CN208585976U - A kind of channel connecting Lou Tiyu tower crane - Google Patents

A kind of channel connecting Lou Tiyu tower crane Download PDF

Info

Publication number
CN208585976U
CN208585976U CN201820886787.XU CN201820886787U CN208585976U CN 208585976 U CN208585976 U CN 208585976U CN 201820886787 U CN201820886787 U CN 201820886787U CN 208585976 U CN208585976 U CN 208585976U
Authority
CN
China
Prior art keywords
tower crane
channel
steel tube
square steel
lou
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820886787.XU
Other languages
Chinese (zh)
Inventor
余秋
陈圣洪
梁晓劼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Construction Engineering Group Co., Ltd
FUJIAN JIANGONG GROUP Co.,Ltd.
Original Assignee
Fujian Construction Engineering Refco Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Construction Engineering Refco Group Ltd filed Critical Fujian Construction Engineering Refco Group Ltd
Priority to CN201820886787.XU priority Critical patent/CN208585976U/en
Application granted granted Critical
Publication of CN208585976U publication Critical patent/CN208585976U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of channel of connection Lou Tiyu tower crane of technical field of building construction, tower crane includes tower crane platform, and building is erected with external scaffolding in vitro, is connected between external scaffolding and tower crane by channel;The channel and external scaffolding lock, and the channel and building body are not connected to;The channel is unconnected to be erected on tower crane platform, and the contact of present apparatus Bu Yu building body will not destroy building body, the screw of pre-buried installation passage on building body again is not needed yet, workload is reduced, efficiency is improved, the other end is only erected on tower crane platform, it does not install or fixes with tower crane, it is not only convenient for disassembly and assembly in this way, but also the shaking of tower crane will not be followed and pull scaffold or building body, reduce security risk, even if the case where tower crane lodges, the present apparatus will not be fallen by pullling.

Description

A kind of channel connecting Lou Tiyu tower crane
Technical field
The utility model relates to technical field of building construction, more particularly to a kind of channel for connecting Lou Tiyu tower crane.
Background technique
With the emergence of skyscraper, vertical transport relies on tower crane substantially to complete in structure construction procedure, takes charge of Machine is on and off duty relatively arduous by the included ladder of tower crane, therefore the occasional passage being arranged between tower crane and building body is very important, existing Using the assembly type tower crane channel of channel steel structure, the channel steel weight used is mainly being generally required according to the channel steel of building standard Measure larger, lifting is difficult, and the weight in unbearable substantially channel steel channel of external scaffolding, this channel has to the building Jia body On floor, if tower crane face be building body shear wall, it is also necessary to building body is drilled, then by channel steel be inserted into building body in, into Row supports, and channel made of this channel steel, it is also more inconvenient to disassemble and install, and as building floor constantly increases, needs not Disconnected makes channel in higher floor, and the biggish channel steel of weight, also more inconvenient installation is unstable in production channel, this logical Road also needs the pre-embedded bolt on structural slab, erroneous for installation, after withdrawing channel, it is also necessary to fill the building body of drilling, this benefit Hole firmly still reduces the intensity of building body, is also easy cracking, and causing a hidden trouble, it is a kind of convenient for disassembly and assembly to need now, more Light channel.
Such as people channel and its construction method on a kind of regularization tower crane of Chinese Patent Application No. CN201710460491.1, It includes supporter, protective fence, template;The two sides of supporter are arranged in protective fence, template-setup on supporter, supporter One end is connect with building floor, and the other end is connect with standard section of tower crane, and supporter includes tower crane fixed knot, floor fixed knot And at least one middle node;One end of tower crane fixed knot is fixed on standard section of tower crane, and the other end is connect with middle node;Floor Fixed knot is fixed on building floor, and the other end is connect with middle node.
Although this assembly type tower crane channel is using double-layer groove steel construction, assembly is convenient, improves the safety in tower crane channel Property, improve tower crane driver convenience on and off duty;It can be recycled, and save the construction cost of engineering, but increase double Layer channel steel, keeps frame heavier, needs more robustly to support, and dismounting is more laborious, also unavoidable to need for passage rack to be set to It is supported on floor, needs to drill to building body, destroy the integrality of building body, and channel both ends are solid respectively at building body and tower crane It is fixed, it is fixedly connected with channel, tower crane meeting nature shakes, and such tower crane can pull external scaffolding and building body when shaking, make It is not lower using cost at hidden danger, the smaller square steel tube of weight.
Based on this, the utility model devises a kind of channel for connecting Lou Tiyu tower crane, to solve the above problems.
Summary of the invention
The purpose of this utility model is to provide a kind of channels for connecting Lou Tiyu tower crane, and weight is lighter, and dismounting is simpler, Material can be recycled, and not need to destroy building body, and be not fixed with tower crane, the round-trip outer foot that will not be pullled by tower crane shaking The channel of hand cradle and tower crane.
The utility model is realized in this way: a kind of channel connecting Lou Tiyu tower crane, tower crane includes tower crane platform, Lou Ti It is erected with external scaffolding outside, is connected between external scaffolding and tower crane by channel;The channel and external scaffolding lock, and described Channel and building body are not connected to;The channel is unconnected to be erected on tower crane platform.
Further, the channel include complex root square steel tube, complex root upright bar, complex root with reinforcing steel pipe and channel Plate, one end of square steel tube described in complex root pass through the vertical equity rod lock of fastener and external scaffolding, square steel tube described in complex root The other end be erected on tower crane platform, upright bar described in complex root pass through respectively bolt be mounted vertically in two it is outermost described It on square steel tube, is connected between the adjacent square steel tube by the reinforcing steel pipe, the square steel tube and the reinforcing steel pipe are logical Crossing the mutual interlocking of fastener is horizontal frame, and the frame of the level is unconnected to be erected on tower crane platform, the level Gangway-floor is equipped on frame.
Further, protective fence is equipped with by bolt between the upright bar all on square steel tube described in same root, institute Stating protective fence is punched-plate.
Further, the square steel tube is at least three.
Further, the gangway-floor is composite plate, the gangway-floor and square steel tube by bolt or steel nail, Or fixation with steel wire connection.
Further, construction sign is mounted on the protective fence.
The beneficial effects of the utility model are: the one end in the utility model channel is directly installed on longitudinal water of external scaffolding On flat bar, the contact of present apparatus Bu Yu building body will not destroy building body, also not need the screw of pre-buried installation passage on building body again, drop Low workload improves efficiency, and the other end is only erected on tower crane platform, does not install with tower crane or fixed, so not It is only convenient for disassembly and assembly, and the shaking of tower crane will not be followed and pull scaffold or building body, security risk is reduced, even if tower crane The case where lodging, the present apparatus will not be fallen by pullling.
Detailed description of the invention
The utility model is further described in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is that the utility model is just schemed;
Fig. 2 is the utility model square steel tube and reinforcing penstock installation top view;
Fig. 3 is the structural schematic diagram in the utility model channel.
In attached drawing, parts list represented by the reference numerals are as follows:
1- longitudinal horizontal rod, 2- tower crane platform, the channel 3-, 31- square steel tube, 32- upright bar, 33- reinforce steel pipe, the channel 34- Floor, 4- protective fence.
Specific embodiment
It please refers to shown in Fig. 1 to 3, the utility model provides a kind of technical solution: a kind of channel connecting Lou Tiyu tower crane, Tower crane includes tower crane platform 2, and building is erected with external scaffolding in vitro, is connected between external scaffolding and tower crane by channel 3;Channel 3 It is locked with external scaffolding, and channel 3 and building body are not connected to;Channel 3 is unconnected to be erected on tower crane platform 2, and channel 3 does not need It is fixedly mounted with building body, it is not necessary to destroy building body, the integrality of wall will not be reduced, not need the pre-buried installation bolt of building body again, save Installation steps have been gone, drilling and subsequent benefit wall has not been needed, reduces workload, will not lead to the problem of and mend wall cracking, channel 3 It is not fixed with tower crane, avoids the case where channel is pullled in tower crane shaking, will not more pull building body and external scaffolding, reduce tower Hang the hidden danger pullled.
Wherein, channel 3 includes complex root square steel tube 31, complex root upright bar 32, complex root reinforcing steel pipe 33 and gangway-floor 34, one end of complex root square steel tube 31 is locked by the longitudinal horizontal rod 1 of fastener and external scaffolding, complex root square steel tube 31 it is another One end is erected at 2 on tower crane platform, and complex root upright bar 32 is mounted vertically in two outermost square steel tubes 31 by bolt respectively On, it is connected between adjacent square steel tube 31 by reinforcing steel pipe 33, square steel tube 31 and reinforcing steel pipe 33 pass through the mutual interlocking of fastener For horizontal frame, horizontal frame is unconnected to be erected on tower crane platform 2, is equipped with gangway-floor on horizontal frame 34, keep 3 structure of channel more stable and firm, by more steady, 31 mass of square steel tube is smaller, installs more convenient, Ke Yishi Length is reduced when splicing increases or is truncated, to adapt to tower crane and building body spacing, operation is more flexible, on same root square steel tube 31 Protective fence 4 is equipped with by bolt between all upright bars 32, protective fence 4 is punched-plate, keep protective fence 4 easy for installation, and The intensity for increasing protective fence 4 increases the safety in channel 3, and square steel tube 31 is at least three, is laid with gangway-floor 34 more Add stabilization, gangway-floor 34 is that composite plate, gangway-floor 34 and square steel tube 31 pass through bolt or steel nail or fixation with steel wire Connection, connection is simple secured, convenient for disassembly and assembly, and construction sign is mounted on protective fence 4, and prompting is taken care by personnel.
One concrete application of embodiment are as follows: the utility model is vertical with external scaffolding respectively by complex root square steel tube 31 It is connected to horizon bar 1, and is connected by fastener, dismounting is very convenient, and there are many building buckles, can may occur The place of angle change uses rotary buckle, needs firm place using right-angle coupler, external scaffolding and tower crane distance compared with When remote, sleeve couple can be used, two or more square steel tubes 31 are connected, form longer channel, square steel tube 31 is preferably 4 Root is placed in parallel, fixed by reinforcing steel pipe 33 between adjacent square steel tube 31, and square steel tube 31 and reinforcing steel pipe 33 pass through fastener Horizontal frame is formed, and is laid with gangway-floor 34 on horizontal frame, keeps channel more stable, is walked more smooth, it is stronger, It has been bolted upright bar 32 at the top of the square steel tube 31 in outside, protective fence 4 is then locked by bolt between upright bar 32, has been increased The safety for having added channel is provided with safe poster on protective fence 4, and the worker for passing by channel is reminded to take care, and uses It should be clear that increasing the active safety of equipment, the other end in channel 3 is not connect with tower crane, is only set up and is placed on tower crane platform 2 Above, it can be mutually shifted, because tower crane is relatively high, inevitably shake, then fixation can be pullled when shaking In devices above, the present apparatus is not fixed or is connect with tower crane, not will receive pullling when tower crane shakes, it is hidden to reduce safety To suffer from, the present apparatus is locked square steel tube 31 and external scaffolding by multiple fasteners, even if tower crane lodges, the present apparatus will not be fallen, Safety is greatly increased, and any part in channel does not need to fix with building body, it is not necessary to drill to building body, not destroy building The integrality and rigidity of body, will not generate drilling after bring trouble and hidden danger, not only save cost, do not need using compared with The channel steel of weight, the present apparatus have used square steel tube 31, have kept overall weight lighter, and installation is more labor-saving, and dismounting is simpler, reduce labour Intensity, each component are connected by bolt with fastener, convenient for disassembly and assembly secured.
Although those familiar with the art answers the foregoing describe specific embodiment of the present utility model Working as understanding, we are merely exemplary described specific embodiment, rather than for the limit to the scope of the utility model Fixed, those skilled in the art modification and variation equivalent made by the spirit according to the utility model all should Cover in the scope of the claimed protection of the utility model.

Claims (6)

1. a kind of channel for connecting Lou Tiyu tower crane, tower crane includes tower crane platform (2), and building is erected with external scaffolding in vitro, special Sign is: being connected between external scaffolding and tower crane by channel (3);The channel (3) and external scaffolding lock, and the channel (3) He Louti is not connected to;The channel (3) is unconnected to be erected on tower crane platform (2).
2. a kind of channel for connecting Lou Tiyu tower crane according to claim 1, it is characterised in that: the channel (3) includes Complex root square steel tube (31), complex root upright bar (32), complex root reinforce steel pipe (33) and gangway-floor (34), side described in complex root One end of steel pipe (31) is locked by the longitudinal horizontal rod (1) of fastener and external scaffolding, square steel tube (31) described in complex root it is another One end is erected on tower crane platform (2), upright bar described in complex root (32) respectively by bolt be mounted vertically in two it is outermost On the square steel tube (31), connected between the adjacent square steel tube (31) by the reinforcing steel pipe (33), the square steel tube It (31) is horizontal frame, the unconnected erection of frame of the level by the mutual interlocking of fastener with the reinforcing steel pipe (33) On tower crane platform (2), gangway-floor (34) are equipped on the frame of the level.
3. a kind of channel for connecting Lou Tiyu tower crane according to claim 2, it is characterised in that: square steel tube described in same root (31) it is equipped with protective fence (4) between all upright bars (32) by bolt on, the protective fence (4) is punched-plate.
4. a kind of channel for connecting Lou Tiyu tower crane according to claim 2, it is characterised in that: the square steel tube (31) is extremely It is less three.
5. a kind of channel for connecting Lou Tiyu tower crane according to claim 2, it is characterised in that: the gangway-floor (34) For composite plate, the gangway-floor (34) is connect with square steel tube (31) by bolt or steel nail or fixation with steel wire.
6. a kind of channel for connecting Lou Tiyu tower crane according to claim 3, it is characterised in that: on the protective fence (4) It is mounted with construction sign.
CN201820886787.XU 2018-06-06 2018-06-06 A kind of channel connecting Lou Tiyu tower crane Active CN208585976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820886787.XU CN208585976U (en) 2018-06-06 2018-06-06 A kind of channel connecting Lou Tiyu tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820886787.XU CN208585976U (en) 2018-06-06 2018-06-06 A kind of channel connecting Lou Tiyu tower crane

Publications (1)

Publication Number Publication Date
CN208585976U true CN208585976U (en) 2019-03-08

Family

ID=65536230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820886787.XU Active CN208585976U (en) 2018-06-06 2018-06-06 A kind of channel connecting Lou Tiyu tower crane

Country Status (1)

Country Link
CN (1) CN208585976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502753A (en) * 2018-06-06 2018-09-07 福建建工集团有限责任公司 A kind of channel of connection building body and tower crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502753A (en) * 2018-06-06 2018-09-07 福建建工集团有限责任公司 A kind of channel of connection building body and tower crane

Similar Documents

Publication Publication Date Title
CN213234203U (en) Disc buckle type upright column ladder cage scaffold
CN211899558U (en) Handling frame encorbelments
CN211229608U (en) Safety rope stand column for steel structure construction
CN206448504U (en) It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction
CN208585976U (en) A kind of channel connecting Lou Tiyu tower crane
CN111335661A (en) Safety rope stand column for steel structure construction and use method thereof
CN108502753A (en) A kind of channel of connection building body and tower crane
CN210013444U (en) Closed cantilever scaffold system
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude
CN219118718U (en) Climbing frame horizontal protection
CN217998886U (en) Narrow space climbing platform
CN217602027U (en) Transition passage device of tower crane and building
CN219906796U (en) Tower crane overhanging attachment device
CN217379735U (en) Wall connecting device suitable for large-span high frame
CN204299207U (en) A kind of frame supported system
CN203867167U (en) Attached lifting scaffold bottom truss
CN211229426U (en) Self-supporting steel pipe scaffold system
CN214220548U (en) Limited space board scaffold structure that encorbelments
CN215948853U (en) Building courtyard lifting construction platform
CN210217105U (en) Scaffold external corner net frame mounting part and external corner net frame mounting structure
CN214653222U (en) Anti-climbing device for tower crane
CN216840812U (en) Assembled ladder cage device
CN220451395U (en) Structural climbing frame attaching supporting device
CN216076209U (en) Adjust nimble outer hanging handling frame of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200928

Address after: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Patentee after: FUJIAN JIANGONG GROUP Co.,Ltd.

Patentee after: Fujian Construction Engineering Group Co., Ltd

Address before: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Patentee before: FUJIAN JIANGONG GROUP Co.,Ltd.