CN201531111U - Movable hanging basket for installing and decorating curtain walls - Google Patents

Movable hanging basket for installing and decorating curtain walls Download PDF

Info

Publication number
CN201531111U
CN201531111U CN2009200745324U CN200920074532U CN201531111U CN 201531111 U CN201531111 U CN 201531111U CN 2009200745324 U CN2009200745324 U CN 2009200745324U CN 200920074532 U CN200920074532 U CN 200920074532U CN 201531111 U CN201531111 U CN 201531111U
Authority
CN
China
Prior art keywords
basket
hanging basket
steel
hang
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200745324U
Other languages
Chinese (zh)
Inventor
周晓莉
王巍
谷志旺
夏敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai City No4 Building Co Ltd
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai City No4 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City No4 Building Co Ltd filed Critical Shanghai City No4 Building Co Ltd
Priority to CN2009200745324U priority Critical patent/CN201531111U/en
Application granted granted Critical
Publication of CN201531111U publication Critical patent/CN201531111U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a movable hanging basket for installing and decorating curtain walls. A truss basket body is made of profile steel; chord members of the basket body are 50*50*3.5 steel square tubes; web members of the basket body are 48*48*2.5 circular tubes; bamboo warp plates are overspread on an operating surface; the hanging basket is arranged radially and fixed onto circumferential secondary structure square steel through phi 16mm steel ropes; the radial slant distance of the hanging basket is 21m; and the width of the hanging basket is 3.3m. Compared with a scaffold, the movable hanging basket can save a large amount of time and construction period, decrease occupied space and reduce a large amount of labor cost and material lease charge. Only the hanging basket with the weight of 1300kg/m2 can be conveniently transferred for effective construction operation, and not only eliminates much trouble of lapping the scaffold, but also provides construction operation platforms and passages below the hanging basket for other work types when the hanging basket is used for installing and decorating construction for glass curtain walls on the upper portion of a building.

Description

Curtain wall is installed, is decorated and hang basket with movable type
Technical field
The utility model relates to a kind of curtain wall to be installed and hangs basket, especially relate to a kind of can conveniently move hang basket.
Background technology
At present, traditional constructing operation method of installation curtain wall is:
A, set up scaffold along the building facade.The method takes a lot of work, time-consuming, floor space is big, needs steel many, the price height, freight volume is big.
B, adopt simple and easy nacelle construction.From the top of building hanging steel rope, ship is hung in configuration, moves up and down with hand and removes cucurbit, and facility are simple and crude, uses inconvenience, no safety guarantee, and labour intensity is big, and efficient is low.
Summary of the invention
The utility model is to solve existing simple and easy nacelle construction, and from the top of building hanging steel rope, ship is hung in configuration, moves up and down with hand and removes cucurbit, facility are simple and crude, use inconvenience, no safety guarantee, labour intensity is big, and inefficient technical problem provides a kind of curtain wall to install, decorate and hang basket with movable type.
For realizing that the technical scheme that the purpose of this utility model adopted is: a kind of curtain wall is installed, is decorated and hang basket with movable type, be made into the truss basket by shaped steel, the chord member of basket is that 50*50*3.5 steel square tube, web member are the 48*48*2.5 pipe, the scope of operation is completely spread the bamboo seesaw, hanging basket radially arranges, and be fixed on the hoop aggregated(particle) structure square tube with ф 16mm steel cable, radially oblique distance is 21m, width is 3.3m.
A. every adjacent two gaps between hanging behind basket hoisted in position are 2m, and the gap is with the protection of the big eye string bag;
B. the space between two gaps of hanging basket connects the contact bar, and the contact bar is the steel pipe of the prefabricated related otic placode of double end;
C. lay wooden springboard on the contact bar, both sides are provided with protects rope, is convenient to the current of personnel and material.
The beneficial effects of the utility model are: compare with scaffold, can save plenty of time and duration.Minimizing takes up room, and reduces a large amount of labour costs and material rent.Has only 1300Kg/m 2Heavy hanging basket can shift easily and carry out effective construction operation, not only saved the trouble of a large amount of scaffolds overlap joint, carrying out building top glass curtain wall, when decoration construction is installed, is returning and hang construction operation platform and the passage of having reserved good other work post below the basket with hanging basket.
The advantage of originally hanging basket is:
A. adopt new moulding mixture combination, in light weight, through measuring and calculating, it is 1300Kg/m that single-unit hangs basket weight 2Being convenient to ground shifts;
B. occupy little space, only in corresponding zone, arrange, effectively guarantee the construction of other work post and the transportation of passage;
C, construction operation face are big, compare with general hanging basket and more can finish complicated arduous construction operation; Such as the large-scale curtain wall of installing (and can install the large-scale curtain wall that has the angle of inclination of difficult construction);
So the use of hanging basket has overcome the shortcoming that above-mentioned construction exists, and is easy for installation, electric up-down, the operating efficiency height, floor space is little, and is safe and reliable.
Description of drawings
Fig. 1 is a schematic perspective view of the present utility model;
Fig. 2 hangs connection diagram between basket;
Fig. 3 is an A place contact bar node enlarged drawing among Fig. 2;
Fig. 4 is a lifting schematic diagram of the present utility model;
Fig. 5 is that suspension centre is arranged schematic diagram;
Fig. 6 hangs a basket lower end guard rail schematic diagram;
Fig. 7 is the construction floor map;
Fig. 8 goes up people's access diagram.
The specific embodiment
Below in conjunction with specific embodiment, further set forth embodiment of the present utility model.Should be understood that these embodiment only to be used to the utility model is described and be not used in the restriction scope of the present utility model.Should be understood that in addition those skilled in the art can make various changes or modifications the utility model after the content of having read the utility model instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
As Fig. 1, shown in 2, curtain wall of the present utility model is installed, is decorated and hang basket with movable type, be made into the truss basket by shaped steel, the chord member of basket is that 50*50*3.5 steel square tube, web member are the 48*48*2.5 pipe, and the scope of operation is completely spread the bamboo seesaw, hanging basket radially arranges, and be fixed on the hoop aggregated(particle) structure square tube with ф 16mm steel cable, radially oblique distance is 21m, width is 3.3m.
Adopt the wide 3.3m of radial arrangement between every hoop two axial lines generally, high by 0.8, long 21m, spacing 2000 hang basket, hang basket and stay the 30mm gap, in case operating personnel climb over the hanging box guardrail to work plane.Be similar to driven hanging basket, hang basket and adopt shaped steel to be made into the truss basket, chord member adopts 50*50*3.5 steel square tube, web member to adopt the 48*48*2.5 pipe.The scope of operation adopts and completely spreads the bamboo seesaw, hangs basket and adopts ф 16mm steel cable to be fixed on the hoop aggregated(particle) structure square tube.Respectively hang the as follows of connection between the basket:
A. every adjacent two hang basket hoisted in position after, two gaps of hanging between the basket are 2m, this gap adopts the protection of the big eye string bag;
B. the space between the gap can connect the two contact bars (Fig. 2,3) that hang between the basket, and the contact bar adopts the steel pipe of the prefabricated related otic placode of double end, links being connected with of bar and is beneficial to the resistance to overturning of hanging basket, and can set up passage.
C. lay wooden springboard on the contact bar, both sides are provided with protects rope, is convenient to the current of personnel and material.
The utility model is heavy applicable to the construction task of lower casing self, and the lower casing bottom also has other a large amount of work, and for creating conditions for other unit construction of bottom, and cornice, uses this hanging basket patent can reach interests and maximizes when higher apart from the relative altitude on ground.
The utility model execute-in-place process:
Hang the preceding preparation of lifting of basket:
A) according to constructure scheme, organize the work of marching into the arena of material, Yin Ben hangs basket and can only disposablely stop, and can not retract once more after removing, so the matching of material is very strong, can not omit;
B) must organizational technology before organizing construction, personnel such as construction, safety, operation study and technology, the safety of carrying out scheme tells somebody what one's real intentions are;
C) hang assembling, lifting, the fixing operation personnel relative fixed of basket, and, take appointment with certificate through the training and examination eligible;
D) construction stage, arrange the professional to carry out the equipment safety check work of every day, and carry out dynamically recording;
E) should adopt coloured flag to set the police circles zone around the lifting position.
Hang the basket lifting:
As shown in Figure 4, two steel wire suspension ring at first are set on the steel work above the suspension centre, and put down two wire rope, adopt 23 tons of hoist engines to promote, when hang the whole 100cm of lifting of basket to every hoist cable all evenly stressed after, reexamine the resistance to overturning and the stressing conditions that once hang basket, normal promote again after errorless, note the stationarity and the synchronism of lifting.
A. the direction control in the lifting should respectively be established a control rope at the two ends of hanging basket before the lifting, is drawn by two workmans in the lifting and holds, and firmly wants suitably the direction that promotes with control.
B. the commander in the lifting, because the circumstance complication on ground, and the scope of operation is the inclined-plane, the restriction of operation height is very important, so must select responsible commander for use, the commander should stand in commander in the visual scope of operative employee and obstruction.
The personnel placement of hoisting process and responsibility
Command one, be responsible for full powers commander and labour's allotment; 2 of stay cords mainly are responsible for lifting process and are hung the aerial control of basket and dynamic observe, and safety custody and problem in time blow tentative whistle, and to commander's report; Answer submit onself to someone's direction and safety custody person's commander.
Points for attention in the lifting:
When a. lifting, all personnel should act in accordance with the division of their functions and duties according to the division of labor;
B. aerial personnel must fasten seat belts, and safety belt should adopt safety lock to tie up in whole operation process on the default safety rope;
Should travel at a slow speed when c. lifting, the control speed of service, and in time adjust;
D. other work post that lifts in the scope should stop operation, and operating personnel and non-operating personnel must not rest on and hang the basket below.
E. lifting puts in place hangs basket strictness and reaches relevant criterion in operation sequence and check and accept, can use after qualified, nominal load, points for attention and security warning board.
Hang basket processing, attention main points safe in utilization and item in the installation process
1. to conscientiously be familiar with drawing before the processing, by scheming construction and controlling processing dimension, welding quality and anticorrosion well;
2. suspension centre is six suspension centres, two ends are fixed on the node of termination up and down, middle suspension centre be fixed on according to actual needs from two ends greater than 1/3 zone in, 1/3 place, bottom passes through for the least favorable hoisting point position calculates as calculated, suspension centre must be arranged near the upper chord node location, as shown in Figure 5.
3. hang the basket be linked to be integrated operation face after, the lower end should increase guard rail, as shown in Figure 6.
4. the hanging box upper chord is controlled at 30mm-40mm from the work plane distance, in case operating personnel cross the hanging box frame;
5. should Φ 16 wire rope be set from two ends up and down when operating personnel construct and fix an anti-slide fastener for per 2 meters as the second protection safety rope, the operator safety band hangs over anti-skidding buckle in case radially slide, as shown in Figure 7.
6. floor should be provided with escape way to hanging box; As shown in Figure 8.

Claims (4)

1. a curtain wall is installed, is decorated and hang basket with movable type, the truss basket of making by shaped steel, it is characterized in that: the chord member of described basket is that 50*50*3.5 steel square tube, web member are the 48*48*2.5 pipe, the scope of operation is completely spread the bamboo seesaw, the described basket that hangs is radially arranged, and be fixed on the hoop aggregated(particle) structure square tube with the 16mm steel cable, radially oblique distance is 21m, width is 3.3M.
2. curtain wall according to claim 1 is installed, decorated and hang basket with movable type, it is characterized in that: every adjacent two described gaps between hanging behind basket hoisted in position are 2M, and the gap is with the protection of the big eye string bag.
3. curtain wall according to claim 1 is installed, decorated and hang basket with movable type, it is characterized in that: the space between described two gaps of hanging basket connects the contact bar, and the contact bar is the steel pipe of the prefabricated related otic placode of double end.
4. curtain wall according to claim 1 is installed, decorated and hang basket with movable type, it is characterized in that: lay wooden springboard on described contact bar, both sides are provided with protects rope.
CN2009200745324U 2009-09-18 2009-09-18 Movable hanging basket for installing and decorating curtain walls Expired - Fee Related CN201531111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200745324U CN201531111U (en) 2009-09-18 2009-09-18 Movable hanging basket for installing and decorating curtain walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200745324U CN201531111U (en) 2009-09-18 2009-09-18 Movable hanging basket for installing and decorating curtain walls

Publications (1)

Publication Number Publication Date
CN201531111U true CN201531111U (en) 2010-07-21

Family

ID=42526515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200745324U Expired - Fee Related CN201531111U (en) 2009-09-18 2009-09-18 Movable hanging basket for installing and decorating curtain walls

Country Status (1)

Country Link
CN (1) CN201531111U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635226A (en) * 2012-05-04 2012-08-15 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN102745596A (en) * 2012-06-27 2012-10-24 浙江宝业幕墙装饰有限公司 Curtain wall lifting sling cart
CN102864859A (en) * 2012-10-19 2013-01-09 上海市机械施工有限公司 Curtain wall steel support structure, construction method thereof and lifting device for construction
CN103821375A (en) * 2014-02-28 2014-05-28 中天建设集团有限公司 Hanging boat auxiliary hung ceiling curtain wall installing method
CN104088449A (en) * 2014-06-12 2014-10-08 中建三局集团有限公司 Safe and fast double-track construction platform of super high-rise curtain wall

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635226A (en) * 2012-05-04 2012-08-15 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN102635226B (en) * 2012-05-04 2014-05-28 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN102745596A (en) * 2012-06-27 2012-10-24 浙江宝业幕墙装饰有限公司 Curtain wall lifting sling cart
CN102745596B (en) * 2012-06-27 2014-07-09 浙江宝业幕墙装饰有限公司 Curtain wall lifting sling cart
CN102864859A (en) * 2012-10-19 2013-01-09 上海市机械施工有限公司 Curtain wall steel support structure, construction method thereof and lifting device for construction
CN102864859B (en) * 2012-10-19 2014-12-10 上海市机械施工有限公司 Curtain wall steel support structure, construction method thereof and lifting device for construction
CN103821375A (en) * 2014-02-28 2014-05-28 中天建设集团有限公司 Hanging boat auxiliary hung ceiling curtain wall installing method
CN104088449A (en) * 2014-06-12 2014-10-08 中建三局集团有限公司 Safe and fast double-track construction platform of super high-rise curtain wall
CN104088449B (en) * 2014-06-12 2017-02-15 中建三局集团有限公司 Safe and fast double-track construction platform of super high-rise curtain wall

Similar Documents

Publication Publication Date Title
CN201433079Y (en) High-altitude inclined supporting wire lifting device for construction curtain wall
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN201531111U (en) Movable hanging basket for installing and decorating curtain walls
CN201268937Y (en) Double-layer hanging cradle for working aloft
CN202881852U (en) Suspension bridge cable installation system
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN201826516U (en) Novel attached lifting scaffold
CN109372243A (en) A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN102864915A (en) Construction method for venue large space double-helix air pipes
CN205637628U (en) Hoist and mount construction structures of aerial vestibule furred ceiling
CN203684625U (en) Suspending cord pipe combined full scaffolding construction platform and protection system
CN113738089A (en) Hanging basket integral installation construction method of specially-made hanging mechanism device
CN206784958U (en) A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure
CN110616902A (en) Installation and construction method for metal cored color steel plate of thermal power plant
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN215101404U (en) Construction elevator mounting structure in well
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN112160582A (en) Assembling platform suitable for construction of spoke type cable membrane system
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN206987720U (en) A kind of double shield cage cat ladders
CN213683170U (en) Assembling platform suitable for construction of spoke type cable membrane system
CN218406387U (en) Steel platform suitable for suspended ceiling of hotel lobby installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100721

Termination date: 20100918