CN206784958U - A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure - Google Patents

A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure Download PDF

Info

Publication number
CN206784958U
CN206784958U CN201720560861.4U CN201720560861U CN206784958U CN 206784958 U CN206784958 U CN 206784958U CN 201720560861 U CN201720560861 U CN 201720560861U CN 206784958 U CN206784958 U CN 206784958U
Authority
CN
China
Prior art keywords
metal
greatly
prefabricated roof
splicing structure
dilatory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720560861.4U
Other languages
Chinese (zh)
Inventor
吕伟才
刘昌平
兰云睆
鲁少虎
孙常力
向伟
于金生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201720560861.4U priority Critical patent/CN206784958U/en
Application granted granted Critical
Publication of CN206784958U publication Critical patent/CN206784958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

It the utility model is related to technical field of building construction, and in particular to a kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure.This kind greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure include lifting elements block, lift unit block, horizontal sliding cell block.This kind greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure conceptual design is reasonable compared with prior art, it is safe and efficient using preassembling form of construction work, the duration can be shortened to greatest extent.The component being easily installed simultaneously using hoist engine and steel wire rope etc. forms constructing operation system, quick reliable during peace is torn open, cheap, has significant economic benefit.

Description

A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure
Technical field
The utility model is related to technical field of building construction, and in particular to it is a kind of greatly across metal encorbelment decoration prefabricated roof and Air translation splicing structure.
Background technology
As the fast development of building technology and the growing tension of urban land resource, multi-rise building quantity are just all with day Increase, wherein occur largely because of practical performance or the Long-span Cantilever roof structure system pursued visual effect and designed, because The particularity of this Long-span Cantilever roof structure system, its extraneous adornment often use metal finishing roofing, real so as to reach With and design effect, and the design of this Long-span Cantilever metal finishing roofing system often gives construction band huge challenge.
Mainly there are three kinds of forms of construction work currently for the construction of this Long-span Cantilever metal finishing roofing system, the first It is for tier building, using full hall scaffold form of construction work, that is, it is the scaffold of size of encorbelmenting to set up width, highly for from ground Face to the scope of operation height;Be for second for multi-rise building, using builder's jack form of construction work, i.e., the structure under the scope of operation For layer using I-steel as encorbelmenting primary structure member, it is the scaffold of size of encorbelmenting to set up width, is highly plane of encorbelmenting to operation The height in face;The third is for multi-rise building, using nacelle construction, i.e., hanging basket is set immediately below construction location, by structure Part is placed on lifting in hanging basket and arrives operation surface construction.
Form of construction work of the prior art mainly has following deficiency:First, prior art is in situ assembled using high-altitude, component More, installation is complicated, easily causes component and falls, has great potential safety hazard.2nd, make when using full hall scaffold form of construction work , it is necessary to which substantial amounts of manpower sets up scaffold during industry, long in time limit, cost is big, and with the increase of support body height, security performance Also decrease.3rd, it is necessary to which substantial amounts of I-steel is as suspension scaffold beaer when using builder's jack form of construction work operation System, required I-steel quantity is big, and cost is high, and I-steel handling is heavy, it is necessary to the longer duration, while there is also great peace Full hidden danger.4th, when using nacelle construction mode when because hanging basket can only vertically operation, it is necessary to hang a large amount of hanging baskets encorbelment fill Adorn on roof structure, so as to add larger construction loads, there is greatly danger, while lifting rope position can not install dress Decoration panel, the amount of doing over again are big.
Utility model content
The utility model purpose is to solve the above problems, there is provided a kind of encorbelmented across metal greatly decorates prefabricated roof and height Empty slipping and assembling structure.
To achieve the above object, the utility model provides a kind of encorbelmented across metal greatly and decorates prefabricated roof and air translation Splicing structure, it is characterised in that:Including lifting elements block, lift unit block, horizontal sliding cell block, lifting elements block includes dress Roofing panel, light gauge steel structure, hoisting ring, dilatory ring and alignment connection sheet are adornd, light gauge steel structure is arranged on decoration roofing Panel back, hoisting ring, dilatory ring, alignment connection sheet are welded on light gauge steel structure, and it is same that lift unit block includes intelligence control Hoist engine, track cable, lifting hook, electric control box and circuit are walked, electric control box passes through circuit volume synchronous with intelligence control The machine of raising is connected, and intelligence control synchronous hoister has two, and two intelligence control synchronous hoisters are respectively at one end of a track cable It is connected, the other end of track cable is provided with bifurcated, and lifting hook is respectively arranged with bifurcated, and horizontal sliding cell block includes intelligence Synchronous hoister, sliding guide rail, pulley, pull rope, the drawing suspension hook that hangs down, dilatory suspension hook, electric control box and circuit are controlled, pulley is placed On sliding guide rail, pulley lower end, which is connected with to hang down, draws suspension hook, and draught line is set in parallel among sliding guide rail, the both ends of draught line An intelligence control synchronous hoister is connected respectively, and intelligence control synchronous hoister is connected by circuit with electric control box, draws suspension hook It is arranged on pull rope.
It is further described to be connected on across the encorbelment dilatory boxing of decoration prefabricated roof and air translation splicing structure of metal greatly The centre of light gauge steel structure.
It is further it is described have 4 across the encorbelment hoisting ring of decoration prefabricated roof and air translation splicing structure of metal greatly, 4 Individual hoisting ring is centrosymmetric relative to dilatory ring.
It is further it is described greatly across the encorbelment alignment connection sheet of decoration prefabricated roof and air translation splicing structure of metal be L Type angle steel, length 5cm, while punching, another side is welded on the both sides of light gauge steel structure, and each two is alignd between connection sheet Spacing is 1m.
It is further it is described greatly across the encorbelment sliding guide rail of decoration prefabricated roof and air translation splicing structure of metal be two The steel wire rope that root is horizontally mounted and is parallel to each other.
The beneficial effects of the utility model:This kind greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure with Prior art is reasonable compared to conceptual design, safe and efficient using preassembling form of construction work, can shorten the duration to greatest extent.Together The component composition constructing operation system that Shi Liyong hoist engines and steel wire rope etc. are easily installed, it is quick reliable during peace is torn open, make Valency is cheap, has significant economic benefit.
Brief description of the drawings
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is lifting elements block schematic diagram of the present utility model;
Fig. 3 is lifting elements block front view of the present utility model;
Fig. 4 is lifting elements block side view of the present utility model;
Fig. 5 is lift unit block schematic diagram of the present utility model;
Fig. 6 is horizontal sliding cell block schematic diagram of the present utility model;
Wherein:1st, roofing panel is decorated, 2, light gauge steel structure, 3, hoisting ring, 4, dilatory ring, 5, alignment connection sheet, 6, Intelligence control synchronous hoister, 7, track cable, 8, lifting hook, 9, sliding guide rail, 10, pulley, 11, pull rope, 12, drawing of hanging down hangs Hook, 13, dilatory suspension hook, 14, electric control box, 15, circuit.
Embodiment
The utility model takes following technical scheme to realize:This kind is encorbelmented greatly across metal decorates prefabricated roof and high-altitude cunning Move splicing structure, including lifting elements block, lift unit block, horizontal sliding cell block.
As shown in Figures 2 to 4, the layout design size for decorating roofing of being encorbelmented according to metal is carried out to decorating roofing panel 1 Segmentation, is divided into a number of calibrated bolck and non-standard piece, then in calibrated bolck and non-standard piece of back side installation lightgage steel joist Structure 2.In both sides, close to middle 1/4 position a hoisting ring 3 is respectively welded, in lightgage steel joist knot in long side light gauge steel structure 2 The middle part of structure 2, a dilatory ring 4 is welded, welded on the both sides long side lightweight steel construction material of light gauge steel structure 2 at interval of 1m One alignment connection sheet 5.It is common to decorate roofing panel 1, light gauge steel structure 2, hoisting ring 3, dilatory ring 4 and alignment connection sheet 5 Constitute lifting elements block.
As shown in figure 5, lift unit block includes intelligence control synchronous hoister 6, track cable 7, lifting hook 8, electric-controlled Case 14 and circuit 15 processed, electric control box 14 are connected by circuit 15 with intelligence control synchronous hoister 6, intelligence control synchronous hoister 6 There are two, two intelligence control synchronous hoisters 6 are connected respectively at one end of a track cable 7, the other end of track cable 7 Bifurcated is provided with, lifting hook 8 is respectively arranged with bifurcated.Intelligence control synchronous hoister is fixed on decoration roof structure top of encorbelmenting.
As shown in fig. 6, horizontal sliding cell block includes intelligence control synchronous hoister 6, sliding guide rail 9, pulley 10, pull rope 11st, hang down and draw suspension hook 12, dilatory suspension hook 13, electric control box 14 and circuit 15, pulley 10 is placed on sliding guide rail 9, pulley 10 Lower end, which is connected with to hang down, draws suspension hook 12, and draught line 11 is set in parallel among sliding guide rail 9, and the both ends of draught line 11 connect one respectively Platform intelligence control synchronous hoister 6, intelligence control synchronous hoister 6 is connected by circuit 15 with electric control box 14, and dilatory suspension hook 13 is set Put on pull rope 11.Sliding guide rail is arranged on decoration roof structure bottom of encorbelmenting, and the both ends for sliding guide rail are connected to dress of encorbelmenting Adorn on roof structure.
As preferred scheme of the present utility model, encorbelmented decoration prefabricated roof and air translation splicing structure across metal greatly Dilatory ring 4 is welded on the centre of light gauge steel structure 2.
As preferred scheme of the present utility model, encorbelmented decoration prefabricated roof and air translation splicing structure across metal greatly Hoisting ring 3 has 4, and 4 hoisting rings 3 are centrosymmetric relative to dilatory ring 4.
As preferred scheme of the present utility model, encorbelmented decoration prefabricated roof and air translation splicing structure across metal greatly Alignment connection sheet 5 is L-type angle steel, and length 5cm, while punching, another side is welded on the both sides of light gauge steel structure 2, each two Spacing between connection sheet 5 of aliging is 1m.
As preferred scheme of the present utility model, encorbelmented decoration prefabricated roof and air translation splicing structure across metal greatly Sliding guide rail 9 is two steel wire ropes for being horizontally mounted and being parallel to each other.
4 hoisting rings 3 of the lifting hook 8 in lift unit block above lifting elements block are connected, pass through electricity Gas control cabinet 14 controls two intelligence control synchronous hoisters 6 in lift unit block that lifting elements block is promoted into horizontal sliding unit Block sustained height, then vertical drawing suspension hook 12 is connected respectively at 4 hoisting rings 3 on lifting elements block, while by dilatory suspension hook 13 are connected with dilatory ring 4, then control the intelligence control synchronous hoister 6 in lift unit block to invert by electric control box 14, Lifting elements block is declined certain altitude, draw the stress of suspension hook 12 so that it is guaranteed that hanging down, then untie lifting hook 8, pass through electric-controlled Intelligence control synchronous hoister 6 in the controlled level sliding element block of case 14 processed drives pull rope 11 to pass through the dilatory dragging of suspension hook 13 lifting Cell block horizontal sliding is to construction location.Then lifting elements block is fixedly mounted on and encorbelmented by electric welding and bolt by operating personnel Decorate on roof structure, adjacent lifting elements by connection sheet 5 of aliging fasten levelling by last worker by bolt.
Electric control box 14 is powered by external power supply.
This kind is encorbelmented greatly across metal decorates prefabricated roof and air translation splicing structure conceptual design compared with prior art Rationally, it is safe and efficient using preassembling form of construction work, the duration can be shortened to greatest extent.Utilize hoist engine and steel wire rope simultaneously Constructing operation system is formed etc. the component being easily installed, it is quick reliable during peace is torn open, it is cheap, have significant economical Benefit.
Preferred embodiment of the present utility model described in detail above.It should be appreciated that the ordinary skill people of this area Member makes many modifications and variations without creative work can according to design of the present utility model.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to design of the present utility model in domain Available technical scheme is tested, all should be in the protection domain being defined in the patent claims.

Claims (5)

1. a kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure, it is characterised in that:Including lifting elements Block, lift unit block, horizontal sliding cell block, lifting elements block include decoration roofing panel, light gauge steel structure, hoisting ring, Dilatory ring and alignment connection sheet, light gauge steel structure are arranged on decoration roofing surface backboard portion, hoisting ring, dilatory ring, alignment connection Piece is welded on light gauge steel structure, and lift unit block includes intelligence control synchronous hoister, track cable, lifting hook, electricity Gas control cabinet and circuit, electric control box are connected by circuit with intelligence control synchronous hoister, and intelligence control synchronous hoister has two, Two intelligence control synchronous hoisters are connected respectively at one end of a track cable, and the other end of track cable is provided with bifurcated, Lifting hook is respectively arranged with bifurcated, horizontal sliding cell block includes intelligence control synchronous hoister, sliding guide rail, pulley, traction Rope, hang down and draw suspension hook, dilatory suspension hook, electric control box and circuit, pulley is placed on sliding guide rail, and pulley lower end is connected with vertical drawing Suspension hook, draught line are set in parallel among sliding guide rail, and the both ends of draught line connect an intelligence control synchronous hoister, intelligence control respectively Synchronous hoister is connected by circuit with electric control box, and dilatory suspension hook is arranged on pull rope.
2. it is according to claim 1 greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure, its feature exist In:Dilatory boxing is connected on the centre of light gauge steel structure.
3. it is according to claim 1 greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure, its feature exist In:Hoisting ring has 4, and 4 hoisting rings are centrosymmetric relative to dilatory ring.
4. it is according to claim 1 greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure, its feature exist In:Alignment connection sheet is L-type angle steel, and length 5cm, while punching, another side is welded on the both sides of light gauge steel structure, each two Spacing between connection sheet of aliging is 1m.
5. it is according to claim 1 greatly across metal encorbelment decoration prefabricated roof and air translation splicing structure, its feature exist In:Sliding guide rail is two steel wire ropes for being horizontally mounted and being parallel to each other.
CN201720560861.4U 2017-05-19 2017-05-19 A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure Active CN206784958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720560861.4U CN206784958U (en) 2017-05-19 2017-05-19 A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720560861.4U CN206784958U (en) 2017-05-19 2017-05-19 A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure

Publications (1)

Publication Number Publication Date
CN206784958U true CN206784958U (en) 2017-12-22

Family

ID=60712768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720560861.4U Active CN206784958U (en) 2017-05-19 2017-05-19 A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure

Country Status (1)

Country Link
CN (1) CN206784958U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284711A (en) * 2019-05-21 2019-09-27 中国华冶科工集团有限公司 The high vacant duct auxiliary positioning apparatus of heavy caliber and in-position installation method
CN111593894A (en) * 2019-02-21 2020-08-28 武汉凌云建筑装饰工程有限公司 High altitude platform suspended ceiling system
CN116427713A (en) * 2023-05-20 2023-07-14 中建八局第四建设有限公司 Horizontal movement lifting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593894A (en) * 2019-02-21 2020-08-28 武汉凌云建筑装饰工程有限公司 High altitude platform suspended ceiling system
CN110284711A (en) * 2019-05-21 2019-09-27 中国华冶科工集团有限公司 The high vacant duct auxiliary positioning apparatus of heavy caliber and in-position installation method
CN116427713A (en) * 2023-05-20 2023-07-14 中建八局第四建设有限公司 Horizontal movement lifting method

Similar Documents

Publication Publication Date Title
CN103086279B (en) Vertical transportation construction method for building construction
CN206784958U (en) A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN109502480A (en) The hoisting that high building turns over
CN105226560B (en) A kind of crossing frame and its construction method
CN107700719A (en) A kind of hanging method of high-rise building glass curtain wall
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN205429566U (en) Crossing structure
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN113335475B (en) Deck bottom fixed pulley sliding platform dismantling process
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
CN201531111U (en) Movable hanging basket for installing and decorating curtain walls
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN202441045U (en) Rail-type electric attached lifting scaffold
CN109378767A (en) A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable
CN207553565U (en) A kind of crosshead of truss
CN205662256U (en) High rises pergola side and hangs a semi -portal bridge crane
CN105155427A (en) Construction method for laying suspension bridge catwalk
CN106968371B (en) A kind of construction method of the high wing articulated structure drifted by wind of curtain wall construction
CN211006334U (en) Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge
CN203499232U (en) Attached lifting scaffold
CN208980193U (en) The curtain wall hanging apparatus of anticollision

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant