CN107575032A - A kind of bolt-ball net frame roofing installation method - Google Patents

A kind of bolt-ball net frame roofing installation method Download PDF

Info

Publication number
CN107575032A
CN107575032A CN201710583758.6A CN201710583758A CN107575032A CN 107575032 A CN107575032 A CN 107575032A CN 201710583758 A CN201710583758 A CN 201710583758A CN 107575032 A CN107575032 A CN 107575032A
Authority
CN
China
Prior art keywords
steel structure
net rack
structure net
lift unit
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710583758.6A
Other languages
Chinese (zh)
Inventor
姚晓阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Green Brilliant Energy Saving Technology Co Ltd
Original Assignee
Jiangsu Green Brilliant Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Green Brilliant Energy Saving Technology Co Ltd filed Critical Jiangsu Green Brilliant Energy Saving Technology Co Ltd
Priority to CN201710583758.6A priority Critical patent/CN107575032A/en
Publication of CN107575032A publication Critical patent/CN107575032A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of bolt-ball net frame roofing installation method, comprise the following steps:1st, assemble steel structure net rack center can lift unit;The 2nd, dead man is set;The 3rd, chain block and cable wind rope are installed;4th, be segmented lifting using dead man and extend out assembled steel structure net rack can lift unit;5th, the preparation continued to lift up using concrete column is operated;6th, the conversion of chain block;7th, be segmented lifting using concrete column and extend out steel structure net rack can lift unit;8th, steel structure net rack is promoted to design height;9th, the fixation of steel structure net rack.The present invention solves when being lifted in medium and small span ones to steel structure net rack, due to large-scale lifting means cannot be introduced into and caused by can not carry out overall lifting in face of steel structure net rack on ground, and merely using the lifting construction problem of insurmountable steel structure net rack during dead man lifting, reduce work high above the ground hidden danger, accelerating construction progress simultaneously.

Description

A kind of bolt-ball net frame roofing installation method
Technical field
The invention belongs to steel building technical field of construction, and in particular to a kind of bolt-ball net frame roofing installation method.
Background technology
Steel structure net rack is relatively common structure type, has big from heavy and light, rigidity, can be processed, is usually used in batch production Roof structure.In Practical Project construction, when steel construction enters construction, civil engineering concrete structure has typically been constructed completions, live Construction site condition can not change.
Rack installation method is more various, can be summarized as seven kinds of main field erected methods, respectively high-altitude dissipates Dress method, slitting or piecemeal Method for Installation, sliding method, whole hanging method, Integral Lifting, integrated lifting and folding and expanding integrally carry The method of liter.Seven kinds of methods respectively have feature, can be selected according to specific grid structure form and site condition.
But above-mentioned centralized way has respective weak point:Assembly in pieces at height needs a large amount of steel pipe scaffolds to set up Operating platform, construction period, operating expenses are higher;Slitting or piecemeal Method for Installation, whole hanging method need large lifting equipment, For narrow space, the unapproachable construction site of crane gear can not use;Sliding method needs open construction site and specially The slip device of door;Folding and expanding Integral Lifting is then the installation method used for the rack of particular design;When construction is empty Between it is narrow and small when, Integral Lifting or integrated lifting can be selected, integrated lifting uses hydraulic jacking equipment and interim branch Support, domestic common hydraulic jacking equipment stroke is 2-3 rice at present, and the jacking of rack needs repeatedly to carry out, and process is numerous and diverse, applies Safe mass control is difficult in work.
The content of the invention
Goal of the invention:The present invention is directed to deficiency of the prior art, proposes a kind of bolt-ball net frame roofing installation method, solves Determined when being lifted in medium and small span ones to steel structure net rack, due to large-scale lifting means cannot be introduced into and caused by Insurmountable steel structure net rack when can not carry out overall lifting in face of steel structure net rack on ground, and be lifted using dead man merely Lifting construction problem, while reduce work high above the ground hidden danger, accelerating construction progress.
Technical scheme:A kind of bolt-ball net frame roofing installation method of the present invention, comprises the following steps:
Step 1, assemble steel structure net rack center can lift unit;Midpoint and the center line of steel structure net rack are released, steel is installed The rod member of structure rack center line both sides, be assembled into steel structure net rack center can lift unit;
Step 2, dead man is set;The steel structure net rack center being completed can the inside of lift unit bars of eradicating are set more;
Step 3, chain block and cable wind rope are installed;Pulled each first and a chain block is respectively hung on gourd hook;Simultaneously The cable wind rope of four direction is fixed on each cable wind rope hook;
Step 4, be segmented lifting using dead man and extend out steel structure net rack can lift unit;By the chain sling on chain block with Steel structure net rack center can lift unit be connected, and by chain block by steel structure net rack center can lift unit lifted To the height that can extend out one layer, steel structure net rack center can lift unit outer ring weld one layer of rack and form steel construction net The first layer of frame can lift unit, continue to lift up steel structure net rack first layer can lift unit to the height that can extend out the second layer Degree, welded again in first layer lift unit outer ring one layer of rack formed steel structure net rack the second layer can lift unit, continue to carry Rise steel structure net rack the second layer can lift unit to the height that can extend out third layer and carry out extending out for third layer to form steel The third layer of structure rack can lift unit, and so on, until by the lifting of the lift unit at steel structure net rack center to pulling out Extended out during the maximum height that bar is supported to form the N layers of steel structure net rack can lift unit;
Step 5, the preparation continued to lift up using concrete column is operated;Second is welded on the built-in fitting of building concrete post Chain block is linked up with;The lifting bracket as rack lifting hanging point is down welded at the lower edge ball of rack simultaneously;
Step 6, the conversion of chain block;Chain block at the top of dead man is transferred into second to pull on gourd hook, simultaneously will Chain block and steel structure net rack center can the hanging point of lift unit be transformed on lifting bracket;
Step 7, be segmented lifting using concrete column and extend out steel structure net rack can lift unit;Can lift unit first to room Each hoist point of interlude of veil frame is lifted in proportion, until interlude rises to its both ends the first both ends adjacent thereto Suspend at section connecting position, then carrying out assembly with adjacent first both ends section to interlude closes up, and makes interlude and the first both ends Section integrator, forms the second interlude, then each hoist point of the second interlude is lifted in proportion, until among second Section, which is risen at the second both ends section connecting position adjacent thereto of its both ends, to be suspended, then to the second interlude and adjacent second liang End section carries out assembly and closed up, and makes the second interlude and the second both ends section integrator, the 3rd interlude is formed, by that analogy to shape Into N interludes, carry out assembly with N both ends section and close up to the complete curved surface entirety rack of formation;
Step 8, steel structure net rack is promoted to design height;Workmen utilizes the built-in fitting on concrete column and lifting branch Steel structure net rack lifting is arrived design height by frame by chain block;
Step 9, the fixation of steel structure net rack;After steel structure net rack lifting to design height, installed on steel structure net rack Net rack support, while lifting bracket and second are pulled into gourd hook excision, finally complete the fixation of steel structure net rack.
Further, the quantity of the dead man described in step 2 is 4 ~ 8, and all dead mans are symmetrical arranged.
Further, can lift unit include the described curved-surface net rack of roof of flexible steel twisted wire connection, flexible steel twisted wire with The tie point of curved-surface net rack of roof is hoist point.
Further, the both ends of interlude are placed in ground floor, and both ends section is supported close to one end of interlude by falsework, One end away from interlude is placed in ground floor.
Beneficial effect:The present invention solves when being lifted in medium and small span ones to steel structure net rack, due to big Type lifting means cannot be introduced into and caused by can not carry out overall lifting in face of steel structure net rack on ground, and use dead man merely The lifting construction problem of insurmountable steel structure net rack during lifting, while reduce work high above the ground hidden danger, accelerating construction progress.
Embodiment
With reference to specific embodiment, the invention will be further described:
Embodiment 1
A kind of bolt-ball net frame roofing installation method, comprises the following steps:
Step 1, assemble steel structure net rack center can lift unit;Midpoint and the center line of steel structure net rack are released, steel is installed The rod member of structure rack center line both sides, be assembled into steel structure net rack center can lift unit;
Step 2, dead man is set;The steel structure net rack center being completed can the inside of lift unit bars of eradicating are set more;
Step 3, chain block and cable wind rope are installed;Pulled each first and a chain block is respectively hung on gourd hook;Simultaneously The cable wind rope of four direction is fixed on each cable wind rope hook;
Step 4, be segmented lifting using dead man and extend out steel structure net rack can lift unit;By the chain sling on chain block with Steel structure net rack center can lift unit be connected, and by chain block by steel structure net rack center can lift unit lifted To the height that can extend out one layer, steel structure net rack center can lift unit outer ring weld one layer of rack and form steel construction net The first layer of frame can lift unit, continue to lift up steel structure net rack first layer can lift unit to the height that can extend out the second layer Degree, welded again in first layer lift unit outer ring one layer of rack formed steel structure net rack the second layer can lift unit, continue to carry Rise steel structure net rack the second layer can lift unit to the height that can extend out third layer and carry out extending out for third layer to form steel The third layer of structure rack can lift unit, and so on, until by the lifting of the lift unit at steel structure net rack center to pulling out Extended out during the maximum height that bar is supported to form the N layers of steel structure net rack can lift unit;
Step 5, the preparation continued to lift up using concrete column is operated;Second is welded on the built-in fitting of building concrete post Chain block is linked up with;The lifting bracket as rack lifting hanging point is down welded at the lower edge ball of rack simultaneously;
Step 6, the conversion of chain block;Chain block at the top of dead man is transferred into second to pull on gourd hook, simultaneously will Chain block and steel structure net rack center can the hanging point of lift unit be transformed on lifting bracket;
Step 7, be segmented lifting using concrete column and extend out steel structure net rack can lift unit;Can lift unit first to room Each hoist point of interlude of veil frame is lifted in proportion, until interlude rises to its both ends the first both ends adjacent thereto Suspend at section connecting position, then carrying out assembly with adjacent first both ends section to interlude closes up, and makes interlude and the first both ends Section integrator, forms the second interlude, then each hoist point of the second interlude is lifted in proportion, until among second Section, which is risen at the second both ends section connecting position adjacent thereto of its both ends, to be suspended, then to the second interlude and adjacent second liang End section carries out assembly and closed up, and makes the second interlude and the second both ends section integrator, the 3rd interlude is formed, by that analogy to shape Into N interludes, carry out assembly with N both ends section and close up to the complete curved surface entirety rack of formation;
Step 8, steel structure net rack is promoted to design height;Workmen utilizes the built-in fitting on concrete column and lifting branch Steel structure net rack lifting is arrived design height by frame by chain block;
Step 9, the fixation of steel structure net rack;After steel structure net rack lifting to design height, installed on steel structure net rack Net rack support, while lifting bracket and second are pulled into gourd hook excision, finally complete the fixation of steel structure net rack.
Further, the quantity of the dead man described in step 2 is 4 ~ 8, and all dead mans are symmetrical arranged.
Further, can lift unit include the described curved-surface net rack of roof of flexible steel twisted wire connection, flexible steel twisted wire with The tie point of curved-surface net rack of roof is hoist point.
Further, the both ends of interlude are placed in ground floor, and both ends section is supported close to one end of interlude by falsework, One end away from interlude is placed in ground floor.
The present invention solves when being lifted in medium and small span ones to steel structure net rack, due to large-scale lifting means Cannot be introduced into and caused by can not carry out overall lifting in face of steel structure net rack on ground, and can not when being lifted using dead man merely The lifting construction problem of the steel structure net rack of solution, while reduce work high above the ground hidden danger, accelerating construction progress.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, the technical spirit according to the present invention Any simple modification, equivalent change and modification made to above example, in the range of still falling within technical solution of the present invention.

Claims (4)

  1. A kind of 1. bolt-ball net frame roofing installation method, it is characterised in that:
    Step 1, assemble steel structure net rack center can lift unit;Midpoint and the center line of steel structure net rack are released, steel is installed The rod member of structure rack center line both sides, be assembled into steel structure net rack center can lift unit;
    Step 2, dead man is set;The steel structure net rack center being completed can the inside of lift unit bars of eradicating are set more;
    Step 3, chain block and cable wind rope are installed;Pulled each first and a chain block is respectively hung on gourd hook;Simultaneously The cable wind rope of four direction is fixed on each cable wind rope hook;
    Step 4, be segmented lifting using dead man and extend out steel structure net rack can lift unit;By the chain sling on chain block with Steel structure net rack center can lift unit be connected, and by chain block by steel structure net rack center can lift unit lifted To the height that can extend out one layer, steel structure net rack center can lift unit outer ring weld one layer of rack and form steel construction net The first layer of frame can lift unit, continue to lift up steel structure net rack first layer can lift unit to the height that can extend out the second layer Degree, welded again in first layer lift unit outer ring one layer of rack formed steel structure net rack the second layer can lift unit, continue to carry Rise steel structure net rack the second layer can lift unit to the height that can extend out third layer and carry out extending out for third layer to form steel The third layer of structure rack can lift unit, and so on, until by the lifting of the lift unit at steel structure net rack center to pulling out Extended out during the maximum height that bar is supported to form the N layers of steel structure net rack can lift unit;
    Step 5, the preparation continued to lift up using concrete column is operated;Second is welded on the built-in fitting of building concrete post Chain block is linked up with;The lifting bracket as rack lifting hanging point is down welded at the lower edge ball of rack simultaneously;
    Step 6, the conversion of chain block;Chain block at the top of dead man is transferred into second to pull on gourd hook, simultaneously will Chain block and steel structure net rack center can the hanging point of lift unit be transformed on lifting bracket;
    Step 7, be segmented lifting using concrete column and extend out steel structure net rack can lift unit;Can lift unit first to room Each hoist point of interlude of veil frame is lifted in proportion, until interlude rises to its both ends the first both ends adjacent thereto Suspend at section connecting position, then carrying out assembly with adjacent first both ends section to interlude closes up, and makes interlude and the first both ends Section integrator, forms the second interlude, then each hoist point of the second interlude is lifted in proportion, until among second Section, which is risen at the second both ends section connecting position adjacent thereto of its both ends, to be suspended, then to the second interlude and adjacent second liang End section carries out assembly and closed up, and makes the second interlude and the second both ends section integrator, the 3rd interlude is formed, by that analogy to shape Into N interludes, carry out assembly with N both ends section and close up to the complete curved surface entirety rack of formation;
    Step 8, steel structure net rack is promoted to design height;Workmen utilizes the built-in fitting on concrete column and lifting branch Steel structure net rack lifting is arrived design height by frame by chain block;
    Step 9, the fixation of steel structure net rack;After steel structure net rack lifting to design height, installed on steel structure net rack Net rack support, while lifting bracket and second are pulled into gourd hook excision, finally complete the fixation of steel structure net rack.
  2. A kind of 2. bolt-ball net frame roofing installation method according to claim 1, it is characterised in that:Institute in step 2 The quantity for the dead man stated is 4 ~ 8, and all dead mans are symmetrical arranged.
  3. A kind of 3. bolt-ball net frame roofing installation method according to claim 1, it is characterised in that:Can lift unit bag Include the described curved-surface net rack of roof of flexible steel twisted wire connection, the tie point as lifting of flexible steel twisted wire and curved-surface net rack of roof Point.
  4. A kind of 4. bolt-ball net frame roofing installation method according to claim 1, it is characterised in that:The both ends of interlude Ground floor is placed in, both ends section is supported close to one end of interlude by falsework, and one end away from interlude is placed in ground floor.
CN201710583758.6A 2017-07-18 2017-07-18 A kind of bolt-ball net frame roofing installation method Pending CN107575032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710583758.6A CN107575032A (en) 2017-07-18 2017-07-18 A kind of bolt-ball net frame roofing installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710583758.6A CN107575032A (en) 2017-07-18 2017-07-18 A kind of bolt-ball net frame roofing installation method

Publications (1)

Publication Number Publication Date
CN107575032A true CN107575032A (en) 2018-01-12

Family

ID=61049178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710583758.6A Pending CN107575032A (en) 2017-07-18 2017-07-18 A kind of bolt-ball net frame roofing installation method

Country Status (1)

Country Link
CN (1) CN107575032A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138452A (en) * 2018-10-19 2019-01-04 青岛建集团有限公司 Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN110792172A (en) * 2019-10-23 2020-02-14 上海园林绿化建设有限公司 Construction method of aluminum alloy cloud nest structure
CN112324157A (en) * 2020-10-27 2021-02-05 长江精工钢结构(集团)股份有限公司 Installation method of electric power synchronous lifting net rack
CN113374275A (en) * 2021-05-08 2021-09-10 北京市机械施工集团有限公司 Construction method for integrally lifting steel structure in house-in-house form

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926547A (en) * 2012-11-28 2013-02-13 中国建筑第八工程局有限公司 Installation method of curved-surface net rack of roof
CN103352576A (en) * 2013-07-24 2013-10-16 山东锦城钢结构有限责任公司 Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN106481083A (en) * 2015-08-24 2017-03-08 华北冶建工程建设有限公司 A kind of installation method of globe building steel construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926547A (en) * 2012-11-28 2013-02-13 中国建筑第八工程局有限公司 Installation method of curved-surface net rack of roof
CN103352576A (en) * 2013-07-24 2013-10-16 山东锦城钢结构有限责任公司 Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN106481083A (en) * 2015-08-24 2017-03-08 华北冶建工程建设有限公司 A kind of installation method of globe building steel construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138452A (en) * 2018-10-19 2019-01-04 青岛建集团有限公司 Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN110792172A (en) * 2019-10-23 2020-02-14 上海园林绿化建设有限公司 Construction method of aluminum alloy cloud nest structure
CN112324157A (en) * 2020-10-27 2021-02-05 长江精工钢结构(集团)股份有限公司 Installation method of electric power synchronous lifting net rack
CN112324157B (en) * 2020-10-27 2021-12-14 长江精工钢结构(集团)股份有限公司 Installation method of electric power synchronous lifting net rack
CN113374275A (en) * 2021-05-08 2021-09-10 北京市机械施工集团有限公司 Construction method for integrally lifting steel structure in house-in-house form
CN113374275B (en) * 2021-05-08 2022-10-14 北京市机械施工集团有限公司 Construction method for integrally lifting steel structure in house-in-house form

Similar Documents

Publication Publication Date Title
CN105604334B (en) A kind of rapid constructing method for large span steel truss integral installation
CN107575032A (en) A kind of bolt-ball net frame roofing installation method
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN202324571U (en) Overhanging type double-row scaffold
CN105226560B (en) A kind of crossing frame and its construction method
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN205429566U (en) Crossing structure
CN107327068A (en) Steel construction truss string structure system roof system ceiling structure and its construction method
CN103352576A (en) Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN206448504U (en) It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction
CN115538792A (en) Residential building machine installation construction method and structure
CN205955160U (en) Antiskid lattice formula elevartor shaft removes operation platform
CN205100531U (en) Lift scaffold support body assembly
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN206346500U (en) Compact simplified arm extending type straddle truck
CN210002838U (en) Device for mounting steel structure vestibule color plate
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN105776092A (en) Stretching type basket device and construction method thereof
CN206693641U (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building
CN107288361B (en) High-rise falling-prevention backward anchoring self-hanging double-layer horizontal safety net device and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180112

WD01 Invention patent application deemed withdrawn after publication