CN217998886U - Narrow space climbing platform - Google Patents

Narrow space climbing platform Download PDF

Info

Publication number
CN217998886U
CN217998886U CN202222046466.8U CN202222046466U CN217998886U CN 217998886 U CN217998886 U CN 217998886U CN 202222046466 U CN202222046466 U CN 202222046466U CN 217998886 U CN217998886 U CN 217998886U
Authority
CN
China
Prior art keywords
steel plate
narrow space
screw rod
fixedly connected
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222046466.8U
Other languages
Chinese (zh)
Inventor
杨新水
彭家辉
吴嘉辉
李晴晴
万险
董弦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Fifth Construction Co Ltd
Original Assignee
China Nuclear Industry Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Fifth Construction Co Ltd filed Critical China Nuclear Industry Fifth Construction Co Ltd
Priority to CN202222046466.8U priority Critical patent/CN217998886U/en
Application granted granted Critical
Publication of CN217998886U publication Critical patent/CN217998886U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a narrow space platform that climbs, include: the steel pipe comprises a connecting frame, a plurality of steel pipes, a plurality of screw rods, a plurality of screw rod connectors, a top steel plate and a bottom steel plate, wherein the top steel plate is arranged above the bottom steel plate; the connecting frame is fixedly connected with the top steel plate and the bottom steel plate; the steel pipes are fixedly connected with the bottom steel plate, the steel pipes are arranged in parallel, and two ends of each steel pipe protrude out of two ends of the bottom steel plate; both ends of each steel pipe are fixedly connected with a screw; one end of each screw rod connector is matched with a screw rod, the other end of each screw rod connector is matched with a pre-buried locating ring, and the pre-buried locating ring is fixedly pre-buried. The utility model discloses change the tradition and set up steel pipe scaffold's construction method, adopt the construction method of whole promotion, the innovation invents a modular steel can whole promotion operation platform, has solved narrow space position operation platform such as lighting well and has protected the problem that the support body set up.

Description

Narrow space climbing platform
Technical Field
The utility model relates to a technical field of building engineering equipment especially relates to a narrow space platform that climbs.
Background
In the field of existing high-rise building engineering, overhanging steel pipe scaffolds or attached lifting scaffolds are often adopted in external scaffold engineering. For narrow space positions of independent groined-shaped structures such as a floor lighting well, due to limited space positions, the installation of a buttress support and a walkway plate of an attached lifting scaffold cannot be normally carried out, and the construction of an external operation platform and a protective scaffold can be carried out only by adopting the traditional construction method for erecting the overhanging steel pipe scaffold so as to meet the requirement of external wall construction. The traditional construction method for erecting the overhanging scaffold needs to be erected in a through-height mode, the using amount of turnover materials such as I-steel, steel pipes, fasteners and bamboo gangboards is large, the number of workers is large, the cost is high, the potential safety hazard problem is prominent, and the image management and control of site cost and safe and civilized construction are not facilitated.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a narrow space platform that climbs.
In order to realize the purpose, the utility model discloses the technical scheme who takes does:
a narrow space climbing platform, comprising:
the top steel plate is arranged above the bottom steel plate;
the connecting frame is fixedly connected with the top steel plate and the bottom steel plate;
the steel pipes are fixedly connected with the bottom steel plate and arranged in parallel, and two ends of each steel pipe protrude out of two ends of the bottom steel plate;
the two ends of each steel pipe are fixedly connected with one screw;
a plurality of screw rod connectors, each the one end of screw rod connector all with one the screw rod cooperatees, each the other end of screw rod connector all cooperatees with a pre-buried holding ring, the fixed pre-buried setting of pre-buried holding ring.
The narrow space climbing platform comprises:
the two ends of the square steel upright posts are respectively and fixedly connected with the top steel plate and the bottom steel plate;
the two ends of each square steel cross rod are fixedly connected with the middle parts of the two square steel stand columns;
the square steel inclined rods are fixedly connected with the two ends of each square steel inclined rod, and a first included angle is formed between each square steel inclined rod and each square steel cross rod.
In the narrow space climbing platform, the bottom steel plate is connected with a movable turning plate, and the movable turning plate extends out of the bottom steel plate.
The narrow space climbing platform is characterized in that the top steel plate is provided with a mounting lifting ring.
The narrow space climbing platform comprises:
the screw rod connecting part is of a circumferential thin-wall structure;
the pre-buried head connecting part is an annular part with an opening, the annular part forms two end parts at the opening respectively, and the two end parts are arranged in the screw rod connecting part;
and each connecting bolt penetrates through the screw rod connecting part and the two end parts.
The narrow space climbing platform described above, wherein the embedded positioning ring includes:
the connecting ring is in a semicircular ring shape;
the two ends of the connecting ring are respectively connected with the embedded parts to form an omega shape, and the embedded parts are embedded in the concrete layer.
In the narrow space climbing platform, the annular portion of the pre-countersunk head connecting portion of the screw connector is connected to the connecting ring.
The utility model discloses owing to adopted above-mentioned technique, make it compare the positive effect that has with prior art and be:
(1) The utility model discloses change the tradition and set up steel pipe scaffold's construction method, adopt the construction method of whole promotion, the innovation invents a modular steel can whole promotion operation platform, has solved narrow space position operation platform such as lighting well and has protected the problem that the support body set up.
(2) The utility model discloses a tower crane carries out combination formula steel operation platform's promotion, installation and demolishs, can repeat the turnover use, greatly increased the availability factor of material.
(3) The utility model discloses promote operation platform is the whole support body of combination formula that is formed by square steel and steel sheet welding, including parts such as rings, activity board, adjustable screw rod, screw rod connector, pre-buried holding ring, the support body bottom is connected with the pre-buried reinforcing bar holding ring on the structural floor through adjustable screw rod connector to fix whole support body on the structural floor.
(4) The utility model discloses when operation platform promoted, adopt the tower crane to hang the rings at operation support body top, the adjustable screw rod of shrink support body bottom for support body and structure floor separation. And lifting the frame body to the upper floor of the lighting well, screwing out the adjustable screw at the bottom of the frame body, and fixedly mounting again, thereby realizing the integral lifting of the frame body.
(5) The utility model provides the high security: the operation lifting platform has the advantages of simple operation, easy management and convenient maintenance, the bottom of the operation lifting platform is totally closed by adopting the turning plate, the protection effect is obvious, and the safety is obviously improved.
(6) The utility model discloses economic nature is good: this hoisting frame running cost is low, can repeat the turnover use, has improved the utilization ratio of material, and the in-service use cost obviously reduces, has good economic nature.
Drawings
Fig. 1 is a schematic top view of the narrow space climbing platform of the present invention.
Fig. 2 is a schematic view of a section B-B of the narrow space climbing platform of the present invention.
Fig. 3 isbase:Sub>A schematic view ofbase:Sub>A sectionbase:Sub>A-base:Sub>A of the narrow space climbing platform of the present invention.
Fig. 4 is a schematic view of the screw connecting portion of the narrow space climbing platform of the present invention.
Fig. 5 is a schematic view of a pre-buried positioning ring of the climbing platform in a narrow space of the present invention.
In the drawings: 1. a top steel plate; 2. a bottom steel plate; 3. a square steel column; 4. a square steel cross bar; 5. a square steel diagonal rod; 11. installing a lifting ring; 21. a movable turning plate; 22. a steel pipe; 23. a screw; 24. a screw connecting portion; 25. pre-burying a head connecting part; 26. a connecting bolt; 27. embedding a positioning ring; 271. a connecting ring; 272. and embedding the part.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments, but not limiting the present invention, and fig. 1 is a schematic top view of a climbing platform for narrow space according to the present invention; fig. 2 is a schematic view of a section B-B of the narrow space climbing platform of the present invention; fig. 3 isbase:Sub>A schematic view ofbase:Sub>A sectionbase:Sub>A-base:Sub>A of the narrow space climbing platform of the present invention;
fig. 4 is a schematic view of a screw rod connecting part of the narrow space climbing platform of the present invention; fig. 5 is a schematic view of the pre-buried positioning ring of the narrow space climbing platform of the present invention, and fig. 1 to 5 show a narrow space climbing platform according to a preferred embodiment, including: the steel tube connecting structure comprises a connecting frame, a plurality of steel tubes 22, a plurality of screw rods 23, a plurality of screw rod connectors, a top steel plate 1 and a bottom steel plate 2, wherein the top steel plate 1 is arranged above the bottom steel plate 2; the connecting frame is fixedly connected with a top steel plate 1 and a bottom steel plate 2; the steel pipes 22 are fixedly connected with the bottom steel plate 2, the steel pipes 22 are arranged in parallel, and two ends of each steel pipe 22 protrude out of two ends of the bottom steel plate 2; both ends of each steel pipe 22 are fixedly connected with a screw 23; one end of each screw rod connector is matched with one screw rod 23, the other end of each screw rod connector is matched with one embedded positioning ring 27, and the embedded positioning rings 27 are fixedly embedded.
In a preferred embodiment, the connection frame comprises:
the two ends of the plurality of square steel upright columns 3 are respectively fixedly connected with a top steel plate 1 and a bottom steel plate 2;
the two ends of each square steel cross rod 4 are fixedly connected with the middle parts of the two square steel upright posts 3;
a plurality of square steel down tube 5, the middle part of the two just stands of equal fixed connection both ends of each square steel down tube 5 has first contained angle between square steel down tube 5 and the square steel horizontal pole 4.
In a preferred embodiment, a movable flap 21 is connected to the bottom steel plate 2, and the movable flap 21 extends out of the bottom steel plate 2.
In particular, movable flap 21 is used to place the fall of construction material.
In a preferred embodiment, the top steel plate 1 is provided with mounting eye 11.
In particular, the hoist link 11 is mounted for hoisting to a corresponding location using a crane, facilitating movement, installation and removal of the device.
The above is merely an example of the preferred embodiments of the present invention, and the embodiments and the protection scope of the present invention are not limited thereby.
The utility model discloses still have following embodiment on above-mentioned basis:
the utility model discloses a in the further embodiment, the screw rod connector includes:
the screw rod connecting part 24 is of a circumferential thin-wall structure;
the pre-buried head connecting part 25 is provided with an opening, the pre-buried head connecting part 25 is an annular part with an opening, two end parts are respectively formed at the opening of the annular part, and the two end parts are arranged in the screw rod connecting part 24;
and connecting bolts 26, each connecting bolt 26 penetrating the screw connecting portion 24 and both end portions.
In a further embodiment of the present invention, the embedded positioning ring 27 includes:
the connecting ring 271, the connecting ring 271 takes the form of a semicircular ring;
the two ends of the pre-embedded part 272 and the connecting ring 271 are respectively connected with a pre-embedded part 272 to form an omega shape, and the pre-embedded part 272 is pre-embedded in the concrete layer.
The utility model discloses a further embodiment, the annular portion of the pre-buried first connecting portion 25 of screw rod connector is connected with go-between 271.
As shown in fig. 4 and 5, the annular portion of the pre-buried head connecting portion 25 of the screw connector is engaged with the annular portion of the connecting ring 271.
The above is only a preferred embodiment of the present invention, and not intended to limit the scope of the invention, and it should be appreciated by those skilled in the art that equivalent substitutions and obvious changes made from the description and drawings should be included within the scope of the present invention.

Claims (7)

1. A narrow space climbing platform, comprising:
the top steel plate is arranged above the bottom steel plate;
the connecting frame is fixedly connected with the top steel plate and the bottom steel plate;
the steel pipes are fixedly connected with the bottom steel plate and arranged in parallel, and two ends of each steel pipe protrude out of two ends of the bottom steel plate;
the two ends of each steel pipe are fixedly connected with one screw;
a plurality of screw rod connectors, each the one end of screw rod connector all with one the screw rod cooperatees, each the other end of screw rod connector all cooperatees with a pre-buried holding ring, the fixed pre-buried setting of pre-buried holding ring.
2. The narrow space climbing platform according to claim 1, wherein the connection frame comprises:
the two ends of the square steel upright posts are respectively and fixedly connected with the top steel plate and the bottom steel plate;
the two ends of each square steel cross rod are fixedly connected with the middle parts of the two square steel stand columns;
the square steel cross rods are fixedly connected with the two ends of the square steel inclined rods respectively, and a first included angle is formed between each square steel inclined rod and each square steel cross rod.
3. The narrow space climbing platform according to claim 1, wherein the bottom steel plate is connected with a movable flap, and the movable flap extends out of the bottom steel plate.
4. The narrow space climbing platform according to claim 1, wherein the top steel plate is provided with a mounting lifting ring.
5. The narrow space climbing platform according to claim 1, wherein the screw connector comprises:
the screw rod connecting part is of a circumferential thin-wall structure;
the pre-buried head connecting part is an annular part with an opening, the annular part forms two end parts at the opening respectively, and the two end parts are arranged in the screw rod connecting part;
and each connecting bolt penetrates through the screw rod connecting part and the two end parts.
6. The narrow space climbing platform according to claim 5, wherein the embedded positioning ring comprises:
the connecting ring is in a semicircular ring shape;
the two ends of the connecting ring are respectively connected with the embedded parts to form an omega shape, and the embedded parts are embedded in the concrete layer.
7. The narrow space climbing platform according to claim 6, wherein the annular portion of the pre-countersunk head connection portion of the screw connector is connected to the connection ring.
CN202222046466.8U 2022-08-04 2022-08-04 Narrow space climbing platform Active CN217998886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222046466.8U CN217998886U (en) 2022-08-04 2022-08-04 Narrow space climbing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222046466.8U CN217998886U (en) 2022-08-04 2022-08-04 Narrow space climbing platform

Publications (1)

Publication Number Publication Date
CN217998886U true CN217998886U (en) 2022-12-09

Family

ID=84319395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222046466.8U Active CN217998886U (en) 2022-08-04 2022-08-04 Narrow space climbing platform

Country Status (1)

Country Link
CN (1) CN217998886U (en)

Similar Documents

Publication Publication Date Title
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN113931313B (en) Construction method of super high-rise core tube horizontal structure
CN211229608U (en) Safety rope stand column for steel structure construction
CN214834605U (en) A climb a structure that adheres to for structure disappearance layer
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN217998886U (en) Narrow space climbing platform
CN209780193U (en) Suspension type scaffold
CN111335661A (en) Safety rope stand column for steel structure construction and use method thereof
CN216616802U (en) Three-layer hydraulic self-lifting construction platform for vertical shaft
CN205976725U (en) A face limit safety barrier for standardizing construction
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN104164889A (en) Demountable tower crane foundation
CN210561738U (en) Assembled pier shaft construction protection system
CN112854702A (en) Large-span silo roof construction platform and erection method
CN113338537A (en) Construction method of ultrahigh large-section concrete frame column
CN111088904A (en) Integral hoisting device and process for iron chimney steel frame with hectometer-height barrel
CN218621853U (en) High mound reinforcing bar installation truss structure
CN202081639U (en) Steel truss tool type supporting structure for concrete framework industrial building templates
CN212688719U (en) Bridge vase-shaped pier body protective bracket
CN219430545U (en) Operation platform for utilizing stiffness framework for tower column head section
CN216196481U (en) Temporary fixation draws bearing structure to one side

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant