CN211006334U - Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge - Google Patents

Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge Download PDF

Info

Publication number
CN211006334U
CN211006334U CN201921424205.7U CN201921424205U CN211006334U CN 211006334 U CN211006334 U CN 211006334U CN 201921424205 U CN201921424205 U CN 201921424205U CN 211006334 U CN211006334 U CN 211006334U
Authority
CN
China
Prior art keywords
tower
hanging
operation platform
inverted
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201921424205.7U
Other languages
Chinese (zh)
Inventor
罗东伟
马骉
蒋彦征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201921424205.7U priority Critical patent/CN211006334U/en
Application granted granted Critical
Publication of CN211006334U publication Critical patent/CN211006334U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,塔中吊点装置利用重力卡在倒Y形塔柱的中部,塔中吊点装置包括环形骨架、轨道、电动行走轮,轨道横桥向设置在环形骨架的下方,电动行走轮卡在轨道上,可沿轨道横桥向行走;悬吊操作平台,2个滑动挂篮对称挂在中间吊篮两侧,可沿中间吊篮顺桥向滑动;吊绳将悬吊操作平台与塔中吊点装置进行连接,带动悬吊操作平台进行竖向升降。本实用新型的检修设备因塔中吊点装置利用重力卡在塔柱中部,不需在塔柱设置锚固件,减少了对塔柱结构的影响;悬吊操作平台可三向移动,能避开斜拉索干涉,可实现对倒Y形塔柱内侧面的全覆盖检修;检修施工时,由于施工影响范围小,对桥面行车影响小。

Figure 201921424205

A three-way movable cable-stayed bridge maintenance equipment for the inner side of the inverted Y-shaped tower column, the hanging point device in the tower is stuck in the middle of the inverted Y-shaped tower column by gravity, and the hanging point device in the tower includes a ring frame, a track, an electric The walking wheel, the horizontal bridge of the track is arranged under the ring frame, the electric walking wheel is stuck on the track, and can walk along the horizontal bridge of the track; the suspension operation platform, two sliding hanging baskets are symmetrically hung on both sides of the middle hanging basket, which can It slides along the bridge along the middle hanging basket; the hanging rope connects the suspension operation platform with the hanging point device in the tower, and drives the suspension operation platform to lift vertically. The maintenance equipment of the utility model uses gravity to be stuck in the middle of the tower column because the hanging point device in the tower does not need to set anchors on the tower column, which reduces the influence on the structure of the tower column; the suspension operation platform can move in three directions and can avoid The interference of the stay cable can realize the full-coverage maintenance of the inner side of the inverted Y-shaped tower; during the maintenance construction, due to the small impact range of the construction, the impact on the traffic on the bridge deck is small.

Figure 201921424205

Description

一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备A maintenance equipment for the inner side of the inverted Y-shaped tower column of a three-way movable cable-stayed bridge

技术领域technical field

本实用新型涉及桥梁维修的技术领域,具体地说是一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备。The utility model relates to the technical field of bridge maintenance, in particular to a maintenance device for the inner side of an inverted Y-shaped tower column of a three-way movable cable-stayed bridge.

背景技术Background technique

斜拉桥因优美的外形、合理的受力、较大的跨越能力在桥梁工程领域中得到了广泛的应用。斜拉桥塔柱作为主要承载构件,承受通过斜拉索传递过来的各种荷载,在桥梁运营过程中,因结构安全要求需对塔柱进行检查、维护或者因景观要求需对塔柱进行涂装、装饰。对于倒Y形塔柱的下部分叉塔柱,存在内侧面向内倾斜和内侧面存在0#拉索干涉等问题,如何对倒Y形塔柱下部分叉塔柱内侧面检修是一个难题。因此有必要研发一种检修设备,这种检修设备能满足重量轻、操作方便、可实现对倒Y形塔柱下部分叉塔柱内侧面检修且不受斜拉索等障碍物影响等要求。Cable-stayed bridges have been widely used in the field of bridge engineering due to their graceful appearance, reasonable stress and large spanning capacity. Cable-stayed bridge pylons, as the main bearing components, bear various loads transmitted through the stay cables. During the operation of the bridge, the pylons need to be inspected and maintained due to structural safety requirements, or the pylons need to be painted due to landscape requirements. outfit, decoration. For the lower part of the inverted Y-shaped tower, there are problems such as inward inclination of the inner side and 0# cable interference on the inner side. How to repair the inner side of the lower part of the inverted Y-shaped tower is a difficult problem. Therefore, it is necessary to develop a maintenance equipment, which can meet the requirements of light weight, convenient operation, and can realize the maintenance of the inner side of the lower part of the inverted Y-shaped tower column without being affected by obstacles such as stay cables.

实用新型内容Utility model content

本实用新型的目的在于提供一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,可实现对倒Y形塔柱下部分叉塔柱内侧面检修且不受斜拉索等障碍物的影响。The purpose of the utility model is to provide a three-way movable cable-stayed bridge maintenance equipment for the inner side of the inverted Y-shaped tower column, which can realize the maintenance of the inner side of the fork column of the lower part of the inverted Y-shaped tower column without being affected by the stay cable and other obstacles.

为了实现上述目的,本实用新型的技术方案如下:一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述的检修设备包括:In order to achieve the above object, the technical scheme of the present utility model is as follows: a kind of maintenance equipment for the inner side of the inverted Y-shaped tower column of a three-way movable cable-stayed bridge is characterized in that, the maintenance equipment includes:

塔中吊点装置,所述塔中吊点装置利用重力卡在倒Y形塔柱的中部,所述的塔中吊点装置包括环形骨架、轨道、电动行走轮,轨道横桥向设置在环形骨架的下方,电动行走轮卡在轨道上,可沿轨道横桥向行走;The hanging point device in the tower, the hanging point device in the tower is stuck in the middle of the inverted Y-shaped tower column by gravity, and the hanging point device in the tower includes a ring frame, a track, and an electric traveling wheel, and the horizontal bridge of the track is arranged in a ring shape. Below the skeleton, the electric walking wheel is stuck on the track and can walk along the horizontal bridge of the track;

悬吊操作平台,所述悬吊操作平台包括1个中间吊篮和2个滑动挂篮,2个滑动挂篮对称挂在中间吊篮两侧,可沿中间吊篮顺桥向滑动;A suspension operation platform, the suspension operation platform includes a middle hanging basket and two sliding hanging baskets, and the two sliding hanging baskets are symmetrically hung on both sides of the middle hanging basket, and can slide along the bridge along the middle hanging basket;

吊绳,所述吊绳将悬吊操作平台与塔中吊点装置进行连接,带动悬吊操作平台进行竖向升降。The suspension rope connects the suspension operation platform with the hanging point device in the tower, and drives the suspension operation platform to lift vertically.

进一步地,所述中间吊篮的两侧外侧分别设置上部栏杆和下部栏杆,滑动挂篮与中间挂篮对应的一侧上部设有与上部栏杆配合设置的开口向下的上部挂钩,下部设有与下部栏杆配合设置的开口向上的下部挂钩,上部挂钩内侧两侧和顶部均设有滑动滚轮,下部挂钩内侧两侧和底部均设有滑动滚轮,滑动挂篮的上挂钩挂在中间挂篮的上部栏杆上,滑动挂篮的下挂钩挂在中间挂篮的下部栏杆上,利用滑动滚轮沿中间吊篮顺桥向滑动。Further, upper railings and lower railings are respectively provided on the outer sides of the two sides of the middle hanging basket, the upper part of the side of the sliding hanging basket corresponding to the middle hanging basket is provided with an upper hook with an opening downwardly arranged in cooperation with the upper railing, and the lower part is provided with an upper hook with a downward opening. A lower hook with an upward opening arranged in cooperation with the lower rail, sliding rollers are provided on both sides and the top of the inner side of the upper hook, and sliding rollers are provided on both sides and bottom of the inner side of the lower hook, and the upper hook of the sliding hanging basket is hung on the middle hanging basket. On the upper railing, the lower hook of the sliding hanging basket is hung on the lower railing of the middle hanging basket, and the sliding roller is used to slide along the bridge along the middle hanging basket.

进一步地,所述塔中吊点装置共包括4个电动行走轮,每侧轨道上2个,同侧的两个电动行走轮通过上连杆相连,以保证同侧两个电动行走轮行走的同步性。Further, the hanging point device in the tower includes a total of 4 electric running wheels, 2 on each side rail, and the two electric running wheels on the same side are connected by the upper link to ensure that the two electric running wheels on the same side travel. synchronicity.

进一步地,所述的悬吊操作平台设有4个吊点,所述的吊绳包括工作绳和安全绳;所述的悬吊操作平台的每个吊点分别通过1根工作绳和1根安全绳与塔中吊点装置中1个电动行走轮连接,正常工作时,工作绳承载受力,安全绳随动收放,工作吊绳发生危险破断时,安全绳开始承载受力,并自动启动安全锁进行制动,阻止悬吊操作平台继续下降。Further, the suspension operation platform is provided with 4 lifting points, and the suspension rope includes a work rope and a safety rope; each suspension point of the suspension operation platform passes through a work rope and a safety rope respectively. The safety rope is connected to an electric walking wheel in the hanging point device in the tower. During normal operation, the working rope bears the force, and the safety rope moves along with it. When the working suspender is dangerously broken, the safety rope begins to bear the force, and automatically Activate the safety lock to brake to prevent the suspended operating platform from continuing to descend.

进一步地,所述的2个滑动挂篮在底部通过下连杆相连,以保证两侧滑动挂篮同步滑动、对称工作。Further, the two sliding hanging baskets are connected at the bottom through a lower link to ensure that the sliding hanging baskets on both sides slide synchronously and work symmetrically.

进一步地,所述悬吊操作平台内安装有驱动操作平台升降移动的提升机、操作控制系统、收绳器和与安全锁。Further, a hoist, an operation control system, a rope retractor and a safety lock are installed in the suspension operation platform to drive the operation platform to move up and down.

进一步地,所述检修设备使用时,先利用悬吊操作平台内的提升机将悬吊操作平台竖向提升至某一高度,然后利用塔中吊点装置中的电动行走轮带动悬吊操作平台横桥向移动至某一位置,最后利用滑动挂篮顺桥向滑动对塔柱内侧面进行检修,同时避开斜拉索的干涉。Further, when the maintenance equipment is used, the hoist in the suspension operation platform is used to vertically lift the suspension operation platform to a certain height, and then the electric traveling wheel in the hanging point device in the tower is used to drive the suspension operation platform. The transverse bridge is moved to a certain position, and finally the inner side of the tower is repaired by sliding the hanging basket along the bridge, while avoiding the interference of the stay cables.

本实用新型的有益效果在于:The beneficial effects of the present utility model are:

1)本检修设备可实现斜拉桥倒Y形塔柱内侧面的全覆盖检修,在遇到斜拉索等障碍物时,可通过悬吊操作平台的三个方向移动避开斜拉索。1) This maintenance equipment can realize the full coverage maintenance of the inner side of the inverted Y-shaped tower column of the cable-stayed bridge. When encountering obstacles such as stay cables, the suspension operation platform can be moved in three directions to avoid the stay cables.

2)塔中环形抱箍装置利用重力卡在塔柱中部,不需在塔柱设置锚固件,减少了对塔柱结构的影响。2) The ring hoop device in the tower is stuck in the middle of the tower column by gravity, and there is no need to set anchors in the tower column, which reduces the impact on the tower column structure.

3)悬吊操作平台、吊绳不使用时,可放置在库房,避免暴露在室外环境中,使用寿命大大增加。3) When the suspension operating platform and the sling are not in use, they can be placed in the warehouse to avoid exposure to the outdoor environment, and the service life is greatly increased.

4)检修施工时,由于施工影响范围小,对桥面行车影响小。4) During the maintenance and construction, due to the small impact scope of the construction, the impact on the traffic on the bridge deck is small.

附图说明Description of drawings

图1为可三向移动式斜拉桥倒Y形塔柱内侧面检修设备横桥向侧视图。Figure 1 is a side view of the transverse bridge of the maintenance equipment on the inner side of the inverted Y-shaped tower column of a three-way movable cable-stayed bridge.

图2为图1中A-A断面图。FIG. 2 is a cross-sectional view A-A in FIG. 1 .

图3为可三向移动式斜拉桥倒Y塔柱内侧面检修设备大样图。Figure 3 is a large sample view of the maintenance equipment on the inner side of the inverted Y tower column of the three-way movable cable-stayed bridge.

图4为图3中的B-B断面图。FIG. 4 is a B-B sectional view in FIG. 3 .

图5为图3中的大样A。Figure 5 is the large sample A in Figure 3 .

图6为图3中的大样B。FIG. 6 is the large sample B in FIG. 3 .

图中包括:1-塔中吊点装置,1.1-环形骨架,1.2-轨道,1.3-电动行走轮,1.4-上连杆,2-悬吊操作平台,2.1-中间吊篮,2.1.1-上部栏杆,2.1.2-下部栏杆,2.2-滑动挂篮,2.2.1-上部挂钩,2.2.2-下部挂钩,2.2.3-滑动滚轮,2.3-下连杆,2.4-吊点,3-吊绳,4-斜拉索,5-塔柱内侧面。Included in the picture: 1- The hanging point device in the tower, 1.1- The ring frame, 1.2- The track, 1.3- The electric traveling wheel, 1.4- The upper link, 2- The suspension operation platform, 2.1- The middle gondola, 2.1.1- Upper railing, 2.1.2-lower railing, 2.2-sliding hanging basket, 2.2.1-upper hook, 2.2.2-lower hook, 2.2.3-sliding roller, 2.3-lower link, 2.4-hanging point, 3- Suspension rope, 4-stayed cable, 5-inner side of tower column.

具体实施方式Detailed ways

下面结合附图1~6和实施例对本实用新型作进一步的描述。Below in conjunction with accompanying drawing 1~6 and embodiment, the utility model is further described.

参照图1,一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其包括:塔中吊点装置1、悬吊操作平台2和吊绳3。塔中吊点装置1利用重力卡在倒Y形塔柱的中部。Referring to FIG. 1 , a three-way movable cable-stayed bridge maintenance equipment for the inner side of the inverted Y-shaped tower column includes: a hanging point device 1 in the tower, a suspension operation platform 2 and a hanging rope 3 . The hanging point device 1 in the tower is stuck in the middle of the inverted Y-shaped tower column by gravity.

参照图3、图4,塔中吊点装置1包括环形骨架1.1、轨道1.2、电动行走轮1.3,环形骨架1.1卡在倒Y形塔柱的中部,轨道1.2横桥向设置在环形骨架1.1的下方,电动行走轮1.3卡在轨道1.2上,可沿轨道1.2横桥向行走。3 and 4, the hanging point device 1 in the tower includes an annular frame 1.1, a track 1.2, and an electric traveling wheel 1.3. The annular frame 1.1 is clamped in the middle of the inverted Y-shaped tower column, and the rail 1.2 is arranged in the horizontal direction of the annular frame 1.1. Below, the electric traveling wheel 1.3 is stuck on the track 1.2, and can walk along the horizontal bridge direction of the track 1.2.

参照图3~图6,悬吊操作平2包括一个中间吊篮2.1和两个滑动挂篮2.2,两个滑动挂篮2.2对称挂在中间吊篮2.1两侧的上部栏杆2.1.1和下部栏杆2.1.2,利用滑动滚轮2.2.1沿中间吊篮2.1顺桥向滑动。3 to 6 , the suspension operation level 2 includes a middle hanging basket 2.1 and two sliding hanging baskets 2.2. The two sliding hanging baskets 2.2 are symmetrically hung on the upper railings 2.1.1 and the lower railings on both sides of the middle hanging basket 2.1 2.1.2, use the sliding roller 2.2.1 to slide along the bridge along the middle gondola 2.1.

具体地,所述中间吊篮2.1的两侧外侧分别设置上部栏杆2.1.1和下部栏杆2.1.2,滑动挂篮2.2与中间挂篮2.1对应的一侧上部设有与上部栏杆2.1.1配合设置的开口向下的上部挂钩2.2.1,下部设有与下部栏杆2.1.2配合设置的开口向上的下部挂钩2.2.2,上部挂钩2.2.1内侧两侧和顶部均设有滑动滚轮2.2.3,下部挂钩2.2.2内侧两侧和底部均设有滑动滚轮2.2.3,滑动挂篮2.2的上部挂钩2.2.1挂在中间挂篮2.1的上部栏杆2.1.1上,滑动挂篮2.2的下部挂钩2.2.2挂在中间挂篮2.1的下部栏杆上2.1.2,操作人员站在中间吊篮2.1上,人工推动滑动挂篮2.2,滑动挂篮2.2利用滑动滚轮2.2.3沿中间吊篮2.1顺桥向滑动。Specifically, an upper rail 2.1.1 and a lower rail 2.1.2 are respectively provided on the outer sides of the two sides of the middle hanging basket 2.1, and the upper side of the sliding hanging basket 2.2 corresponding to the middle hanging basket 2.1 is provided with a matching upper rail 2.1.1 The upper hook 2.2.1 with the opening downward is provided, the lower part is provided with the lower hook 2.2.2 with the opening upward which cooperates with the lower railing 2.1.2, and the upper hook 2.2.1 is provided with sliding rollers 2.2 on both sides and at the top. 3. There are sliding rollers 2.2.3 on both sides and bottom of the lower hook 2.2.2. The upper hook 2.2.1 of the sliding hanging basket 2.2 is hung on the upper rail 2.1.1 of the middle hanging basket 2.1. The lower hook 2.2.2 is hung on the lower rail 2.1.2 of the middle hanging basket 2.1. The operator stands on the middle hanging basket 2.1 and manually pushes the sliding hanging basket 2.2. The sliding hanging basket 2.2 uses the sliding roller 2.2.3 along the middle hanging basket 2.1 Slide along the bridge.

参照图1,吊绳3将悬吊操作平台2与塔中吊点装置1进行连接,带动悬吊操作平台2进行竖向升降。Referring to FIG. 1 , the suspension rope 3 connects the suspension operation platform 2 with the hanging point device 1 in the tower, and drives the suspension operation platform 2 to vertically lift.

参照图3、图4,所述检修设备共有四个电动行走轮1.3,每侧轨道上两个。同侧的两个电动行走轮通过上连杆1.4相连,以保证同侧两个电动行走轮1.3行走的同步性。Referring to Figures 3 and 4, the maintenance equipment has four electric running wheels 1.3, two on each side rail. The two electric running wheels on the same side are connected through the upper link 1.4 to ensure the synchronization of the two electric running wheels 1.3 on the same side.

参照3、图4,悬吊操作平台2设有四个吊点2.4,吊绳3包括工作绳和安全绳;悬吊操作平台2的每个吊点2.4分别通过1根工作绳和1根安全绳与塔中吊点装置1中一个电动行走轮1.3连接,正常工作时,工作绳承载受力,安全绳随动收放,工作吊绳发生危险破断时,安全绳开始承载受力,并自动启动安全锁进行制动,阻止悬吊操作平台继续下降。Referring to 3 and 4, the suspension operation platform 2 is provided with four lifting points 2.4, the suspension rope 3 includes a working rope and a safety rope; each suspension point 2.4 of the suspension operation platform 2 passes through a working rope and a safety rope respectively. The rope is connected to an electric walking wheel 1.3 in the hanging point device 1 in the tower. During normal operation, the working rope bears the force, and the safety rope moves along with it. When the working suspender is dangerously broken, the safety rope begins to bear the force, and automatically Activate the safety lock to brake to prevent the suspended operating platform from continuing to descend.

参照图3,两个滑动挂篮2.2在底部通过下连杆2.3相连,以保证两侧滑动挂篮2.2同步滑动、对称工作。Referring to Figure 3, the two sliding hanging baskets 2.2 are connected at the bottom through a lower link 2.3 to ensure that the sliding hanging baskets 2.2 on both sides slide synchronously and work symmetrically.

参照图1、图2,检修设备使用时,先利用悬吊操作平台2内的提升机将悬吊操作平台2竖向提升至某一高度,然后利用塔中吊点装置1中的电动行走轮1.3带动悬吊操作平台2横桥向移动至某一位置,最后利用滑动挂篮2.2顺桥向滑动对塔柱内侧面5进行检修,同时避开斜拉索4的干涉。Referring to Figures 1 and 2, when the maintenance equipment is in use, first use the hoist in the suspension operation platform 2 to vertically lift the suspension operation platform 2 to a certain height, and then use the electric traveling wheel in the hanging point device 1 in the tower. 1.3 Drive the suspension operation platform 2 to move the horizontal bridge to a certain position, and finally use the sliding hanging basket 2.2 to slide along the bridge to repair the inner side 5 of the tower column, while avoiding the interference of the stay cables 4.

上述实施例仅例示性说明本实用新型的原理及其功效,而非用于限制本实用新型。任何熟悉此技术的人士皆可在不违背本实用新型的精神及范畴下,对上述实施例进行修饰或改变。因此,举凡所属技术领域中具有通常知识者在未脱离本实用新型所揭示的精神与技术思想下所完成的一切等效修饰或改变,仍应由本实用新型的权利要求所涵盖。The above-mentioned embodiments merely illustrate the principles and effects of the present invention, but are not intended to limit the present invention. Anyone skilled in the art can modify or change the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the technical field without departing from the spirit and technical idea disclosed by the present invention should still be covered by the claims of the present invention.

Claims (6)

1.一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述的检修设备包括:1. a three-way mobile cable-stayed bridge can be inverted Y-shaped pylon inner side maintenance equipment, it is characterized in that, described maintenance equipment comprises: 塔中吊点装置,所述塔中吊点装置利用重力卡在倒Y形塔柱的中部,所述的塔中吊点装置包括环形骨架、轨道、电动行走轮,轨道横桥向设置在环形骨架的下方,电动行走轮卡在轨道上,可沿轨道横桥向行走;The hanging point device in the tower, the hanging point device in the tower is stuck in the middle of the inverted Y-shaped tower column by gravity, and the hanging point device in the tower includes a ring frame, a track, and an electric traveling wheel, and the horizontal bridge of the track is arranged in a ring shape. Below the skeleton, the electric walking wheel is stuck on the track and can walk along the horizontal bridge of the track; 悬吊操作平台,所述悬吊操作平台包括1个中间吊篮和2个滑动挂篮,2个滑动挂篮对称挂在中间吊篮两侧,可沿中间吊篮顺桥向滑动;A suspension operation platform, the suspension operation platform includes a middle hanging basket and two sliding hanging baskets, and the two sliding hanging baskets are symmetrically hung on both sides of the middle hanging basket, and can slide along the bridge along the middle hanging basket; 吊绳,所述吊绳将悬吊操作平台与塔中吊点装置进行连接,带动悬吊操作平台进行竖向升降。The suspension rope connects the suspension operation platform with the hanging point device in the tower, and drives the suspension operation platform to lift vertically. 2.如权利要求1所述的一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述中间吊篮的两侧外侧分别设置上部栏杆和下部栏杆,滑动挂篮与中间挂篮对应的一侧上部设有与上部栏杆配合设置的开口向下的上部挂钩,下部设有与下部栏杆配合设置的开口向上的下部挂钩,上部挂钩内侧两侧和顶部均设有滑动滚轮,下部挂钩内侧两侧和底部均设有滑动滚轮,滑动挂篮的上挂钩挂在中间挂篮的上部栏杆上,滑动挂篮的下挂钩挂在中间挂篮的下部栏杆上,利用滑动滚轮沿中间吊篮顺桥向滑动。2. A kind of maintenance equipment for the inner side of the inverted Y-shaped tower column of a three-way movable cable-stayed bridge as claimed in claim 1, characterized in that, an upper railing and a lower railing are respectively provided on the outer sides of both sides of the middle gondola The upper part of the side corresponding to the sliding hanging basket and the middle hanging basket is provided with an upper hook with an opening downward, which is arranged in cooperation with the upper rail, and a lower hook with an upward opening arranged in cooperation with the lower rail is arranged in the lower part. There are sliding rollers on both sides and the bottom of the lower hook. The upper hook of the sliding hanging basket is hung on the upper rail of the middle hanging basket, and the lower hook of the sliding hanging basket is hung on the lower rail of the middle hanging basket. , and use the sliding roller to slide along the middle gondola along the bridge. 3.如权利要求1所述的一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述塔中吊点装置共包括4个电动行走轮,每侧轨道上2个,同侧的两个电动行走轮通过上连杆相连,以保证同侧两个电动行走轮行走的同步性。3. the maintenance equipment of a kind of three-way movable cable-stayed bridge inverted Y-shaped tower column inner side as claimed in claim 1, is characterized in that, the hanging point device in the described tower comprises 4 electric traveling wheels in total, each There are 2 on the side track, and the two electric traveling wheels on the same side are connected by the upper link to ensure the synchronization of the two electric traveling wheels on the same side. 4.如权利要求1所述的一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述悬吊操作平台设有4个吊点,所述吊绳包括工作绳和安全绳;所述悬吊操作平台的每个吊点分别通过1根工作绳和1根安全绳与塔中吊点装置中的1个电动行走轮连接。4. The maintenance equipment for the inner side of the inverted Y-shaped tower column of a three-way movable cable-stayed bridge as claimed in claim 1, wherein the suspension operation platform is provided with 4 lifting points, and the suspension operation platform is provided with 4 lifting points. The rope includes a working rope and a safety rope; each hanging point of the suspension operation platform is connected to an electric traveling wheel in the hanging point device in the tower through a working rope and a safety rope respectively. 5.如权利要求1所述的一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述的2个滑动挂篮在底部通过下连杆相连,以保证两侧滑动挂篮同步滑动、对称工作。5. the maintenance equipment of a kind of three-way movable cable-stayed bridge inverted Y-shaped tower column inner side as claimed in claim 1, is characterized in that, described 2 sliding hanging baskets are connected by lower link at the bottom, In order to ensure the synchronous sliding and symmetrical work of the sliding hanging baskets on both sides. 6.如权利要求1所述的一种可三向移动式斜拉桥倒Y形塔柱内侧面的检修设备,其特征在于,所述悬吊操作平台内安装有驱动操作平台升降移动的提升机、操作控制系统、收绳器和与安全锁。6. A kind of maintenance equipment for the inner side of the inverted Y-shaped tower column of a three-way movable cable-stayed bridge as claimed in claim 1, wherein the suspension operation platform is provided with a lift that drives the operation platform to move up and down. machine, operating control system, rope retractor and with safety lock.
CN201921424205.7U 2019-08-28 2019-08-28 Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge Withdrawn - After Issue CN211006334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921424205.7U CN211006334U (en) 2019-08-28 2019-08-28 Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921424205.7U CN211006334U (en) 2019-08-28 2019-08-28 Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN211006334U true CN211006334U (en) 2020-07-14

Family

ID=71481476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921424205.7U Withdrawn - After Issue CN211006334U (en) 2019-08-28 2019-08-28 Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN211006334U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485290A (en) * 2019-08-28 2019-11-22 上海市政工程设计研究总院(集团)有限公司 It is a kind of can the three-dimensional movable type cable-stayed bridge king-post of falling Y shape medial surface repair apparatus
CN112431132A (en) * 2020-12-18 2021-03-02 中铁二十三局集团第一工程有限公司 Sliding hanging basket for repairing and cleaning stay cable sleeve of cable-stayed bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485290A (en) * 2019-08-28 2019-11-22 上海市政工程设计研究总院(集团)有限公司 It is a kind of can the three-dimensional movable type cable-stayed bridge king-post of falling Y shape medial surface repair apparatus
CN110485290B (en) * 2019-08-28 2025-04-04 上海市政工程设计研究总院(集团)有限公司 A three-way movable maintenance device for the inner side of an inverted Y-shaped tower column of a cable-stayed bridge
CN112431132A (en) * 2020-12-18 2021-03-02 中铁二十三局集团第一工程有限公司 Sliding hanging basket for repairing and cleaning stay cable sleeve of cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN110485290B (en) A three-way movable maintenance device for the inner side of an inverted Y-shaped tower column of a cable-stayed bridge
CN205591111U (en) Portable type bridge of cantilever type bottom is repaired and is used platform device
WO2014015757A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN110004834B (en) Automatic climbing platform for hanging cable construction
CN202144437U (en) Standing type single-person hanging seat device
CN106545172A (en) A kind of installation method of high-altitude long-span steel truss
CN208413709U (en) Unit type glass curtain wall double-ring track hoisting system
KR20140081827A (en) System of vertical and horizontal movement of the transport cabin in a elevator translator plant for the overcoming of obstacles
CN105780646B (en) A kind of bridge maintenance equipment of automatically walk
CN101559905A (en) Deck unit erection gantry
CN211006334U (en) Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge
CN110485289A (en) A kind of inspection platform in extension type double plane cable stayed bridge king-post drag-line area
CN110485292B (en) A maintenance system and maintenance method for an inverted Y-shaped tower column of a cable-stayed bridge
CN203128099U (en) Slipping type pipeline lifting device
CN102635066A (en) Hanger articulated bridge inspection vehicle
CN210031529U (en) Automatic climbing platform for construction of hanging cable
CN210856930U (en) A maintenance system for the inverted Y-shaped tower column of a cable-stayed bridge
CN110820555B (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN210886923U (en) Maintenance system of straight pylon of double-cable-plane cable-stayed bridge
CN107881907B (en) Inspection vehicle for bridge main arch
CN202543799U (en) Hanging bracket hinging type bridge maintenance vehicle
CN210507143U (en) Bridge bottom construction hanging flower basket
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN103879860A (en) Device special for elevator installation
CN207498824U (en) A kind of hanger radial type single track bridge inspection car

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned