A kind of curtain wall profiles boom hoisting Download PDFInfo
- Publication number
- CN206051364U CN206051364U CN201621066694.XU CN201621066694U CN206051364U CN 206051364 U CN206051364 U CN 206051364U CN 201621066694 U CN201621066694 U CN 201621066694U CN 206051364 U CN206051364 U CN 206051364U
- Authority
- CN
- China
- Prior art keywords
- support
- boom hoisting
- curtain wall
- wall profiles
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑设备技术领域,更进一步地说是涉及一种幕墙型材起吊装置。The utility model relates to the technical field of construction equipment, in particular to a curtain wall profile lifting device.
背景技术Background technique
建筑施工过程中需要向楼层吊装各种材料,对于后期幕墙施工来说,需要将地面的幕墙外窗向上运送到指定楼层,传统的吊装方法通常采用吊车进行垂直起吊,在需要幕墙型材起吊的建筑立面一侧支架吊车,通过吊车直接向上吊运;或者通过人工搬运、外挂电梯及室内电梯垂直运输,通过人工作业将幕墙型材运输到相应的位置。During the building construction process, various materials need to be hoisted to the floor. For the later curtain wall construction, the outer window of the curtain wall on the ground needs to be transported upwards to the designated floor. The traditional hoisting method usually uses a crane to lift vertically. In buildings that need to lift curtain wall profiles The crane on the support on one side of the facade can be directly lifted up by the crane; or it can be transported vertically by manual handling, external elevators and indoor elevators, and the curtain wall profiles can be transported to the corresponding position by manual work.
使用吊车进行垂直起吊,施工现场场地狭小,不利于支架吊车,施工现场人员较多,在使用吊车吊装的过程中吊车臂和吊装的重物都有极高的安全隐患,而且租用吊车的费用高,不利于降低成本。人工搬运、外挂电梯和室内电梯运输受到电梯承重和空间的限制,运输速度过慢,会影响其他工种的正常作业,无法适用于工期紧张的工程;而且人工运输过程占用人力资源过高。Use a crane for vertical lifting, the construction site is small, it is not conducive to the support crane, and there are many people on the construction site. During the process of using the crane to lift, the crane arm and the heavy objects hoisted have extremely high safety hazards, and the cost of renting a crane is high. , is not conducive to reducing costs. Manual handling, external elevator and indoor elevator transportation are limited by the load and space of the elevator, and the transportation speed is too slow, which will affect the normal operation of other types of work and cannot be applied to projects with tight schedules; and the manual transportation process takes up too much human resources.
实用新型内容Utility model content
本实用新型提供一种幕墙型材起吊装置,结构简单,成本低,占用空间少,用于吊装施工使用的幕墙型材,减少人力资源的占用。The utility model provides a lifting device for curtain wall profiles, which is simple in structure, low in cost and takes up less space, and is used for hoisting curtain wall profiles used in construction, reducing the occupation of human resources.
一种幕墙型材起吊装置,包括第一支架和第二支架,所述第一支架和所述第二支架上固定设置主挑梁,所述主挑梁的端部伸出所述第二支架形成吊装杆,所述主挑梁位于所述第一支架和所述第二支架之间的部分为支撑杆,所述支撑杆的长度大于所述吊装杆的长度;所述第一支架上设置起吊装置,所述起吊装置的钢丝绳穿过所述吊装杆(端部设置的定滑轮吊装重物。A curtain wall profile lifting device, comprising a first bracket and a second bracket, the first bracket and the second bracket are fixed with a main cantilever beam, and the end of the main cantilever beam protrudes from the second bracket to form a The lifting rod, the part of the main cantilever located between the first bracket and the second bracket is a supporting rod, the length of the supporting rod is greater than the length of the lifting rod; the first bracket is provided with a lifting device, the wire rope of the hoisting device passes through the hoisting rod (the fixed pulleys provided at the ends hoist heavy objects.
可选地,所述第二支架的顶部竖直设置稳定杆;所述稳定杆的顶端与所述主挑梁一端的第一连接点连接拉杆,所述稳定杆的顶端与所述主挑梁另一端的第二连接点连接拉杆。Optionally, a stabilizer bar is vertically provided on the top of the second bracket; the top of the stabilizer bar is connected to the first connection point at one end of the main cantilever beam, and the top of the stabilizer bar is connected to the first connection point of the main cantilever beam. The second connection point at the other end is connected to the pull rod.
可选地,所述稳定杆与所述第一连接点、所述稳定杆与所述第二连接点均通过钢丝绳连接;所述稳定杆的顶端设置定滑轮,所述第一连接点和所述第二连接点之间连接的钢丝绳穿过所述稳定杆顶端的定滑轮。Optionally, the stabilizer bar is connected to the first connection point, and the second connection point is connected by a wire rope; a fixed pulley is set on the top of the stabilizer bar, and the first connection point and the second connection point The wire rope connected between the second connection points passes through the fixed pulley at the top of the stabilizer bar.
可选地,所述主挑梁包括相互套装的外筒和内筒,所述主挑梁上设置固定装置以固定所述主挑梁的长度。Optionally, the main cantilever includes an outer cylinder and an inner cylinder that fit into each other, and a fixing device is provided on the main cantilever to fix the length of the main cantilever.
可选地,所述外筒和所述内筒上对应开设多个通孔,所述主挑梁由固定销插装到不同的通孔内调节长度。Optionally, a plurality of through holes are correspondingly opened on the outer cylinder and the inner cylinder, and the main cantilever is inserted into different through holes by fixing pins to adjust its length.
可选地,所述第二支架呈等腰三角形,所述第二支架的顶角设置定滑轮,所述起吊装置的钢丝绳穿过所述第二支架顶角处的定滑轮。Optionally, the second support is in the shape of an isosceles triangle, fixed pulleys are provided at the top corners of the second support, and the wire rope of the lifting device passes through the fixed pulleys at the top corners of the second support.
可选地,所述第一支架的末端固定设置配重块;所述第一支架上设置竖直杆,所述配重块插装设置于所述竖直杆上。Optionally, a counterweight is fixedly arranged at the end of the first bracket; a vertical rod is arranged on the first bracket, and the counterweight is inserted and arranged on the vertical rod.
可选地,所述起吊装置为电动卷扬机;所述第一支架的支架上设置用于控制所述电动卷扬机的控制箱。Optionally, the lifting device is an electric hoist; a control box for controlling the electric hoist is arranged on the bracket of the first bracket.
可选地,所述第一支架与所述主挑梁、所述第二支架与所述主挑梁通过螺栓可拆卸固定。Optionally, the first support and the main cantilever, the second support and the main cantilever are detachably fixed by bolts.
可选地,所述主挑梁呈水平设置或朝所述吊装杆向上倾斜。Optionally, the main cantilever is arranged horizontally or inclined upward toward the lifting rod.
本实用新型提供了一种幕墙型材起吊装置,包括第一支架和第二支架,第一支架和第二支架放置于地面上,对整个装置进行支撑。在第一支架和第二支架上固定设置主挑梁,主挑梁起吊装的作用,主挑梁的端部伸出第二支架形成吊装杆,吊装杆的端部用于吊挂重物,主挑梁位于第一支架和第二支架之间的部分为支撑杆,支撑杆的长度大于吊装杆的长度,根据杠杆原理,以第二支架为支点,主挑梁吊装重物一侧的长度小于另一侧的长度,可以吊装更重的物体。在第一支架上设置起吊装置,起吊装置的钢丝绳穿过吊装杆端部设置的定滑轮吊装重物。The utility model provides a curtain wall profile lifting device, which comprises a first bracket and a second bracket. The first bracket and the second bracket are placed on the ground to support the whole device. The main cantilever beam is fixed on the first support and the second support. The main cantilever beam plays the role of hoisting. The end of the main cantilever beam extends out of the second support to form a lifting rod. The end of the lifting rod is used for hanging heavy objects. The part of the main cantilever beam between the first bracket and the second bracket is a support rod, and the length of the support rod is longer than that of the hoisting rod. Less than the length of the other side, it can lift heavier objects. A hoisting device is arranged on the first bracket, and the wire rope of the hoisting device passes through the fixed pulley provided at the end of the hoisting rod to hoist the heavy object.
将吊装装置安置在指定的楼层的边缘,将吊装杆伸到外部,钢丝绳下垂固定幕墙型材后由操作者开启起吊装置将型材吊起,运送到装置所在楼层。本实用新型提供的吊装装置结构简单,体积小,方便加工制造,对施工现场的场地空间要求不高。Place the hoisting device on the edge of the designated floor, extend the hoisting rod to the outside, and the steel wire rope hangs down to fix the curtain wall profile, and the operator opens the hoisting device to lift the profile and transport it to the floor where the device is located. The hoisting device provided by the utility model has the advantages of simple structure, small volume, convenient processing and manufacturing, and low requirements on the site space of the construction site.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本申请幕墙型材起吊装置一种具体设置形式的结构示意图;Fig. 1 is a structural schematic diagram of a specific setting form of the curtain wall profile lifting device of the present application;
图2为侧面结构图;Fig. 2 is a side structural view;
图3为另一角度的轴测图;Figure 3 is an axonometric view from another angle;
图4为使用过程的演示图。Figure 4 is a demonstration diagram of the use process.
其中:in:
第一支架1、配重块11、控制箱12、第二支架2、稳定杆21、主挑梁3、吊装杆31、支撑杆32、第一连接点301、第二连接点302、起吊装置4。First support 1, counterweight 11, control box 12, second support 2, stabilizer bar 21, main cantilever beam 3, hoisting bar 31, support bar 32, first connection point 301, second connection point 302, lifting device 4.
具体实施方式detailed description
本实用新型的核心在于提供一种幕墙型材起吊装置,结构简单,成本低,占用空间少,用于吊装施工使用的幕墙型材,减少人力资源的占用。The core of the utility model is to provide a lifting device for curtain wall profiles, which has a simple structure, low cost, and takes up less space, and is used for hoisting curtain wall profiles used in construction, reducing the occupation of human resources.
为了使本领域的技术人员更好地理解本实用新型的技术方案,下面将结合附图及具体的实施方式,对本申请的幕墙型材起吊装置进行详细的介绍说明。In order to enable those skilled in the art to better understand the technical solution of the present invention, the curtain wall profile lifting device of the present application will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
如图1所示,为本申请幕墙型材起吊装置一种具体设置形式的结构示意图;图2为侧面结构图;图3为另一角度的轴测图。该起吊装置包括第一支架1和第二支架2,第一支架1和第二支架2安置在地面上,对整个装置起支撑作用。第一支架1和第二支架2上固定设置主挑梁3,可固定在第一支架1和第二支架2的最顶部,主挑梁3主体横向延伸。按位置的不同,主挑梁3分为两段,分别为吊装杆31和支撑杆32;主挑梁3的端部伸出第二支架2形成吊装杆31,主挑梁3位于第一支架1和第二支架2之间的部分为支撑杆32,吊装杆31的端部穿过起吊用的钢丝绳。支撑杆32的长度大于吊装杆31的长度,根据杠杆原理,以第二支架2为支点,吊装重物的一侧长度小于另一侧长度,能够吊起更多的物体。幕墙型材由钢丝绳吊装,在第一支架1上设置起吊装置4,起吊装置4的钢丝绳穿过吊装杆31端部设置的定滑轮吊装重物,重物可为幕墙型材等建筑用料。As shown in Figure 1, it is a structural schematic diagram of a specific setting form of the curtain wall profile lifting device of the present application; Figure 2 is a side structural view; Figure 3 is an axonometric view from another angle. The lifting device includes a first support 1 and a second support 2, and the first support 1 and the second support 2 are placed on the ground to support the whole device. The main cantilever 3 is fixedly arranged on the first support 1 and the second support 2, and can be fixed on the top of the first support 1 and the second support 2, and the main cantilever 3 extends laterally. According to different positions, the main cantilever 3 is divided into two sections, which are the hoisting rod 31 and the support rod 32; The part between 1 and the second support 2 is a support rod 32, and the end of the lifting rod 31 passes through the wire rope for lifting. The length of the support rod 32 is greater than the length of the lifting rod 31. According to the principle of leverage, with the second support 2 as the fulcrum, the length of one side of the lifting weight is less than the length of the other side, so more objects can be lifted. The curtain wall profiles are hoisted by wire ropes, and a hoisting device 4 is set on the first bracket 1. The wire ropes of the hoisting device 4 pass through fixed pulleys provided at the end of the hoisting rod 31 to hoist heavy objects. The heavy objects can be building materials such as curtain wall profiles.
本实用新型提供的幕墙型材起吊装置结构简单,主体结构为第一支架1、第二支架2和主挑梁3,占用空间少,制造成本低,吊装过程不占用过多人力资源,加快吊装施工进度。The curtain wall profile lifting device provided by the utility model has a simple structure, the main structure is the first support 1, the second support 2 and the main cantilever beam 3, occupies less space, and has low manufacturing cost. The hoisting process does not occupy too many human resources, and the hoisting construction is accelerated schedule.
在此基础上,在第二支架2的顶部竖直设置稳定杆21,稳定杆21设置在第二支架2上方,由第二支架2提供垂直向上的支撑力。在吊装重物时主挑梁3受到较大的弯矩,为了使抵抗主挑梁3的弯矩,在稳定杆21的顶端与主挑梁3一端的第一连接点301连接拉杆,稳定杆21的顶端与主挑梁3另一端的第二连接点302连接拉杆。拉杆分别与第一连接点301和第二连接点302固定连接,呈倾斜设置,可以对主挑梁3的两端提供向上的分力,降低主挑梁3受到的弯矩。拉杆由第二支架2上的稳定杆21提供向上的支撑力,支撑力通过拉杆传递到主挑梁3的两端。On this basis, a stabilizing bar 21 is vertically arranged on the top of the second bracket 2 , the stabilizing bar 21 is arranged above the second bracket 2 , and the second bracket 2 provides a vertical upward supporting force. When hoisting heavy objects, the main cantilever beam 3 is subject to a larger bending moment. In order to resist the bending moment of the main cantilever beam 3, the top of the stabilizer bar 21 is connected with the first connection point 301 at one end of the main cantilever beam 3. The top of 21 is connected with the second connection point 302 at the other end of the main cantilever beam 3 with a tie rod. The tie rods are fixedly connected to the first connection point 301 and the second connection point 302 respectively, and are arranged obliquely, which can provide upward force components to both ends of the main cantilever beam 3 and reduce the bending moment on the main cantilever beam 3 . The pull rod is provided with an upward support force by the stabilizing rod 21 on the second bracket 2, and the support force is transmitted to the two ends of the main cantilever beam 3 through the pull rod.
具体地,稳定杆21与第一连接点301、稳定杆21与第二连接点302均通过钢丝绳连接,由钢丝绳作为拉杆。第一连接点301与稳定杆21、第二连接点302与稳定杆21之间的钢丝绳可为完整的一段,也可为两段,本实施例在此优选地设置为一段。在稳定杆21的顶端设置定滑轮,第一连接点301和第二连接点302之间连接的钢丝绳穿过稳定杆21顶端的定滑轮。钢丝绳的长度固定,两端分别连接在主挑梁3的两端,中部由稳定杆21顶起以提供向上的支撑力,具体地可采用φ14的钢丝绳。当然,上述情况仅为优选的实施例,拉杆也可选用刚性直杆。Specifically, the stabilizing bar 21 is connected to the first connection point 301 , and the stabilizing bar 21 and the second connecting point 302 are connected by steel wire ropes, and the steel wire ropes are used as pull rods. The wire rope between the first connection point 301 and the stabilizing bar 21 , and the second connecting point 302 and the stabilizing bar 21 can be a complete section or two sections, and in this embodiment, it is preferably set as one section. A fixed pulley is arranged at the top of the stabilizer bar 21 , and the steel wire rope connected between the first connection point 301 and the second connection point 302 passes through the fixed pulley at the top of the stabilizer bar 21 . The length of the wire rope is fixed, and the two ends are respectively connected to the two ends of the main cantilever beam 3, and the middle part is jacked up by the stabilizing bar 21 to provide an upward supporting force, specifically a wire rope of φ14 can be used. Of course, the above situation is only a preferred embodiment, and the pull rod can also be a rigid straight rod.
在上述任一技术方案及其相互组合的基础上,主挑梁3包括相互套装的外筒和内筒,主挑梁3上设置固定装置以固定主挑梁3的长度。主挑梁3分为两段的优点在于,一是可以调节第一支架1与第二支架2之间的距离,二是方便拆装连接。On the basis of any of the above-mentioned technical solutions and their mutual combinations, the main cantilever beam 3 includes an outer cylinder and an inner cylinder that fit into each other, and a fixing device is provided on the main cantilever beam 3 to fix the length of the main cantilever beam 3 . The advantage of the main cantilever 3 being divided into two sections is that one is that the distance between the first bracket 1 and the second bracket 2 can be adjusted, and the other is that it is convenient for disassembly and connection.
具体地,在外筒和内筒上对应开设多个通孔,主挑梁3由固定销插装到不同的通孔内调节长度。调节外筒和内筒的伸缩,将主挑梁3的外筒和内筒上不同位置的通孔相对,插装固定销以实现长度的固定。主挑梁3的主体部分为矩形钢管,两端采用120*120*4mm的矩形钢管作为外筒,中间插接一个100*100*4mm的矩形钢管作为内筒,中间的钢管与两端外筒其中一个焊接固定,在内筒与另一端的外筒上对应开设通孔。Specifically, a plurality of through holes are correspondingly opened on the outer cylinder and the inner cylinder, and the main cantilever 3 is inserted into different through holes by fixing pins to adjust the length. Adjust the expansion and contraction of the outer cylinder and the inner cylinder, the outer cylinder of the main beam 3 and the through holes at different positions on the inner cylinder are opposite, and the fixing pins are inserted to realize the fixing of the length. The main part of the main cantilever beam 3 is a rectangular steel pipe, the two ends use a 120*120*4mm rectangular steel pipe as the outer cylinder, and a 100*100*4mm rectangular steel pipe is inserted in the middle as the inner cylinder, and the middle steel pipe and the two ends of the outer cylinder One of them is welded and fixed, and through holes are correspondingly opened on the inner cylinder and the outer cylinder at the other end.
进一步,第二支架2呈等腰三角形,三角形的第二支架2的顶角处设置定滑轮,起吊装置2的钢丝绳穿过第二支架2顶角处的定滑轮,再穿过吊装杆31端部设置的定滑轮。起吊装置2的钢丝绳通过第二支架2顶角处的定滑轮形成钝角,减少每段钢丝绳的长度,以使钢丝绳拉动时更为稳定。Further, the second support 2 is an isosceles triangle, and a fixed pulley is arranged at the top corner of the second triangle support 2, and the wire rope of the lifting device 2 passes through the fixed pulley at the top corner of the second support 2, and then passes through the end of the lifting rod 31 The fixed pulley set at the top. The steel wire rope of hoisting device 2 forms obtuse angle by the fixed pulley at second support 2 vertices, reduces the length of every section steel wire rope, more stable when making steel wire rope pulling.
第一支架1的末端固定设置配重块11,具体地,在第一支架1上固定设置竖直杆,配重块11分为多块,能够逐个插装设置于竖直杆上。配重块11可采用水泥块,在中间预留贯通孔。The end of the first bracket 1 is fixedly provided with counterweights 11 , specifically, a vertical rod is fixedly provided on the first bracket 1 , and the counterweights 11 are divided into multiple pieces, which can be inserted and arranged on the vertical rods one by one. Counterweight block 11 can adopt cement block, reserves through hole in the middle.
具体地,起吊装置4为电动卷扬机,电力驱动钢丝绳拉动重物。第一支架1具有水平部与竖直部,在竖直的支架上设置用于控制电动卷扬机的控制箱12,操作者通过控制箱12控制电动卷扬机转动。配重块11设置在第一支架1水平部的末端,尽量设置在远离吊装杆31端部的位置。Specifically, the hoisting device 4 is an electric hoist, and the electric power drives the wire rope to pull the heavy object. The first support 1 has a horizontal part and a vertical part, and a control box 12 for controlling the electric winch is arranged on the vertical support, and the operator controls the rotation of the electric winch through the control box 12 . The counterweight 11 is arranged at the end of the horizontal part of the first bracket 1 , as far away as possible from the end of the lifting rod 31 .
第一支架1与主挑梁3、第二支架2与主挑梁3通过螺栓可拆卸固定。在第一支架1的顶部设置插装框,在第二支架2上也设置插装框,主挑梁3可分别插入两个插装框内,并采用螺栓进行固定连接,可方便拆卸。The first support 1 and the main cantilever 3, the second support 2 and the main cantilever 3 are detachably fixed by bolts. The top of the first bracket 1 is provided with an insertion frame, and the second bracket 2 is also provided with an insertion frame. The main cantilever beam 3 can be inserted into the two insertion frames respectively, and fixedly connected by bolts, which can be easily disassembled.
主挑梁3呈水平设置,或者朝吊装杆31的方向向上倾斜。本实用新型给出的起吊装置各个部件都采用矩形钢管制成,各钢件之间6mm满焊及通过螺栓连接固定。可选用额定负载为2吨的电动卷扬机,配重块11的重量不小于700kg。The main cantilever beam 3 is arranged horizontally, or is inclined upward toward the direction of the hoisting rod 31 . Each part of the lifting device provided by the utility model is made of a rectangular steel pipe, and the 6mm full welding between each steel part is fixed by bolt connection. Can choose rated load to be the electric winch of 2 tons, the weight of counterweight block 11 is not less than 700kg.
如图4所示,为使用过程的演示图。目标是将幕墙窗吊装到A层,将装置安置在楼层的边缘,吊装杆31向外伸出,用平板小车将幕墙窗体运至首层,钩好钢丝绳,由专业操作人员控制电动卷扬机进行吊装,严格控制吊装速度。为防止吊装过程受风力等外界因素产生晃动,在B、C、D等下方楼层处依次安排人员做好防止窗体摆的措施,避免与楼板、石材和龙骨产生碰撞。As shown in Figure 4, it is a demonstration diagram of the use process. The goal is to hoist the curtain wall window to the A floor, place the device on the edge of the floor, extend the hoisting rod 31 outward, transport the curtain wall window to the first floor with a flat trolley, hook the wire rope, and professional operators control the electric winch to complete the installation. Hoisting, strictly control the hoisting speed. In order to prevent shaking caused by external factors such as wind force during the hoisting process, personnel are arranged in sequence on the lower floors of B, C, and D to take measures to prevent the windows from swinging, so as to avoid collisions with floors, stones, and keels.
本实用新型的起吊装置结构简单,可灵活移动,拆装方便,可重复使用,经济性好,不占用过多空间,缩短了吊装的工时。The lifting device of the utility model has the advantages of simple structure, flexible movement, convenient disassembly and assembly, reusable use, good economy, no excessive space occupation, and shortened hoisting working hours.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理,可以在不脱离本实用新型的精神或范围的情况下,在其它实施例中实现。因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables those skilled in the art to realize or use the utility model. Various modifications to these embodiments will be obvious to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present utility model . Therefore, the present invention will not be limited to these embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621066694.XU CN206051364U (en) | 2016-09-20 | 2016-09-20 | A kind of curtain wall profiles boom hoisting |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621066694.XU CN206051364U (en) | 2016-09-20 | 2016-09-20 | A kind of curtain wall profiles boom hoisting |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206051364U true CN206051364U (en) | 2017-03-29 |
Family
ID=58370755
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621066694.XU Expired - Fee Related CN206051364U (en) | 2016-09-20 | 2016-09-20 | A kind of curtain wall profiles boom hoisting |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206051364U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106241618A (en) * | 2016-09-20 | 2016-12-21 | 中建八局第四建设有限公司 | A kind of curtain wall profiles boom hoisting |
| CN110844796A (en) * | 2019-11-08 | 2020-02-28 | 中铁二局集团有限公司 | Interlayer crane |
| CN114436134A (en) * | 2021-12-31 | 2022-05-06 | 中建三局集团有限公司 | Glass vertical hoisting in-place tool capable of being flexibly adjusted and displaced in multiple directions and use method |
-
2016
- 2016-09-20 CN CN201621066694.XU patent/CN206051364U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106241618A (en) * | 2016-09-20 | 2016-12-21 | 中建八局第四建设有限公司 | A kind of curtain wall profiles boom hoisting |
| CN110844796A (en) * | 2019-11-08 | 2020-02-28 | 中铁二局集团有限公司 | Interlayer crane |
| CN114436134A (en) * | 2021-12-31 | 2022-05-06 | 中建三局集团有限公司 | Glass vertical hoisting in-place tool capable of being flexibly adjusted and displaced in multiple directions and use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106241618A (en) | A kind of curtain wall profiles boom hoisting | |
| CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
| CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
| CN107119921B (en) | A kind of skyscraper Bailey beam Demolition Construction method | |
| CN205688774U (en) | A kind of electric bridge scaffold | |
| CN206051364U (en) | A kind of curtain wall profiles boom hoisting | |
| CN104803303A (en) | Single-movable-arm grounded derrick with rocking balance arm | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN203255914U (en) | Unit-typed curtain wall lifting device | |
| CN110670879A (en) | A kind of high-rise hoisting method for large equipment | |
| CN109516390B (en) | Flat-head tower crane convenient for manual carrying and installation and field installation method | |
| CN215626205U (en) | A kind of ALC wall panel installation auxiliary crane device | |
| CN108483212A (en) | Cladding glass installation self-control electric hoist hanger system and its hanging method | |
| CN204983692U (en) | Concrete panel's hoist device | |
| CN119122250A (en) | A hanging basket device and construction method for large-area inclined glass curtain wall | |
| CN208869158U (en) | Multifunctional hanging tool equipment | |
| CN219031629U (en) | Lifting equipment for indoor plate installation | |
| CN217756625U (en) | Existing building roof hoist and mount system | |
| CN114014176B (en) | Indoor and outdoor universal crane applicable to various building models and hoisting method | |
| CN205527413U (en) | Hang cantilever crane | |
| CN115385262A (en) | Lifting tool | |
| CN209957241U (en) | a steel hanger | |
| CN210029781U (en) | Anti-shaking device for hoisting | |
| CN217175641U (en) | An electric hanging basket suspension mechanism | |
| CN205653097U (en) | A simple hoisting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20210920 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |