CN206448504U - It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction - Google Patents
It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction Download PDFInfo
- Publication number
- CN206448504U CN206448504U CN201720128434.9U CN201720128434U CN206448504U CN 206448504 U CN206448504 U CN 206448504U CN 201720128434 U CN201720128434 U CN 201720128434U CN 206448504 U CN206448504 U CN 206448504U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- operating platform
- stones
- laying bricks
- latch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, including support body and loading plate, the support body is made up of vertical rod, level connection joint component, latch and climbing pedal stroke, bottom of upright rod is provided with universal caster wheel, vertical rod top offers some latch eyelets at a certain distance, level connection joint component is formed by steel pipe and sleeve weld, and sleeve is inserted in vertical rod and is fixed on by latch in vertical rod;Loading plate is made up of some reinforced mesh, is laid and is fixed on level connection joint component;Climbing pedal stroke is fixed between two vertical rods.The utility model realizes that operating platform is moved in the horizontal direction using universal caster wheel, and the adjustment of loading plate relative altitude is realized by adjusting position of the level connection joint component in vertical rod, have the advantages that to install, remove and using simple to operate flexible, safe and reliable, can be widely applied for indoor wall and build by laying bricks or stones, plaster and fit up etc. to construct.
Description
Technical field
The utility model is related to construction and ascended a height operation auxiliary equipment, specifically a kind of lift Mobile operating platform, mainly
The construction such as build, plaster and fit up by laying bricks or stones for indoor wall.
Background technology
Architectural engineering is built by laying bricks or stones, plastered or during fitment operation carrying out indoor wall, is generally required progress and is ascended a height operation, ascends a height
Operation conventional method is usually to use to set up simple wooden operating platform or use sizing door type frame operating platform, but Simple wood
Matter operating platform stability is poor, and potential safety hazard is big, and the door type frame operating platform shaped can not be adjusted according to need of work
Highly, application limitation is big.
The content of the invention
The purpose of this utility model be to provide it is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction,
It can be adjusted according to face height, and installation and dismounting are convenient, movement is flexible, stability is good, safe and reliable, energy is preferable
Ground builds by laying bricks or stones for indoor wall, plaster and fitment operation provides safe and convenient operating condition of ascending a height.
The utility model reaches above-mentioned purpose by using following technical scheme:One kind is built by laying bricks or stones for interior, plastering construction
Lift Mobile operating platform, including support body and loading plate, concrete structure and annexation are:The support body is by vertical rod, water
Flushconnection component, latch and step pole for climbing composition, bottom of upright rod are provided with universal caster wheel, and vertical rod top is opened up at a certain distance
There are some latch eyelets, level connection joint component is formed by steel pipe and sleeve weld, sleeve is inserted in vertical rod and is fixed on by latch
In vertical rod, climbing pedal stroke is fixed between two vertical rods.Loading plate is made up of some reinforced mesh, is laid and is fixed on
On level connection joint component.
Described vertical rod is common scaffolding steel pipe, specification 48mm × 3.5mm, length 1.5m.
Described universal caster wheel welded and installed offers diameter in the root of every vertical rod, vertical rod every 200mm spacing
12mm eyelet.
Described level connection joint scantling specification is 0.6m × 1.8m, is formed by four steel pipes and four sleeve welds,
Steel pipe specification is 48mm × 3.5mm, and length is each 2 of 0.6m and 1.8m;Sleeve is length 60mm, internal diameter 55mm, wall thickness 3.8mm
Lengths of steel pipes.
Sleeve on described level connection joint component is inserted in after vertical rod, is fixed in using latch in vertical rod;
Described loading plate is made up of some reinforced mesh, and reinforced mesh specification is 600 × 450mm, using diameter 10-12
Reinforcement welding formed, reinforced mesh both sides be provided with shackle, can lay and be fixed on level connection joint component;
The common scaffolding steel pipe tubing that described climbing pedal stroke is length 0.6m, its two ends is welded with sleeve, passed through
Latch is fixed between two vertical rods, is supported as step when falling operating platform in personnel's climbing.
It is of the present utility model to have the prominent advantages that:
1st, the utility model is tool-type, regularization and dismountable operating platform, can need spirit according to operation height
Lifting living, conveniently moving, strong applicability.
2nd, with good stability, security, ascending a height to operate for personnel provides safety guarantee.
3rd, make and assemble and disassemble simply, it is with low cost.
Brief description of the drawings
Fig. 1 be it is described in the utility model be used for interior build by laying bricks or stones, the structure of the lift Mobile operating platform of plastering construction
Schematic diagram.
Fig. 2 be it is described in the utility model be used for interior build by laying bricks or stones, the vertical rod of the lift Mobile operating platform of plastering construction
It is intended to.
Fig. 3 be it is described in the utility model be used for interior build by laying bricks or stones, the level of the lift Mobile operating platform of plastering construction
Bar component schematic diagram.
Fig. 4 be it is described in the utility model be used for interior build by laying bricks or stones, the climbing of the lift Mobile operating platform of plastering construction
Pedal stroke schematic diagram.
Fig. 5 be it is described in the utility model be used for interior build by laying bricks or stones, the carrying of the lift Mobile operating platform of plastering construction
Plate schematic diagram.
Embodiment
The technical solution of the utility model is described further below by way of drawings and examples.
As shown in Figures 1 to 5, it is described in the utility model be used for interior build by laying bricks or stones, the lift moving operation of plastering construction
Platform, including support body and loading plate, its concrete structure and annexation are:
The support body includes vertical rod 1, level connection joint component 2 and step pole for climbing 3, and the root of vertical rod 1 is provided with universal caster wheel
4, vertical rod 1 offers some latch eyelets 5 at a certain distance;Level connection joint component 2 welded by four steel pipes and four sleeves 6 and
Into sleeve 6 is inserted in vertical rod 1 and inserts latch 7 and is fixed in vertical rod 1;Loading plate is made up of some reinforced mesh 8 and shackle 9, paving
And if being fixed on level connection joint component 2;Climbing pedal stroke 3 is fixed between two vertical rods 1.
Described vertical rod 1 is common scaffolding steel pipe, and specification is 48mm × 3.5mm, length 1.5m.
The described welded and installed of universal caster wheel 4 offers diameter in the root of every vertical rod 1, vertical rod 1 every 200mm spacing
12mm latch eyelet 5.
The described specification of level connection joint component 2 is 0.6m × 1.8m, is welded by four steel pipes and four sleeves 6, steel
Pipe specification is 48mm × 3.5mm, and length is each 2 of 0.6m and 1.8m;Sleeve 6 is length 60mm, internal diameter 55mm, wall thickness 3.8mm
Lengths of steel pipes.
Described loading plate is made up of some reinforced mesh, and the specification of reinforced mesh 8 is 600 × 450mm, and its both sides is provided with energy
Enough lodges are fixed on the shackle 9 on level connection joint component 2.
The described two ends of climbing pedal stroke 3 are welded with sleeve 6, can be fixed between two vertical rods 1.
It is described in the utility model be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction assembly and use
Method, comprises the following steps:
1st, the assembly of operating platform:Four vertical rods 1 are respectively penetrated into level connection joint component 2 and the sleeve 6 of pedal stroke 3 is climbed
It is interior, and be tentatively fixed on level connection joint component 2 and climbing pedal stroke 3 in vertical rod 1 using latch 7;
2nd, the regulation of operating platform:Adjustment climbing pedal stroke 3 and level connection joint component 2 meet it in the position of vertical rod 1
Ascend a height operation and personnel climbing the need for.
3rd, reinforced mesh 8 is layered on level connection joint component 2, and withholds the shackle 9 of the both sides of reinforced mesh 8 and connected in level
On connection member 2.
4th, the locking of universal caster wheel 4 of the every lower end of vertical rod 1 can be come into operation.
Claims (6)
1. it is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, including support body and loading plate, its feature exists
In concrete structure and annexation are:The support body is made up of vertical rod, level connection joint component, latch and step pole for climbing, vertical rod
Bottom is provided with universal caster wheel, and vertical rod top offers some latch eyelets, the set jacket casing of level connection joint component at a certain distance
Enter vertical rod and be fixed on by latch in vertical rod, climbing pedal stroke is fixed between two vertical rods;Loading plate is laid and consolidated
It is scheduled on level connection joint component.
2. it is according to claim 1 be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, its feature exists
In the vertical rod is the common scaffolding steel pipe that four specifications are 48mm × 3.5mm, length 1.5m.
3. it is according to claim 1 be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, its feature exists
In the vertical rod offers diameter 12mm latch eyelet every 200mm spacing.
4. it is according to claim 1 be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, its feature exists
In the level connection joint scantling specification is 0.6m × 1.8m, is formed by four steel pipes and four sleeve welds, steel pipe specification
For 48mm × 3.5mm, length is each 2 of 0.6m and 1.8m, and sleeve is length 60mm, internal diameter 55mm, wall thickness 3.8mm steel pipe
Section.
5. it is according to claim 1 be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, its feature exists
In the loading plate is made up of some reinforced mesh, and reinforced mesh specification is 600 × 450mm, and reinforced mesh both sides are provided with hook
Ring.
6. it is according to claim 1 be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction, its feature exists
In the climbing pedal stroke two ends are welded with sleeve, are fixed on by sleeve and latch between two vertical rods, as personnel
On climbing step support when falling operating platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720128434.9U CN206448504U (en) | 2017-02-13 | 2017-02-13 | It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720128434.9U CN206448504U (en) | 2017-02-13 | 2017-02-13 | It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206448504U true CN206448504U (en) | 2017-08-29 |
Family
ID=59665808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720128434.9U Expired - Fee Related CN206448504U (en) | 2017-02-13 | 2017-02-13 | It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206448504U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806236A (en) * | 2017-10-19 | 2018-03-16 | 安徽建诚国际经济技术合作有限公司 | A kind of adjustable construction scaffold and its installation method |
CN107989353A (en) * | 2017-12-30 | 2018-05-04 | 金华市亚虎工具有限公司 | A kind of table top overturning type foot hand cradle |
CN113700340A (en) * | 2021-08-05 | 2021-11-26 | 福建省城投科技有限公司 | Temporary stair for building construction and displacement method thereof |
CN114809552A (en) * | 2022-04-18 | 2022-07-29 | 云南交投集团云岭建设有限公司 | Bridge construction safety is with supporting protective bracket device |
-
2017
- 2017-02-13 CN CN201720128434.9U patent/CN206448504U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806236A (en) * | 2017-10-19 | 2018-03-16 | 安徽建诚国际经济技术合作有限公司 | A kind of adjustable construction scaffold and its installation method |
CN107989353A (en) * | 2017-12-30 | 2018-05-04 | 金华市亚虎工具有限公司 | A kind of table top overturning type foot hand cradle |
CN113700340A (en) * | 2021-08-05 | 2021-11-26 | 福建省城投科技有限公司 | Temporary stair for building construction and displacement method thereof |
CN114809552A (en) * | 2022-04-18 | 2022-07-29 | 云南交投集团云岭建设有限公司 | Bridge construction safety is with supporting protective bracket device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206448504U (en) | It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN103422668A (en) | Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof | |
CN206233543U (en) | A kind of climbing device for jacking construction platform | |
CN107254933A (en) | The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN109958134B (en) | Suspension type deep basal pit stairs up and down | |
CN204752026U (en) | Tower crane escape way | |
CN203452375U (en) | Hydraulic self-jacking oblique creeping formwork | |
CN107035131A (en) | A kind of construction method of elevator integral lifting construction operation platform and elevator | |
CN206917244U (en) | A kind of elevator integral lifting construction operation platform | |
CN202866261U (en) | Operation hanging rack for civil construction | |
CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
CN207160448U (en) | A kind of assembled architecture reinforced concrete stairs structure | |
CN105776092A (en) | Stretching type basket device and construction method thereof | |
CN206053393U (en) | One kind can have enough to meet the need steel stair operating platform | |
CN108756197A (en) | A kind of construction method of hoistway operation platform | |
CN208517943U (en) | A kind of concrete support moves horizontally adjustable Hanging Basket | |
CN108792963A (en) | A kind of Steel Space Truss formula tower crane wall-attached supporting seat method for high-rise roof framework | |
CN208585976U (en) | A kind of channel connecting Lou Tiyu tower crane | |
CN206053339U (en) | Tower passage on a kind of scalable turnover type tower crane driver | |
CN111764623A (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20220213 |
|
CF01 | Termination of patent right due to non-payment of annual fee |