CN105155832A - Hanging basket device and moving method thereof - Google Patents
Hanging basket device and moving method thereof Download PDFInfo
- Publication number
- CN105155832A CN105155832A CN201510337407.8A CN201510337407A CN105155832A CN 105155832 A CN105155832 A CN 105155832A CN 201510337407 A CN201510337407 A CN 201510337407A CN 105155832 A CN105155832 A CN 105155832A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- connecting portion
- assembly pulley
- pulley
- hoist engine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a hanging basket device, comprising a hanging basket a suspension gear, steel wire ropes, inhaul cables, a winch, a hauling cable, and a far-end fixed pulley. The hanging basket is hung on the steel wire ropes through the suspension gear. The steel wire rope is hung on a net rack lower chord through the plurality of inhaul cables which are arranged at interval. The winch is arranged in the hanging basket and is connected with the far-end fixed pulley through the hauling cable. The invention also provides a moving method for the hanging basket device. The method comprises: when the hanging basket moves close to the inhaul cable, switching off the winch, dismounting a first pulley block of the suspension gear which is close to the inhaul cable; switching on the winch, to make the hanging basket slide a certain distance, to make a part of a connecting portion which is provided with the first pulley block cross the inhaul cable and switching off the winch; installing the first pulley block on the connecting portion again, and dismounting a second pulley block from the connecting portion; switching on the winch to make the hanging basket slide a certain distance, to make a part of the connecting portion which is provided with the second pulley block cross the inhaul cable and switching off the winch, and installing the second pulley block on the connecting portion again.
Description
Technical field
The present invention relates to building field, particularly a kind of hanging basket equipment and moving method thereof.
Background technology
Along with large across and the greatly developing of super-span steel building, the concatenation construction difficulty of roof grid structure is more and more large.Usually the concatenation construction of roof grid structure is carried out by setting up full hall formula scaffold.But full hall formula scaffold needs tens thousand of tons of scaffold tubes and fastener, cause lease, transport, storage and labour cost higher; And because the height of full hall formula scaffold is higher, technical difficulty is large and security risk is high.Therefore, existing full hall formula scaffold setting up speed, solve superelevation super-span set up in be difficult to meet construction requirement as construction period, safety requirements etc., be also difficult to solve floor load-bearing problem, affect expansion and the integral construction progress of other work post working face.
Summary of the invention
Technical problem to be solved by this invention is, provides a kind of simple to operate and be convenient to hanging basket equipment and the moving method thereof of movement.
The present invention is achieved in that provides a kind of hanging basket equipment, comprises hanging basket, suspension arrangement, wire rope, drag-line, hoist engine, pull rope and far-end fixed pulley; Wherein, described hanging basket is hung on described wire rope by described suspension arrangement; Described wire rope is hung on rack lower chord by many spaced described drag-lines; Described hoist engine to be arranged in described hanging basket and to be connected with described far-end fixed pulley by described pull rope.
Further, described suspension arrangement comprises connecting portion, the first assembly pulley and the second assembly pulley; Described connecting portion is fixed on described hanging basket; Described first assembly pulley and described second assembly pulley are removably disposed on described connecting portion.
Further, described connecting portion takes the shape of the letter U, and comprises two vertical arm; Described first assembly pulley and described second assembly pulley are separately positioned in two vertical arm of described connecting portion by bolt.
Further, described first assembly pulley and described second assembly pulley comprise the first side plate, the second side plate and pulley respectively; Described first side plate and described second side plate are crossed on described wire rope; Described pulley to be arranged between described first side plate and described second side plate and to contact with described wire rope.
Further, described hanging basket is provided with adjutage; Described connecting portion is arranged on described adjutage.
The embodiment of the present invention also provides a kind of moving method of above-mentioned hanging basket equipment, comprising:
The hoist engine opened in described hanging basket equipment makes the hanging basket in described hanging basket equipment move horizontally towards next construction area;
When described hanging basket moves near the drag-line in described hanging basket equipment, close described hoist engine, pull down the first assembly pulley in the suspension arrangement in the described hanging basket equipment of described drag-line;
Opening described hoist engine makes described hanging basket slide one end distance, the part of the connecting portion in described suspension arrangement being installed described first assembly pulley is made to cross described drag-line, and the second assembly pulley in described suspension arrangement is near described drag-line, and close described hoist engine;
Again described first assembly pulley is arranged on described connecting portion, and described second assembly pulley is pulled down from described connecting portion;
Opening described hoist engine makes described hanging basket slide one end distance, makes the part of described connecting portion being installed described second assembly pulley cross described drag-line, closes described hoist engine and described second assembly pulley is reinstalled in described connecting portion;
Opening described hoist engine makes described hanging basket continue to move horizontally towards described next construction area.
Hanging basket equipment in the embodiment of the present invention and the hanging basket in moving method thereof hang on a steel cord by suspension arrangement, and wire rope is hung on rack lower chord further by many drag-lines, measure can be reduced drop into, increase the turnover of measure and recycle, reduce construction cost; Further, because wire rope is hung on rack lower chord by many drag-lines, there is not excessive downwarp in wire rope in hanging basket long distance slipping, can ensure the construction space of space truss structure, and constructor can realize the horizontal movement of hanging basket in hanging basket; Barrel structure is simple, it is simple and easy to hang, bolt connects, and installs and convenient disassembly.
Accompanying drawing explanation
Fig. 1 is the structural representation of hanging basket equipment in one embodiment of the invention.
Fig. 2 is the enlarged diagram of Fig. 1 centre circle a part.
Fig. 3 is the decomposing schematic representation of suspension arrangement in Fig. 2.
Fig. 4 to Fig. 9 is the process schematic of hanging basket equipment level movement in Fig. 1.
Detailed description of the invention
In order to make technical problem to be solved by this invention, technical scheme and beneficial effect clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Fig. 1 is the structural representation of hanging basket equipment 100 in one embodiment of the invention.As shown in Figure 1, hanging basket equipment 100 comprises hanging basket 110, suspension arrangement 120, wire rope 130, drag-line 150, hoist engine 160, pull rope 170 and far-end fixed pulley 180.Wherein, hanging basket 110 is hung on wire rope 130 by suspension arrangement 120; Wire rope 130 is hung on rack lower chord 200 by drag-line 150; Hoist engine 160 to be arranged in hanging basket 110 and to be connected with far-end fixed pulley 180 by pull rope 170.
Particularly, the corner of hanging basket 110 is respectively equipped with adjutage 112.Adjutage 112 roughly extends along vertical direction.In one embodiment, hanging basket 100 can adopt the square steel in cross section 30 × 30 × 2.5 to make.
Suspension arrangement 120 is separately positioned on adjutage 112.As shown in fig. 1, suspension arrangement 120 can be divided into two groups, and first group of suspension arrangement 120 namely near far-end fixed pulley 180 comprises two suspension arrangements 120 and comprise two suspension arrangements 120 away from second group of suspension arrangement 120 of nearly far-end fixed pulley 180.
As shown in Figures 2 and 3, each suspension arrangement 120 comprises connecting portion 122, first assembly pulley 123 and the second assembly pulley 124.Connecting portion 122 is fixed on adjutage 112 by modes such as welding.First assembly pulley 123 and the second assembly pulley 124 are removably disposed on connecting portion 122.In the embodiment shown in Fig. 2 and Fig. 3, connecting portion 122 roughly takes the shape of the letter U, and comprises two vertical arm; First assembly pulley 123 and the second assembly pulley 124 are separately positioned in two vertical arm of connecting portion 122 by bolt.
First assembly pulley 123 and the second assembly pulley 124 comprise the first side plate 125, second side plate 126 and pulley 127 respectively.And the almost parallel setting relative with the second side plate 126 of first side plate 125.Pulley 127 is arranged between the first side plate 125 and the second side plate 126.
In actual use, first side plate 125 and the second side plate 126 from top to down can be crossed on wire rope 130 makes pulley 127 be arranged on wire rope 130, and utilize screw bolt passes first side plate 125, connecting portion 122 and the second side plate 126, the first assembly pulley 123/ second assembly pulley 124 can be arranged on wire rope 130 and hanging basket 110.
Wire rope 130 is hung on rack lower chord 200 by drag-line 150.Wire rope 130 can adopt φ 8 wire rope.In order to downwarp under preventing the Action of Gravity Field of wire rope 130 constructor in hanging basket 110 and hanging basket 110 is excessive, below rack lower chord 200, a drag-line 150 can be set each preset distance as 6 meters.Such as the top, one end of drag-line 150 is fixed on rack lower chord 200, and bottom is connected with wire rope 130.In one embodiment, drag-line 150 can adopt φ 8 wire rope.
Hoist engine 160 is fixed on the centre position of hanging basket 110, and is connected with far-end fixed pulley 180 by pull rope 170.
Above-mentioned is the concrete structure of hanging basket equipment 100 in one embodiment of the invention, briefly explains the moving method of this hanging basket equipment 100 below.
In actual use, constructor can carry out the constructions such as welding in hanging basket 110.After a certain construction area completes construction, by controlling hoist engine 160, hanging basket 110 is moved horizontally towards next construction area.
As depicted in figs. 1 and 2, when hanging basket 110 moves near drag-line 150, close hoist engine 160.
As shown in Figure 4 and Figure 5, pull down the first assembly pulley 123 (as shown in Figure 5) in first group of suspension arrangement 120 of drag-line 150, then opening hoist engine 160 makes hanging basket 110 slide one end distance, the part of connecting portion 122 being installed the first assembly pulley 123 is made to cross drag-line 150, and the second assembly pulley 124 is near drag-line, and close hoist engine 160.
As shown in Figure 6 and Figure 7, again the first assembly pulley 123 is arranged on connecting portion 122, and the second assembly pulley 124 is pulled down from connecting portion 122.
As shown in Figure 8 and Figure 9, open hoist engine 160 and make hanging basket 110 slide one end distance, make the part of connecting portion 122 being installed the second assembly pulley 124 cross drag-line 150, close hoist engine 160 and also the second assembly pulley 124 is reinstalled on connecting portion 122.
Opening hoist engine 160 makes hanging basket 110 continue to move horizontally towards next construction area.
As mentioned above, the hanging basket equipment 100 in the embodiment of the present invention and moving method thereof at least have following advantage:
1) hanging basket 110 is hung on wire rope 130 by suspension arrangement 120, and wire rope 130 is hung on rack lower chord 200 further by drag-line 150, can reduce measure and drop into, increase the turnover of measure and recycle, reduce construction cost;
2) because wire rope 130 is hung on rack lower chord 200 by many drag-lines 150, there is not excessive downwarp in wire rope 130 in hanging basket 110 long distance slipping, can ensure the construction space of space truss structure, and constructor can realize the horizontal movement of hanging basket in hanging basket 110;
3) hanging basket 110 structure simple, hang simple and easy, bolt and connect, install and convenient disassembly.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.
Claims (6)
1. a hanging basket equipment, is characterized in that, comprises hanging basket, suspension arrangement, wire rope, drag-line, hoist engine, pull rope and far-end fixed pulley; Wherein, described hanging basket is hung on described wire rope by described suspension arrangement; Described wire rope is hung on rack lower chord by many spaced described drag-lines; Described hoist engine to be arranged in described hanging basket and to be connected with described far-end fixed pulley by described pull rope.
2. hanging basket equipment according to claim 1, is characterized in that, described suspension arrangement comprises connecting portion, the first assembly pulley and the second assembly pulley; Described connecting portion is fixed on described hanging basket; Described first assembly pulley and described second assembly pulley are removably disposed on described connecting portion.
3. hanging basket equipment according to claim 2, is characterized in that, described connecting portion takes the shape of the letter U, and comprises two vertical arm; Described first assembly pulley and described second assembly pulley are separately positioned in two vertical arm of described connecting portion by bolt.
4. hanging basket equipment according to claim 2, is characterized in that, described first assembly pulley and described second assembly pulley comprise the first side plate, the second side plate and pulley respectively; Described first side plate and described second side plate are crossed on described wire rope; Described pulley to be arranged between described first side plate and described second side plate and to contact with described wire rope.
5. hanging basket equipment according to claim 2, is characterized in that, described hanging basket is provided with adjutage; Described connecting portion is arranged on described adjutage.
6. according to a moving method for the hanging basket equipment in claim 1 to 5 described in any one, it is characterized in that, described moving method comprises:
The hoist engine opened in described hanging basket equipment makes the hanging basket in described hanging basket equipment move horizontally towards next construction area;
When described hanging basket moves near the drag-line in described hanging basket equipment, close described hoist engine, pull down the first assembly pulley in the suspension arrangement in the described hanging basket equipment of described drag-line;
Opening described hoist engine makes described hanging basket slide one end distance, the part of the connecting portion in described suspension arrangement being installed described first assembly pulley is made to cross described drag-line, and the second assembly pulley in described suspension arrangement is near described drag-line, and close described hoist engine;
Again described first assembly pulley is arranged on described connecting portion, and described second assembly pulley is pulled down from described connecting portion;
Opening described hoist engine makes described hanging basket slide one end distance, makes the part of described connecting portion being installed described second assembly pulley cross described drag-line, closes described hoist engine and described second assembly pulley is reinstalled in described connecting portion;
Opening described hoist engine makes described hanging basket continue to move horizontally towards described next construction area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510337407.8A CN105155832B (en) | 2015-06-17 | 2015-06-17 | A kind of hanging basket equipment and its moving method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510337407.8A CN105155832B (en) | 2015-06-17 | 2015-06-17 | A kind of hanging basket equipment and its moving method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105155832A true CN105155832A (en) | 2015-12-16 |
CN105155832B CN105155832B (en) | 2017-08-25 |
Family
ID=54796841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510337407.8A Active CN105155832B (en) | 2015-06-17 | 2015-06-17 | A kind of hanging basket equipment and its moving method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105155832B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
CN110847583A (en) * | 2019-10-22 | 2020-02-28 | 浑云松 | Automatic coating hanging basket |
CN115095131A (en) * | 2022-06-10 | 2022-09-23 | 中国水利水电第七工程局有限公司 | Steel-structure canopy glass installation movable hanging basket and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10104248C1 (en) * | 2001-01-31 | 2002-10-02 | Asg Aluminium Systeme Gmbh | Horizontally-moving trolley for use on facade of building has two pairs of rollers running on overhead rail and includes pulley drive system |
CN102409838A (en) * | 2011-08-22 | 2012-04-11 | 中国建筑第八工程局有限公司 | Mobile operation platform and roof suspended ceiling construction method using same |
CN102733589A (en) * | 2012-06-26 | 2012-10-17 | 中建钢构有限公司 | Mobile operating platform and construction method thereof |
CN202767494U (en) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | Hanging basket for high-altitude roof inner plate construction |
CN203701560U (en) * | 2013-12-31 | 2014-07-09 | 森特士兴集团股份有限公司 | Suspension hanging basket for high-altitude roofing inner plate construction |
CN104631810A (en) * | 2015-01-15 | 2015-05-20 | 中誉远发国际建设集团有限公司 | High-altitude movable hanging basket system and construction method thereof |
CN204899184U (en) * | 2015-06-17 | 2015-12-23 | 中建钢构有限公司 | Hanging flower basket equipment |
-
2015
- 2015-06-17 CN CN201510337407.8A patent/CN105155832B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10104248C1 (en) * | 2001-01-31 | 2002-10-02 | Asg Aluminium Systeme Gmbh | Horizontally-moving trolley for use on facade of building has two pairs of rollers running on overhead rail and includes pulley drive system |
CN102409838A (en) * | 2011-08-22 | 2012-04-11 | 中国建筑第八工程局有限公司 | Mobile operation platform and roof suspended ceiling construction method using same |
CN102733589A (en) * | 2012-06-26 | 2012-10-17 | 中建钢构有限公司 | Mobile operating platform and construction method thereof |
CN202767494U (en) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | Hanging basket for high-altitude roof inner plate construction |
CN203701560U (en) * | 2013-12-31 | 2014-07-09 | 森特士兴集团股份有限公司 | Suspension hanging basket for high-altitude roofing inner plate construction |
CN104631810A (en) * | 2015-01-15 | 2015-05-20 | 中誉远发国际建设集团有限公司 | High-altitude movable hanging basket system and construction method thereof |
CN204899184U (en) * | 2015-06-17 | 2015-12-23 | 中建钢构有限公司 | Hanging flower basket equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
CN110847583A (en) * | 2019-10-22 | 2020-02-28 | 浑云松 | Automatic coating hanging basket |
CN115095131A (en) * | 2022-06-10 | 2022-09-23 | 中国水利水电第七工程局有限公司 | Steel-structure canopy glass installation movable hanging basket and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN105155832B (en) | 2017-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204899184U (en) | Hanging flower basket equipment | |
CN201458596U (en) | Crane with self-dismounting device | |
CN201221193Y (en) | High altitude packway ceiling construction operating platform | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN110228743A (en) | Two-to-one suspension is set in elevator traction than building hoist and its operational method | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN217028004U (en) | Annular hanging basket suspension device for curtain wall construction of super high-rise building | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN104631810A (en) | High-altitude movable hanging basket system and construction method thereof | |
CN106241618A (en) | A kind of curtain wall profiles boom hoisting | |
CN102635225A (en) | Equipment hoisting platform and method for super high-rise buildings | |
CN202689495U (en) | Self-elevating chimney and water tower construction tower frame | |
CN105155832A (en) | Hanging basket device and moving method thereof | |
CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN105776092A (en) | Stretching type basket device and construction method thereof | |
CN203878957U (en) | Protective screen module unit | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN102009930A (en) | Installation rack for height operation platform elevator | |
CN204508532U (en) | Oil storage cave depot To Construction of Silo bont | |
CN109279522A (en) | Movable units body glass curtain wall cantilevered hanging device | |
CN103058083B (en) | Bolt sphere truss gig | |
CN107060347A (en) | A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Science And Industry Co.,Ltd. Address before: 518040 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A Patentee before: China Construction Steel Structure Corp.,Ltd. |
|
CP03 | Change of name, title or address |