CN105155832B - A kind of hanging basket equipment and its moving method - Google Patents

A kind of hanging basket equipment and its moving method Download PDF

Info

Publication number
CN105155832B
CN105155832B CN201510337407.8A CN201510337407A CN105155832B CN 105155832 B CN105155832 B CN 105155832B CN 201510337407 A CN201510337407 A CN 201510337407A CN 105155832 B CN105155832 B CN 105155832B
Authority
CN
China
Prior art keywords
hanging basket
connecting portion
pulley group
hoist engine
drag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510337407.8A
Other languages
Chinese (zh)
Other versions
CN105155832A (en
Inventor
黄思成
徐联民
毛荣英
冯锋
武立山
张海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201510337407.8A priority Critical patent/CN105155832B/en
Publication of CN105155832A publication Critical patent/CN105155832A/en
Application granted granted Critical
Publication of CN105155832B publication Critical patent/CN105155832B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of hanging basket equipment, including hanging basket, suspension arrangement, steel wire rope, drag-line, hoist engine, pull rope and distal end fixed pulley;Hanging basket is hung on a steel cord by suspension arrangement;Steel wire rope is hung on rack lower boom by many spaced drag-lines;Hoist engine is arranged in hanging basket and is connected by pull rope with distal end fixed pulley.The present invention also provides a kind of moving method of above-mentioned hanging basket equipment, including:When hanging basket is moved near drag-line, hoist engine is closed, the first pulley group in the suspension arrangement of drag-line is pulled down;Opening hoist engine makes hanging basket slide one end distance so that crosses drag-line and closes hoist engine in the part that first pulley group is installed on connecting portion;Again first pulley group is arranged on connecting portion, and second pulley group is pulled down from connecting portion;Opening hoist engine makes hanging basket slide one end distance so that drag-line is crossed in the part that second pulley group is installed on connecting portion, closes hoist engine and second pulley group is reinstalled in into connecting portion.

Description

A kind of hanging basket equipment and its moving method
Technical field
The present invention relates to building field, more particularly to a kind of hanging basket equipment and its moving method.
Background technology
With greatly across and super-span steel building greatly develop, the concatenation construction difficulty of roof grid structure is more and more big. Generally the concatenation construction of roof grid structure is carried out by setting up full hall formula scaffold.However, full hall formula scaffold needs tens thousand of tons Scaffold tubes and fastener, cause to lease, transport, storing and labour cost is higher;The height for being additionally, since full hall formula scaffold is higher, Technical difficulty is big and security risk is high.Therefore, existing full hall formula scaffold is setting up speed, is solving the superelevation super-span side of setting up Face is difficult to meet construction requirement such as construction period, safety requirements etc., it is also difficult to solves the problems, such as floor load-bearing, influences other work posts to apply The expansion in work face and integral construction progress.
The content of the invention
The technical problems to be solved by the invention be there is provided it is a kind of simple to operate and be easy to mobile hanging basket equipment and its Moving method.
The present invention is achieved in that a kind of hanging basket equipment of offer, including hanging basket, suspension arrangement, steel wire rope, drag-line, volume Raise machine, pull rope and distal end fixed pulley;Wherein, the corner of the hanging basket is hung on institute by the suspension arrangement described in four respectively State on steel wire rope, each described suspension arrangement includes connecting portion, first pulley group and second pulley group, the connecting portion is in U-shaped, it includes two vertical arm, and the connecting portion is fixed on the hanging basket, the first pulley group and second pulley group It is bolted respectively in two vertical arm of the connecting portion;The steel wire rope passes through many spaced drawings Rope is hung on rack lower boom;The hoist engine is arranged in the hanging basket and slided surely with the distal end by the pull rope Wheel connection.
Further, the first pulley group and the second pulley group include the first side plate, the second side plate and cunning respectively Wheel;First side plate and second side plate are crossed on the steel wire rope;The pulley be arranged on first side plate and Contacted between second side plate and with the steel wire rope.
Further, the hanging basket is provided with adjutage;The connecting portion is arranged on the adjutage.
The embodiment of the present invention also provides a kind of moving method of above-mentioned hanging basket equipment, including:
Hoist engine in the hanging basket equipment is opened so that hanging basket in the hanging basket equipment is towards next construction area Move horizontally;
When the hanging basket is moved near the drag-line in the hanging basket equipment, the hoist engine is closed, is pulled down close to institute State the first pulley group in the suspension arrangement in the hanging basket equipment of drag-line;
Opening the hoist engine makes the hanging basket slide a segment distance so that installed on the connecting portion in the suspension arrangement Second pulley group in the drag-line, and the suspension arrangement is crossed close to the drag-line in the part of the first pulley group, and Close the hoist engine;
Again the first pulley group is arranged on the connecting portion, and by the second pulley group from the connecting portion On pull down;
Opening the hoist engine makes the hanging basket slide a segment distance so that the second pulley is installed on the connecting portion The drag-line is crossed in the part of group, closes the hoist engine and the second pulley group is reinstalled in into the connecting portion;
Opening the hoist engine makes the hanging basket continue to move horizontally towards next construction area.
The hanging basket in hanging basket equipment and its moving method in the embodiment of the present invention is hung on steel wire rope by suspension arrangement On, and steel wire rope is further hung on rack lower boom by many drag-lines, can reduce measure input, increases the turnover of measure And recycling, reduce construction cost;Also, because steel wire rope is hung on rack lower boom by many drag-lines, in hanging basket Steel wire rope occurs without excessive downwarp in long range slipping, it is ensured that the construction space of grid structure, and workmen is hanging The horizontal displacement of hanging basket can be achieved in basket;Barrel structure is simple, hang simple, bolt connection, installs and convenient disassembly.
Brief description of the drawings
Fig. 1 is the structural representation of hanging basket equipment in one embodiment of the invention.
Fig. 2 is the enlarged diagram of Fig. 1 centre circle a parts.
Fig. 3 is the decomposing schematic representation of suspension arrangement in Fig. 2.
Fig. 4 to Fig. 9 is the process schematic of hanging basket equipment level movement in Fig. 1.
Embodiment
In order that technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Drawings and Examples are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
Fig. 1 is the structural representation of hanging basket equipment 100 in one embodiment of the invention.As shown in figure 1, hanging basket equipment 100 is wrapped Include hanging basket 110, suspension arrangement 120, steel wire rope 130, drag-line 150, hoist engine 160, pull rope 170 and distal end fixed pulley 180.Its In, hanging basket 110 is hung on steel wire rope 130 by suspension arrangement 120;Steel wire rope 130 is hung on rack lower edge by drag-line 150 On bar 200;Hoist engine 160 is arranged in hanging basket 110 and is connected by pull rope 170 with distal end fixed pulley 180.
Specifically, the corner of hanging basket 110 is respectively equipped with adjutage 112.Adjutage 112 extends approximately along vertical direction. In one embodiment, hanging basket 100 can be made using the square steel in section 30 × 30 × 2.5.
Suspension arrangement 120 is separately positioned on adjutage 112.As shown in fig. 1, suspension arrangement 120 can be divided into two groups, First group of suspension arrangement 120 i.e. close to distal end fixed pulley 180 includes two suspension arrangements 120 and away from nearly distal end fixed pulley 180 second group of suspension arrangement 120 includes two suspension arrangements 120.
As shown in Figures 2 and 3, each suspension arrangement 120 includes connecting portion 122, first pulley group 123 and second pulley group 124.Connecting portion 122 can be fixed on adjutage 112 by modes such as welding.First pulley group 123 and second pulley group 124 can Releasably it is arranged on connecting portion 122.In the embodiment shown in Fig. 2 and Fig. 3, connecting portion 122 is substantially u-shaped, including two Vertical arm;First pulley group 123 and second pulley group 124 are separately positioned in two vertical arm of connecting portion 122 by bolt.
First pulley group 123 and second pulley group 124 include the first side plate 125, the second side plate 126 and pulley 127 respectively. First side plate 125 and the second side plate 126 are relative and be arranged substantially in parallel.Pulley 127 is arranged on the first side plate 125 and the second side plate Between 126.
In actual use, the first side plate 125 and the second side plate 126 can be crossed on steel wire rope from top to down On 130 pulley 127 is arranged on steel wire rope 130, and utilizes screw bolt passes the first side plate 125, connecting portion 122 and the Two side plates 126, you can the second pulley group 124 of first pulley group 123/ is arranged on steel wire rope 130 and hanging basket 110.
Steel wire rope 130 is hung on rack lower boom 200 by drag-line 150.Steel wire rope 130 can use the steel wire ropes of φ 8.For Preventing steel wire rope 130, downwarp is excessive under the Action of Gravity Field of workmen in hanging basket 110 and hanging basket 110, can be in rack lower edge The each preset distance in the lower section of a bar 200 piece drag-line 150 of such as 6 meters settings.One end of drag-line 150 such as top is fixed on rack lower boom On 200, bottom is connected with steel wire rope 130.In one embodiment, drag-line 150 can use the steel wire ropes of φ 8.
Hoist engine 160 is fixed on the centre position of hanging basket 110, and is connected by pull rope 170 with distal end fixed pulley 180.
Above-mentioned is the concrete structure of hanging basket equipment 100 in one embodiment of the invention, is briefly described as follows the hanging basket equipment 100 Moving method.
In actual use, workmen can carry out the construction such as welding in hanging basket 110.It is complete in a certain construction area Into after construction, by controlling hoist engine 160 so that hanging basket 110 is moved horizontally towards next construction area.
As depicted in figs. 1 and 2, when hanging basket 110 is moved near drag-line 150, hoist engine 160 is closed.
As shown in Figure 4 and Figure 5, first pulley group 123 in first group of suspension arrangement 120 close to drag-line 150 is pulled down (such as Shown in Fig. 5), it is then turned on hoist engine 160 and makes hanging basket 110 slide a segment distance so that first pulley group is installed on connecting portion 122 Drag-line 150 is crossed in 123 part, and second pulley group 124 is close to drag-line, and closes hoist engine 160.
As shown in Figure 6 and Figure 7, first pulley group 123 is arranged on connecting portion 122 again, and by second pulley group 124 Pulled down from connecting portion 122.
As shown in Figure 8 and Figure 9, opening hoist engine 160 makes hanging basket 110 slide a segment distance so that installed on connecting portion 122 Drag-line 150 is crossed in the part of second pulley group 124, closes hoist engine 160 and second pulley group 124 is reinstalled in into connecting portion On 122.
Opening hoist engine 160 makes hanging basket 110 continue to move horizontally towards next construction area.
Had the advantage that as described above, the hanging basket equipment 100 and its moving method in the embodiment of the present invention at least have:
1) hanging basket 110 is hung on steel wire rope 130 by suspension arrangement 120, and steel wire rope 130 further passes through drag-line 150 are hung on rack lower boom 200, can reduce measure input, increase the turnover and recycling of measure, reduction is constructed into This;
2) because steel wire rope 130 is hung on rack lower boom 200 by many drag-lines 150, slided over long distances in hanging basket 110 Steel wire rope 130 occurs without excessive downwarp during shifting, it is ensured that the construction space of grid structure, and workmen is in hanging basket 110 The interior horizontal displacement that hanging basket can be achieved;
3) hanging basket 110 is simple in construction, hang simple, bolt connection, installs and convenient disassembly.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (4)

1. a kind of hanging basket equipment, it is characterised in that including hanging basket, suspension arrangement, steel wire rope, drag-line, hoist engine, pull rope and remote Hold fixed pulley;Wherein, the corner of the hanging basket is hung on the steel wire rope by the suspension arrangement described in four respectively, each The individual suspension arrangement includes connecting portion, first pulley group and second pulley group, and the connecting portion takes the shape of the letter U, and it includes two Vertical arm, and the connecting portion is fixed on the hanging basket, the first pulley group and second pulley group are connected by bolt respectively It is connected in two vertical arm of the connecting portion;The steel wire rope is hung under rack by many spaced drag-lines On chord member;The hoist engine is arranged in the hanging basket and is connected by the pull rope with the distal end fixed pulley.
2. hanging basket equipment according to claim 1, it is characterised in that the first pulley group and the second pulley component Bao Kuo not the first side plate, the second side plate and pulley;First side plate and second side plate are crossed on the steel wire rope;Institute Pulley is stated to be arranged between first side plate and second side plate and contact with the steel wire rope.
3. hanging basket equipment according to claim 1, it is characterised in that the hanging basket is provided with adjutage;The connecting portion It is arranged on the adjutage.
4. the moving method of a kind of hanging basket equipment according to any one of claims 1 to 3, it is characterised in that described Moving method includes:
Hoist engine in the hanging basket equipment is opened so that hanging basket in the hanging basket equipment is towards next construction area level It is mobile;
When the hanging basket is moved near the drag-line in the hanging basket equipment, the hoist engine is closed, pulls down and is drawn close to described The first pulley group in suspension arrangement in the hanging basket equipment of rope;
Opening the hoist engine makes the hanging basket slide a segment distance so that install described on the connecting portion in the suspension arrangement Second pulley group in the drag-line, and the suspension arrangement is crossed close to the drag-line in the part of first pulley group, and closes The hoist engine;
Again the first pulley group is arranged on the connecting portion, and the second pulley group is torn open from the connecting portion Under;
Opening the hoist engine makes the hanging basket slide a segment distance so that the second pulley group is installed on the connecting portion The drag-line is crossed in part, closes the hoist engine and the second pulley group is reinstalled in into the connecting portion;
Opening the hoist engine makes the hanging basket continue to move horizontally towards next construction area.
CN201510337407.8A 2015-06-17 2015-06-17 A kind of hanging basket equipment and its moving method Active CN105155832B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510337407.8A CN105155832B (en) 2015-06-17 2015-06-17 A kind of hanging basket equipment and its moving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510337407.8A CN105155832B (en) 2015-06-17 2015-06-17 A kind of hanging basket equipment and its moving method

Publications (2)

Publication Number Publication Date
CN105155832A CN105155832A (en) 2015-12-16
CN105155832B true CN105155832B (en) 2017-08-25

Family

ID=54796841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510337407.8A Active CN105155832B (en) 2015-06-17 2015-06-17 A kind of hanging basket equipment and its moving method

Country Status (1)

Country Link
CN (1) CN105155832B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958219A (en) * 2019-04-11 2019-07-02 中国十七冶集团有限公司 A kind of complex environment roofing truss lower part liner plate suspension cable installation method
CN110847583A (en) * 2019-10-22 2020-02-28 浑云松 Automatic coating hanging basket

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10104248C1 (en) * 2001-01-31 2002-10-02 Asg Aluminium Systeme Gmbh Horizontally-moving trolley for use on facade of building has two pairs of rollers running on overhead rail and includes pulley drive system
CN102409838B (en) * 2011-08-22 2014-05-28 中国建筑第八工程局有限公司 Moveable operating platform and method for constructing suspended ceiling of roof by using same
CN102733589A (en) * 2012-06-26 2012-10-17 中建钢构有限公司 Mobile operating platform and construction method thereof
CN202767494U (en) * 2012-09-06 2013-03-06 安徽富煌钢构股份有限公司 Hanging basket for high-altitude roof inner plate construction
CN203701560U (en) * 2013-12-31 2014-07-09 森特士兴集团股份有限公司 Suspension hanging basket for high-altitude roofing inner plate construction
CN104631810B (en) * 2015-01-15 2016-06-08 中誉远发国际建设集团有限公司 High altitude moving hanging basket system and construction method
CN204899184U (en) * 2015-06-17 2015-12-23 中建钢构有限公司 Hanging flower basket equipment

Also Published As

Publication number Publication date
CN105155832A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN204899184U (en) Hanging flower basket equipment
CN203905425U (en) Elevator shaft construction tool type operation platform and safety protection integrated structure
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN105155832B (en) A kind of hanging basket equipment and its moving method
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN109667416B (en) Elevator shaft integral lifting operation platform and lifting method thereof
CN205773024U (en) Convenient pipeline promotes auxiliary device
CN206769351U (en) A kind of regularization hoistway operation platform hoisting frame
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN201649654U (en) Discharging platform for high-rise building construction
CN203891442U (en) High-rise elevator shaft template supporting platform
CN203430008U (en) Integrally movable type construction platform for cast-in-situ of elevator shaft
CN203257106U (en) Multifunctional power-driven walking type walking system
CN206722431U (en) Discharging platform for high-rise building construction
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN205558308U (en) Integrated form platform of unloading
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN109279522A (en) Movable units body glass curtain wall cantilevered hanging device
CN206108724U (en) Simple and easy installing support device of long large -diameter pile base steel reinforcement cage self -control
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN202672694U (en) Circulating operation platform for hoistway construction
CN209567730U (en) A kind of small-sized lattice dead man steel construction
CN204355947U (en) Large-scale without eye plate lifting beam device
CN204492173U (en) Elevator shaft integral lifting template operation platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518040 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.