging apparatus as claimed in claim 1 or 2 is characterized in that: described lashing comprises preceding lashing (12) and back lashing (8).
7. sliding pipeline hanging apparatus as claimed in claim 6, it is characterized in that: the front side of described arm (5) is provided with arm lashing set collar (11), lashing set collar (21,25) before the front side of bottom walking bearing (17) is provided with, preceding lashing (12) is arranged between arm lashing set collar (11) and the preceding lashing set collar (21,25).
8. sliding pipeline hanging apparatus as claimed in claim 6, it is characterized in that: the rear side of described arm (5) is provided with flower basket bolt link (4), the rear side of bottom walking bearing (17) is provided with back lashing set collar (26,27), and back lashing (8) is arranged between flower basket bolt link (4) and the back lashing set collar (26,27).
9. sliding pipeline hanging apparatus as claimed in claim 1 is characterized in that: the bottom of described bottom walking bearing (17) is provided with cardan wheel (18).
CN 201320115666 2013-03-14 2013-03-14 Slipping type pipeline lifting device Expired - Fee Related CN203128099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320115666 CN203128099U (en) 2013-03-14 2013-03-14 Slipping type pipeline lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320115666 CN203128099U (en) 2013-03-14 2013-03-14 Slipping type pipeline lifting device

Publications (1)

Publication Number Publication Date
CN203128099U true CN203128099U (en) 2013-08-14

Family

ID=48936097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320115666 Expired - Fee Related CN203128099U (en) 2013-03-14 2013-03-14 Slipping type pipeline lifting device

Country Status (1)

Country Link
CN (1) CN203128099U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105752872A (en) * 2016-04-29 2016-07-13 张哲瑜 Pole-mounted circuit breaker lifting device
CN105948237A (en) * 2016-07-15 2016-09-21 蓝海环境工程有限公司 Overwater driving type underwater water impeller
CN108506568A (en) * 2018-06-27 2018-09-07 西安西电开关电气有限公司 The draft gear and traction method of pipeline are lifted in vertical shaft
CN108773784A (en) * 2018-07-17 2018-11-09 北京市第三建筑工程有限公司 lifter
WO2022084229A1 (en) * 2020-10-22 2022-04-28 Autostore Technology AS Container handling vehicle with increased stability

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105752872A (en) * 2016-04-29 2016-07-13 张哲瑜 Pole-mounted circuit breaker lifting device
CN105752872B (en) * 2016-04-29 2019-01-22 陈朱亨 A kind of pole-mounted circuit breaker boom hoisting
CN105948237A (en) * 2016-07-15 2016-09-21 蓝海环境工程有限公司 Overwater driving type underwater water impeller
CN108506568A (en) * 2018-06-27 2018-09-07 西安西电开关电气有限公司 The draft gear and traction method of pipeline are lifted in vertical shaft
CN108773784A (en) * 2018-07-17 2018-11-09 北京市第三建筑工程有限公司 lifter
WO2022084229A1 (en) * 2020-10-22 2022-04-28 Autostore Technology AS Container handling vehicle with increased stability

Similar Documents

Publication Publication Date Title
CN203128099U (en) Slipping type pipeline lifting device
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN205387439U (en) Mast hoisting accessory
CN206486233U (en) A kind of installing engineering Special elevator
CN103523683A (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN208413709U (en) Unit type glass curtain wall double-ring track hoisting system
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN105621280A (en) Device and method for mounting and dismounting crane boom
CN205397854U (en) Gasifier hoist and mount hoisting device
CN102602834B (en) Platform-free lifting method and system of installing large rectangular devices to high-rise buildings
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN103708360B (en) Swing arm tower crane, standard knot introduction system thereof and standard knot introduction method
CN204827251U (en) Novel suit derrick upright
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN202379620U (en) Lifting and operating platform comprehensive equipment
CN204342257U (en) A kind of large-scale component turning device
CN204418629U (en) Integrated form climbs frame
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN203874306U (en) Rescue vehicle for climbing building
CN103977512A (en) Building climbing rescue vehicle
CN202718381U (en) Transfer-free lifting device
CN105110205A (en) Reverse disassembling method for tower crane
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN211006334U (en) Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20210314

CF01 Termination of patent right due to non-payment of annual fee