CN205976725U - A face limit safety barrier for standardizing construction - Google Patents

A face limit safety barrier for standardizing construction Download PDF

Info

Publication number
CN205976725U
CN205976725U CN201620810742.5U CN201620810742U CN205976725U CN 205976725 U CN205976725 U CN 205976725U CN 201620810742 U CN201620810742 U CN 201620810742U CN 205976725 U CN205976725 U CN 205976725U
Authority
CN
China
Prior art keywords
connecting tube
connecting pipe
stand
column
safety barrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620810742.5U
Other languages
Chinese (zh)
Inventor
余日升
宋立新
赵红兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd
Original Assignee
JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd filed Critical JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd
Priority to CN201620810742.5U priority Critical patent/CN205976725U/en
Application granted granted Critical
Publication of CN205976725U publication Critical patent/CN205976725U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a face limit safety barrier for standardizing construction, including establishhing in a plurality of stands on ground perpendicularly, the upper end of stand and stand be perpendicular to be provided with first connecting pipe, the middle part and the perpendicular second connecting pipe and the third connecting pipe of being provided with of stand of stand, be provided with sheer pole and last horizontal pole between per two stands respectively, the both ends of sheer pole are connected on the second connecting pipe and third connecting pipe at stand middle part through the PPR connecting pipe respectively, it connects on the first connecting pipe of two stand upper ends through the PPR connecting pipe respectively to go up the both ends of horizontal pole, the lower extreme of stand is provided with the high sole that keeps off. The utility model discloses simple structure, the design is compact, and convenient to use can utilize the building site steel pipe to face frontier defense and protect and set up, and the expense is low effectual, circulated used repeatedly, the cost is lower, and it is easy to dismantle, and steel pipe less prominent when setting up does not hinder currently, and is difficult for leading to the fact personnel to collide the injury.

Description

A kind of face side safety barrier for standardized construction
Technical field
This utility model be related to a kind of face side safety barrier for standardized construction, belong to safety guarantee equipment and technology neck Domain.
Background technology
Standardization building site construction is by building site management job content materialization, quantification, systematization, site layout project, inspection Look into content and inspection method etc. and be converted into working standard, realize live " standardization ", layout " scientific ", train " regular practice ", Life " regularization ".
At the construction field (site), though when the edge of work surface in high-rise working is not gone along with sb. to guard him facility or gone along with sb. to guard him facility, it is high When degree is less than 800mm, side operation is referred to as faced in this class operation.When carrying out facing side operation, by regulation, should safety protection facility be set, Facility is mainly guard rail, safety net, safety door etc..
The other depth of job site and passage is on the stake holes of 2m and more than 2m, manhole, groove and the edge such as pipeline, hole Operation, referred to as hole operation.Horizontal hole short side dimension is more than 25mm, and vertical hole height is more than 750mm, is intended to setting anti- Guard rail rod.
" four mouthfuls " refer to stairs port, elevator shaft mouth, reserved opening, passway." five face side " refer to the groove that depth is more than 2m, Hole, the periphery of ditch;The no roofing (scope of operation) of external scaffolding and the periphery of frame structure floor in construction;Well cabinet frame, gantry Two sides of the passage of frame, external elevator and scaffold and building, upper and lower runway and oblique side line;Breast board, railing are not yet installed Balcony, the periphery expected platform, choose platform;Building in construction
Traditional hole adopts reinforcement welding guard rail with facing side, or is formed using steel pipe and all kinds of fastener association, no The requirement of normalized security Civilization Worksite can be met, and traditional handicraft is coarse, stability difference is it is difficult to meet increasingly enhanced safety Requirement of shelter;The guard rail of particularly reinforcement welding can not have enough to meet the need, high cost;The guard rail set up with steel pipe and steering fastener Bar, because being affected to meet the requirement that staircase two runs bench central idle width by steering fastener size, makes guard rail In the outside of bench it is impossible to meet the requirement installing foot guard plate and guard rail.
The hole developed in recent years and face side safety barrier joint and be attached using bigger steel pipe or cast iron pipe, even Fastened by screw steel pipe is adopted after connecing.The method can meet the requirement of normalized security Civilization Worksite, but joint weight weight, assembling is relatively Complexity, construction efficiency is low.
Content of the invention
The purpose of this utility model be in order to solve existing face side safety barrier to install constant, construction efficiency low, outside steel pipe Dew easily causes the problem of potential safety hazard, there is provided a kind of structure is simple, compact to design faces side safety for standardized construction Guardrail.
This utility model adopts the following technical scheme that:A kind of face side safety barrier for standardized construction, including vertical It is built in some root posts on ground, the upper end of described column and uprights vertical are provided with the first connecting tube, in described column Portion and uprights vertical are provided with the second connecting tube and the 3rd connecting tube, are respectively arranged with sheer pole and upper horizontal stroke between every two root posts Bar, the two ends of described sheer pole are connected in the second connecting tube and the 3rd connecting tube in the middle part of column by PPR connecting tube respectively, The two ends of described cross tube are connected in the first connecting tube of two root posts upper end by PPR connecting tube respectively, described column Lower end is provided with high foot guard plate.
Further, the spacing of described column is 2-3m.
Further, described sheer pole is apart from ground 0.5-0.6m.
Further, described cross tube is apart from ground 1.0-1.2m.
Further, described PPR connecting tube is through type or right angle two formula.
Further, the height of described high foot guard plate is 175-185mm.
This utility model structure is simple, compact to design, easy to use, can carry out facing frontier defense shield using building site steel pipe and take If the poorly efficient fruit of expense is good, reuse capable of circulation, and cost is relatively low, easily, when setting up, steel pipe does not project for dismounting, and without prejudice to is passed through, And do not easily cause personnel's collision injury.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is pillar construction schematic diagram of the present utility model.
Reference:Column 1, the first connecting tube 2, the second connecting tube 3, the 3rd connecting tube 4, sheer pole 5, cross tube 6, PPR connecting tube 7, high foot guard plate 8, steel plate cushion block 9.
Specific embodiment
Below in conjunction with accompanying drawing, the utility model will be further described.
As Figure 1-Figure 2, a kind of face side safety barrier for standardized construction, if including being vertically built in ground Dry root post 1, the upper end of column 1 and uprights vertical are provided with the first connecting tube 2, and the middle part of column 1 and uprights vertical are provided with Second connecting tube 3 and the 3rd connecting tube 4, the spacing of column 1 is 2-3m, is respectively arranged with sheer pole 5 and upper between every two root posts 1 Cross bar 6, sheer pole 5 passes through apart from ground 1.0-1.2m, the two ends of sheer pole 5 respectively apart from ground 0.5-0.6m, cross tube 6 PPR connecting tube 7 is connected in second connecting tube 3 and the 3rd connecting tube 4 at column 1 middle part, and the two ends of cross tube 6 are passed through respectively PPR connecting tube 7 is connected in the first connecting tube 2 of two root posts 1 upper end, and the lower end of column 1 is provided with high foot guard plate 8, high gear The height of sole 8 is 175-185mm, and PPR connecting tube 7 is through type or right angle two formula.
Preparation and installation method:
(1)The preparation of material:50 × 150 × 10mm steel plate is some;Φ 10 setscrew is some;If Φ 48*3.0 steel pipe Dry;Template is some;The through type PPR connecting tube of internal diameter 50(Long 80mm)Some;If the right angle of internal diameter 50 two formula PPR connecting tube Dry;Red paint is some;Dirty oil paint is some;Raw material band is some;
(2)The preparation of vertical rod:In one piece of 150 × 150 × 10mm steel plate cushion block middle piece 1000~1200mm of full weld Steel pipe make vertical rod, 150 × 150 × 10mm steel plate cushion block opens 4 φ 12 holes according to drawing;
Make the first connecting tube in steel pipe top full weld 200mm long Φ 48 steel pipe;
It is respectively prepared the second connecting tube in 2 50mm long Φ 48 steel pipes of two ends full weld at steel pipe top 500~600mm With the second connecting tube;
(3)Vertical rod is fixed with four setscrews on the ground;
(4)Sheer pole on installing 2 meters long in the vertical rod fixing, the connection between cross tube, sheer pole and vertical rod is adopted With the PPR connecting tube of internal diameter 50 or the right angle two-way PPR connecting tube of internal diameter 50, before connecting PPR pipe joint, completely twine raw material band To be connected firmly;
(5)Fix vertical rod with 4 Φ 10 setscrews on cross tube, sheer pole another side concrete slab, joint is same Using PPR pipe joint, the same previous step of way;
(6)Facing the side safety barrier bottom setting high foot guard plate of 180mm, the brushing of 180mm high foot guard plate spacing 150mm is red-black Alternate paint, at 45 ° with foot guard plate;
(7)Vertical rod and cross tube, sheer pole are spaced and varnish with lacquer.

Claims (7)

1. a kind of for standardized construction face side safety barrier it is characterised in that:Including being vertically built in some of ground Column(1), described column(1)Upper end and column(1)It is vertically installed with the first connecting tube(2), described column(1)Middle part with Column(1)It is vertically installed with the second connecting tube(3)With the 3rd connecting tube(4), every two root posts(1)Between be respectively arranged with sheer pole (5)And cross tube(6), described sheer pole(5)Two ends respectively pass through PPR connecting tube(7)It is connected to column(1)The second of middle part Connecting tube(3)With the 3rd connecting tube(4)On, described cross tube(6)Two ends respectively pass through PPR connecting tube(7)It is connected to two Column(1)First connecting tube of upper end(2)On, described column(1)Lower end be provided with high foot guard plate(8).
2. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described column(1)'s Spacing is 2-3m.
3. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described sheer pole(5) Apart from ground 0.5-0.6m.
4. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described cross tube(6) Apart from ground 1.0-1.2m.
5. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described PPR connecting tube (7)For through type or right angle two formula.
6. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described high foot guard plate (8)Height be 175-185mm.
7. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described column(1)With It is provided with steel plate cushion block between ground(9), described column(1)Fixed on the ground by swell fixture.
CN201620810742.5U 2016-07-28 2016-07-28 A face limit safety barrier for standardizing construction Active CN205976725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620810742.5U CN205976725U (en) 2016-07-28 2016-07-28 A face limit safety barrier for standardizing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620810742.5U CN205976725U (en) 2016-07-28 2016-07-28 A face limit safety barrier for standardizing construction

Publications (1)

Publication Number Publication Date
CN205976725U true CN205976725U (en) 2017-02-22

Family

ID=58027032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620810742.5U Active CN205976725U (en) 2016-07-28 2016-07-28 A face limit safety barrier for standardizing construction

Country Status (1)

Country Link
CN (1) CN205976725U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350366A (en) * 2020-03-12 2020-06-30 中建四局第五建筑工程有限公司 Quick-release type edge-facing protective fence and construction method thereof
CN112854894A (en) * 2021-01-14 2021-05-28 中国十七冶集团有限公司 High-rise building edge and opening enclosure falling-proof object construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350366A (en) * 2020-03-12 2020-06-30 中建四局第五建筑工程有限公司 Quick-release type edge-facing protective fence and construction method thereof
CN112854894A (en) * 2021-01-14 2021-05-28 中国十七冶集团有限公司 High-rise building edge and opening enclosure falling-proof object construction method

Similar Documents

Publication Publication Date Title
CN211622528U (en) Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN205976725U (en) A face limit safety barrier for standardizing construction
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN213626818U (en) Frame type safety ladder cage
CN105822076A (en) Construction edge safety protection warning fence
CN111851982A (en) Scaffold frame liftable prevents weighing down safety device
CN110847589A (en) Scaffold with safety protection mechanism and building method
CN111622483A (en) Method for erecting reverse-construction type overhanging scaffold
CN211256664U (en) Guardrail for bridge floor
KR200395096Y1 (en) Length-adjustable guardrail
CN219118917U (en) Safe anti-climbing fence platform device of tower crane
CN214615635U (en) Frame type safety ladder stand
CN214330012U (en) Can have enough to meet need instrument formula stair and prevent railing temporarily
CN201261947Y (en) Assembly type escape way
CN110219478A (en) Assembled protection canopy
CN214697029U (en) Steel construction assembled house floor face limit protector
CN207004058U (en) A kind of assembled steel tubing string welding procedure operating platform
CN208441106U (en) A kind of foundation pit edge protection facility integrated with spray equipment
CN211256688U (en) Steel trestle integral type construction platform and steel-pipe pile positioning system
CN215107394U (en) Tool type tower crane pedestrian passageway
CN211056565U (en) Device for preventing tower crane from climbing
CN220487281U (en) Protective railing structure convenient to dismantle
CN219808677U (en) Scaffold for tunnel construction
CN115288414B (en) Construction method of hydraulic climbing operation frame of super high-rise core tube special-shaped shaft
CN217398151U (en) Adjustable passageway platform of construction elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant