CN104763109B - Quick construction method for pressed bottom tile of large-span steel structure factory building roof - Google Patents
Quick construction method for pressed bottom tile of large-span steel structure factory building roof Download PDFInfo
- Publication number
- CN104763109B CN104763109B CN201510171627.8A CN201510171627A CN104763109B CN 104763109 B CN104763109 B CN 104763109B CN 201510171627 A CN201510171627 A CN 201510171627A CN 104763109 B CN104763109 B CN 104763109B
- Authority
- CN
- China
- Prior art keywords
- factory building
- measure platform
- platform
- truss
- building roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention discloses a quick construction method for pressed bottom tile of a large-span steel structure factory building roof. The quick construction method for the pressed bottom tile of the large-span steel structure factory building roof includes that 1) designing a movable measure platform with support legs and handrails, arranging rolling wheels at the downsides of the support legs, and paving channel steel on two crane beams to form an orbit; 2) horizontally arranging the movable measure platform on the two crane beams through the rolling wheels so as to make the movable measure platform capable of moving on the orbit; 3) constructing the pressed bottom tile of the factory building roof through a constructor on the measure platform. The quick construction method for the pressed bottom tile of the large-span steel structure factory building roof uses the crane beams of a standard factory building as support, truss support legs are set according to the roof height, the problem that the operation height of the bottom tile constructor is limited is well solved, and the construction method can be used for constructing the bottom tiles of different heights of factory buildings. The truss is movable, the move range of the worker on the platform is larger, the construction region limitation is solved, the bottom tile is faster and more convenient to mount, and the construction efficiency is improved.
Description
Technical field
The present invention relates to a kind of steel structural plant roof die mould under tile construction method, more particularly, to a kind of large-span industrial building is adopted
It is assembled into the rapid constructing method of measure platform with standard knot, belong to technical field of buildings.
Background technology
At present, Chongqing region steel construction Standard Factory Room Roof Design is mostly veneer or composite plate, because composite plate is ordered goods
Cycle length and mounting technique complexity, and the long-term temperature difference in Chongqing region is less, less demanding to heat-insulating property (in addition to particular/special requirement),
Therefore bilayer veneer, from more extensive, both met thermal requirements, had reduced cost again.Double-deck veneer is easy for installation, unit in charge of construction
Can voluntarily on-site roll forming, top watt can suppress according to slope of roof plagioclase, install and only need to overlap joint and buckle well, and under tile installation is just
Complex, workman's no operation planar.
Traditional under tile installation method is by the use of mounted roofing tie-rod as interim spandrel girder, divides into suspension bracket and puts down
Platform, is used as sliding rail by steel wire rope, and this measure method can be only done local construction, and steel wire rope bearing capacity is poor, for flexibility
Part no rigidity, safety coefficient is low.For the Factory Building that large span, duration are tight, conventional construction method obviously can not meet requirement.
Also there is the movable Scaffold very low using construction height, the relatively low Factory Building bottom of line height can only be entered on this scaffold
Watt laying construction.This movable Scaffold both platforms as operator, and the podium level as placement construction tool.This shifting
Dynamic scaffold, in addition to construction height is limited it is impossible to meet the higher Standard Factory Room under tile laying construction requirement of height, also exists
Platform area is little, and construction area is limited, less stable, and efficiency of construction is low, relatively costly etc. not enough.Therefore how to standard
Factory roof under tile enters to act charitably and fast installation is a problem anxious to be resolved.
Content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide one kind can be used for various Height Standard Factory Buildings
Under tile construction, the large-span steel factory building roof that safety coefficient is high, bearing capacity is big and construction area is big, efficiency of construction is higher
Die mould under tile rapid constructing method.
For achieving the above object, the technical scheme is that and be achieved in:
A kind of large-span steel factory building roof die mould under tile rapid constructing method, step is as follows,
1) design length and crane beam spacing identical in Factory Building may move measure platform, this removable measure platform first
There are four supporting legs, each supporting leg is arranged below scroll wheel, be formed around security guardrail in removable measure platform;Simultaneously
Lay channel-section steel in two crane beam length directions and form track;
2) by removable measure platform across being arranged on two crane beams, the scroll wheel on supporting leg is located at groove steel rail
Interior, so that removable measure platform can be moved in orbit;
3) workmen stands in and can carry out the construction of factory building roof die mould under tile on measure platform, by changing measure platform
Position on crane beam, can carry out zones of different under tile construction.
Further, described removable measure platform is included between the end section and some sections positioned at both ends at two ends
The standard knot being sequentially connected;It is detachably connected by bolt between adjacent standard knot and end section and standard knot;Institute
State four supporting legs and be respectively arranged on both ends section outermost end for one group two-by-two.
Specifically, described end section and standard knot are truss structure, and this truss structure is passed through by two parallel truss pieces
Some cross bars are formed by connecting, and every sub-truss piece is by parallel top boom, lower boom and some oblique abdomen connecting top-bottom chord
Bar is constituted, and diagonal web member is end to end;Wherein part cross bar is used for connecting the top boom of two truss pieces, and remaining cross bar is used for connecting
The lower boom of two truss pieces;Top boom and lower boom are welded with bracket, described diagonal web member two ends are welded on bracket with logical
Cross bracket to connect top-bottom chord;Supporting leg is welded on the corresponding truss piece top boom of end section and the same one end of lower boom.
On the framework that end section and standard knot two top boom and corresponding cross bar are formed, laying bamboo springboard is linked as one to be formed
The confession workmen of body stands and places the operation platform of material.
It is provided with vertical ladder in removable measure platform one end, vertical ladder is vertically mounted on crane beam top flange top surface to measure
Between platform top surface, vertical ladder upper end is provided with hook, hangs over removable measure platform top surface.
Described railing is independent four section, and this four sections of railings are arranged on removable measure platform surrounding by hinge respectively,
Every section of railing can 180 ° spin upside down, with lock locking when erecting.
Compared to existing technology, the invention has the following beneficial effects:
1st, this truss relies on Standard Factory Room crane beam is to support, and truss support lower limb is arranged according to roof height, solves well
The under tile construction worker that determined operates height-limited problem, can be used for various Height Standard Factory Building under tile constructions.
2nd, this truss may move, and workman's range of activity on platform is bigger, solves construction area limitation problem, peace
Dress under tile is faster more convenient, and improves efficiency of construction.
3 the invention provides a kind of from heavy and light, safety coefficient is high, bearing capacity is big, low the applying of construction surface width, cost input
Work method, installs roofing under tile by the method convenient and swift, time saving and energy saving.
The method that the method for the present invention has broken away from traditional roofing die mould under tile local construction, Factory Building span is big and the duration
Require tight in the case of, using operating platform bearing capacity is big, construction surface width and moveable feature, achievable integral construction, section
The about duration, improve efficiency.This mobile operating platform easy accessibility is quick, reusable edible, from heavy and light, low cost,
Be a kind of can popularization and application and can be mass-produced standard steel construction Factory Building under tile construction measure platform.
Brief description
Fig. 1-integral construction schematic diagram of the present invention.
Fig. 2-truss-like standard knot structural representation of the present invention.
Structural representation is saved in Fig. 3-truss-like end of the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
Large-span steel factory building roof die mould under tile rapid constructing method of the present invention, step is as follows,
1) design length and crane beam spacing identical in Factory Building may move measure platform, this removable measure platform first
There are four supporting legs 1, each supporting leg 1 is arranged below scroll wheel 2, be formed around security guardrail 3 in removable measure platform;
Lay channel-section steel in two crane beam length directions simultaneously and form track 4, channel-section steel can be anchored on crane beam top flange, and track two ends set
Car bumper.
2) by removable measure platform across being arranged on two crane beams, the scroll wheel on supporting leg is located at groove steel rail
Interior, so that removable measure platform can be moved in orbit, the longitudinal sliding motion in practice weekly notes platform whole Factory Building span;The present invention
Effect such as Fig. 1 after installation.
3) workmen stands in and can carry out the construction of factory building roof die mould under tile on measure platform, by changing measure platform
Position on crane beam, can carry out zones of different under tile construction.
Bamboo springboard of the present invention, pressed tile, beat watt equipment and operator is arranged on measure platform, workman is put down with measure
Platform is operation horizontal plane, and the die mould under tile in all measure platform coverages all completes on measure platform, without ground behaviour
Workmanship coordinates.For improving safety, safety net is set below measure platform, prevents high-altitude object from falling.
Described removable measure platform includes being sequentially connected between the end section 6 and some sections positioned at both ends at two ends
Standard knot 7;All it is detachably connected by bolt between adjacent standard knot 7 and end section 6 and standard knot 7;Described
Four supporting legs 1 are respectively arranged on both ends for one group two-by-two and save 6 outermost end.Thus can be by the quantity of increase and decrease standard knot
The length of change measure platform, with adapt to different spans Factory Building and driving case bay construction needs, without for every kind of across
Such measure platform processed by the Factory Building of degree.
Specifically, described end section and standard knot are truss structure, referring also to Fig. 2 and Fig. 3, and this truss structure is by two
Parallel truss piece is formed by connecting by some cross bars 8, and every sub-truss piece is by parallel top boom 9, lower boom 10 and will be upper
Some diagonal web members 11 that lower boom connects are constituted, and diagonal web member 11 is end to end.Wherein part cross bar is used for connecting two truss pieces
Top boom, remaining cross bar is used for connecting the lower boom of two truss pieces.Top boom 9 and lower boom 10 are welded with bracket 12,
Described diagonal web member 11 two ends are welded on to be connected top-bottom chord by bracket on bracket 12, are so more able to ensure that truss piece
Bulk strength.Supporting leg is welded on the corresponding truss piece top boom of end section and the same one end of lower boom.This truss is steel frame construction, respectively
Connection between part is all realized with welding manner.
On the framework that end section and standard knot two top boom and corresponding cross bar are formed, laying bamboo springboard is linked as one to be formed
The confession workmen of body stands and places the operation platform of material.
It is provided with the vertical ladder 5 with shield cage in removable measure platform one end, vertical ladder 5 is vertically mounted on crane beam top flange
To between measure platform top surface, vertical ladder upper end is provided with hook to top surface, hangs over removable measure platform top surface, workman Ke Tong
Cross vertical ladder to swash entrance measure platform from crane beam walkway board.
Described railing is independent four section, 1.2 meters of every section of height during actual design.This four sections of railings are pacified by hinge respectively
Be contained in removable measure platform surrounding, every section of railing can 180 ° spin upside down, with lock locking when erecting.Roof truss is met during construction
Place, turning hang down, between two roof trusses construct when turning upwards.
Constitute measure platform each several part in this method to be described below:
(1) truss-like standard knot makes:
On a, truss, lower edge adopts H-beam Rolling, and diagonal web member adopts H-beam Rolling, is connected by high-strength bolt;
On b, truss, lower edge connecting portion staggers 200mm, and single groove weldering high-strength bolt auxiliary connection is opened in end, and carries out two
Level seam inspection;
The bracket that c, upper lower edge connect diagonal web member is welded on chord member, and loose mail on-site consolidation made by diagonal web member, if transport bar
Part allows, and factory can be assembled into plane;
Standard knot is composite roof truss pattern, mitigates deadweight, meets safety requirements, and width is maximum to be less than 3 meters, meets transport
Condition, length direction controls within 5 meters, meets structural requirement.
(2) truss-like end restraining is made:
On a, truss, lower edge adopts H-beam Rolling, and diagonal web member adopts H-beam Rolling, is connected by high-strength bolt;
On b, truss, lower edge connecting portion staggers 200mm, and single groove weldering high-strength bolt auxiliary connection is opened in end, and carries out two
Level seam inspection;
The bracket that c, upper lower edge connect diagonal web member is welded on chord member and supporting leg, and loose mail on-site consolidation made by diagonal web member;
D, supporting leg bottom set scroll wheel, and scroll wheel is connected with supporting leg by bearing pin;
(3) track installation:
Channel-section steel selected by a, track, and specification determines it is ensured that track center of gravity line is in crane beam according to crane beam top flange width
On heart line;
B, track are 12 meter of one section, side jar plate, and boring is anchored on crane beam top flange.It is not recommended that using welding
The method of channel-section steel, in order to avoid causing crane beam top flange to deform, two ends set car bumper.
(4) railing fabrication and installation:
A, railing specification select steel ladder atlas " 02j401 ";
B, railing install using can 180 ° of hinges spinning upside down, meet and can put down during obstacle temporarily, available lock when erecting
Padlock is tight.
(5) vertical ladder fabrication and installation:
A, vertical ladder specification select steel ladder atlas " 02j401 ";
B, vertical ladder are vertically mounted on crane beam top flange top surface between measure platform top surface, end make 180 ° curved
Hook, hangs over measure platform top surface load-bearing.
Present invention employs a kind of mobile operating platform, this operating platform is by the standard knot group of some fixed dimensions
Become, can be according to Factory Building span big freedom in minor affairs assembled formation.This assemble method is as follows: makes standard knot, standard knot size one first
As press Factory Building span mean allocation, and meet structural requirement, ensure equivalently-sized as far as possible, so can achieve any group of order
Close, standard knot can be divided into four planes to be fabricated to part, by high-strength bolt on-site consolidation molding, be so beneficial to transport and deposit
Put;Operation platform can be connected into by high-strength bolt between the standard knot assembling, end section supporting leg bottom sets scroll wheel, whole
Body is lifted into crane beam top flange top surface, and here setting channel-section steel supplies operating platform to slide as track, upper berth bamboo springboard, and surrounding sets
Put safe protective railing, workman can realize the under tile construction in whole span scope on the platform.The present invention has broken away from biography
The method of the roofing die mould under tile local construction of system, in the case that Factory Building span is big and construction period is tight, using operating platform
Bearing capacity is big, construction surface width and moveable feature, achievable integral construction, has saved the duration, has improve efficiency.This may move
Formula operating platform easy accessibility is quick, reusable edible, from heavy and light, low cost, is that one kind can popularization and application and can in high volume giving birth to
The measure platform of the standard steel construction Factory Building under tile construction produced.
The present invention installs this truss by the crane beam in Standard Factory Room, and the height of truss is because driving depth of beam is natural
Reach a base altitude, starting point is just higher than existing movable Scaffold many, but this truss oneself height is not very high.?
The length of support leg constructing operation according to needed for workman is highly configured, so so that under tile construction height direction
Unrestricted, very convenient.
Above example only illustrates technical scheme and unrestricted, although with reference to preferred embodiment to scheme of the invention
Be described in detail, it will be understood by those within the art that, technical scheme can be modified or
Person's equivalent, the objective without deviating from technical solution of the present invention and scope, it all should cover the claim model in the present invention
In enclosing.
Claims (4)
1. a kind of large-span steel factory building roof die mould under tile rapid constructing method it is characterised in that: step is as follows,
1) design length and crane beam spacing identical in Factory Building may move measure platform first, and this removable measure platform has
Four supporting legs, each supporting leg is arranged below scroll wheel, is formed around security guardrail in removable measure platform;Simultaneously two
Crane beam length direction laying channel-section steel forms track;
2) by removable measure platform across being arranged on two crane beams, the scroll wheel on supporting leg is located in groove steel rail, makes
Removable measure platform can move in orbit;
3) workmen stands in and can carry out the construction of factory building roof die mould under tile on measure platform, is expert at by changing measure platform
Position in bicycle beam, can carry out zones of different under tile construction;
Described removable measure platform includes the mark being sequentially connected between the end section and some sections positioned at both ends at two ends
Quasi- section;It is detachably connected by bolt between adjacent standard knot and end section and standard knot;Described four supporting legs
It is respectively arranged on both ends section outermost end for one group two-by-two;
Described end section and standard knot are truss structure, and this truss structure is connected by some cross bars by two parallel truss pieces
Form, by parallel top boom, lower boom and some diagonal web members of connecting top-bottom chord are constituted every sub-truss piece, diagonal web member
End to end;Wherein part cross bar is used for connecting the top boom of two truss pieces, and remaining cross bar is used for connecting under two truss pieces
Chord member;Top boom and lower boom are welded with bracket, described diagonal web member two ends are welded on bracket to be incited somebody to action up and down by bracket
Chord member connects;Supporting leg is welded on the corresponding truss piece top boom of end section and the same one end of lower boom.
2. large-span steel factory building roof die mould under tile rapid constructing method according to claim 1 it is characterised in that:
On the framework that end section and standard knot two top boom and corresponding cross bar are formed, laying bamboo springboard is applied with forming the confession being connected as a single entity
Workman person stands and places the operation platform of material.
3. large-span steel factory building roof die mould under tile rapid constructing method according to claim 1 it is characterised in that:
It is provided with vertical ladder in removable measure platform one end, vertical ladder is vertically mounted on crane beam top flange top surface to measure platform top surface
Between, vertical ladder upper end is provided with hook, hangs over removable measure platform top surface.
4. large-span steel factory building roof die mould under tile rapid constructing method according to claim 1 it is characterised in that:
Described railing is independent four section, and this four sections of railings are arranged on removable measure platform surrounding, every section of railing by hinge respectively
Can 180 ° spin upside down, when erecting with lock locking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510171627.8A CN104763109B (en) | 2015-04-13 | 2015-04-13 | Quick construction method for pressed bottom tile of large-span steel structure factory building roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510171627.8A CN104763109B (en) | 2015-04-13 | 2015-04-13 | Quick construction method for pressed bottom tile of large-span steel structure factory building roof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104763109A CN104763109A (en) | 2015-07-08 |
CN104763109B true CN104763109B (en) | 2017-01-25 |
Family
ID=53645172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510171627.8A Active CN104763109B (en) | 2015-04-13 | 2015-04-13 | Quick construction method for pressed bottom tile of large-span steel structure factory building roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104763109B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442773A (en) * | 2015-12-31 | 2016-03-30 | 沈阳三新实业有限公司 | Technology and construction platform for installing and constructing inner plates of metal roof |
CN106437047B (en) * | 2016-07-21 | 2018-10-09 | 中铁四局集团建筑工程有限公司 | A kind of equipment transported for factory building roof plate with installing |
CN107514145A (en) * | 2017-07-02 | 2017-12-26 | 上海二十冶建设有限公司 | A kind of removable steel roofing liner installation construction device and method |
CN110723660A (en) * | 2019-09-05 | 2020-01-24 | 中国十七冶集团有限公司 | Novel installation method of steel structure workshop composite roof panel |
CN111636667A (en) * | 2020-04-28 | 2020-09-08 | 贵州航天建设工程有限公司 | Construction method and operating platform of high-altitude operating platform applied to large-span workshop |
CN111827575B (en) * | 2020-08-04 | 2024-12-03 | 潮峰钢构集团有限公司 | A steel structure large-span roof truss system and installation method thereof |
CN113235840A (en) * | 2021-06-09 | 2021-08-10 | 中建四局安装工程有限公司 | Quick installation and construction method for inner-layer plate of factory building roof |
CN113958074A (en) * | 2021-11-29 | 2022-01-21 | 中冶建工集团有限公司 | Method for mounting bottom tile of roof of tall and big factory building |
CN114411973A (en) * | 2022-01-13 | 2022-04-29 | 上海二十冶建设有限公司 | A method for installing the roof structure of a cast iron yard |
CN115874798A (en) * | 2022-11-17 | 2023-03-31 | 中天建设集团有限公司 | A high-altitude roof large-span steel structure construction device and construction method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131445A (en) * | 1996-10-28 | 1998-05-19 | Sanko Metal Ind Co Ltd | Construction support device for curved architectural plate and its construction method |
CN2850874Y (en) * | 2005-09-09 | 2006-12-27 | 上海五冶冶金建设有限公司工业炉窑工程公司 | Super long roof high altitude tile-making tower |
CN201560539U (en) * | 2009-09-30 | 2010-08-25 | 中太建设集团股份有限公司 | Tool car for long-span net rack roof space plate |
CN201620535U (en) * | 2009-12-04 | 2010-11-03 | 中国第一冶金建设有限责任公司 | Colored steel bottom tile mounting device of steel roof |
CN201695592U (en) * | 2010-06-30 | 2011-01-05 | 中国五冶集团有限公司 | Inversion type color steel tile fast mounting platform |
CN102071780A (en) * | 2009-11-24 | 2011-05-25 | 中冶成工上海五冶建设有限公司 | Method for manufacturing and mounting 120-meter long roof tile at high altitude |
CN102505813A (en) * | 2011-09-30 | 2012-06-20 | 湖南省第五工程有限公司 | Roof panel transport vehicle and roof construction method |
CN202324567U (en) * | 2011-11-18 | 2012-07-11 | 中建七局建筑装饰工程有限公司 | Moving type large-scale operation platform |
CN102864879A (en) * | 2012-10-15 | 2013-01-09 | 中国二冶集团有限公司 | Elevated-platform plate pressing device |
CN202925871U (en) * | 2012-11-14 | 2013-05-08 | 中国机械工业第一建设有限公司 | Movable operating platform for aloft work |
-
2015
- 2015-04-13 CN CN201510171627.8A patent/CN104763109B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131445A (en) * | 1996-10-28 | 1998-05-19 | Sanko Metal Ind Co Ltd | Construction support device for curved architectural plate and its construction method |
CN2850874Y (en) * | 2005-09-09 | 2006-12-27 | 上海五冶冶金建设有限公司工业炉窑工程公司 | Super long roof high altitude tile-making tower |
CN201560539U (en) * | 2009-09-30 | 2010-08-25 | 中太建设集团股份有限公司 | Tool car for long-span net rack roof space plate |
CN102071780A (en) * | 2009-11-24 | 2011-05-25 | 中冶成工上海五冶建设有限公司 | Method for manufacturing and mounting 120-meter long roof tile at high altitude |
CN201620535U (en) * | 2009-12-04 | 2010-11-03 | 中国第一冶金建设有限责任公司 | Colored steel bottom tile mounting device of steel roof |
CN201695592U (en) * | 2010-06-30 | 2011-01-05 | 中国五冶集团有限公司 | Inversion type color steel tile fast mounting platform |
CN102505813A (en) * | 2011-09-30 | 2012-06-20 | 湖南省第五工程有限公司 | Roof panel transport vehicle and roof construction method |
CN202324567U (en) * | 2011-11-18 | 2012-07-11 | 中建七局建筑装饰工程有限公司 | Moving type large-scale operation platform |
CN102864879A (en) * | 2012-10-15 | 2013-01-09 | 中国二冶集团有限公司 | Elevated-platform plate pressing device |
CN202925871U (en) * | 2012-11-14 | 2013-05-08 | 中国机械工业第一建设有限公司 | Movable operating platform for aloft work |
Non-Patent Citations (1)
Title |
---|
超长屋面瓦高空制作和安装技术;王宏 等;《四川建筑》;20141031;第34卷(第5期);第158页左栏第1-2段、第159页第2.3节、图3 * |
Also Published As
Publication number | Publication date |
---|---|
CN104763109A (en) | 2015-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104763109B (en) | Quick construction method for pressed bottom tile of large-span steel structure factory building roof | |
CN106958346B (en) | Intelligent attached lifting scaffold equipment for curved surface super high-rise building and construction method | |
US20130232887A1 (en) | Assembly of prefabricated elements to form a prefabricated building with at least two floors and related building and installation process | |
CN105569358A (en) | Construction method of special-shaped curved surface roof with large span and multiple curvatures | |
CN101892736B (en) | High altitude moving hanging basket construction method | |
CN106193568A (en) | Mobile steel truss operating platform | |
CN101871259B (en) | Building method of integral slip type scaffold used for steel grid construction | |
CN108547225A (en) | A kind of assembly moving type security construction of prevention work job platform and construction method and application | |
CN101775896A (en) | Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold | |
CN113719163A (en) | Modular maintenance platform structure | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN105442773A (en) | Technology and construction platform for installing and constructing inner plates of metal roof | |
CN212897815U (en) | Modular maintenance platform structure and maintenance platform for cement plant storage warehouse | |
CN213268816U (en) | Assembled shaped steel horizontal protection platform of encorbelmenting | |
CN115306137B (en) | Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN116181041B (en) | Building machine of multilayer quick construction | |
CN205276727U (en) | Metal roofing inner panel construction and installation platform | |
CN205955164U (en) | Portable steel truss operation platform | |
CN116607426A (en) | Arch bridge outsourcing concrete construction platform system and construction method | |
CN212507305U (en) | High-altitude operation platform applied to large-span factory building | |
CN107035037A (en) | High building top layer curtain wall frame and its installation method | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN205134533U (en) | Complicated special -shaped steel mesh frame and steel skeleton construction and installation structure | |
CN215671309U (en) | Prefabricated temporary stair of going up people |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |