CN203320415U - Novel large-scale pier coating operation hanging basket - Google Patents
Novel large-scale pier coating operation hanging basket Download PDFInfo
- Publication number
- CN203320415U CN203320415U CN201320338488XU CN201320338488U CN203320415U CN 203320415 U CN203320415 U CN 203320415U CN 201320338488X U CN201320338488X U CN 201320338488XU CN 201320338488 U CN201320338488 U CN 201320338488U CN 203320415 U CN203320415 U CN 203320415U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- main body
- shaped main
- lower device
- people
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a novel large-scale pier coating operation hanging basket, which comprises a hanging basket and four electric hoists which are used for lifting the hanging basket, and is characterized in that the hanging basket comprises a U-shaped main body and connecting plates which are detachably connected to two ends of an opening of the U-shaped main body; a worker and material lifting device is also arranged on the bottom of the U-shaped main body; a hauling cable is wound on a bridge floor. When the hanging basket is in a horizontal working state, connecting steel wires of the four electric hoists are respectively connected to the bridge floor and the four corners of the hanging basket; when the U-shaped main body is in a moving state with the opening facing downwards, the connecting steel wires of the two electric hoists close to the worker and material lifting device are respectively connected to the corresponding positions of the worker and material lifting device and the hanging basket; the connecting steel wires of the two electric hoists located at the opening end are respectively connected to the corresponding positions of the hauling cable and the hanging basket. Compared with the prior art, the hanging basket has the advantages that the use stability, the reliability and the safety are good, the hanging basket can be conveniently moved and mounted, and the omnibearing construction of a pier is facilitated.
Description
Technical field
The utility model relates to the engineering construction apparatus, specifically refers to a kind of novel Bridge Piers painting operation hanging basket.
Background technology
Hanging basket is the building machinery of construction work work high above the ground, for substituting traditional scaffold, is mainly used in the construction operations such as maintenance cleaning of curtain wall installation, outside Wall Cleaning, application, heat preservation construction and exterior wall; Also can be used for the operation of the engineerings such as large tank, bridge and dam.The hanging basket flexible operation, easily, convenient and practical, safety is also fine in displacement.Compared to traditional scaffold construction, it can reduce labor intensity, and increases work efficiency, and can reuse; And the construction cost of hanging basket is low, its operating expenses is only 28% of traditional scaffold.
As the notice of authorization number Chinese utility model patent disclosed " suspending basket for bridge detection " that is CN2653504Y, it comprises basket body, the two ends of basket body are respectively equipped with hanger, be connected with a plurality of self-lockings on each hanger from climbing cucurbit, each self-locking is connected with the wire rope for the basket body of slinging on climbing cucurbit.This hanging basket is owing to being mainly to do detection use, if come as building operations, the material that uses is more difficult is transported in hanging basket.
The Chinese utility model that notice of authorization number is CN202530375U for another example disclosed " a kind of beam body construction hanging basket dolly ", it comprises dolly and hanging basket, the top of dolly and hanging basket is by connecting as one across beam, the bottom of hanging basket is work plane, surrounding along the bottom work plane is provided with fence, by the dual-gripper beam, be fixed on across on beam, the height of dolly is the height to anti-collision wall a little more than the inner beam face, its below is provided with wheel, the width of dolly is greater than 2~3 times of the width of hanging basket, in the outermost end of dolly, is counterweight balancing mechanism.This utility model is can carry hanging basket along the dolly of bridge walking by arranging, and there is to certain limitation constructed work plane position.
Summary of the invention
Technical problem to be solved in the utility model is the present situation for prior art, and a kind of material and convenient novel Bridge Piers painting operation hanging basket of regulating work plane of conveniently transporting is provided.
The utility model solves the problems of the technologies described above adopted technical scheme: the Bridge Piers painting operation hanging basket that this is novel, comprise hanging basket and for four cucurbits of the described hanging basket of lifting, it is characterized in that described hanging basket comprises the U-shaped main body suitable with bridge pier to be onstructed and can dismantle the junction plate at the opening two ends that are connected to described U-shaped main body, described U-shaped bottom part body side also is provided with described hanging basket and is connected mutually, supplies the people of operating personnel's walking and material transportation to expect upper lower device, on described bridge floor, is surrounded with stay cord; Under the duty of described hanging basket in level, the connection steel wire of four cucurbits be connected on bridge floor and four angles of described hanging basket on; When described U-shaped main body under downward opening mobile status, expect that near described people the connection steel wire of two cucurbits of upper lower device is connected on the correspondence position that described people expects upper lower device and described hanging basket, the connection steel wire that is positioned at two cucurbits at described U-shaped body openings two ends is connected on the correspondence position of described stay cord and described hanging basket.
The Bridge Piers painting operation hanging basket that this is novel, can also comprise hanging basket and for four cucurbits of the described hanging basket of lifting, it is characterized in that described hanging basket comprises the U-shaped main body suitable with bridge pier to be onstructed and can dismantle the junction plate at the opening two ends that are connected to described U-shaped main body, described U-shaped body openings is respectively equipped with connection cord on two ends, described U-shaped bottom part body side also is provided with described hanging basket and is connected mutually, supplies the people of operating personnel's walking and material transportation to expect upper lower device, on described bridge floor, is surrounded with stay cord; Under the duty of described hanging basket in level, the connection steel wire of four cucurbits be connected on bridge floor and four angles of described hanging basket on; Under downward opening mobile status, near described people, expect that the connection steel wire of two cucurbits of upper lower device is connected on the correspondence position that described people expects upper lower device and described hanging basket when described U-shaped main body, the upper end of described connection cord connects described stay cord.
In such scheme, described people expects that upper lower device can have various structures, preferably, described people expects that upper lower device can comprise support and be connected to described support lower end for being connected the ladder of described hanging basket, described connection bracket is provided with can be along the castor of bridge floor walking, and, also be provided with the step for constructor's walking on described support.This people expects that upper and lower apparatus structure is fairly simple, and walking is convenient.
Preferably, described support is " C " font or " G " font.
Compared with prior art, novel Bridge Piers painting operation hanging basket provided by the utility model is owing on four angles of hanging basket, a cucurbit respectively being installed, four angles of hanging basket all have the steel wire of connection to hang, and have guaranteed stability, reliability and safety in the hanging basket use procedure; And the design of hanging basket " U " shape main body and junction plate is not only convenient to the omnibearing construction of bridge pier, and be convenient to installation and the movement of hanging basket; The design of stay cord makes operating personnel can position and install hanging basket easily on the bridge floor of having constructed, simple to operate, easy to use, safe.
The accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment duty.
Fig. 2 is the structural representation of the utility model embodiment U-shaped main body mobile status.
Fig. 3 is the lateral view of Fig. 1.
Fig. 4 is the top view of U-shaped main body in Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, embodiment is described in further detail the utility model.
As shown in Figures 1 to 4, this novel Bridge Piers painting operation hanging basket comprises:
Hanging basket, carry out the platform of constructing operation to bridge pier 6, comprise U-shaped main body 1 and can dismantle the junction plate (not shown) that is connected to U-shaped plate body openings two ends.
The people expects upper lower device 3, is arranged on U-shaped bottom part body side, for the transportation of the material that walks up and down and construct between bridge floor 7 and hanging basket for operating personnel.It comprises support 31 and is connected to the ladder 32 for being connected hanging basket of support lower end.Support in the present embodiment is " C " font, also can be designed to as required " G " font, support is provided with castor 33 and the balancing weight (not shown) for the walking of the bridge floor having constructed, castor in the present embodiment adopts universal wheel, also is provided with the step for constructor's walking on support.Ladder 32 is fixed on the lower end of support, for the people expects the convergence piece between upper lower device and hanging basket.
Stay cord 4, be looped around on the bridge floor of having constructed, for drawing high an end that hanging basket hangs down to horizontal level.
The effect of stay cord 4 is mainly for pulling the openend of U-shaped main body, makes hanging basket to horizontal level.Between stay cord and hanging basket, can be connected by connection cord, the present embodiment adopts this mode, and two connection cords 5 are as standby rope, and an end is connected on stay cord 4, and the other end is connected on the two ends of U-shaped body openings in advance.Also can not use connection cord, connection steel wire corresponding on cucurbit is arranged to enough length, before dismounting, this connection steel wire first is bolted to the people and expect on upper lower device, when moving to next bridge pier, be connected on stay cord 4.
The operating principle of above-mentioned novel Bridge Piers painting operation hanging basket is described below:
During work, control the lifting of hanging basket by operating four cucurbits, thereby complete the construction of whole bridge pier.In work progress, walking about of the transportation of material and constructor all can expect that step, ladder on upper lower device complete by the people.
When a Bridge Pier Construction complete, in the time of need to carrying out the construction of next bridge pier, first remove junction plate, then be the not connection steel wire of two cucurbits connection bridge floors of opening one side (namely bottom side) of hanging basket on the left of untiing, these two connection steel wires are fixed to the people by the bridge floor transfer and expect on upper lower device; Simultaneously, the free end that is fixed in advance the connection cord of openend is fixed on to the people and expects on upper lower device above, then untie two that two, right side cucurbit is connected on bridge floor and connect steel wires, make the U-shaped main hanger of hanging basket hang over the people and expect on upper lower device, as shown in Figure 2.Now, promote support, make the people expect that the U-shaped main body of upper lower device drive hanging basket moves along bridge floor together.When the people expects that upper lower device arrives next construction bridge pier, expect that by being fixed on the people connection cord on upper lower device is fixed on stay cord, pull stay cord by hoop, two connection cords holding U-shaped body openings end are pulled on bridge floor, continue to pull two connection cords, make U-shaped main body be enclosed within bridge pier outward and become horizontal direction, connect fixation with steel wire at bridge floor by two of two cucurbits again, finally, junction plate is overlapped on to the openend of U-shaped main body, can completes the installation of hanging basket.
For the scheme of not using connection cord: before discharging, first hanging basket is hung and is raised to extreme higher position, near the soffit of bridge floor, two of left side is connected to fixations with steel wire on people's material on lower device the time, connect steel wires enough length is arranged due to two of the right side cucurbit, therefore can by wherein one remaining section the connection steel wire in advance fixedly the people expect on upper lower device, like this, connect steel wires after bridge floor discharges when two of right side, hanging basket is when plumbness, on the mobile human material, lower device is to next construction bridge pier place, to be fixed on again the people and expect that the wherein connection fixation with steel wire of remaining section on upper lower device is to pulling cord, hoop pulls stay cord, the U-shaped main body of hanging basket can be pulled to level, at this moment existing three of hanging basket connects that steel wires haul and in level, the people can be sitting on hanging basket, after passing on the 4th connection steel wire, the personnel that are positioned on bridge floor can connect fixation with steel wire in bridge floor by the 4th.
In the above-described embodiments, for fear of the interference of bridge pier, stay cord can be looped around on the bridge floor at next construction bridge pier place in advance.But consider the convenience around stay cord, can be when a Bridge Pier Construction be complete, utilize hanging basket, bridge floor pressed on ring at mobile side direction winds stay cord, such as next one bridge pier to be onstructed is positioned at the bridge pier right side of having constructed, can wind stay cord in the bridge floor pressed on ring on the bridge pier right side of having constructed, make the stay cord on the bridge floor between adjacent bridge pier to expect what upper lower device moved together along with the people, at this moment, if the length long enough of connection cord or above-mentioned connection steel wire, all can be positioned at the connection cord in the bridge pier left side of having constructed or the connection steel wire of remaining section directly is connected on this stay cord by former, such scheme can reach the purpose of this utility model equally.
Claims (4)
1. a novel Bridge Piers painting operation hanging basket, comprise hanging basket and for four cucurbits of the described hanging basket of lifting, it is characterized in that described hanging basket comprises the U-shaped main body suitable with bridge pier to be onstructed and can dismantle the junction plate at the opening two ends that are connected to described U-shaped main body, described U-shaped bottom part body side also is provided with described hanging basket and is connected mutually, supplies the people of operating personnel's walking and material transportation to expect upper lower device, on described bridge floor, is surrounded with stay cord; Under the duty of described hanging basket in level, the connection steel wire of four cucurbits be connected on bridge floor and four angles of described hanging basket on; When described U-shaped main body under downward opening mobile status, expect that near described people the connection steel wire of two cucurbits of upper lower device is connected on the correspondence position that described people expects upper lower device and described hanging basket, the connection steel wire that is positioned at two cucurbits at described U-shaped body openings two ends is connected on the correspondence position of described stay cord and described hanging basket.
2. a novel Bridge Piers painting operation hanging basket, comprise hanging basket and for four cucurbits of the described hanging basket of lifting, it is characterized in that described hanging basket comprises the U-shaped main body suitable with bridge pier to be onstructed and can dismantle the junction plate at the opening two ends that are connected to described U-shaped main body, described U-shaped body openings is respectively equipped with connection cord on two ends, described U-shaped bottom part body side also is provided with described hanging basket and is connected mutually, supplies the people of operating personnel's walking and material transportation to expect upper lower device, on described bridge floor, is surrounded with stay cord; Under the duty of described hanging basket in level, the connection steel wire of four cucurbits be connected on bridge floor and four angles of described hanging basket on; Under downward opening mobile status, near described people, expect that the connection steel wire of two cucurbits of upper lower device is connected on the correspondence position that described people expects upper lower device and described hanging basket when described U-shaped main body, the upper end of described connection cord connects described stay cord.
3. novel Bridge Piers painting operation hanging basket according to claim 1 and 2, it is characterized in that described people expects that upper lower device comprises support and is connected to described support lower end for being connected the ladder of described hanging basket, described connection bracket is provided with can be along the castor of bridge floor walking, and, also be provided with the step for constructor's walking on described support.
4. novel Bridge Piers painting operation hanging basket according to claim 3, is characterized in that described support is " C " font or " G " font.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320338488XU CN203320415U (en) | 2013-06-13 | 2013-06-13 | Novel large-scale pier coating operation hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320338488XU CN203320415U (en) | 2013-06-13 | 2013-06-13 | Novel large-scale pier coating operation hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203320415U true CN203320415U (en) | 2013-12-04 |
Family
ID=49659781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320338488XU Expired - Fee Related CN203320415U (en) | 2013-06-13 | 2013-06-13 | Novel large-scale pier coating operation hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203320415U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104372746A (en) * | 2014-12-12 | 2015-02-25 | 大连鑫硕建筑劳务有限公司 | Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge |
CN108385541A (en) * | 2017-11-24 | 2018-08-10 | 中铁七局集团第五工程有限公司 | Pier top hanging basket mounting platform |
-
2013
- 2013-06-13 CN CN201320338488XU patent/CN203320415U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104372746A (en) * | 2014-12-12 | 2015-02-25 | 大连鑫硕建筑劳务有限公司 | Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge |
CN104372746B (en) * | 2014-12-12 | 2016-02-17 | 大连鑫硕建筑劳务有限公司 | The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof |
CN108385541A (en) * | 2017-11-24 | 2018-08-10 | 中铁七局集团第五工程有限公司 | Pier top hanging basket mounting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204899184U (en) | Hanging flower basket equipment | |
CN204454402U (en) | Detachable winch hanging apparatus | |
CN207974504U (en) | Climbing type hanging basket system for tilting decoration of exterior wall construction | |
CN103193137B (en) | High-altitude full automatic lifting and using method thereof | |
CN203320415U (en) | Novel large-scale pier coating operation hanging basket | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN104291222A (en) | Rigid protection and crane integration system inside super high-rise building core tube | |
CN102777048A (en) | Vertical transportation device | |
CN201531111U (en) | Movable hanging basket for installing and decorating curtain walls | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
JP5105146B2 (en) | Gondola device and method for constructing exterior of building using gondola device | |
CN209585654U (en) | Adhesion type goes up and down discharging platform | |
CN203874306U (en) | Rescue vehicle for climbing building | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN105776092A (en) | Stretching type basket device and construction method thereof | |
CN102807178A (en) | Chamfered hanging basket device with slide rail | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN208980193U (en) | The curtain wall hanging apparatus of anticollision | |
CN103359588B (en) | Folding-jib Trapezoidal elevator hanging basket | |
CN103977512A (en) | Building climbing rescue vehicle | |
CN213141328U (en) | Hanging basket for mounting safety type outdoor high-rise building electrical appliances | |
CN108035530A (en) | A kind of inner wall of oil tank construction hanging basket | |
CN210886924U (en) | Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area | |
CN105155832B (en) | A kind of hanging basket equipment and its moving method | |
CN104249963A (en) | Electric lifting basket for large-size lock drainage shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131204 Termination date: 20170613 |
|
CF01 | Termination of patent right due to non-payment of annual fee |