CN213268816U - Assembled shaped steel horizontal protection platform of encorbelmenting - Google Patents

Assembled shaped steel horizontal protection platform of encorbelmenting Download PDF

Info

Publication number
CN213268816U
CN213268816U CN202021809778.4U CN202021809778U CN213268816U CN 213268816 U CN213268816 U CN 213268816U CN 202021809778 U CN202021809778 U CN 202021809778U CN 213268816 U CN213268816 U CN 213268816U
Authority
CN
China
Prior art keywords
platform
shaped steel
steel platform
building
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021809778.4U
Other languages
Chinese (zh)
Inventor
王乐威
彭柱
付喜然
李瑞英
冉岐昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Construction Engineering Group Co Ltd
Original Assignee
Hunan Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Construction Engineering Group Co Ltd filed Critical Hunan Construction Engineering Group Co Ltd
Priority to CN202021809778.4U priority Critical patent/CN213268816U/en
Application granted granted Critical
Publication of CN213268816U publication Critical patent/CN213268816U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses an assembled shaped steel level protection platform of encorbelmenting, including the shaped steel platform, the one end that the structural layer of shaped steel platform and building met is the link, and the one end that the shaped steel platform encorbelmented outside the building is the free end, the link of shaped steel platform is equipped with spacing support, spacing support is including setting up in many flexible stands of shaped steel platform upside, the structural layer of building is connected to the upper end of flexible stand, and the lower extreme and the shaped steel platform of flexible stand are connected, and are adjacent link to each other through the pull rod between the flexible stand. The utility model discloses can batch production, reuse, rigidity is big, the high protection system of intensity. Can also reduce the outdoor high altitude installation work load of operation personnel under the prerequisite of not destroying the structural layer, realize that the equipment is simple, dismantle convenient, satisfy various layer height operating mode and protective effect good, the high instrument formula shaped steel of outward appearance image protection platform that encorbelments, have very good economic nature and practicality, can generally promote in the trade.

Description

Assembled shaped steel horizontal protection platform of encorbelmenting
Technical Field
The utility model belongs to the building field, concretely relates to assembled shaped steel level protection platform of encorbelmenting.
Background
With the rapid development of the building industry, high-rise and super high-rise buildings develop rapidly, and the requirements of temporary protection work on construction sites are higher and higher. Especially, some buildings are located in downtown areas, near-street areas and personnel-dense areas, and the potential safety hazards such as the throwing radius of the buildings and falling objects are inevitably considered. Meanwhile, in most construction processes, partial cross operation exists due to process requirements. Therefore, how to ensure that the bottom operating personnel and the external environment are not influenced by the upper construction in the building construction process reduces the potential safety hazard in the construction process, and further scientifically setting one or more temporary horizontal protections in the middle of the construction process is worthy of being explored by people.
The traditional horizontal protection platform that encorbelments of building mainly has following several:
1. the steel pipe is directly assembled and combined with the bamboo frame plates in a scattered mode, the steel pipe serves as an overhanging main beam, the floor pre-buried vertical steel pipe serves as an anchoring end, the overhanging steel pipe is connected with the pre-buried vertical steel pipe through double fasteners at the supporting end, the supporting end of the overhanging steel pipe is low, the outer side of the overhanging steel pipe is high, and pre-deformation is performed on the overhanging steel pipe in advance. The end part of the overhanging end adopts a steel wire rope as a drawknot, a common steel pipe is transversely placed on the overhanging steel pipe, is fixed by a fastener and is gradually erected from the building edge from inside to outside, and finally, a bamboo frame plate is laid on the steel pipe. The horizontal protection strength formed by adopting the combination of the forms is not high, and the impact resistance is not strong. The protection adopts steel pipe combination, and the integral rigidity is not enough, and has high requirement on the process erection quality, and the stability of the steel pipe combination can not meet the requirement of no deformation under the action of high-rise climate.
2. The steel pipe and bamboo frame plate combined cantilever beam is mainly operated by using I-shaped steel as a cantilever main beam on a selected floor, using a U-shaped ring as an anchoring end at the end part, and using a steel wire rope for pulling and connecting an I-shaped steel cantilever section. The common steel pipe is transversely placed on the I-shaped steel, is fixed by the fastener, is gradually erected outwards from the building edge, and finally the bamboo frame plate is laid on the steel pipe. Although the strength and the rigidity of the integral horizontal protection are effectively improved by adopting the method, the U-shaped ring needs to be pre-embedded in the floor in advance, the U-shaped ring needs to be cut off after the U-shaped ring is dismantled in the later period, and if the U-shaped ring is positioned in a structure with a waterproof requirement, water stopping treatment is also needed.
3. The beam is formed by combining I-shaped steel, steel pipes and bamboo frame plates, the main pulling and erecting method is similar to that of the type 2, and only the end part of the anchoring end of the overhanging I-shaped steel is fixedly connected on the structural beam by adopting a chemical anchor bolt. By adopting the method, the phenomenon that the U-shaped ring is directly embedded in the floor slab, but the anchoring fulcrum is arranged on the outer side beam, the chemical anchor bolt still has certain damage to the structure, and the side beam at the position of the balcony of the house belongs to the cantilever beam and can not be directly used as the anchoring fulcrum, so that the application range of the method is limited.
The three methods are all formed by utilizing materials such as steel pipes, bamboo frame plates, I-shaped steel and the like in a scattered splicing mode, so that all the materials need to be finished by operators at high altitudes without operation surfaces, great potential safety hazards exist for the operators, small parts easily fall off in the splicing process, potential safety hazards also exist for the operators below, and secondly, the process of the combination process is complex, the material waste is large, and the later-stage dismantling is also complex.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that exists among the background art, the utility model aims at providing a can also can the outdoor high altitude installation work load of the biggest reduction operation personnel under the prerequisite of not destroying the structural layer, further realize the equipment simple, dismantle convenient, satisfy various high operating mode in layer, the good assembled shaped steel of protecting effect protection platform of encorbelmenting. In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides an assembled shaped steel level protection platform of encorbelmenting, includes the shaped steel platform, the one end that the structural layer of shaped steel platform and building met is the link, and the one end that the shaped steel platform encorbelmented outside the building is the free end, the link of shaped steel platform is equipped with spacing the support, spacing the support including setting up in many flexible stands of shaped steel platform upside, the structural layer of building is connected to the upper end of flexible stand, and the lower extreme and the shaped steel platform of flexible stand are connected, and are adjacent link to each other through the pull rod between the flexible stand.
Therefore, the utility model discloses an assembled shaped steel level protection platform of encorbelmenting is fixed in between the upper and lower two-layer structure layer of building through spacing support with the shaped steel platform, and each component all can transport the job site after the off-site installation and hoist the installation, and the equipment is simple, can the outdoor high altitude installation work load of the biggest reduction operation personnel under the prerequisite of not destroying the structure layer. And the disassembly is convenient, the material can be recycled, and the material waste is avoided.
Specifically, the shaped steel platform includes the member of encorbelmenting and connects in horizontal fossil fragments, the vertical fossil fragments of the member upper end of encorbelmenting, constitutes rectangular frame between horizontal fossil fragments and the vertical fossil fragments, the rectangular frame upper end is equipped with the punching press graticule. The cantilever rod piece is made of narrow-flange H-shaped steel and serves as a main bearing beam of the platform, the cantilever rod piece is required to meet the national standard, and forms a section steel platform together with the transverse keel, the longitudinal keel and the stamping grid, and the transverse keel and the longitudinal keel are both rectangular cold-formed hollow section steel.
Specifically, flexible stand includes the outer column that lower extreme and shaped steel platform are connected, locates the interior stand in the outer column and locates the adjustable brace of interior stand upper end, it is spacing to adopt bolted connection between outer column, the interior stand. The inner diameter of the outer stand column is larger than that of the inner stand column, the inner stand column is inserted into the outer stand column to restrict the position of the inner stand column, the inner stand column can freely stretch out and draw back up and down, bolt holes are reserved in the upper report of the stand column, the stretching height of the outer stand column and the stretching height of the inner stand column are determined and then connected and limited by thick-tooth high-strength bolts, and the top adjustable support can be adjusted up and down to be.
Specifically, the end of the suspended end of the section steel platform is provided with a tail adjusting plate, and the tail adjusting plate can be connected with a structural layer of a building through an adjusting screw. The deviation caused by uneven ground when the end of the structural layer is placed is conveniently adjusted.
Specifically, a hanging end of the section steel platform is provided with an anchor pulling system, the anchor pulling system comprises an anchor ring, a safety cable, a lifting ring and a buckle, the anchor ring is arranged in a building structural layer above the section steel platform, and the lifting ring is arranged at the hanging end of the section steel platform; one end of the safety cable is connected with the anchoring ring through a buckle, and the other end of the safety cable is connected with the hanging ring through a buckle. The anchor ring and the hanging ring are connected by the safety cable and are tied with the profile steel platform to be used as a stress fulcrum of the overhanging end of the profile steel platform and act together with the limiting support to form an upward lifting anchor pulling system and a downward pressing combined stress limiting support, but the anchor pulling system is a safety device in the actual checking and calculating process and cannot directly participate in stress calculation.
Specifically, the free end of shaped steel platform is equipped with the protection system, the protection system is including preventing the railing, prevent that the railing locates the outside edge of the free end of shaped steel platform, the joint support pole between connecting rod and the shaped steel platform, the downside of rail guard is equipped with the fender foot board.
In order to guarantee the control requirement of the dust raising on the construction site, the top of the protective railing is provided with a spraying facility, so that the safety protection and the dust fall environmental protection are effectively combined.
Specifically, the shaped steel platform is equipped with the connection system, the connection system includes angle steel, apron and bolt. The angle steel is arranged on two sides of the section steel platform, and the cover plate is arranged on the angle steel of the two adjacent section steel platforms and connected with the angle steel through bolts. The unit plates of the profile steel platform are independently installed, so that gaps exist among the unit plates, and the unit plates need to be connected by a connecting system. The connecting system further combines the independent steel platform plates to form an effective whole, and simultaneously can reduce the deformation stress among the steel platform unit plates. The angle steel is welded on the overhanging rod piece in an inverted mode after each unit plate is installed, the upper portion of the angle steel is sealed through a groove-shaped cover plate and fastened through common bolts, and warning paint marks are made.
The utility model discloses the beneficial effect who possesses: the utility model discloses an assembled shaped steel level of encorbelmenting protection platform rigidity is big, intensity is high. The structural steel platform is fixed between the upper and lower structural layers of the building through the limiting supports, all the components can be transported to a construction site for hoisting and mounting after being mounted outside the field, the assembly is simple, the outdoor high-altitude mounting workload of operators can be reduced to the maximum extent on the premise of not damaging the structural layers, and various layer height working conditions can be met. And the disassembly is convenient, the material can be recycled, and the material waste is avoided.
Drawings
Fig. 1 is a plan view of an embodiment of the present invention.
Fig. 2 is a side view of an embodiment of the invention.
Fig. 3 is a perspective view (a) of the embodiment of the present invention.
Fig. 4 is a perspective view (ii) of the embodiment of the present invention.
Fig. 5 is a schematic structural diagram of the node a of the present invention.
Fig. 6 is a schematic structural diagram of a node B according to the present invention.
Fig. 7 is a schematic structural diagram of the node C of the present invention.
Fig. 8 is a schematic structural diagram of the connection system of the present invention.
In the figure: 1-cantilever bar, 2-transverse keel, 3-longitudinal keel, 4-punched grid plate, 5-limit support, 6-anchor pulling system, 7-connecting system, 8-protecting system, 9-transverse pull rod, 10-vertical pull rod, 11 a-outer upright post, 11 b-inner upright post, 12-baffle plate, 13-hinge, 14-lifting ring, 15-tail adjusting plate, 16-adjusting screw, 17-expanding screw, 18-anchoring ring, 19-safety cable, 20-buckle, 21-turnbuckle, 22-guard rail, 23-foot baffle plate, 24-pull rod, 25-fixing pin, 26-spraying facility, 27-lock pin, 28-adjustable support, 29-coarse tooth high-strength bolt, 30-angle steel, 31-cover plate, 32-common bolt, 33-adjusting shim plate, 34-structural layer, 35-section steel platform, 36-node A, 37-node B and 38-node C.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
Referring to fig. 1 and 2, an assembled section steel horizontal protection platform that encorbelments comprises a member of encorbelmenting 1, horizontal fossil fragments 2, vertical fossil fragments 3, punching press grid plate 4, spacing support 5, draw anchor system 6, connecting system 7, face limit system 8.
Referring to fig. 1, the cantilever bar 1 is a narrow flange H steel, and serves as a main bearing beam of the platform, the cantilever bar 1 should meet the national standard and is no less than 16#, and forms a section steel platform 35 with the transverse keel 2, the longitudinal keel 3 and the punching grid plate 4, the transverse keel 2 and the longitudinal keel 3 are rectangular cold-formed hollow section steel, and the end of the cantilever bar 1 is provided with a tail adjusting plate 15 and an adjusting screw 16, so that the deviation caused by unevenness of the ground when the end of the structural layer 34 is placed is convenient to adjust.
See fig. 5, according to node a. Horizontal fossil fragments 2 all adopt thick tooth high-strength bolt 29 to be connected with vertical fossil fragments 3 and the member 1 of encorbelmenting, need set up the rectangle mouth in 3 positions of vertical fossil fragments in advance, and its horizontal fossil fragments 2 directly pass vertical fossil fragments 3 and set up adjusting plate 33 in horizontal fossil fragments 2 bottoms for adjust horizontal fossil fragments 2 height. The mutual positions of each component of shaped steel platform 35 need correspond one by one, should put out a pattern on ground in advance before the installation, and its from last position relation down is: punched grid plate 4 → longitudinal keel 3 → transverse keel 2 → cantilever bar 1.
See fig. 6, according to node B. The both sides of shaped steel platform 35 respectively set up a longitudinal joist 3, and with the member of encorbelmenting 1 inlay each other and adopt thick tooth high-strength bolt 29 to be connected, as the direct support of steel platform, the 3 bottoms of longitudinal joist set up adjusting shim plate 33 and are used for adjusting the height of longitudinal joist 3 and the member of encorbelmenting 1. The position relationship from top to bottom is as follows: cantilever rod 1 → punched grid plate 4 → longitudinal keel 3.
See fig. 7, according to node C. The end part of the transverse keel 2 is embedded with the longitudinal keel 3 and is connected with the longitudinal keel by a thick-tooth high-strength bolt 29, the position of the transverse keel 2 is further restrained, and the bottom of the transverse keel 2 is provided with an adjusting base plate 33 for adjusting the height of the transverse keel 2. The position relationship from top to bottom is as follows: the overhanging rod piece 1 → the punched grid plate 4 → the longitudinal keel 3 → the transverse keel 2.
See fig. 2, 3. The limiting support 5 comprises a transverse pull rod 9, a vertical pull rod 10, an outer upright post 11a, an inner upright post 11b and an adjustable supporting support 28. The inner diameter of the outer upright post 11a is larger than that of the inner upright post 11b, the inner upright post 11b is inserted into the outer upright post 11a to restrain the position of the inner upright post 11b, vertical free expansion can be achieved, bolt holes are reserved in the upper portion of the upright post, after the outer upright post 11a and the inner upright post 11b expand and contract in place according to the floor height, the outer upright post and the inner upright post are connected and limited through thick-tooth high-strength bolts 29, the top adjustable support 28 can be adjusted up and down, and one section of the top adjustable support is supported and limited in the. In order to ensure that the limiting support 5 can effectively form a whole, the transverse pull rod 9 and the vertical pull rod 10 are combined and crossed on the outer upright post 11a and the inner upright post 11b to form a cross-bracing mode, and the limiting support 5 is combined and reinforced up and down, left and right. The limiting support 5 directly restricts the tail end of the cantilever rod piece 1 in the section steel horizontal cantilever and is locked by a lock pin 27 to restrict the left and right displacement of the cantilever rod piece 1. The wall thickness of all the rod pieces of the limiting support 5 is not less than 3 mm.
See fig. 2, 3. The anchor pulling system 6 comprises an anchoring ring 18, a safety cable 19, a lifting ring 14, a buckle 20 and a turnbuckle 21. The anchoring ring 18 and the hanging ring 14 are connected by utilizing the safety cable 19 and are tied with the section steel platform 35 to be used as a stress fulcrum of the cantilever end of the section steel platform 35 and act together with the limit support 5 to form the stress of the combination of upward lifting of the anchor pulling system 6 and downward pressing of the limit support 5, but the anchor pulling system 6 is a safety device in the actual checking process and cannot directly participate in stress calculation. Before the construction of the structural layer 34, the anchoring ring 18 needs to be marked in advance and embedded in the structural layer 34, and the diameter of the anchoring ring 18 is not less than phi 16mm and is made of round steel which is not cold-drawn. For convenient installation during convenient hoisting, 2 rings 14 are arranged on the overhanging rod piece 1, the rings 14 are made of round steel which is not subjected to cold drawing and have the diameter not less than phi 16mm, the rings 14 are directly welded on the overhanging rod piece 1, and the length of a welding line is not less than 10DD and has the diameter. The connecting sections of the safety cable 19 and the anchoring ring 18 and the safety cable 19 and the lifting ring 14 are required to be provided with buckles 20, the number of the buckles 20 is not less than 3, the safety cable 19 at the annular direction position of the buckles 20 has surplus length, and the safety cable 19 at the middle section is fastened by using a turnbuckle 21 to enable the safety cable 19 to form upward pulling force.
Referring to fig. 8, the unit plates of the section steel platform 35 are all independently installed, so that gaps exist among the unit plates, and the unit plates need to be connected by using the connecting system 7. The connecting system 7 is positioned between two adjacent steel platform 35 plates and comprises angle steel 30, a cover plate 31 and common bolts 32. The connecting system 7 further combines the independent steel platforms 35 into an effective whole, and simultaneously can reduce the deformation stress among the steel platforms 35. After each unit plate is installed, the angle steel 30 in the connecting system 7 is welded on the cantilever rod piece 1 in an inverted mode, the upper portion of the angle steel is sealed through a groove-shaped cover plate 31 and fastened through a common bolt 32, and warning paint marks are made.
See fig. 2, 4. The protection system 8 comprises a protection railing 22, a foot baffle plate 23, a pull rod 24 and a fixing pin 25, wherein the protection railing 22 is connected with the overhanging rod piece 1 through a common bolt 32, a bolt hole needs to be reserved in the end part of the overhanging rod piece 1 in advance, the protection height is 1.2m, and the foot baffle plate 23 is 180 mm. In order to ensure the rigidity and stability of the guard rail 22, pull rods 24 are arranged at intervals of 2m, and the pull rods 24 are connected with the cantilever bar 1 by adopting fixing pins 25. Combine job site raise dust control requirement, prevent that guardrail bar top sets up the round and sprays facility 26, effectively combine safety protection and dust fall environmental protection.
Specifically, any one component in this assembled shaped steel horizontal protection platform of encorbelmenting is instrument formula equipment, all transports the job site in advance after the off-site installation and hoists the installation, realizes that can assemble, can dismantle, scalable, can be suitable for each operating mode in the protection system of an organic whole in a flexible way.
In order to realize that shaped steel platform 35 and structural layer are totally enclosed, set up adjustable fender 12 at shaped steel platform 35 and structural layer juncture, baffle 12 adopts hinge 13 and shaped steel platform 35 fixed, conveniently adjusts baffle 12 height and inclination from top to bottom.
In order to realize the assembling performance, the parts of the components only bearing the stress action adopt thick-tooth high-strength bolts 29, and the bolts only bearing the connecting action adopt ordinary bolts 34.
In order to realize the accuracy of the installation process, all the reserved holes are arranged and positioned in advance, and the holes are mechanically opened.
Specifically, the section steel horizontal cantilever transverse keel 2 is designed by adopting a modulus of 500mm, and free assembly can be realized for different cantilever lengths.
The utility model discloses the implementation step as follows:
s1, determining an installation floor, and performing sanitary cleaning on the floor;
s2, optimizing a structural layer, determining a structural steel overhanging horizontal protection layout, and determining an optimal limiting support position;
s3, holes are formed in each section in advance, and the section steel platforms are assembled: positioning a cantilever rod piece → installing a longitudinal keel → installing a transverse keel → fastening a bolt of the longitudinal keel → installing a stamping grid plate → installing a hanging ring → installing a protective railing;
s4, the hoisting steel wire rope cannot be connected and removed before the hoisting steel platform anchor system is not installed;
s5, mounting a limiting support, and supporting the adjustable supporting support against the upper-layer structural slab;
s6, installing a pull anchor system and a connecting system;
s7, installing a baffle and a spraying facility;
and S8, checking and identifying.
The present invention and its embodiments have been described above schematically, but the description is not limiting, and the actual method is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, the structure and the embodiment similar to the above technical solution are not designed creatively without departing from the spirit of the present invention, and all of them belong to the protection scope of the present invention.

Claims (9)

1. The utility model provides an assembled shaped steel horizontal protection platform of encorbelmenting, includes the shaped steel platform, the one end that the structural layer of shaped steel platform and building met is the link, and the one end that the shaped steel platform encorbelmented outside the building is the free end, its characterized in that: the link of shaped steel platform is equipped with spacing the support, spacing the support including setting up in many flexible stands of shaped steel platform upside, the structural layer of building is connected to the upper end of flexible stand, and the lower extreme and the shaped steel platform of flexible stand are connected, and are adjacent link to each other through the pull rod between the flexible stand.
2. The fabricated section steel cantilever horizontal protection platform of claim 1, wherein: the telescopic upright column comprises an outer upright column, an inner upright column and an adjustable support, wherein the lower end of the outer upright column is connected with the profile steel platform, the inner upright column is arranged in the outer upright column, the adjustable support is arranged at the upper end of the inner upright column, and the outer upright column and the inner upright column are connected through bolts for limiting.
3. The fabricated section steel cantilever horizontal protection platform of claim 1, wherein: the end part of the suspended end of the section steel platform is provided with a tail adjusting plate, and the tail adjusting plate can be connected with a structural layer of a building through an adjusting screw.
4. The fabricated section steel cantilever horizontal protection platform of claim 1, wherein: the hanging end of the section steel platform is provided with an anchor pulling system, the anchor pulling system comprises an anchor ring, a safety cable, a lifting ring and a buckle, the anchor ring is arranged in a building structural layer above the section steel platform, and the lifting ring is arranged at the hanging end of the section steel platform; one end of the safety cable is connected with the anchoring ring through a buckle, and the other end of the safety cable is connected with the hanging ring through a buckle.
5. The fabricated section steel cantilever horizontal protection platform of claim 1, wherein: the free end of shaped steel platform is equipped with the protection system, the protection system is including preventing the railing, prevent that the railing locates the outside edge of the free end of shaped steel platform, the joint support pole between connecting rod and the shaped steel platform.
6. The fabricated section steel cantilever horizontal protection platform of claim 5, wherein: and a foot baffle plate is arranged at the lower side of the guard rail.
7. The fabricated section steel cantilever horizontal protection platform of claim 5, wherein: and a spraying facility is arranged at the top of the protective railing.
8. The fabricated section steel cantilever horizontal protection platform of claim 1, wherein: the shaped steel platform is equipped with the connection system, the connection system includes angle steel, apron and bolt, the shaped steel platform both sides are located to the angle steel, the apron is located on the angle steel of two adjacent shaped steel platforms to be connected with the angle steel through the bolt.
9. The fabricated section steel cantilever horizontal protection platform according to any one of claims 1 to 7, wherein: the shaped steel platform includes the member of encorbelmenting and connects in horizontal fossil fragments, the vertical fossil fragments of the member upper end of encorbelmenting, constitutes rectangular frame between horizontal fossil fragments and the vertical fossil fragments, the rectangular frame upper end is equipped with the punching press graticule.
CN202021809778.4U 2020-08-26 2020-08-26 Assembled shaped steel horizontal protection platform of encorbelmenting Active CN213268816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021809778.4U CN213268816U (en) 2020-08-26 2020-08-26 Assembled shaped steel horizontal protection platform of encorbelmenting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021809778.4U CN213268816U (en) 2020-08-26 2020-08-26 Assembled shaped steel horizontal protection platform of encorbelmenting

Publications (1)

Publication Number Publication Date
CN213268816U true CN213268816U (en) 2021-05-25

Family

ID=75976934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021809778.4U Active CN213268816U (en) 2020-08-26 2020-08-26 Assembled shaped steel horizontal protection platform of encorbelmenting

Country Status (1)

Country Link
CN (1) CN213268816U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016718A (en) * 2021-10-28 2022-02-08 中建四局第六建设有限公司 A face empty operation platform for prefabricated building fire compartment wall is built by laying bricks or stones
CN114991449A (en) * 2022-07-13 2022-09-02 山西四建集团有限公司 Construction method of anti-deformation profile steel combined platform for fire-fighting corridor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016718A (en) * 2021-10-28 2022-02-08 中建四局第六建设有限公司 A face empty operation platform for prefabricated building fire compartment wall is built by laying bricks or stones
CN114991449A (en) * 2022-07-13 2022-09-02 山西四建集团有限公司 Construction method of anti-deformation profile steel combined platform for fire-fighting corridor

Similar Documents

Publication Publication Date Title
CN201053200Y (en) Assembled
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN104763109B (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN113931313B (en) Construction method of super high-rise core tube horizontal structure
CN104790644B (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN107761961A (en) A kind of electronic climbing frame monolithic construction method of high-rise building
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
US20050066609A1 (en) Preassembled roof and floor deck panel system
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN110863641A (en) Ultrahigh floor type boarding scaffold in hyperbolic cooling tower and erection method thereof
CN111519891A (en) Anchor ring buckling type rigid outer frame wall connecting piece and construction method thereof
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN213174700U (en) Building block type splicing operation frame
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN209081302U (en) Tower crane attached assembly type operation maintenance platform
CN110565934A (en) building outer wall suspension type passenger-cargo elevator construction platform and installation method thereof
CN212271577U (en) Anchor ring fastening type rigid outer frame wall connecting piece
CN110080235A (en) Foundation pit support construction slab column operation platform
CN211313314U (en) Steel elevator shaft main structure construction operation platform frame
CN210659342U (en) Detachable stair face limit guard rail
CN217998886U (en) Narrow space climbing platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant