CN202767494U - Hanging basket for high-altitude roof inner plate construction - Google Patents

Hanging basket for high-altitude roof inner plate construction Download PDF

Info

Publication number
CN202767494U
CN202767494U CN 201220452475 CN201220452475U CN202767494U CN 202767494 U CN202767494 U CN 202767494U CN 201220452475 CN201220452475 CN 201220452475 CN 201220452475 U CN201220452475 U CN 201220452475U CN 202767494 U CN202767494 U CN 202767494U
Authority
CN
China
Prior art keywords
hanging basket
roof
suspension cable
hanging
steel
Prior art date
Application number
CN 201220452475
Other languages
Chinese (zh)
Inventor
何焰江
Original Assignee
安徽富煌钢构股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 安徽富煌钢构股份有限公司 filed Critical 安徽富煌钢构股份有限公司
Priority to CN 201220452475 priority Critical patent/CN202767494U/en
Application granted granted Critical
Publication of CN202767494U publication Critical patent/CN202767494U/en

Links

Abstract

The utility model discloses a hanging basket for high-altitude roof inner plate construction. The hanging basket is characterized by comprising a hanging basket suspended cable and a frame-type hanging basket body. Two ends of a steel wire rope are respectively and fixedly connected to roof steel beams at two ends of a main body structure through ring clamps, and the two roof steel beams and the steel wire rope connected between the two beams form the hanging basket suspended cable. A hanging ring is arranged on the periphery of the hanging basket body and hung on the hanging basket suspended cable through a U-shaped clamp which is inverted. The hanging ring can slide along the hanging basket suspended cable. The hanging basket enables construction of inner plates of extra-large steel structure factory building roofs to be fast and safe.

Description

High-altitude roof inner slab construction hanging basket
Technical field
The utility model relates to a kind of steel structural overhead roof inner slab construction hanging basket.
Background technology
In field of steel structure, the super large steel-structure factory building is increasing, and the roof inner slab terrain clearance is also more and more higher, and its roof inner slab difficulty of construction is increasing; Because roof inner slab is on girder steel, below roof purline, traditional ground moving operating platform can not satisfy construction needs and safe handling requirement, has seriously restricted construction speed, has greatly increased construction cost.
Summary of the invention
The utility model is for avoiding the existing weak point of above-mentioned prior art, providing the roof inner slab construction of a kind of high-altitude to use hanging basket, so that the construction of super large steel structural plant roof inner panel is more quick, safety.
The utility model is that the technical solution problem adopts following technical scheme:
The roof inner slab construction of a kind of high-altitude of the utility model is to arrange with the design feature of hanging basket:
One hanging basket suspension cable is that the two ends with wire rope are fixedly connected on the steel roof joist at agent structure two ends by annular snap respectively; Consist of the hanging basket suspension cable with described two ends steel roof joist and the wire rope that is connected to therebetween;
One frame type hanging basket is provided with suspension ring in the periphery of described hanging basket, and described suspension ring are hung on the hanging basket suspension cable by inverted " U " shape card, and can slide at the hanging basket suspension cable.
The roof inner slab construction of the utility model high-altitude also is with the design feature of hanging basket:
Described hanging basket suspension cable be the twice that be arranged in parallel be one group; Described frame type hanging basket is to hang on twice hanging basket suspension cable so that dual-side is parallel.
The hanging basket suspension cable that the four road hanging basket suspension cables that be arranged in parallel between the twice steel roof joist, two frame type hanging baskets are separately positioned on separately can synchronizing moving.
Compared with the prior art, the utility model beneficial effect is embodied in:
The utility model utilizes hanging basket to realize the construction of superelevation roof inner slab, and work progress is efficient, quick; Easy construction, safety, reliability.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model section of structure;
Fig. 3 is the utility model frame type barrel structure schematic diagram;
Number in the figure: 1 hanging basket; 2 wire rope; 3 steel roof joists; 4 roof inner slabs; 5 roofing outside plates; 6 roof purlines; 7 angle steel; 8 round steel; 9 suspension ring.
The specific embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3, the construction of the present embodiment high and medium roof inner slab is set to the structure of hanging basket:
One hanging basket suspension cable is to be that the two ends of the wire rope 2 of 20mm are fixedly connected on the steel roof joist 3 at agent structure two ends by annular snap respectively with diameter, and per 30 meters of wire rope 2 arranges temporary fixed point at middle girder steel; Consist of the hanging basket suspension cables with twice steel roof joist 3 and the wire rope 2 that is connected to therebetween;
One frame type hanging basket is provided with suspension ring 9 in the periphery of hanging basket 1, and suspension ring 9 are hung on the hanging basket suspension cable by inverted " U " shape card, and can slide at the hanging basket suspension cable.In order to reduce friction, can be on wire rope 2 coating butter, play lubricated effect.
In the implementation, the hanging basket suspension cable be the twice that be arranged in parallel be one group; The frame type hanging basket adopts rectangular configuration, hangs on twice hanging basket suspension cable so that its dual-side is parallel.
Because roof inner slab has certain length, therefore, the four road hanging basket suspension cables that can between the twice steel roof joist, be arranged in parallel, two frame type hanging baskets respectively can synchronizing moving at suspension cable separately.
Existing part roof inner slab 4 has been finished installation among Fig. 1 and Fig. 2, and roofing outside plate 5 and roof purline 6 are by the designing requirement construction; The hanging basket of frame type shown in Fig. 31 is take angle steel 7 as framework, at the fixing welding of angle steel 7 round steel 8, and the fixing welding hanging ring 9 on the top of round steel 8.
Bracketplant constructing operation method
After wire rope 2 and frame type hanging basket 1 is all in place, upper three people in each frame type hanging basket, two frame type hanging baskets arranged side by side are one group, according to the distance between the length adjustment of roof inner slab two frame type hanging baskets arranged side by side.Begin to install first roof inner slab from the original position of roof inner slab, install between first roof inner slab, second roof inner slab then is installed; Stand in two personnel's synchronizing moving hanging baskets in the frame type hanging basket mobile forward, mobile method is that hand is grabbed roof purline, and both hands firmly drop backward, slowly the frame type hanging basket are moved forward, finish successively the installation of the 3rd, the 4th roof inner slab;
Because agent structure length is usually very large, wire rope 2 has about 100 ~ 200 meters usually, and per 30 meters of wire rope arranges temporary fixed point at middle girder steel, the like; Wire rope is below girder steel, hanging basket can directly be slided over, after the workman operates wire rope and arrives temporary fixed point, solve the constraint of temporary fixed point, hanging basket is slided in the past, recover subsequently the constraint of temporary fixed point, proceed the roof inner slab construction, until the whole installations of roof inner slab.

Claims (3)

1. hanging basket is used in a high-altitude roof inner slab construction, it is characterized in that arranging:
One hanging basket suspension cable is that the two ends with wire rope (2) are fixedly connected on the steel roof joist (3) at agent structure two ends by annular snap respectively; Consist of the hanging basket suspension cable with described two ends steel roof joists (3) and the wire rope (2) that is connected to therebetween;
One frame type hanging basket is provided with suspension ring (9) in the periphery of described hanging basket (1), and described suspension ring (9) are hung on the hanging basket suspension cable by inverted " U " shape card, and can slide at the hanging basket suspension cable.
2. hanging basket is used in roof inner slab construction in high-altitude according to claim 1, it is characterized in that described hanging basket suspension cable be the twice that be arranged in parallel be one group; Described frame type hanging basket (1) is to hang on twice hanging basket suspension cable so that dual-side is parallel.
3. high-altitude according to claim 1 roof inner slab construction hanging basket, it is characterized in that: the four road hanging basket suspension cables that be arranged in parallel between twice steel roof joist (3), the hanging basket suspension cable that two frame type hanging baskets (1) are separately positioned on separately can synchronizing moving.
CN 201220452475 2012-09-06 2012-09-06 Hanging basket for high-altitude roof inner plate construction CN202767494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220452475 CN202767494U (en) 2012-09-06 2012-09-06 Hanging basket for high-altitude roof inner plate construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220452475 CN202767494U (en) 2012-09-06 2012-09-06 Hanging basket for high-altitude roof inner plate construction

Publications (1)

Publication Number Publication Date
CN202767494U true CN202767494U (en) 2013-03-06

Family

ID=47774077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220452475 CN202767494U (en) 2012-09-06 2012-09-06 Hanging basket for high-altitude roof inner plate construction

Country Status (1)

Country Link
CN (1) CN202767494U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060813A (en) * 2014-07-02 2014-09-24 浙江省二建钢结构有限公司 Construction device and method for large-span steel girder frame connection platform
CN104358393A (en) * 2014-10-24 2015-02-18 中铁航空港建设集团北京有限公司 Horizontal moving platform hung at high altitude
CN104631810A (en) * 2015-01-15 2015-05-20 中誉远发国际建设集团有限公司 High-altitude movable hanging basket system and construction method thereof
CN104963495A (en) * 2015-06-05 2015-10-07 中国十七冶集团有限公司 Suspension hanging basket for installation of roof surface bottom layer color plate
CN105155832A (en) * 2015-06-17 2015-12-16 中建钢构有限公司 Hanging basket device and moving method thereof
CN105715032A (en) * 2016-04-15 2016-06-29 中国五冶集团有限公司 Construction hanging basket with spanning movement function and spanning movement method
CN104060809B (en) * 2014-07-16 2016-07-06 深圳市特艺达装饰设计工程有限公司 A kind of roofing daylighting glass steelframe installs equipment and operation method thereof
CN106115573A (en) * 2016-08-19 2016-11-16 中国化学工程第三建设有限公司 The installation equipment of factory roof coloured silk steel inner panel and installation method
CN108468433A (en) * 2018-04-12 2018-08-31 陈年康 A kind of construction tool of workshop metal Roof inner panel

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060813A (en) * 2014-07-02 2014-09-24 浙江省二建钢结构有限公司 Construction device and method for large-span steel girder frame connection platform
CN104060813B (en) * 2014-07-02 2016-06-08 浙江省二建钢结构有限公司 The constructing device of large-span steel girder framework connection mode platform and constructional method
CN104060809B (en) * 2014-07-16 2016-07-06 深圳市特艺达装饰设计工程有限公司 A kind of roofing daylighting glass steelframe installs equipment and operation method thereof
CN104358393A (en) * 2014-10-24 2015-02-18 中铁航空港建设集团北京有限公司 Horizontal moving platform hung at high altitude
CN104631810A (en) * 2015-01-15 2015-05-20 中誉远发国际建设集团有限公司 High-altitude movable hanging basket system and construction method thereof
CN104963495A (en) * 2015-06-05 2015-10-07 中国十七冶集团有限公司 Suspension hanging basket for installation of roof surface bottom layer color plate
CN104963495B (en) * 2015-06-05 2017-07-14 中国十七冶集团有限公司 A kind of hanging basket for installing roofing bottom colored steel
CN105155832A (en) * 2015-06-17 2015-12-16 中建钢构有限公司 Hanging basket device and moving method thereof
CN105715032A (en) * 2016-04-15 2016-06-29 中国五冶集团有限公司 Construction hanging basket with spanning movement function and spanning movement method
CN105715032B (en) * 2016-04-15 2017-09-29 中国五冶集团有限公司 It is a kind of that there is the construction hanging basket for crossing over locomotive function and moving method is crossed over
CN106115573A (en) * 2016-08-19 2016-11-16 中国化学工程第三建设有限公司 The installation equipment of factory roof coloured silk steel inner panel and installation method
CN108468433A (en) * 2018-04-12 2018-08-31 陈年康 A kind of construction tool of workshop metal Roof inner panel

Similar Documents

Publication Publication Date Title
CN100557168C (en) A kind of method for high altitude installation of large span steel truss
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN101672011B (en) Steel tube arch rib vertical lifting method
CN105604334A (en) Rapid-construction method used for overall installation of large-span steel truss
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106348188B (en) The manufacture method of planer-type building-construction lifting device
PH12015500868A1 (en) Methods, systems and components for multi-storey building construction
CN201458596U (en) Crane with self-dismounting device
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN202755634U (en) Suspension type operational platform
CN203377546U (en) High speed railway spanning construction apparatus
CN103711323B (en) Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing
CN102409838B (en) Moveable operating platform and method for constructing suspended ceiling of roof by using same
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN105484158A (en) Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length
CN104278637B (en) A kind of main rope of suspension bridge strand is without the cableway erection method in cat road
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN203821720U (en) High-altitude large roof panel installing tool trolley
CN201417657Y (en) Installation device of indoor transformer
CN103061506A (en) Construction method of steel structure dome
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN104060540B (en) A kind of cable of space cable suspension bridge false stull and construction method for hanging thereof
CN104480862A (en) Installation method of span steel truss girder of cable-stayed bridge side

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant