CN204418629U - Integrated form climbs frame - Google Patents
Integrated form climbs frame Download PDFInfo
- Publication number
- CN204418629U CN204418629U CN201420827849.1U CN201420827849U CN204418629U CN 204418629 U CN204418629 U CN 204418629U CN 201420827849 U CN201420827849 U CN 201420827849U CN 204418629 U CN204418629 U CN 204418629U
- Authority
- CN
- China
- Prior art keywords
- wall
- main frame
- guide rail
- supporting seat
- integrated form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 claims description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 230000007306 turnover Effects 0.000 claims description 4
- 238000005452 bending Methods 0.000 claims description 3
- 230000004224 protection Effects 0.000 description 6
- 238000009435 building construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000001681 protective effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 206010057071 Rectal tenesmus Diseases 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 230000004983 pleiotropic effect Effects 0.000 description 1
- 208000012271 tenesmus Diseases 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides an integrated form climbs frame, including fixing on the wall body or can bear on the roof beam of load attach the wall support, be equipped with the guide rail and can pass through the guide rail is in attach gliding main frame on the wall support, still include wire rope, wire rope one end is fixed attach on the wall support, the other end is walked around and is installed the loose pulley assembly of main frame bottom connects on the hoisting beam of main frame, be equipped with control on the hoisting beam the electric block that wire rope promoted. The utility model discloses an integrated form climbs the frame, becomes the low department operation with the eminence operation, becomes the inside operation of support body with unsettled operation, and the support body is pleasing to the eye, sets up simply, does not occupy tower crane hoist and mount time, has shortened the time limit for a project greatly, has saved manual work and material cost, has good security performance and economic nature.
Description
Technical field
The utility model relates to technical field of building construction, the integrated form climbing frame of particularly a kind of external wall of high-rise building construction.
Background technology
In recent years, along with the fast development of China's economy, high-rise, super highrise building gets more and more, and usually uses double protection outrigger, namely set up console mode, overall height totally enclosed fastener type double-row steel pipe scaffold in building surrounding in traditional external wall of high-rise building construction.The scaffold consumable quantity of this structure is large, cost is high, labour drops into many, and labour intensity is large, and operating environment is dangerous, long construction period, progress is slow, and tower crane occupancy is high, and is unfavorable for the insertion of secondary structure, also bad to project economic situation of Profit, therefore need high, the artificial less investment of a kind of regularization degree and can the climbing frame of Integral lifting.
Utility model content
The utility model proposes a kind of integrated form climbing frame, solve the problems such as double protection outrigger consumable quantity in prior art is large, cost is high, artificial input is many, poor stability.
The technical solution of the utility model is achieved in that a kind of integrated form climbing frame, comprise be fixed on body of wall or can wall-attached supporting seat on the beam of bearing load, guide rail is housed and the main frame that can be slided on described wall-attached supporting seat by described guide rail, also comprise wire rope, described wire rope one end is fixed on described wall-attached supporting seat, the other end walks around the pulley assembly be arranged on bottom described main frame, be connected in the lifting beam of described main frame, described lifting beam is provided with the electric block controlling described rope hoisting.Wall-attached supporting seat is installed on structural shear wall or carrier bar, wall-attached supporting seat is installed guide wheel and is connected with the guide rail on main frame, electric block is arranged in the lifting beam on main frame, wire rope one end to be arranged on wall-attached supporting seat and painstaking pretension, the other end is through the pulley assembly bottom main frame, be connected on the hook of the electric block be arranged in main frame lifting beam, main frame can be realized like this and depend on the upper and lower relative motion of wall-attached supporting seat by guide rail, thus realize the elevating movement of main frame.
Described guide rail is provided with multiple anti-fall baffle plate perpendicular to described guide rail, and described wall-attached supporting seat is provided with the catching device matched with described anti-fall baffle plate.The effect of catching device automatically can hold guide rail when main frame falls under abnormal condition.During propradation, catching device swings all the time in the anti-fall plate of guide rail, and when main frame drops suddenly, the anti-fall baffle plate of guide rail held by catching device, stops main frame to continue to glide.
Described wall-attached supporting seat is provided with anti-dumping guide wheel group, and described guide rail is provided with the slideway matched with described anti-dumping guide wheel group.Main frame can only move up and down along guide rail slideway and cannot topple over inward or outward, thus plays anti-dumping effect.
In order to further improve safety, described main frame outside is provided with protective screening, and every layer operation platform is all laid with bending checkered steel plate, and between steel plate and main frame, gap steel turnover panel covers tightly.
The utility model adopts integrated form climbing frame to replace console mode external scaffolding, builder's jack, this integrated form climbing frame is set up certain altitude and is attached in engineering structures, rely on self jacking equipment and device, can successively climb with engineering structures or decline, high-rise working is become lower operation by it, hanging operation is become support body inside processing, support body is attractive in appearance, set up simple, do not take the tower crane lifting time, security performance is high, substantially reduce the duration, save artificial and Master Cost, alien invasion is provided with protective screening integral protection, main frame is furnished with fall arrest, the multiple protectives such as anti-tilting apparatus, there is good security performance and economy.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the first embodiment structural representation of a kind of integrated form climbing frame of the utility model;
Fig. 2 is the utility model anti-drop system schematic diagram;
Fig. 3 is the utility model anti-roll system schematic diagram;
Fig. 4 is a kind of integrated form climbing frame of the utility model the second embodiment structural representation;
Fig. 5 is the third embodiment structural representation of a kind of integrated form climbing frame of the utility model.
Mark in figure, 1, body of wall; 1a, carrier bar; 2, wall-attached supporting seat; 3, guide rail; 4, main frame; 5, wire rope; 6, pulley assembly; 7, lifting beam; 8, electric block; 9, anti-fall baffle plate; 10, catching device; 11, anti-dumping guide wheel group; 12, slideway; 13, through-wall bolt; 14, oblique pull wire rope; 15, horizontal gird.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
In figure, wall-attached supporting seat 2 to be fixed on body of wall 1 or can on the beam (1a) of bearing load, main frame 4 be equipped with guide rail 3 and can be slided on wall-attached supporting seat 2 by guide rail 3, wire rope 5 one end is fixed on wall-attached supporting seat 2, the other end walks around the pulley assembly 6 be arranged on bottom main frame 4, be connected in the lifting beam 7 of main frame 4, lifting beam 7 is provided with the electric block 8 controlling wire rope 5 and promote.Guide rail 3 is provided with multiple anti-fall baffle plate 9 perpendicular to guide rail 3, and wall-attached supporting seat 2 is provided with catching device 10.Wall-attached supporting seat 2 is provided with anti-dumping guide wheel group 11, and the both sides of guide rail 3 are provided with the slideway 12 matched with anti-dumping guide wheel group 11.For the sake of security, the outside of main frame 4 is all provided with safety guard net, and every layer operation platform of main frame 4 is all laid with bending checkered steel plate, and between steel plate and main frame 4, gap steel turnover panel covers tightly, and at utmost ensures constructing operation personal security.
When execution is climbed and is operated, first comprehensively climbing device and main frame 4 is checked, then pretension is debugged to electric block 8, main frame 4 is promoted to a upper floor or assigned address by wire rope 3, after in place, socket fixing to main frame 4, now wall-attached supporting seat 2 turnover can be installed to installation site, upper strata, prepare to be elevated circulation next time.
Anti-fall principle of the present utility model is such: as shown in Figure 2, guide rail 3 is fixed on main frame 4, guide rail 3 is provided with multiple anti-fall baffle plate 9 perpendicular to guide rail 3, catching device 10 is arranged in each wall-attached supporting seat 2, during propradation, catching device 10 swings all the time in the anti-fall baffle plate 9 of guide rail 3, when main frame 4 drops suddenly, the anti-fall baffle plate 9 of guide rail 3 held by catching device 10, thus stops main frame 4 to continue tenesmus.Owing to being all equipped with catching device 10 in each wall-attached supporting seat 2, so Pleiotropic Protections can be provided, increase safety.
Anti-inclination principle of the present utility model is such: as shown in Figure 3, wall-attached supporting seat 2 is fixed on body of wall 1 by through-wall bolt, wall-attached supporting seat 2 is provided with anti-dumping guide wheel group 11, guide rail 3 two sides are provided with the slideway 12 matched with anti-dumping guide wheel group 11, anti-dumping guide wheel group 11 is positioned at the outside of guide rail 3, main frame 4 can only move up and down along guide rail 3 and cannot topple over inward or outward, thus plays anti-dumping effect.
Fig. 1 is the first embodiment of the present utility model, and body of wall 1 is shear wall, and external surface is more smooth, at this moment the wall-attached supporting seat 2 corbel type bearing that structure can be adopted comparatively compact.
Fig. 4 is the second embodiment of the present utility model, and body of wall 1 is shear wall, but external surface is not too smooth, has other blocking structures, is unfavorable for that integrated form climbing frame is installed, at this moment the wall-attached supporting seat 2 triangle supporting bearing that physical dimension can be adopted larger.
Fig. 5 is the third embodiment of the present utility model, weight body is carrier bar 1a, and this carrier bar 1a exists only in each deck, at this moment wall-attached supporting seat 2 can adopt as Fig. 5 form, be fixed on carrier bar 1a by horizontal gird 15 one end through-wall bolt 13 of wall-attached supporting seat 2, the other end utilizes oblique pull wire rope 14 to be fixed on the carrier bar of a deck.Avoid the problem that wall-attached supporting seat 2 structure is excessive like this, be convenient to dismounting and recycle.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (4)
1. an integrated form climbing frame, comprise and be fixed on the wall-attached supporting seat (2) of body of wall (1) above or on the beam (1a) of energy bearing load, guide rail (3) is housed and the main frame (4) that above can be slided at described wall-attached supporting seat (2) by described guide rail (3), it is characterized in that: also comprise wire rope (5), described wire rope (5) one end is fixed on described wall-attached supporting seat (2), the other end walks around the pulley assembly (6) being installed on described main frame (4) bottom, be connected in the lifting beam (7) of described main frame (4), described lifting beam (7) is provided with the electric block (8) controlling described wire rope (5) and promote.
2. a kind of integrated form climbing frame according to claim 1, it is characterized in that, described guide rail (3) is provided with multiple anti-fall baffle plate (9) perpendicular to described guide rail (3), and described wall-attached supporting seat (2) is provided with the catching device (10) matched with described anti-fall baffle plate (9).
3. a kind of integrated form climbing frame according to claim 2, it is characterized in that, described wall-attached supporting seat (2) is provided with anti-dumping guide wheel group (11), and described guide rail (3) is provided with the slideway (12) matched with described anti-dumping guide wheel group (11).
4. a kind of integrated form climbing frame according to any one of claims 1 to 3 claim, it is characterized in that, described main frame (4) outside is provided with shoulder guard net, and every layer operation platform is all laid with bending checkered steel plate, between steel plate and main frame (4), gap steel turnover panel covers tightly.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420827849.1U CN204418629U (en) | 2014-12-24 | 2014-12-24 | Integrated form climbs frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420827849.1U CN204418629U (en) | 2014-12-24 | 2014-12-24 | Integrated form climbs frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204418629U true CN204418629U (en) | 2015-06-24 |
Family
ID=53469012
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420827849.1U Expired - Fee Related CN204418629U (en) | 2014-12-24 | 2014-12-24 | Integrated form climbs frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204418629U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106150057A (en) * | 2016-08-24 | 2016-11-23 | 中国三冶集团有限公司 | A kind of split blade type hydraulic pressure lift climbing frame |
| CN107675870A (en) * | 2016-08-01 | 2018-02-09 | 河北盛卓建筑设备制造有限公司 | The Novel hoisting mechanism of the completely adjustable attachment type raise scaffold in seat in the plane |
| CN111456527A (en) * | 2020-04-13 | 2020-07-28 | 上海建工二建集团有限公司 | An externally mounted integral lifting enclosure system |
| CN112302326A (en) * | 2020-10-29 | 2021-02-02 | 中国建筑第八工程局有限公司 | Self-climbing safety hard protection and hoisting integrated platform and construction method thereof |
| CN112942790A (en) * | 2021-04-08 | 2021-06-11 | 中国华西企业有限公司 | Cantilever climbing device and construction method of cantilever structure |
-
2014
- 2014-12-24 CN CN201420827849.1U patent/CN204418629U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107675870A (en) * | 2016-08-01 | 2018-02-09 | 河北盛卓建筑设备制造有限公司 | The Novel hoisting mechanism of the completely adjustable attachment type raise scaffold in seat in the plane |
| CN106150057A (en) * | 2016-08-24 | 2016-11-23 | 中国三冶集团有限公司 | A kind of split blade type hydraulic pressure lift climbing frame |
| CN106150057B (en) * | 2016-08-24 | 2018-12-04 | 中国三冶集团有限公司 | A kind of split blade type hydraulic pressure lift climbing frame |
| CN111456527A (en) * | 2020-04-13 | 2020-07-28 | 上海建工二建集团有限公司 | An externally mounted integral lifting enclosure system |
| CN112302326A (en) * | 2020-10-29 | 2021-02-02 | 中国建筑第八工程局有限公司 | Self-climbing safety hard protection and hoisting integrated platform and construction method thereof |
| CN112942790A (en) * | 2021-04-08 | 2021-06-11 | 中国华西企业有限公司 | Cantilever climbing device and construction method of cantilever structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205077885U (en) | Hydraulic intelligent climbing protection platform for core tube of building | |
| CN204418629U (en) | Integrated form climbs frame | |
| CN201714054U (en) | Climbing platform system for construction of elevator shaft of high-rise building | |
| CN201826542U (en) | Self-climbing protective screening | |
| CN201923740U (en) | Construction operation hanging basket for installing elevators | |
| CN202144437U (en) | Standing type single-person hanging seat device | |
| CN208814562U (en) | A kind of visualization formula glass curtain wall plate vertical transit system | |
| CN205637541U (en) | Balanced automatic hanging flower basket | |
| CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
| CN113137052A (en) | Self-climbing safety hard protection and curtain wall circular rail hoisting integrated platform | |
| CN206971760U (en) | A kind of full steel structure assembled climbs material platform | |
| CN109653484A (en) | A kind of roofing superelevation faces the plug-in hanging basket mounting structure of sky curtain wall engineering | |
| CN106315426A (en) | Block form tower crane mounting and jacking method for assembled building | |
| CN102828608A (en) | Hydraulic climbing protection device for high-rise building construction | |
| CN203128099U (en) | Slipping type pipeline lifting device | |
| CN204850497U (en) | Promote no lower hem material platform | |
| CN204626930U (en) | Integrated lifting frame operating platform | |
| CN103991800A (en) | Roof surface crane for building | |
| CN202731270U (en) | Movable platform for aerial installation operation of space steel structure | |
| CN205242983U (en) | Reduce inserted lift scaffold who promotes turnover | |
| CN103977512B (en) | One is climbed building and is sued and laboured car | |
| CN205314595U (en) | Elevartor shaft protection frame | |
| CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
| CN206219113U (en) | One kind lifting chassis | |
| CN216196501U (en) | Construction is with fixed hanging flower basket of no support |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150624 Termination date: 20151224 |
|
| EXPY | Termination of patent right or utility model |