CN108468433A - A kind of construction tool of workshop metal Roof inner panel - Google Patents

A kind of construction tool of workshop metal Roof inner panel Download PDF

Info

Publication number
CN108468433A
CN108468433A CN201810323600.XA CN201810323600A CN108468433A CN 108468433 A CN108468433 A CN 108468433A CN 201810323600 A CN201810323600 A CN 201810323600A CN 108468433 A CN108468433 A CN 108468433A
Authority
CN
China
Prior art keywords
platform
roof
sunpender
construction
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810323600.XA
Other languages
Chinese (zh)
Inventor
陈年康
Original Assignee
陈年康
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈年康 filed Critical 陈年康
Priority to CN201810323600.XA priority Critical patent/CN108468433A/en
Publication of CN108468433A publication Critical patent/CN108468433A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The present invention relates to construction of hydropower technical fields, specifically a kind of construction tool of workshop metal Roof inner panel, hanging component includes two pulleys, one driving wheel, one directive wheel, hanging component hangs over roof purline lower edge, hanging component lower end is effectively connect with operating platform, hanging component is respectively provided in each roof purline, three hanging components are arranged in the roof purline lower end, hanger rod component is connect by bolt with track, rotation axis is provided between track and hanger rod component, roof purline bottom is provided with steel roof joist, hoisting platform, anti- platform sling is installed, translate platform;Middle hanger is taken out, is installed to right end, is then laid down rear suspension bar, continue to move to platform;Fixed rear suspension bar, then lays down preceding sunpender, continues to move to platform;Sunpender before fixed, continues to move to platform, and the present invention saves material, securely and reliably, sliding platform is realized freely cross in the air, efficient, and sliding rail is detached with lifeline, and personal safety is secure using roof purline as construction track.

Description

A kind of construction tool of workshop metal Roof inner panel
Technical field
The present invention relates to construction of hydropower technical field, specifically a kind of construction tool of workshop metal Roof inner panel.
Background technology
With the development of modern manufacturing industry, industrial premises demand is big, and than great, foundation basic construction follows light Steel-Structure Factory with Steel Traditional method also cannot achieve full assembled installation, and construction efficiency is relatively low, is generally set up at present using ground using technical solution The landing stage of scaffold adds pulley under platform, is arbitrarily slid in construction area, operating platform is set up on crane girder into line slip Operation will first install roofing outside plate in operation, and terrace pours to smash recycles landing stage of scaffold installation roof inner slab afterwards, existing Construction method because the facility floor construction stage height it is uneven, limited by construction site, it is difficult to implement, while by workshop Height limitation itself, if factory building height is very high, sliding scaffold scheme is of high cost, and safety is poor, in addition also by mill construction Limitation, some workshops do not have crane girder, are limited by working procedure and progress, and working procedure cannot sometimes be coordinated and civil engineering list The contradiction of position.
Therefore, to overcome the shortcomings of that above-mentioned technology is designed using roof purline as construction track, material, safety are saved Reliably, sliding platform is realized freely cross in the air, efficient, and sliding rail is detached with lifeline, personal safety it is secure one The construction tool of kind workshop metal Roof inner panel, exactly inventor's problem to be solved.
Invention content
In view of the deficiencies of the prior art, the object of the present invention is to provide a kind of construction tool of workshop metal Roof inner panel, Its is simple in structure, using roof purline as construction track, saves material, and securely and reliably, sliding platform is realized freely cross in the air, Efficient, sliding rail is detached with lifeline, and personal safety is secure.
The technical solution adopted by the present invention to solve the technical problems is:A kind of construction work of workshop metal Roof inner panel Dress comprising hanging component, bolt, shifting axle, track, roof purline, steel roof joist, hanging component include two pulleys, one A driving wheel, a directive wheel, the hanging component hang over roof purline lower edge, and hanging component lower end effectively connects with operating platform It connects, hanging component is respectively provided in each roof purline, and three hanging components, the hanger rod component is arranged in the roof purline lower end It is connect with track by bolt, rotation axis is provided between the track and hanger rod component, the roof purline bottom is provided with Steel roof joist.
Further, the pulley includes a driving wheel, other two is directive wheel.
Further, the hanger rod component includes preceding sunpender, middle hanger, rear suspension bar, the preceding sunpender, middle hanger, rear suspension bar One end is connect with track, and preceding sunpender, middle hanger, the rear suspension bar other end are connect with operating platform.
Further, the operating platform both sides are provided with guardrail.
A kind of construction method of workshop metal Roof inner panel, step 1:Hoisting platform installs anti-platform sling, translates platform;Step Rapid two:Middle hanger is taken out, is installed to right end, is then laid down rear suspension bar, continue to move to platform;Step 3:Fixed rear suspension bar, then Preceding sunpender is laid down, platform is continued to move to;Step 4:Sunpender before fixed, continues to move to platform.
The beneficial effects of the invention are as follows:
1, the present invention saves material, securely and reliably, sliding platform realizes freedom in the air using roof purline as construction track Across efficient, sliding rail is detached with lifeline, and personal safety is secure.
Description of the drawings
Fig. 1 is construction tool structural schematic diagram of the present invention.
Fig. 2 is two schematic diagram of construction procedure of the present invention.
Fig. 3 is three schematic diagram of construction procedure of the present invention.
Fig. 4 is four schematic diagram of construction procedure of the present invention.
Fig. 5 is construction tool sectional view along A-A of the present invention.
Reference sign:1- hanging components;2- bolts;3- shifting axles;4- tracks;5- roof purlines;6- built-in fittings;7- Fastening bolt;8- operating platforms;Sunpender before 9-;10- middle hangers;11- rear suspension bars.
Specific implementation mode
Present invention will be further explained below with reference to specific examples, it should be appreciated that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, people in the art Member can make various changes or modifications the present invention, and such equivalent forms are also fallen within defined by application the appended claims Range.
It is schematic structural view of the invention, a kind of construction tool of workshop metal Roof inner panel comprising lifting group referring to Fig. 1 Part 1, bolt 2, shifting axle 3, track 4, roof purline 5, steel roof joist 6, hanging component 1 include two pulleys, a driving wheel, One directive wheel, the hanging component 1 hang over 5 lower edge of roof purline, and 1 lower end of hanging component effectively connect with operating platform 8, hangs Arrangement 1 is respectively provided in each roof purline 5, and three hanging components 1 are arranged in 5 lower end of the roof purline, is this hair referring to Fig. 5 Bright construction tool sectional view along A-A, the hanging component 1 are connect by bolt 2 with track 4, the track 4 and hanging component 1 Between be provided with shifting axle 3,5 bottom of the roof purline is provided with steel roof joist 6.
Pulley includes a driving wheel, other two is directive wheel, hanging component 1 include preceding sunpender 9, middle hanger 10, after Sunpender 11, the preceding sunpender 9, middle hanger 10,11 one end of rear suspension bar are connect with track 4, preceding sunpender 9, middle hanger 10, rear suspension bar 11 The other end is connect with operating platform 8, and 8 both sides of operating platform are provided with guardrail.
It is construction procedure schematic diagram of the present invention, step 1 referring to Fig. 2-4:Hoisting platform installs anti-platform sling, translates platform; Step 2:Middle hanger 10 is taken out, is installed to right end, is then laid down rear suspension bar 11, continue to move to platform;Step 3:It is hung after fixation Bar 11, sunpender 9 before then laying down, continues to move to platform;Step 4:Sunpender 9 before fixed, continues to move to platform.Fig. 5 is the present invention For middle A-A to structure sectional view, the basis further includes having built-in fitting 6, and 6 bottom of the built-in fitting is arranged inside steel reinforcement cage 2, in advance 6 top of embedded part passes through concrete foundation crash bearer 4 to be fixed with fastening bolt 7.
The present invention makes full use of roof purline lower edge, using purlin as track, makes a kind of hanging component, hanging component by Three pulleys composition, a driving wheel, other two is guide wheel group at hanging over purlin lower edge, hanging component lower end and operation Platform effectively connects, and platform hanging component is respectively provided in each purlin, and three hanging components are arranged in each purlin, another in workshop One fixed pulley of end setting, pulls platform to be slid to the other end, slides at girder steel, by moving hanging component sequence by fixed pulley Transition and leap of the platform at girder steel are realized in position, successively toward in addition sliding on one side, so that it is flat to provide work for inner panel construction Platform.The present invention by roof purline 5 as construction track, save material, securely and reliably, sliding platform realizes in the air freedom across More, efficient, sliding rail is detached with lifeline, and personal safety is secure.

Claims (5)

1. a kind of construction tool of workshop metal Roof inner panel, it is characterised in that:It includes hanging component, bolt, shifting axle, rail Road, roof purline, steel roof joist, hanging component include two pulleys, a driving wheel, a directive wheel, the hanging component Roof purline lower edge is hung over, hanging component lower end is effectively connect with operating platform, and hanging component is respectively provided in each roof purline, Three hanging components are arranged in the roof purline lower end, and the hanger rod component is connect by bolt with track, the track with hang Rotation axis is provided between bar assembly, the roof purline bottom is provided with steel roof joist.
2. a kind of construction tool of workshop metal Roof inner panel according to claim 1, it is characterised in that:The pulley packet A driving wheel is included, other two is directive wheel.
3. a kind of construction tool of workshop metal Roof inner panel according to claim 1, it is characterised in that:The sunpender group Part includes preceding sunpender, middle hanger, rear suspension bar, and the preceding sunpender, middle hanger, rear suspension bar one end are connect with track, preceding sunpender, in hang Bar, the rear suspension bar other end are connect with operating platform.
4. a kind of construction tool of workshop metal Roof inner panel according to claim 3, it is characterised in that:The operation is flat Platform both sides are provided with guardrail.
5. a kind of construction method of workshop metal Roof inner panel, it is characterised in that:Method includes following operation, step 1:Lifting Platform installs anti-platform sling, translates platform;Step 2:Middle hanger is taken out, is installed to right end, is then laid down rear suspension bar, continue to move to Platform;Step 3:Fixed rear suspension bar, then lays down preceding sunpender, continues to move to platform;Step 4:Sunpender before fixed, continues to move to Platform.
CN201810323600.XA 2018-04-12 2018-04-12 A kind of construction tool of workshop metal Roof inner panel Pending CN108468433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810323600.XA CN108468433A (en) 2018-04-12 2018-04-12 A kind of construction tool of workshop metal Roof inner panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810323600.XA CN108468433A (en) 2018-04-12 2018-04-12 A kind of construction tool of workshop metal Roof inner panel

Publications (1)

Publication Number Publication Date
CN108468433A true CN108468433A (en) 2018-08-31

Family

ID=63262843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810323600.XA Pending CN108468433A (en) 2018-04-12 2018-04-12 A kind of construction tool of workshop metal Roof inner panel

Country Status (1)

Country Link
CN (1) CN108468433A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202467148U (en) * 2012-03-16 2012-10-03 中建五局工业设备安装有限公司 Hanging basket for construction
CN202767494U (en) * 2012-09-06 2013-03-06 安徽富煌钢构股份有限公司 Hanging basket for high-altitude roof inner plate construction
CN203320928U (en) * 2013-05-31 2013-12-04 德州天元集团有限责任公司 Overhead hanging basket
CN203701560U (en) * 2013-12-31 2014-07-09 森特士兴集团股份有限公司 Suspension hanging basket for high-altitude roofing inner plate construction
CN105986664A (en) * 2016-07-20 2016-10-05 中国建筑局(集团)有限公司 Hanging basket and roof reverse-hanging plate work platform including same
CN207194419U (en) * 2017-07-14 2018-04-06 中国一冶集团有限公司 It may span across the aerial work platform of landing beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202467148U (en) * 2012-03-16 2012-10-03 中建五局工业设备安装有限公司 Hanging basket for construction
CN202767494U (en) * 2012-09-06 2013-03-06 安徽富煌钢构股份有限公司 Hanging basket for high-altitude roof inner plate construction
CN203320928U (en) * 2013-05-31 2013-12-04 德州天元集团有限责任公司 Overhead hanging basket
CN203701560U (en) * 2013-12-31 2014-07-09 森特士兴集团股份有限公司 Suspension hanging basket for high-altitude roofing inner plate construction
CN105986664A (en) * 2016-07-20 2016-10-05 中国建筑局(集团)有限公司 Hanging basket and roof reverse-hanging plate work platform including same
CN207194419U (en) * 2017-07-14 2018-04-06 中国一冶集团有限公司 It may span across the aerial work platform of landing beam

Similar Documents

Publication Publication Date Title
CN203821720U (en) High-altitude large roof panel installing tool trolley
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN205330690U (en) Cloth welding platform truck is hung to tunnel water proofing board
CN106758828A (en) The application process of fixed asymmetric bridge girder cantilever assembly equipment
CN102733608B (en) Construction method for spray head layer of granulation tower
CN206720680U (en) A kind of roofing color corrugated sheet steel lifting device
CN108468433A (en) A kind of construction tool of workshop metal Roof inner panel
CN204982628U (en) Horizontal drawing cable bridge
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN208395664U (en) Pulley-type suspension bridge suspender tension platform hanging basket
CN206319628U (en) One kind building assembled wallboard fitting machine
CN206530037U (en) A kind of elevating platform assembly for Construction of Silo
CN109944430A (en) A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation
CN102787717B (en) Self-supporting combined steel template construction method
CN206784725U (en) Large span assembled open-type builds bottom plate I-beam erection support and mounting assembly
CN206128603U (en) Curtain mounting structure that leads a wandering life cornices
CN205276727U (en) Metal roofing inner panel construction and installation platform
CN202324658U (en) Device for installing large-span roof truss
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station
CN205529915U (en) Ladder type masts type hangs pieces together loop wheel machine
CN203878966U (en) Ascending and descending protecting screen of spine structure
CN210594932U (en) T beam mold board hoist
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN203257106U (en) Multifunctional power-driven walking type walking system
CN102733612B (en) Mounting method of electric hoist orbit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180831