CN104963495B - A kind of hanging basket for installing roofing bottom colored steel - Google Patents
A kind of hanging basket for installing roofing bottom colored steel Download PDFInfo
- Publication number
- CN104963495B CN104963495B CN201510306087.XA CN201510306087A CN104963495B CN 104963495 B CN104963495 B CN 104963495B CN 201510306087 A CN201510306087 A CN 201510306087A CN 104963495 B CN104963495 B CN 104963495B
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- wire rope
- steel
- steel wire
- roofing bottom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a kind of hanging basket for installing roofing bottom colored steel, wingceltis bar including girder steel and on girder steel, the first steel wire rope and the second steel wire rope are respectively fixed with the girder steel at the wingceltis bar two ends, first steel wire rope connects the 3rd steel wire rope by the first lever hoist, second steel wire rope connects the 3rd steel wire rope by the second lever hoist, and the 3rd steel wire rope connects hanging basket by moveable roller.A kind of hanging basket for installing roofing bottom colored steel, can be according to job site the need for, the position of flexible regulation hanging basket, and by from gripping mechanism clamping, to strengthen the stability of hanging basket;And can be by adjusting being accurately positioned property of the suspension hook raising to hanging basket.
Description
Technical field
The present invention relates to a kind of hanging basket, more particularly to a kind of hanging basket for installing roofing bottom colored steel belongs to and built
Build technical field of construction.
Background technology
Steel-structure factory building is due to attractive in appearance, durable, low cost, construction period short advantage, and being applied in engineering construction to get over
Come more extensive, in order to reduce the aesthetic property in the temperature in factory building, increase factory building, the roofing of factory building is often designed to double-deck coloured silk
Plate, centre is to spread one layer of color steel above heat-preservation cotton, roof purline to be exposed, and resistance wind rain shines, and is inhaled below roof purline
One layer of colored steel, holds heat-preservation cotton, can play purposes attractive in appearance, and middle heat-preservation cotton plays insulation effect again;Just as entering to factory building
Go furred ceiling, roofing steel truss is covered by bottom colored steel, in factory building room, and whole factory building can't see a purlin from the bottom up,
Succinctly, it is elegant in appearance.
The installation of bottom colored steel below roof purline is complex and danger, and normal construction method is exactly to build a framework to apply
Work, by frame by there is facility floor to set up to roofing, provides an operating platform to workmen and installs roofing bottom colored steel colored steel.
A kind of method is to set up overall shelf, and workmen installs roofing bottom colored steel in station on the top of the shelf, constructs in this way, although
The efficiency high of period is installed, but its shortcoming is to take, tear open the costly of shelf, influences the construction of next procedure, it is necessary to and multiple tracks
Process is mutually coordinated, and the cycle of whole construction work is long;Another method is to set up moveable shelf, installs one block of bottom coloured silk
Plate, a mobile shelf, installing bottom layer colored steel and this two processes of mobile shelf are ceaselessly overlapping, until bottom colored steel peace
Install into, workmen continually above and below, safety do not ensure, although this method saves the circulation material of large quantities of shelfs
With take, tear expense, but inefficiency open, also produce interference with other processes, the construction period is long.Sometimes due to the resistance of above ground structure
Hinder, it is impossible to mobile shelf, directly influence the completion of whole engineering.
The content of the invention
The technical problem to be solved in the present invention be overcome existing defect there is provided it is a kind of install roofing bottom colored steel suspension
Hanging basket, is not only moved easily;And the height of hanging basket, the problem of effectively can solving in background technology can be controlled.
In order to solve the above-mentioned technical problem, the invention provides following technical scheme:
A kind of hanging basket for installing roofing bottom colored steel of the present invention, including girder steel and the wingceltis bar on girder steel,
The first steel wire rope and the second steel wire rope are respectively fixed with the girder steel at the wingceltis bar two ends, first steel wire rope passes through first-hand
Plate cucurbit connects the 3rd steel wire rope, and second steel wire rope connects the 3rd steel wire rope, the 3rd steel by the second lever hoist
Cord connects hanging basket by moveable roller.
Adjustment is provided with as a preferred technical solution of the present invention, on the 3rd steel wire rope of the hanging basket both sides to hang
Hook.
As a preferred technical solution of the present invention, the 3rd steel wire rope is 3-5 and the pulley one with pulley
Side is provided with from gripping mechanism.
As a preferred technical solution of the present invention, the guard rail rod group that the hanging basket is connected by bottom bar and by diagonal brace
Into being provided with the bottom bar on sheer pole, the sheer pole and be equipped with plank;Cross tube is provided with the guard rail rod.
The beneficial effect that is reached of the present invention is compared with prior art:A kind of suspension for installing roofing bottom colored steel is hung
Basket, can be according to job site the need for, the position of flexible regulation hanging basket, and by from gripping mechanism clamping, being hung with strengthening
The stability of basket;And can be by adjusting being accurately positioned property of the suspension hook raising to hanging basket.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and constitutes a part for specification, the reality with the present invention
Applying example is used to explain the present invention together, is not construed as limiting the invention.
In the accompanying drawings:
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the barrel structure schematic diagram of the present invention;
Label in figure:1st, wingceltis bar;2nd, girder steel;3rd, the first steel wire rope;4th, the second steel wire rope;5th, the first Lever Blocks;6th,
Two lever hoists;7th, hanging basket;8th, pulley;9th, from gripping mechanism;10th, suspension hook is adjusted;11st, guard rail rod;12nd, cross tube;13rd, bottom
Bar;14th, sheer pole;15th, plank;16th, diagonal brace;17th, the 3rd steel wire rope.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that preferred reality described herein
Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment:As shown in figure 1, a kind of hanging basket for installing roofing bottom colored steel of the present invention, including girder steel 2 and peace
The first steel wire rope 3 and the second steel wire rope 4 are respectively fixed with wingceltis bar 1 on girder steel 2, the girder steel 2 at the two ends of wingceltis bar 1,
First steel wire rope 3 connects the 3rd steel wire rope 17 by the first lever hoist 5, and second steel wire rope 4 passes through the second palm
Cucurbit 6 connects the 3rd steel wire rope 17, and the 3rd steel wire rope 17 is flexibly connected hanging basket 7 by pulley 8.
Further, adjustment suspension hook 10 is provided with the 3rd steel wire rope 17 of the both sides of hanging basket 7.By adjusting suspension hook 10
The 3rd steel wire rope 17 degree of disturbance of itself can be effectively reduced.3rd steel wire rope 17 is 3-5 and the cunning with pulley 8
8 sides are taken turns to be provided with from gripping mechanism 9.Multiple pulleys 8 are installed on hanging basket 7, and the 3rd steel wire rope 17 is passed through into pulley 8.
The guard rail rod 11 that the hanging basket 7 is connected by bottom bar 13 and by diagonal brace 16 is constituted, and is provided with the bottom bar 13
Plank 15 is equipped with sheer pole 14, the sheer pole 14;Cross tube 12 is provided with the guard rail rod 11.The surrounding of hanging basket 7 is set
Put guard rail rod 11, it is ensured that the security of construction worker.
The present invention is flexibly connected hanging basket 7 by many steel wire ropes, and hanging basket 7 is raised into suitable height by two lever hoists
Degree, and by from the clamping hanging basket of gripping mechanism 9, then reducing the degree of disturbance of steel wire rope by adjusting suspension hook 10.
A kind of hanging basket for installing roofing bottom colored steel of the present invention, can be according to job site the need for, it is flexible to adjust
The position of hanging basket 7 is saved, and by from the clamping of gripping mechanism 9, to strengthen the stability of hanging basket 7;And can be by adjusting suspension hook
10 improve the being accurately positioned property to hanging basket 7.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention,
Although the present invention is described in detail with reference to the foregoing embodiments, for a person skilled in the art, it still may be used
To be modified to the technical scheme described in foregoing embodiments, or to which part technical characteristic progress equivalent.
Within the spirit and principles of the invention, any modifications, equivalent substitutions and improvements made etc., should be included in the present invention's
Within protection domain.
Claims (4)
1. a kind of hanging basket for installing roofing bottom colored steel, it is characterised in that including girder steel (2) and installed in girder steel (2)
On wingceltis bar (1), be respectively fixed with the first steel wire rope (3) and the second steel wire rope (4) on the girder steel (2) at wingceltis bar (1) two ends,
First steel wire rope (3) connects the 3rd steel wire rope (17) by the first lever hoist (5), and second steel wire rope (4) passes through
Second lever hoist (6) connects the 3rd steel wire rope (17), and the 3rd steel wire rope (17) is flexibly connected hanging basket by pulley (8)
(7)。
2. a kind of hanging basket for installing roofing bottom colored steel according to claim 1, it is characterised in that the hanging basket
(7) adjustment suspension hook (10) is provided with the 3rd steel wire rope (17) of both sides.
3. a kind of hanging basket for installing roofing bottom colored steel according to claim 2, it is characterised in that the 3rd steel
Cord (17) is 3-5 with pulley (8) and pulley (8) side is provided with from gripping mechanism (9).
4. a kind of hanging basket for installing roofing bottom colored steel according to claim 2, it is characterised in that the hanging basket
(7) guard rail rod (11) connected by bottom bar (13) and by diagonal brace (16) is constituted, and sheer pole is provided with the bottom bar (13)
(14), it is equipped with plank (15) on the sheer pole (14);Cross tube (12) is provided with the guard rail rod (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510306087.XA CN104963495B (en) | 2015-06-05 | 2015-06-05 | A kind of hanging basket for installing roofing bottom colored steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510306087.XA CN104963495B (en) | 2015-06-05 | 2015-06-05 | A kind of hanging basket for installing roofing bottom colored steel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104963495A CN104963495A (en) | 2015-10-07 |
CN104963495B true CN104963495B (en) | 2017-07-14 |
Family
ID=54217560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510306087.XA Active CN104963495B (en) | 2015-06-05 | 2015-06-05 | A kind of hanging basket for installing roofing bottom colored steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104963495B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115573A (en) * | 2016-08-19 | 2016-11-16 | 中国化学工程第三建设有限公司 | The installation equipment of factory roof coloured silk steel inner panel and installation method |
CN106812295A (en) * | 2017-02-09 | 2017-06-09 | 成都启立辰智科技有限公司 | A kind of construction hanging basket |
CN106836109B (en) * | 2017-03-14 | 2022-07-05 | 辽宁华三建设工程技术有限公司 | Suspended platform device for protecting, repairing and processing bottom of suspended building |
CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10104247C1 (en) * | 2001-01-31 | 2002-07-25 | Asg Aluminium Systeme Gmbh | Traversing installation, used for working on building facades, comprises an endless drive element with a specified minimum value of its total wrap angle on the traction disks |
CN101892736A (en) * | 2010-08-10 | 2010-11-24 | 中建三局东方装饰设计工程有限公司 | High altitude moving hanging basket construction method |
CN102433985A (en) * | 2011-10-15 | 2012-05-02 | 于学恭 | Quick construction hanging bracket for external wall of large storage tank |
CN202767494U (en) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | Hanging basket for high-altitude roof inner plate construction |
EP2677095A2 (en) * | 2012-06-21 | 2013-12-25 | GESTA Gesellschaft für Stahlrohrgerüste mit beschränkter Haftung | Access system for overhanging or convex curved walls |
CN203530851U (en) * | 2013-10-16 | 2014-04-09 | 中国十七冶集团有限公司 | Basket device for combined basket working vehicle |
CN203701560U (en) * | 2013-12-31 | 2014-07-09 | 森特士兴集团股份有限公司 | Suspension hanging basket for high-altitude roofing inner plate construction |
-
2015
- 2015-06-05 CN CN201510306087.XA patent/CN104963495B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10104247C1 (en) * | 2001-01-31 | 2002-07-25 | Asg Aluminium Systeme Gmbh | Traversing installation, used for working on building facades, comprises an endless drive element with a specified minimum value of its total wrap angle on the traction disks |
CN101892736A (en) * | 2010-08-10 | 2010-11-24 | 中建三局东方装饰设计工程有限公司 | High altitude moving hanging basket construction method |
CN102433985A (en) * | 2011-10-15 | 2012-05-02 | 于学恭 | Quick construction hanging bracket for external wall of large storage tank |
EP2677095A2 (en) * | 2012-06-21 | 2013-12-25 | GESTA Gesellschaft für Stahlrohrgerüste mit beschränkter Haftung | Access system for overhanging or convex curved walls |
CN202767494U (en) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | Hanging basket for high-altitude roof inner plate construction |
CN203530851U (en) * | 2013-10-16 | 2014-04-09 | 中国十七冶集团有限公司 | Basket device for combined basket working vehicle |
CN203701560U (en) * | 2013-12-31 | 2014-07-09 | 森特士兴集团股份有限公司 | Suspension hanging basket for high-altitude roofing inner plate construction |
Also Published As
Publication number | Publication date |
---|---|
CN104963495A (en) | 2015-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963495B (en) | A kind of hanging basket for installing roofing bottom colored steel | |
CN105822072B (en) | The lifting construction structure and its construction method of aerial vestibule furred ceiling | |
CN202881852U (en) | Suspension bridge cable installation system | |
CN105433855B (en) | Frame-type multifunctional stretches window cleaning equipment | |
CN103711323A (en) | Construction method of sprung roof plates by use of movable type pipe truss platform | |
CN105484502B (en) | A kind of industrial premises steel structural roof purlin and support bar combined installation method | |
CN105625645B (en) | Suspension type steel structure lighting skylight construction method | |
CN107089600A (en) | The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN101775896A (en) | Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold | |
CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN201635377U (en) | Rigid suspended type scaffold provided with large-span steel roof equipment pipeline | |
CN203947755U (en) | A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device | |
CN205637628U (en) | Hoist and mount construction structures of aerial vestibule furred ceiling | |
CN208648493U (en) | A kind of no scaffold installation elevator operation platform device | |
CN204111122U (en) | Optimize the composition component without scaffold lift-mounting | |
JP5181275B2 (en) | Perimeter curing device and curtain wall construction method | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN104060809A (en) | Roof lighting glass steel frame installation device and operation method thereof | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
CN208578156U (en) | Fast assembling-disassembling can plug-type heat preservation steel structure | |
CN201649607U (en) | Overhung-type outer wall scaffold | |
CN209635724U (en) | Platform is lifted for the more rod piece closures in four purlins | |
CN107060347A (en) | A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |