CN105908960A - Construction rack for construction of high and large space - Google Patents

Construction rack for construction of high and large space Download PDF

Info

Publication number
CN105908960A
CN105908960A CN201610457301.6A CN201610457301A CN105908960A CN 105908960 A CN105908960 A CN 105908960A CN 201610457301 A CN201610457301 A CN 201610457301A CN 105908960 A CN105908960 A CN 105908960A
Authority
CN
China
Prior art keywords
construction
fixedly connected
platform
joint
electric lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610457301.6A
Other languages
Chinese (zh)
Other versions
CN105908960B (en
Inventor
程晓民
程志军
应建方
吴岳定
戴姣燕
俞友宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baihe Shenghua Construction Technology Co ltd
Ningbo University of Technology
Original Assignee
Ningbo University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University of Technology filed Critical Ningbo University of Technology
Priority to CN201610457301.6A priority Critical patent/CN105908960B/en
Publication of CN105908960A publication Critical patent/CN105908960A/en
Application granted granted Critical
Publication of CN105908960B publication Critical patent/CN105908960B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/38Scaffolds partly supported by the building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)
  • Ladders (AREA)

Abstract

本发明涉及用于高大空间施工的施工架,包括桁架机构和电动升降平台,电动升降平台的中间设置有施工平台,施工平台的上方设置有顶部带有台阶的脚手架,桁架机构的上方设有滑轨、多根连接杆和多根第二附墙杆,滑轨的下方设有与滑块相配合的安全绳。所述施工架搭建用的钢管和钢板用量少,成本低,搭设速度快,搭建时间短,施工架稳定性能好,安装、拆卸时方便、安全可靠无风险,其中脚手架还可用于普通建筑的施工,重复利用率高,节约成本,与搭建传统满堂架脚手架的方法相比,减少施工人员搭架子的工作量及运输建筑材料的工作量,施工效率显著提高。

The invention relates to a construction frame for construction in a large space, comprising a truss mechanism and an electric lifting platform, a construction platform is arranged in the middle of the electric lifting platform, a scaffold with steps on the top is arranged above the construction platform, and a slide rails, multiple connecting rods and multiple second wall-attached rods, and a safety rope matched with the slide block is provided under the slide rail. The amount of steel pipes and steel plates used for the construction of the construction frame is small, the cost is low, the construction speed is fast, the construction time is short, the construction frame has good stability, it is convenient to install and disassemble, safe, reliable and risk-free, and the scaffolding can also be used in ordinary buildings. Construction, high reuse rate, cost saving, compared with the method of building traditional full-frame scaffolding, it reduces the workload of construction workers and the workload of transporting building materials, and the construction efficiency is significantly improved.

Description

用于高大空间施工的施工架 Construction frame for tall space construction

技术领域 technical field

本发明涉及一种用于高大空间施工的施工架,属于建筑工程技术领域。 The invention relates to a construction frame used for construction in tall and large spaces, and belongs to the technical field of construction engineering.

背景技术 Background technique

传统的施工架均采用钢结构搭接,如钢管、钢板等钢材料,广泛用于建筑立面施工,也可用于层数低、跨度小、屋面为平面的屋面施工。但如果对具有高大空间的建筑结构(如具有高大空间的中央大厅)进行施工,则是非常困难的一个工程,尤其是中央大厅的穹顶更是最困难的一个施工位置,因为从中央大厅的地面到穹顶的顶部一般都在几十米甚至上百米的高度,属于大空间,超高的施工部位。传统的施工方法是用脚手架从底层开始落地满堂搭设,一直搭设到顶部的操作面,这种施工方法不仅钢管、钢板等钢材料用量巨大,工人搭设的工作量也很大,施工速度慢,很难满足实际的施工要求。 Traditional construction frames are all made of overlapping steel structures, such as steel pipes, steel plates and other steel materials, which are widely used in building facade construction, and can also be used in roof construction with low floors, small spans, and flat roofs. However, it is a very difficult project to construct a building structure with a tall space (such as a central hall with a tall space), especially the dome of the central hall is the most difficult construction position, because the ground of the central hall The height to the top of the dome is generally tens of meters or even hundreds of meters, which belongs to the large space and super high construction site. The traditional construction method is to use scaffolding from the bottom to the top of the operation surface. This construction method not only consumes a huge amount of steel materials such as steel pipes and steel plates, but also requires a lot of work for the workers. The construction speed is slow and very slow. Difficult to meet the actual construction requirements.

例如,对从地面到顶部为27米的建筑中央大厅进行穹顶进行装饰及装潢工程,除了需要对建筑中央大厅的四面墙壁要做结构柱子的贴砖装修,另一面为还需要对墙面做浮雕装饰,该工程的一个非常重要的装修难点就是穹顶的采光棚要做装饰工程,从地面到穹顶的最底部近27米高,如果按传统的满堂架脚手架方案,所需搭建的脚手架用的钢管和钢板数量巨大,钢管和钢板的总重量最少有400吨重,并且搭设时间不低于3个月长,满足不了工期要求;而且对这样的超高层建筑屋面进行施工,传统的施工架还则存在重量大、搭建安装麻烦、安全性不高、装拆不方便等缺点,并且由于建筑屋面为弧形面而非平面,传统的施工架还不能随时调整工作平台的角度,无法确保工作平台始终与穹顶的弧面之间具有足够的操作空间,存在施工死角;且工人在超高层建筑屋面进行施工、安装、拆卸时都具有一定的安全风险。 For example, to decorate and decorate the dome of the central hall of the building with a length of 27 meters from the ground to the top, in addition to the need to decorate the four walls of the central hall with structural columns and brick decoration, the other side also needs to make reliefs on the wall Decoration, a very important difficulty in the decoration of the project is that the lighting shed of the dome needs to be decorated. The height from the ground to the bottom of the dome is nearly 27 meters. The total weight of steel pipes and steel plates is at least 400 tons, and the erection time is not less than 3 months, which cannot meet the requirements of the construction period; and for the construction of such super high-rise building roofs, traditional construction frames are still There are disadvantages such as heavy weight, troublesome construction and installation, low safety, inconvenient assembly and disassembly, etc., and because the building roof is curved instead of flat, the traditional construction frame cannot adjust the angle of the working platform at any time, and cannot ensure that the working platform is always There is enough operating space between the dome and the curved surface of the dome, and there are construction dead ends; and workers have certain safety risks when constructing, installing, and dismantling the roof of super high-rise buildings.

发明内容 Contents of the invention

本发明针对现有技术存在的不足,提供了用于高大空间施工的施工架,具体技术方案如下: Aiming at the deficiencies in the prior art, the present invention provides a construction frame for construction in tall and large spaces, and the specific technical scheme is as follows:

用于高大空间施工的施工架,包括桁架机构和电动升降平台,桁架机构包括四根设置在墙角的桁架立柱,桁架立柱的底端与地面固定连接,桁架立柱上设置有多根第一附墙杆,桁架立柱通过第一附墙杆与墙面固定连接;电动升降平台设置在桁架机构的两相对的侧边,电动升降平台上设置有驱动电机,电动升降平台的边沿设置有一圈第一围栏,第一围栏与电动升降平台固定连接,驱动电机带动电动升降平台沿着桁架立柱限定的方向往复运动;所述电动升降平台的中间设置有施工平台,施工平台与电动升降平台之间通过螺栓固定连接,施工平台的边沿设置有一圈第二围栏,第二围栏与施工平台固定连接,施工平台的上方设置有顶部带有台阶的脚手架,脚手架的周围设置有多根钢丝绳,其中一部分的钢丝绳将脚手架固定在电动升降平台上的第一围栏上,剩余的钢丝绳将脚手架固定在施工平台上的第二围栏上;所述桁架机构的上方设置有滑轨、多根连接杆和多根第二附墙杆,滑轨的端部与连接杆的顶端固定连接,连接杆的尾端通过第二附墙杆与墙面固定连接,第二附墙杆的中间部分通过螺栓与桁架立柱的顶端固定连接,滑轨上设置有多个相互独立的滑块,滑轨的下方设置有与滑块相配合的安全绳,安全绳的顶端与滑块固定连接,安全绳的尾端与地面接触,安全绳通过滑块沿着滑轨限定的方向运动。 The construction frame used for the construction of high and large spaces includes a truss mechanism and an electric lifting platform. The truss mechanism includes four truss columns arranged at the corners of the wall. The pole and the truss column are fixedly connected to the wall through the first wall-attached pole; the electric lifting platform is arranged on the two opposite sides of the truss mechanism, the electric lifting platform is provided with a driving motor, and the edge of the electric lifting platform is provided with a circle of the first fence , the first fence is fixedly connected with the electric lifting platform, and the driving motor drives the electric lifting platform to reciprocate along the direction defined by the truss column; a construction platform is arranged in the middle of the electric lifting platform, and the construction platform and the electric lifting platform are fixed by bolts Connection, the edge of the construction platform is provided with a circle of second fence, the second fence is fixedly connected with the construction platform, above the construction platform is provided with a scaffold with steps on the top, and there are multiple steel wire ropes around the scaffold, some of which are connected to the scaffold. It is fixed on the first fence on the electric lifting platform, and the remaining wire ropes fix the scaffold on the second fence on the construction platform; above the truss mechanism, there are slide rails, multiple connecting rods and multiple second attached walls The end of the slide rail is fixedly connected to the top of the connecting rod, the tail end of the connecting rod is fixedly connected to the wall through the second wall-attached rod, and the middle part of the second wall-attached rod is fixedly connected to the top of the truss column by bolts. There are multiple independent sliders on the slide rail, and a safety rope matching the slider is arranged under the slide rail. The slider moves along the direction defined by the slide rail.

作为上述技术方案的改进,所述桁架立柱由多个单元框架串联组成,相邻的单元框架之间通过螺栓固定连接,单元框架的一侧设置有与单元框架相垂直的U形爬杆,爬杆的开口端与单元框架固定连接形成封闭结构。 As an improvement of the above technical solution, the truss column is composed of a plurality of unit frames connected in series, and the adjacent unit frames are fixedly connected by bolts. One side of the unit frames is provided with a U-shaped climbing pole perpendicular to the unit frames. The open end of the rod is fixedly connected with the unit frame to form a closed structure.

作为上述技术方案的改进,所述脚手架包括多个竖直分布的立柱和多个水平分布的横杆,立柱和横杆纵横交错形成三维网格状结构,横杆的左右两侧分别设置有第一接头,第一接头的横截面为等腰梯形,第一接头与横杆固定连接;所述立柱上设置有多个固定盘,固定盘的中央设置有第一安装孔,立柱穿过第一安装孔与固定盘固定连接,固定盘的上表面设置有最少四对与第一接头相配合的凸筋,凸筋对称分布在第一安装孔的周围;第一接头与固定盘之间设置有“7”形固定销,第一接头上设置有与固定销相配合且上下贯通的固定孔,每对凸筋之间设置有与固定销相配合且上下贯通的定位孔,第一接头和固定盘之间以固定销依次插入第一接头上的固定孔和固定盘上的定位孔的方式活动连接。 As an improvement of the above technical solution, the scaffolding includes a plurality of vertically distributed columns and a plurality of horizontally distributed crossbars, the upright columns and horizontal bars are criss-crossed to form a three-dimensional grid structure, and the left and right sides of the horizontal bars are respectively provided with the second A joint, the cross section of the first joint is isosceles trapezoidal, the first joint is fixedly connected with the crossbar; the column is provided with a plurality of fixed plates, the center of the fixed plate is provided with a first installation hole, and the column passes through the first The mounting hole is fixedly connected to the fixed plate, and the upper surface of the fixed plate is provided with at least four pairs of ribs that match the first joint, and the ribs are symmetrically distributed around the first mounting hole; between the first joint and the fixed plate, there are "7"-shaped fixed pin, the first joint is provided with a fixed hole that matches the fixed pin and penetrates up and down, and a positioning hole that matches the fixed pin and penetrates up and down is provided between each pair of convex ribs. The first joint and the fixed The disks are flexibly connected in the manner that the fixing pins are sequentially inserted into the fixing holes on the first joint and the positioning holes on the fixing disks.

作为上述技术方案的改进,所述固定盘的上方设置有锁盘,锁盘中央设置有第二安装孔,立柱穿过第二安装孔与锁盘固定连接,锁盘上还设置有最少四个锁孔,锁孔对称分布在第二安装孔的周围;固定销的尾端上设置有绑孔,锁盘和固定销之间设置有绑绳,绑绳的一端穿过锁孔与锁盘连接,绑绳的另一端穿过绑孔与固定销连接。 As an improvement of the above technical solution, a lock plate is provided above the fixed plate, and a second installation hole is provided in the center of the lock plate, and the upright column is fixedly connected with the lock plate through the second installation hole, and at least four Lock holes, the lock holes are symmetrically distributed around the second installation hole; the tail end of the fixing pin is provided with a binding hole, and a binding rope is arranged between the lock plate and the fixing pin, and one end of the tie rope passes through the lock hole and is connected with the lock plate , the other end of the binding rope passes through the binding hole and is connected with the fixed pin.

作为上述技术方案的改进,所述立柱的底端设置有第一万向轮,第一万向轮与立柱的底端活动连接。 As an improvement of the above technical solution, the bottom end of the column is provided with a first universal wheel, and the first universal wheel is movably connected with the bottom end of the column.

作为上述技术方案的改进,所述脚手架上还设置有斜梯,斜梯的上下两端分别设置有与横杆相配和的卡勾,卡勾与斜梯之间设置有第二接头,第二接头的一端与斜梯固定连接,卡勾的一侧设置有两个供螺栓穿过的弧形第三安装孔;所述第二接头的另一端设置有与卡勾相配合的弧形调解部,调解部与第二接头固定连接,调解部上设置有两个结构与第三安装孔相同的第四安装孔,卡勾与第二接头之间通过螺栓固定连接。 As an improvement of the above technical solution, the scaffold is also provided with an inclined ladder, the upper and lower ends of the inclined ladder are respectively provided with hooks matched with the cross bars, and a second joint is arranged between the hook and the inclined ladder. One end of the joint is fixedly connected with the inclined ladder, and one side of the hook is provided with two arc-shaped third mounting holes for bolts to pass through; the other end of the second joint is provided with an arc-shaped adjustment part matched with the hook , the mediation part is fixedly connected with the second joint, and the mediation part is provided with two fourth installation holes having the same structure as the third installation hole, and the hook and the second joint are fixedly connected by bolts.

作为上述技术方案的改进,所述凸筋与固定盘之间为一体式结构。 As an improvement of the above technical solution, the convex rib and the fixed plate are in an integral structure.

作为上述技术方案的改进,所述施工平台的底面设置有多个第二万向轮,第二万向轮与施工平台的底面活动连接。 As an improvement of the above technical solution, a plurality of second universal wheels are provided on the bottom surface of the construction platform, and the second universal wheels are movably connected with the bottom surface of the construction platform.

本发明所述用于高大空间施工的施工架具有以下优点: The construction frame used in the construction of tall and large spaces according to the present invention has the following advantages:

1)、施工架搭建用的钢管和钢板用量少,成本低,搭设速度快,搭建时间短,施工架稳定性能好,方便、安全可靠无风险; 1) The amount of steel pipes and steel plates used for the construction of the construction frame is small, the cost is low, the erection speed is fast, the construction time is short, the construction frame has good stability, convenience, safety, reliability and no risk;

2)、利用电动升降平台将脚手架和施工平台提升至需要操作的顶部,施工平台与电动升降平台之间可拆卸移动,不仅能随时调整施工平台、脚手架与穹顶之间的角度,避免出现不能施工的死角,而且与搭建传统满堂架脚手架的施工方法相比,大大减少了施工人员搭架子的工作量及运输建筑材料的工作量,施工效率显著提高; 2) Use the electric lifting platform to lift the scaffolding and the construction platform to the top that needs to be operated. The construction platform and the electric lifting platform can be disassembled and moved, which can not only adjust the angle between the construction platform, scaffolding and the dome at any time, to avoid the failure of construction Compared with the construction method of traditional full-frame scaffolding, it greatly reduces the workload of construction workers and the workload of transporting building materials, and the construction efficiency is significantly improved;

3)、利用滑轨上加装多根相互独立的安全绳进一步为施工人员在高空作业施工安全提供了可靠的保障,安全绳相互独立不影响施工; 3) The use of multiple independent safety ropes on the slide rail further provides a reliable guarantee for the safety of construction workers working at heights, and the safety ropes are independent of each other and do not affect the construction;

4)、施工架上的桁架立柱、电动升降平台、滑轨、脚手架、施工平台等拆卸简单、安全无风险,运输方便;其中脚手架还可用于普通建筑的施工,重复利用率高,并且脚手架在搭建过程中不需要工具,方便快速,而且搭建的脚手架安全可靠,缩短了搭建脚手架的时间,降低了脚手架的成本和劳动强度,提高了生产效率;施工完成后时,脚手架上的部件能够重复利用并且不易丢失,降低了生产成本和使用成本。 4) The truss columns, electric lifting platforms, slide rails, scaffolding, construction platforms, etc. on the construction frame are easy to disassemble, safe and risk-free, and easy to transport; among them, the scaffolding can also be used for the construction of ordinary buildings, with high reuse rate, and the scaffolding is in The construction process does not require tools, it is convenient and fast, and the scaffolding is safe and reliable, which shortens the time to build the scaffolding, reduces the cost and labor intensity of the scaffolding, and improves production efficiency; after the construction is completed, the components on the scaffolding can be reused And it is not easy to lose, which reduces the production cost and use cost.

附图说明 Description of drawings

图1为本发明所述用于高大空间施工的施工架结构示意图; Fig. 1 is the structural representation of the construction frame that is used for tall and large space construction according to the present invention;

图2为本发明所述桁架机构示意图; Fig. 2 is a schematic diagram of the truss mechanism of the present invention;

图3为本发明所述单元框架示意图; Fig. 3 is a schematic diagram of the unit frame of the present invention;

图4为本发明所述单元框架示意图(俯视状态); Fig. 4 is a schematic diagram of the unit frame of the present invention (top view state);

图5为本发明所述脚手架结构示意图; Fig. 5 is the structural representation of scaffolding described in the present invention;

图6为本发明所述固定盘结构示意图; Fig. 6 is a schematic structural view of the fixed plate of the present invention;

图7为图6中A-A视图; Fig. 7 is A-A view among Fig. 6;

图8为本发明所述固定盘和第一接头连接时的示意图; Fig. 8 is a schematic diagram of the connection between the fixed disk and the first joint according to the present invention;

图9为本发明所述固定销结构示意图; Fig. 9 is a structural schematic diagram of the fixing pin of the present invention;

图10为本发明所述锁盘结构示意图; Fig. 10 is a schematic structural view of the locking plate of the present invention;

图11为本发明所述斜梯结构示意图; Fig. 11 is a schematic diagram of the structure of the inclined ladder of the present invention;

图12为本发明所述卡勾结构示意图; Fig. 12 is a schematic diagram of the hook structure of the present invention;

图13为本发明所述第二接头结构示意图; Fig. 13 is a schematic diagram of the structure of the second joint according to the present invention;

图14为本发明所述滑轨结构示意图。 Fig. 14 is a schematic diagram of the structure of the slide rail of the present invention.

具体实施方式 detailed description

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。 In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

如图1、图2和图14所示,所述用于高大空间施工的施工架,包括桁架机构和电动升降平台20,桁架机构包括四根设置在墙角的桁架立柱10,桁架立柱10的底端与地面固定连接,桁架立柱10上设置有多根第一附墙杆11,桁架立柱10通过第一附墙杆11与墙面固定连接;电动升降平台20设置在桁架机构的两相对的侧边,电动升降平台20上设置有驱动电机22,电动升降平台20的边沿设置有一圈第一围栏21,第一围栏21与电动升降平台20固定连接,驱动电机22带动电动升降平台20沿着桁架立柱10限定的方向往复运动;所述电动升降平台20的中间设置有施工平台60,施工平台60与电动升降平台20之间通过螺栓固定连接,施工平台60的边沿设置有一圈第二围栏61,第二围栏61与施工平台60固定连接,施工平台60的上方设置有顶部带有台阶的脚手架40,脚手架40的周围设置有多根钢丝绳50,其中一部分的钢丝绳50将脚手架40固定在电动升降平台20上的第一围栏21上,剩余的钢丝绳50将脚手架40固定在施工平台60上的第二围栏61上;所述桁架机构的上方设置有滑轨30、多根连接杆32和多根第二附墙杆33,滑轨30的端部与连接杆32的顶端固定连接,连接杆32的尾端通过第二附墙杆33与墙面固定连接,第二附墙杆33的中间部分通过螺栓与桁架立柱10的顶端固定连接,滑轨30上设置有多个相互独立的滑块301,滑轨30的下方设置有与滑块301相配合的安全绳31,安全绳31的顶端与滑块301固定连接,安全绳31的尾端与地面接触,安全绳31通过滑块301沿着滑轨30限定的方向运动。 As shown in Fig. 1, Fig. 2 and Fig. 14, the construction frame used for tall space construction includes a truss mechanism and an electric lifting platform 20. The end is fixedly connected with the ground, and the truss column 10 is provided with a plurality of first wall-attached rods 11, and the truss column 10 is fixedly connected with the wall through the first wall-attached rods 11; the electric lifting platform 20 is arranged on two opposite sides of the truss mechanism On the side, the electric lifting platform 20 is provided with a driving motor 22, and the edge of the electric lifting platform 20 is provided with a first fence 21, the first fence 21 is fixedly connected with the electric lifting platform 20, and the driving motor 22 drives the electric lifting platform 20 along the truss Reciprocating movement in the direction defined by the column 10; a construction platform 60 is arranged in the middle of the electric lifting platform 20, and the construction platform 60 and the electric lifting platform 20 are fixedly connected by bolts, and the edge of the construction platform 60 is provided with a second fence 61, The second fence 61 is fixedly connected with the construction platform 60. A scaffold 40 with a step on the top is arranged above the construction platform 60. A plurality of steel wire ropes 50 are arranged around the scaffold 40, and a part of the steel wire ropes 50 fix the scaffold 40 on the electric lifting platform. On the first fence 21 on the 20, the remaining wire rope 50 fixes the scaffold 40 on the second fence 61 on the construction platform 60; the top of the truss mechanism is provided with a slide rail 30, a plurality of connecting rods 32 and a plurality of first Two attached wall rods 33, the end of slide rail 30 is fixedly connected with the top of connecting rod 32, the tail end of connecting rod 32 is fixedly connected with wall surface by second attached wall rod 33, the middle part of second attached wall rod 33 passes Bolts are fixedly connected to the top of the truss column 10, a plurality of mutually independent sliders 301 are arranged on the slide rail 30, and a safety rope 31 matched with the slider 301 is arranged under the slide rail 30, and the top of the safety rope 31 is connected with the slide The block 301 is fixedly connected, the tail end of the safety rope 31 is in contact with the ground, and the safety rope 31 moves along the direction defined by the slide rail 30 through the slider 301 .

所述施工架可用来对高几十米的建筑穹顶进行建筑施工,其搭设及使用方法如下: The construction frame can be used to construct a building dome with a height of tens of meters, and its erection and use methods are as follows:

1)沿着墙角搭设好四根桁架立柱10,再安装好电动升降平台20,调整好电动升降平台20的水平度。 1) Set up four truss columns 10 along the wall corners, install the electric lifting platform 20, and adjust the levelness of the electric lifting platform 20.

2)根据需要在电动升降平台20的中间搭设施工平台60,设施工平台60由多根钢管及多块钢板焊接而成,调整好施工平台60的水平度,用螺栓将施工平台60固定在电动升降平台20上;其中施工平台60的宽度小于电动升降平台20的长度,使得电动升降平台20和施工平台60之间形成一个“工”字形结构,不但使得施工平台60的钢管和钢板的用料最少节省一半,还减轻了电动升降平台20的负载载荷,降低驱动电机22的负担,节约材料成本及能源成本。 2) Build a construction platform 60 in the middle of the electric lifting platform 20 as required. The construction platform 60 is welded by multiple steel pipes and multiple steel plates. Adjust the level of the construction platform 60 and fix the construction platform 60 on the electric lifting platform with bolts on the lifting platform 20; the width of the construction platform 60 is smaller than the length of the electric lifting platform 20, so that an "I"-shaped structure is formed between the electric lifting platform 20 and the construction platform 60, which not only makes the steel pipe and steel plate of the construction platform 60 At least half is saved, and the load on the electric lifting platform 20 is reduced, the burden on the driving motor 22 is reduced, and material costs and energy costs are saved.

3)在施工平台60上搭设脚手架40,脚手架40在搭设时按照建筑的穹顶的弧度走向在脚手架40的顶部设置若干个台阶;利用钢丝绳50将脚手架40固定在电动升降平台20上的第一围栏21上,再利用钢丝绳50将脚手架40固定在施工平台60上的第二围栏61上,使得脚手架40与施工平台60之间的固定稳定、稳固,还方便拆卸,并且钢丝绳50还具有卸荷作用。 3) Set up the scaffolding 40 on the construction platform 60. When the scaffolding 40 is erected, set several steps on the top of the scaffolding 40 according to the arc of the building's dome; 21, the steel wire rope 50 is used to fix the scaffold 40 on the second fence 61 on the construction platform 60, so that the fixing between the scaffold 40 and the construction platform 60 is stable and stable, and it is also convenient to disassemble, and the steel wire rope 50 also has an unloading effect. .

4)滑轨30与多根连接杆32之间,连接杆32与第二附墙杆33之间,滑块301与安全绳31之间先在地面组装完成,再利用电动升降平台20、施工平台60、脚手架40将滑轨30抬到建筑穹顶的下方,滑轨30与建筑穹顶的最高处相差不超过2米,然后利用第二附墙杆33将连接杆32的尾端固定在墙面上;再利用螺栓将第二附墙杆33的中间部分与桁架立柱10的顶端固定,进一步加固上述结构,使其保证稳定,保证滑轨30的独立性、稳定性以及安全性,避免当电动升降平台20、脚手架40、施工平台60等发生意外时对滑轨30的安全性造成影响,进一步提高滑轨30的安全性,使得施工人员的安全性得到保障。其中电动升降平台20在第一次上升过程中需要经过多次调试驱动电机22,保证施工平台60在上升过程中不发生倾斜,虽然第一围栏21和第二围栏61具有安全防护作用,但是为保证施工人员安全,施工人员需要系上保险绳扣,保险绳上的安全钩勾在第一围栏21或第二围栏61上。 4) Between the slide rail 30 and a plurality of connecting rods 32, between the connecting rod 32 and the second wall-attached rod 33, and between the slider 301 and the safety rope 31 are first assembled on the ground, and then the electric lifting platform 20 is used for construction. The platform 60 and the scaffold 40 lift the slide rail 30 to the bottom of the building dome, the difference between the slide rail 30 and the highest point of the building dome is no more than 2 meters, and then the tail end of the connecting rod 32 is fixed on the wall by the second wall-attached rod 33 above; use bolts to fix the middle part of the second wall-attached rod 33 with the top of the truss column 10, further strengthen the above-mentioned structure, make it stable, ensure the independence, stability and safety of the slide rail 30, and avoid being electric When accidents happen to the lifting platform 20, scaffolding 40, construction platform 60, etc., the safety of the slide rail 30 will be affected, and the safety of the slide rail 30 will be further improved, so that the safety of construction personnel is guaranteed. Wherein the electric lifting platform 20 needs to pass through the driving motor 22 of multiple debuggings in the first rising process, guarantees that the construction platform 60 does not tilt during the rising process, although the first fence 21 and the second fence 61 have a safety protection effect, but for To ensure the safety of the construction personnel, the construction personnel need to fasten the safety rope buckle, and the safety hook on the safety rope is hooked on the first fence 21 or the second fence 61 .

5)当滑轨30安装完毕时,将施工平台60降落到地面上,然后将建筑材料以及工具搬到施工平台60和脚手架40上,施工人员在腰上系上与安全绳31相配合的绳索保护器,如GRIGRI保护器(一种具有自锁功能的攀登保护器),然后利用电动升降平台20将脚手架40升空至指定位置;在施工平台60上升过程中,如果因为意外使得施工平台60发生倾斜或者其他意外,在安全绳31和绳索保护器的作用下,避免施工人员从施工平台60上掉落,最大限度保证施工人员的安全;当在脚手架40上时,安全绳31随着施工人员的移动沿着滑轨30移动,安全方便,不会对施工过程造成干扰,实施效果好。 5) When the slide rail 30 is installed, lower the construction platform 60 to the ground, then move the construction materials and tools to the construction platform 60 and the scaffold 40, and the construction personnel tie a rope matching the safety rope 31 on their waists Protectors, such as GRIGRI protectors (a climbing protector with self-locking function), then use the electric lifting platform 20 to lift the scaffold 40 to the designated position; during the rising of the construction platform 60, if the construction platform 60 is accidentally Tilting or other accidents occur, under the action of the safety rope 31 and the rope protector, the construction personnel are prevented from falling from the construction platform 60, and the safety of the construction personnel is guaranteed to the greatest extent; when on the scaffold 40, the safety rope 31 follows the construction Personnel move along the slide rail 30, which is safe and convenient, does not cause interference to the construction process, and has a good implementation effect.

6)当建筑穹顶的一侧完成施工后,将施工平台60从电动升降平台20上拆卸下来,然后将施工平台60向电动升降平台20的左侧或右侧移动一段距离后,再将施工平台60固定在电动升降平台20上,按照步骤5继续对建筑穹顶进行施工直至建筑穹顶施工完成。 6) After the construction is completed on one side of the building dome, the construction platform 60 is disassembled from the electric lifting platform 20, and then the construction platform 60 is moved to the left or right side of the electric lifting platform 20 for a certain distance, and then the construction platform 60 is fixed on the electric lifting platform 20, and the construction of the building dome is continued according to step 5 until the construction of the building dome is completed.

7)当施工平台60靠近墙壁时(安全距离300mm),可对墙壁进行贴砖装修或者浮雕装饰,该过程多名施工人员可站在施工平台60和脚手架40上,同时对墙面进行施工,提高施工效率,缩短施工时间。 7) When the construction platform 60 is close to the wall (the safety distance is 300mm), the wall can be decorated with bricks or embossed. During this process, multiple construction workers can stand on the construction platform 60 and the scaffolding 40 and carry out construction on the wall at the same time. Improve construction efficiency and shorten construction time.

为方便安全安装桁架立柱10,如图3和图4所示,所述桁架立柱10由多个单元框架101串联组成,相邻的单元框架101之间通过螺栓固定连接,单元框架101的一侧设置有与单元框架101相垂直的U形爬杆102,爬杆102的开口端与单元框架101固定连接形成封闭结构。爬杆102的作用一方面使得安装后的桁架立柱10的侧面形成供施工人员攀登的阶梯,便于施工人员连续施工;另一方面,在往上安装单元框架101时,施工人员需要系上保险绳扣,保险绳上的安全钩勾在U形爬杆102上,进一步保障施工人员的安全;并且U形爬杆102还使得单元框架101在运输过程变得简单,方便。桁架立柱10由多个单元框架101串联后用螺栓固定,使得桁架立柱10的安装、拆卸变得更为方便、简单,而且有四根桁架立柱10构成的桁架结构使得所述施工架稳定性好,用量少。 For convenient and safe installation of the truss column 10, as shown in Figure 3 and Figure 4, the truss column 10 is composed of a plurality of unit frames 101 connected in series, and the adjacent unit frames 101 are fixedly connected by bolts, one side of the unit frame 101 A U-shaped climbing pole 102 perpendicular to the unit frame 101 is provided, and the opening end of the climbing pole 102 is fixedly connected with the unit frame 101 to form a closed structure. The function of the climbing rod 102 on the one hand makes the side of the installed truss column 10 form a ladder for the construction personnel to climb, which is convenient for the construction personnel to continue construction; on the other hand, when the unit frame 101 is installed upwards, the construction personnel need to tie the safety rope Buckle, the safety hook on the safety rope is hooked on the U-shaped climbing pole 102 to further ensure the safety of the construction personnel; and the U-shaped climbing pole 102 also makes the transportation of the unit frame 101 simple and convenient. The truss column 10 is fixed by bolts after a plurality of unit frames 101 are connected in series, which makes the installation and disassembly of the truss column 10 more convenient and simple, and the truss structure composed of four truss columns 10 makes the construction frame stable , less dosage.

在施工过程中,由于建筑穹顶结构不规则,因此为适应建筑穹顶的施工,为方便拆卸、安装以及重复利用脚手架40,如图5~10所示,所述脚手架40包括多个竖直分布的立柱410和多个水平分布的横杆420,立柱410和横杆420纵横交错形成三维网格状结构,立柱410和横杆420都可根据需要选用钢管焊接制成;横杆420的左右两侧分别设置有第一接头421,第一接头421的横截面为等腰梯形,第一接头421与横杆420固定连接;所述立柱410上设置有多个固定盘411,固定盘411的中央设置有第一安装孔4111,立柱410穿过第一安装孔4111与固定盘411固定连接,固定盘411的上表面设置有最少四对与第一接头421相配合的凸筋4112,凸筋4112对称分布在第一安装孔4111的周围;第一接头421与固定盘411之间设置有“7”形固定销430,第一接头421上设置有与固定销430相配合且上下贯通的固定孔,每对凸筋4112之间设置有与固定销430相配合且上下贯通的定位孔4113,第一接头421和固定盘411之间以固定销430依次插入第一接头421上的固定孔和固定盘411上的定位孔4113的方式活动连接。 In the construction process, due to the irregular structure of the building dome, in order to adapt to the construction of the building dome, for the convenience of disassembly, installation and reuse of scaffolding 40, as shown in Figures 5 to 10, the scaffolding 40 includes a plurality of vertically distributed Upright column 410 and a plurality of horizontally distributed crossbars 420, the upright column 410 and crossbar 420 are criss-crossed to form a three-dimensional grid structure, upright column 410 and crossbar 420 can be made by welding steel pipes according to needs; the left and right sides of crossbar 420 The first joint 421 is respectively provided with a cross-section of an isosceles trapezoid, and the first joint 421 is fixedly connected with the cross bar 420; the column 410 is provided with a plurality of fixed plates 411, and the center of the fixed plate 411 is set There is a first installation hole 4111, and the column 410 passes through the first installation hole 4111 and is fixedly connected to the fixed plate 411. The upper surface of the fixed plate 411 is provided with at least four pairs of ribs 4112 that match the first joint 421. The ribs 4112 are symmetrical Distributed around the first mounting hole 4111; a "7"-shaped fixing pin 430 is provided between the first joint 421 and the fixing plate 411, and a fixing hole that matches the fixing pin 430 and penetrates up and down is provided on the first joint 421. Between each pair of convex ribs 4112, there is a positioning hole 4113 that matches with the fixing pin 430 and penetrates up and down. Between the first joint 421 and the fixing plate 411, the fixing pin 430 is sequentially inserted into the fixing hole and the fixing plate on the first joint 421. The positioning hole 4113 on the 411 is flexibly connected.

所述固定盘411的上方设置有锁盘440,锁盘440中央设置有第二安装孔4401,立柱410穿过第二安装孔4401与锁盘440固定连接,锁盘440上还设置有最少四个锁孔4402,锁孔4402对称分布在第二安装孔4401的周围;固定销430的尾端上设置有绑孔431,锁盘440和固定销430之间设置有绑绳441,绑绳441的一端穿过锁孔4402与锁盘440连接,绑绳441的另一端穿过绑孔431与固定销430连接。 The top of the fixed plate 411 is provided with a lock plate 440, and the center of the lock plate 440 is provided with a second installation hole 4401, and the column 410 is fixedly connected with the lock plate 440 through the second installation hole 4401, and the lock plate 440 is also provided with at least four A locking hole 4402, the locking hole 4402 is symmetrically distributed around the second mounting hole 4401; the tail end of the fixing pin 430 is provided with a binding hole 431, and a binding rope 441 is arranged between the locking disc 440 and the fixing pin 430, and the binding rope 441 One end of the tie rope 441 passes through the lock hole 4402 and is connected to the lock disc 440 , and the other end of the tie rope 441 passes through the tie hole 431 and is connected to the fixing pin 430 .

在脚手架40安装过程中,立柱410可根据高度需要用钢管焊接制成,横杆420和立柱410之间通过第一接头421和固定盘411固定,用固定销430第一接头421和固定盘411锁紧。第一接头421和固定盘411之间以固定销430依次插入第一接头421上的固定孔和固定盘411上的定位孔4113的方式活动连接使得横杆420和立柱410之间安装拆卸简单、方便并且不存在生锈无法使用的缺陷。第一接头421的横截面为等腰梯形使得每对凸筋4112都是“八”字形,方便加工,并且使得第一接头421与凸筋4112之间的配合更稳定、牢固,避免发生滑脱。采用固定销430锁定使得固定结构易于拆卸,方便脚手架重复施工及运输。凸筋4112的数量设置成最少四对可满足前后左右四方的安装需求,便于脚手架稳定。在绑绳441的作用下,使得脚手架在搭建前固定销430不易丢失。其中凸筋4112与固定盘411之间为一体式结构而不采用焊接的原因是,由于焊接产生的焊缝凸起会使得第一接头421与凸筋4112之间配合不紧密,使得横杆420与立柱410之间容易发生晃动,降低脚手架40的稳定性。 During the scaffolding 40 installation process, the column 410 can be welded with steel pipes according to the height requirements, the cross bar 420 and the column 410 are fixed by the first joint 421 and the fixed plate 411, and the first joint 421 and the fixed plate 411 are fixed by the fixed pin 430 lock tight. Between the first joint 421 and the fixed plate 411, the fixed pin 430 is sequentially inserted into the fixed hole on the first joint 421 and the positioning hole 4113 on the fixed plate 411, so that the installation and disassembly between the cross bar 420 and the column 410 are simple, It is convenient and does not have the defect that rust cannot be used. The cross-section of the first joint 421 is isosceles trapezoidal so that each pair of ribs 4112 is in the shape of a "eight", which is convenient for processing, and makes the cooperation between the first joint 421 and the ribs 4112 more stable and firm to avoid slippage. Locking with the fixing pin 430 makes the fixing structure easy to disassemble, which facilitates repeated construction and transportation of the scaffold. The number of convex ribs 4112 is set to at least four pairs to meet the installation requirements of the front, rear, left, and right sides, which is convenient for the stability of the scaffold. Under the effect of the binding rope 441, the fixing pin 430 is not easy to be lost before the scaffold is erected. The reason why the rib 4112 and the fixed plate 411 are in an integrated structure without welding is that the weld bulge caused by welding will make the fit between the first joint 421 and the rib 4112 not tight, so that the cross bar 420 It is easy to shake between the column 410 and reduce the stability of the scaffold 40 .

为便于脚手架在施工平台60移动上,所述立柱410的底端设置有第一万向轮412,第一万向轮412与立柱410的底端活动连接。 In order to facilitate the movement of the scaffold on the construction platform 60 , the bottom end of the column 410 is provided with a first universal wheel 412 , and the first universal wheel 412 is movably connected with the bottom end of the column 410 .

为方便在脚手架40上攀登,如图11~13所示,所述脚手架40上还设置有斜梯450,并且为方便在行走,在每一层的横杆420上铺设钢板;斜梯450的上下两端分别设置有与横杆420相配和的卡勾452,卡勾452与斜梯450之间设置有第二接头451,第二接头451的一端与斜梯450固定连接,卡勾452的一侧设置有两个供螺栓穿过的弧形第三安装孔4521;所述第二接头451的另一端设置有与卡勾452与相配合的弧形调解部4511,调解部4511与第二接头451固定连接,调解部4511上设置有两个结构与第三安装孔4521相同的第四安装孔4512,卡勾452与第二接头451之间通过螺栓固定连接。 For the convenience of climbing on the scaffold 40, as shown in Figures 11 to 13, the scaffold 40 is also provided with an inclined ladder 450, and for the convenience of walking, a steel plate is laid on the cross bar 420 of each floor; The upper and lower ends are respectively provided with a hook 452 matching with the cross bar 420, a second joint 451 is arranged between the hook 452 and the inclined ladder 450, one end of the second joint 451 is fixedly connected with the inclined ladder 450, and the hook 452 One side is provided with two arc-shaped third mounting holes 4521 for bolts to pass through; the other end of the second joint 451 is provided with an arc-shaped mediation part 4511 that cooperates with the hook 452, and the mediation part 4511 and the second The joint 451 is fixedly connected, and the mediation part 4511 is provided with two fourth installation holes 4512 having the same structure as the third installation hole 4521 , and the hook 452 is fixedly connected to the second joint 451 by bolts.

根据不同的施工需求,脚手架40搭设的高度不同,因此脚手架40上每一层的横杆420的密度不同,为使得斜梯450与横杆420之间更好的卡合,卡勾452与横杆420之间的固定角度会随之变化。由于弧形第三安装孔4521和弧形的第四安装孔4512的作用,可根据实际需要对弧形调解部4511与卡勾452之间的角度进行调整,使得卡勾452与斜梯450之间的角度满足需求,再将螺栓穿过第三安装孔4521或第四安装孔4512,将卡勾452固定在第二接头451上,保证斜梯450能牢牢的挂在横杆420上,避免斜梯450在移动或者其他负重的情况下发生脱落,造成安全事故。 According to different construction requirements, the scaffolding 40 is erected at different heights, so the density of the crossbar 420 on each floor of the scaffolding 40 is different. The fixed angle between the rods 420 will change accordingly. Due to the effect of the arc-shaped third installation hole 4521 and the arc-shaped fourth installation hole 4512, the angle between the arc-shaped mediation part 4511 and the hook 452 can be adjusted according to actual needs, so that the angle between the hook 452 and the inclined ladder 450 meet the requirements, then pass the bolt through the third installation hole 4521 or the fourth installation hole 4512, and fix the hook 452 on the second joint 451 to ensure that the inclined ladder 450 can be firmly hung on the cross bar 420. Prevent the inclined ladder 450 from falling off when moving or other loads, causing safety accidents.

为方便在施工过程中移动地面上的施工平台60,所述施工平台60的底面设置有多个第二万向轮63,第二万向轮63与施工平台60的底面活动连接。当将施工平台60从电动升降平台20上拆卸下来时,第二万向轮63会与地面接触,在第二万向轮63的作用下,移动施工平台60将变得更为容易,省时省力。 For the convenience of moving the construction platform 60 on the ground during the construction process, the bottom surface of the construction platform 60 is provided with a plurality of second universal wheels 63 , and the second universal wheels 63 are movably connected with the bottom surface of the construction platform 60 . When the construction platform 60 is disassembled from the electric lifting platform 20, the second universal wheel 63 will be in contact with the ground, and under the action of the second universal wheel 63, moving the construction platform 60 will become easier and save time. Save effort.

所述施工架可用于从地面到顶部为27米的建筑中央大厅进行穹顶装饰及装潢工程,除了需要对建筑中央大厅的四面墙壁要做结构柱子的贴砖装修,另一面为还需要对墙面做浮雕装饰,该工程的一个非常重要的装修难点就是穹顶的采光棚要做装饰工程,从地面到穹顶的最底部近27米高,如果按传统的满堂架脚手架方案,所需搭建的脚手架用的钢管和钢板数量巨大,钢管和钢板的总重量最少有400吨重,并且搭设时间不低于3个月长,满足不了工期要求。而所述施工架上桁架立柱10、电动升降平台20、滑轨30、脚手架40、施工平台60等的总重量不超过150吨,不但节省原料,而且搭建时间快,而且桁架立柱10、电动升降平台20、脚手架40、施工平台60的搭建可同步进行,只需在后期再移动位置进行固定安装即可,一个月不到即可搭建好,大大缩减搭建时间。 The construction frame can be used for dome decoration and decoration works in the central hall of a building with a height of 27 meters from the ground to the top. In addition to the need to decorate the four walls of the central hall with bricks for the structural columns, the other side also needs to repair the wall. Relief decoration, a very important difficulty in the decoration of the project is that the lighting shed of the dome needs to be decorated. The height from the ground to the bottom of the dome is nearly 27 meters. The number of steel pipes and steel plates is huge, the total weight of steel pipes and steel plates is at least 400 tons, and the erection time is not less than 3 months, which cannot meet the construction period requirements. And the total weight of the truss column 10, electric lifting platform 20, slide rail 30, scaffolding 40, construction platform 60, etc. on the construction frame is not more than 150 tons, which not only saves raw materials, but also has a fast construction time, and the truss column 10, electric lifting The construction of the platform 20, scaffolding 40, and construction platform 60 can be carried out simultaneously, and only need to move the position for fixed installation in the later stage. The construction can be completed in less than a month, greatly reducing the construction time.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.

Claims (8)

1.用于高大空间施工的施工架,其特征在于:包括桁架机构和电动升降平台(20),桁架机构包括四根设置在墙角的桁架立柱(10),桁架立柱(10)的底端与地面固定连接,桁架立柱(10)上设置有多根第一附墙杆(11),桁架立柱(10)通过第一附墙杆(11)与墙面固定连接;电动升降平台(20)设置在桁架机构的两相对的侧边,电动升降平台(20)上设置有驱动电机(22),电动升降平台(20)的边沿设置有一圈第一围栏(21),第一围栏(21)与电动升降平台(20)固定连接,驱动电机(22)带动电动升降平台(20)沿着桁架立柱(10)限定的方向往复运动;所述电动升降平台(20)的中间设置有施工平台(60),施工平台(60)与电动升降平台(20)之间通过螺栓固定连接,施工平台(60)的边沿设置有一圈第二围栏(61),第二围栏(61)与施工平台(60)固定连接,施工平台(60)的上方设置有顶部带有台阶的脚手架(40),脚手架(40)的周围设置有多根钢丝绳(50),其中一部分的钢丝绳(50)将脚手架(40)固定在电动升降平台(20)上的第一围栏(21)上,剩余的钢丝绳(50)将脚手架(40)固定在施工平台(60)上的第二围栏(61)上;所述桁架机构的上方设置有滑轨(30)、多根连接杆(32)和多根第二附墙杆(33),滑轨(30)的端部与连接杆(32)的顶端固定连接,连接杆(32)的尾端通过第二附墙杆(33)与墙面固定连接,第二附墙杆(33)的中间部分通过螺栓与桁架立柱(10)的顶端固定连接,滑轨(30)上设置有多个相互独立的滑块(301),滑轨(30)的下方设置有与滑块(301)相配合的安全绳(31),安全绳(31)的顶端与滑块(301)固定连接,安全绳(31)的尾端与地面接触,安全绳(31)通过滑块(301)沿着滑轨(30)限定的方向运动。 1. The construction frame used for the construction of high and large spaces is characterized in that: it includes a truss mechanism and an electric lifting platform (20). The truss mechanism includes four truss columns (10) arranged at the corners of the wall. The ground is fixedly connected, and the truss column (10) is provided with a plurality of first wall-attached poles (11), and the truss column (10) is fixedly connected to the wall through the first wall-attached poles (11); the electric lifting platform (20) is set On the two opposite sides of the truss mechanism, the electric lifting platform (20) is provided with a drive motor (22), and the edge of the electric lifting platform (20) is provided with a circle of first fence (21), the first fence (21) and The electric lifting platform (20) is fixedly connected, and the driving motor (22) drives the electric lifting platform (20) to reciprocate along the direction defined by the truss column (10); the middle of the electric lifting platform (20) is provided with a construction platform (60 ), the construction platform (60) and the electric lifting platform (20) are fixedly connected by bolts, the edge of the construction platform (60) is provided with a second fence (61), the second fence (61) and the construction platform (60) Fixed connection, a scaffold (40) with a step on the top is arranged above the construction platform (60), and a plurality of steel wire ropes (50) are arranged around the scaffold (40), and part of the steel wire ropes (50) fix the scaffold (40) On the first fence (21) on the electric lifting platform (20), the remaining wire rope (50) fixes the scaffold (40) on the second fence (61) on the construction platform (60); A slide rail (30), a plurality of connecting rods (32) and a plurality of second wall attachment rods (33) are arranged on the top, and the end of the slide rail (30) is fixedly connected with the top of the connecting rod (32), and the connecting rod ( The tail end of 32) is fixedly connected to the wall through the second wall-attached rod (33), the middle part of the second wall-attached rod (33) is fixedly connected to the top of the truss column (10) by bolts, and the slide rail (30) A plurality of mutually independent sliding blocks (301) are arranged, and a safety rope (31) matched with the sliding block (301) is arranged under the sliding rail (30), and the top of the safety rope (31) and the sliding block (301) The connection is fixed, the tail end of the safety rope (31) is in contact with the ground, and the safety rope (31) moves along the direction defined by the slide rail (30) through the slider (301). 2.根据权利要求1所述的用于高大空间施工的施工架,其特征在于:所述桁架立柱(10)由多个单元框架(101)串联组成,相邻的单元框架(101)之间通过螺栓固定连接,单元框架(101)的一侧设置有与单元框架(101)相垂直的U形爬杆(102),爬杆(102)的开口端与单元框架(101)固定连接形成封闭结构。 2. The construction frame for high and large space construction according to claim 1, characterized in that: the truss column (10) is composed of a plurality of unit frames (101) connected in series, and the gap between adjacent unit frames (101) Connected by bolts, one side of the unit frame (101) is provided with a U-shaped climbing rod (102) perpendicular to the unit frame (101), and the opening end of the climbing rod (102) is fixedly connected with the unit frame (101) to form a closed structure. 3.根据权利要求1所述的用于高大空间施工的施工架,其特征在于:所述脚手架(40)包括多个竖直分布的立柱(410)和多个水平分布的横杆(420),立柱(410)和横杆(420)纵横交错形成三维网格状结构,横杆(420)的左右两侧分别设置有第一接头(421),第一接头(421)的横截面为等腰梯形,第一接头(421)与横杆(420)固定连接;所述立柱(410)上设置有多个固定盘(411),固定盘(411)的中央设置有第一安装孔(4111),立柱(410)穿过第一安装孔(4111)与固定盘(411)固定连接,固定盘(411)的上表面设置有最少四对与第一接头(421)相配合的凸筋(4112),凸筋(4112)对称分布在第一安装孔(4111)的周围;第一接头(421)与固定盘(411)之间设置有“7”形固定销(430),第一接头(421)上设置有与固定销(430)相配合且上下贯通的固定孔,每对凸筋(4112)之间设置有与固定销(430)相配合且上下贯通的定位孔(4113),第一接头(421)和固定盘(411)之间以固定销(430)依次插入第一接头(421)上的固定孔和固定盘(411)上的定位孔(4113)的方式活动连接。 3. The construction frame for high and large space construction according to claim 1, characterized in that: the scaffold (40) includes a plurality of vertically distributed columns (410) and a plurality of horizontally distributed cross bars (420) , the columns (410) and cross bars (420) criss-cross to form a three-dimensional grid-like structure, the left and right sides of the cross bar (420) are respectively provided with first joints (421), and the cross-section of the first joints (421) is equal to Waist trapezoidal, the first joint (421) is fixedly connected to the cross bar (420); the column (410) is provided with a plurality of fixed plates (411), and the center of the fixed plate (411) is provided with a first installation hole (4111 ), the column (410) passes through the first installation hole (4111) and is fixedly connected with the fixed plate (411), and the upper surface of the fixed plate (411) is provided with at least four pairs of convex ribs ( 4112), the convex ribs (4112) are symmetrically distributed around the first installation hole (4111); a "7"-shaped fixing pin (430) is arranged between the first joint (421) and the fixed plate (411), the first joint (421) is provided with a fixing hole that cooperates with the fixing pin (430) and penetrates up and down, and a positioning hole (4113) that cooperates with the fixing pin (430) and penetrates up and down is provided between each pair of convex ribs (4112). The first joint (421) and the fixed plate (411) are flexibly connected in a manner that a fixed pin (430) is sequentially inserted into a fixing hole on the first joint (421) and a positioning hole (4113) on the fixed plate (411). 4.根据权利要求3所述的一种便于拆卸安装的脚手架,其特征在于:所述固定盘(411)的上方设置有锁盘(440),锁盘(440)中央设置有第二安装孔(4401),立柱(410)穿过第二安装孔(4401)与锁盘(440)固定连接,锁盘(440)上还设置有最少四个锁孔(4402),锁孔(4402)对称分布在第二安装孔(4401)的周围;固定销(430)的尾端上设置有绑孔(431),锁盘(440)和固定销(430)之间设置有绑绳(441),绑绳(441)的一端穿过锁孔(4402)与锁盘(440)连接,绑绳(441)的另一端穿过绑孔(431)与固定销(430)连接。 4. A scaffold that is easy to disassemble and install according to claim 3, characterized in that: a lock plate (440) is provided above the fixed plate (411), and a second installation hole is provided in the center of the lock plate (440) (4401), the upright post (410) passes through the second installation hole (4401) and is fixedly connected with the lock plate (440), and there are at least four lock holes (4402) on the lock plate (440), and the lock holes (4402) are symmetrical Distributed around the second installation hole (4401); a binding hole (431) is provided on the tail end of the fixing pin (430), and a binding rope (441) is provided between the lock plate (440) and the fixing pin (430), One end of the binding rope (441) passes through the lock hole (4402) and is connected with the lock plate (440), and the other end of the binding rope (441) passes through the binding hole (431) and is connected with the fixing pin (430). 5.根据权利要求3所述的一种便于拆卸安装的脚手架,其特征在于:所述立柱(410)的底端设置有第一万向轮(412),第一万向轮(412)与立柱(410)的底端活动连接。 5. A scaffold that is easy to disassemble and install according to claim 3, characterized in that: the bottom end of the column (410) is provided with a first universal wheel (412), and the first universal wheel (412) and The bottom of the column (410) is flexibly connected. 6.根据权利要求3所述的用于高大空间施工的施工架,其特征在于:所述脚手架(40)上还设置有斜梯(450),斜梯(450)的上下两端分别设置有与横杆(420)相配和的卡勾(452),卡勾(452)与斜梯(450)之间设置有第二接头(451),第二接头(451)的一端与斜梯(450)固定连接,卡勾(452)的一侧设置有两个供螺栓穿过的弧形第三安装孔(4521);所述第二接头(451)的另一端设置有与卡勾(452)相配合的弧形调解部(4511),调解部(4511)与第二接头(451)固定连接,调解部(4511)上设置有两个结构与第三安装孔(4521)相同的第四安装孔(4512),卡勾(452)与第二接头(451)之间通过螺栓固定连接。 6. The construction frame for tall space construction according to claim 3, characterized in that: the scaffold (40) is also provided with an inclined ladder (450), and the upper and lower ends of the inclined ladder (450) are respectively provided with A hook (452) matched with the cross bar (420), a second joint (451) is arranged between the hook (452) and the inclined ladder (450), and one end of the second joint (451) is connected to the inclined ladder (450) ) is fixedly connected, one side of the hook (452) is provided with two arc-shaped third mounting holes (4521) for bolts to pass through; the other end of the second joint (451) is provided with a hook (452) The matching arc-shaped mediation part (4511), the mediation part (4511) is fixedly connected with the second joint (451), and the mediation part (4511) is provided with two fourth mounting holes with the same structure as the third mounting hole (4521). The hole (4512), the hook (452) and the second joint (451) are fixedly connected by bolts. 7.根据权利要求3所述的用于高大空间施工的施工架,其特征在于:所述凸筋(4112)与固定盘(411)之间为一体式结构。 7. The construction frame for construction in a large space according to claim 3, characterized in that: the convex rib (4112) and the fixed plate (411) are in an integrated structure. 8.根据权利要求1所述的用于高大空间施工的施工架,其特征在于:所述施工平台(60)的底面设置有多个第二万向轮(63),第二万向轮(63)与施工平台(60)的底面活动连接。 8. The construction frame for tall space construction according to claim 1, characterized in that: the bottom surface of the construction platform (60) is provided with a plurality of second universal wheels (63), the second universal wheels ( 63) It is movably connected with the bottom surface of the construction platform (60).
CN201610457301.6A 2016-06-23 2016-06-23 Scaffold for large space construction Expired - Fee Related CN105908960B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610457301.6A CN105908960B (en) 2016-06-23 2016-06-23 Scaffold for large space construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610457301.6A CN105908960B (en) 2016-06-23 2016-06-23 Scaffold for large space construction

Publications (2)

Publication Number Publication Date
CN105908960A true CN105908960A (en) 2016-08-31
CN105908960B CN105908960B (en) 2018-02-23

Family

ID=56758214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610457301.6A Expired - Fee Related CN105908960B (en) 2016-06-23 2016-06-23 Scaffold for large space construction

Country Status (1)

Country Link
CN (1) CN105908960B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724664A (en) * 2017-11-20 2018-02-23 北京城建亚泰建设集团有限公司 A kind of long and narrow working face foundation construction lift operating platform of deep basal pit
CN108412206A (en) * 2018-03-28 2018-08-17 中大建设股份有限公司 The construction method of truss operating platform suitable for large space construction
CN109162470A (en) * 2018-09-18 2019-01-08 安徽伟宏钢结构集团股份有限公司 A kind of main couple adjustable safety channel
CN111155788A (en) * 2018-11-07 2020-05-15 上海川勤建筑工程有限公司 House building pushing truss dismantling method
CN111706053A (en) * 2020-07-02 2020-09-25 中国十七冶集团有限公司 Be used for construction machinery and construction synchronous elevation structure
TWI758780B (en) * 2020-07-14 2022-03-21 傅仰立 Lifting frame assembly steps and device
CN121006883A (en) * 2025-10-28 2025-11-25 山西一建集团有限公司 A protective device for pitched roof construction and its usage method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2485069A1 (en) * 1980-06-03 1981-12-24 Baurep & Rekonstr Kom Veb Scaffolding structure with work platform - includes vertically movable platform carrying catches which releasably locate into guide rails
JP2006214095A (en) * 2005-02-01 2006-08-17 Alinco Inc Safety handrail
US20080236944A1 (en) * 2004-07-12 2008-10-02 Bruno Patron Platform Support Device For Lifting Loads Or Persons The Height Of A Structure
CN201506699U (en) * 2009-09-25 2010-06-16 北京星河模板脚手架工程有限公司 Electric lifting bridge rack for construction
CN102337782A (en) * 2010-07-27 2012-02-01 北京星河模板脚手架工程有限公司 Lift system for constructing truss platform on top of tall and large space and construction method for lift system
US20140102828A1 (en) * 2005-06-29 2014-04-17 Sky Climber, Llc Suspension platform system
CN206144124U (en) * 2016-06-23 2017-05-03 浙江森晟建设有限公司 A scaffold for construction of tall and big space

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2485069A1 (en) * 1980-06-03 1981-12-24 Baurep & Rekonstr Kom Veb Scaffolding structure with work platform - includes vertically movable platform carrying catches which releasably locate into guide rails
US20080236944A1 (en) * 2004-07-12 2008-10-02 Bruno Patron Platform Support Device For Lifting Loads Or Persons The Height Of A Structure
JP2006214095A (en) * 2005-02-01 2006-08-17 Alinco Inc Safety handrail
US20140102828A1 (en) * 2005-06-29 2014-04-17 Sky Climber, Llc Suspension platform system
CN201506699U (en) * 2009-09-25 2010-06-16 北京星河模板脚手架工程有限公司 Electric lifting bridge rack for construction
CN102337782A (en) * 2010-07-27 2012-02-01 北京星河模板脚手架工程有限公司 Lift system for constructing truss platform on top of tall and large space and construction method for lift system
CN206144124U (en) * 2016-06-23 2017-05-03 浙江森晟建设有限公司 A scaffold for construction of tall and big space

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724664A (en) * 2017-11-20 2018-02-23 北京城建亚泰建设集团有限公司 A kind of long and narrow working face foundation construction lift operating platform of deep basal pit
CN108412206A (en) * 2018-03-28 2018-08-17 中大建设股份有限公司 The construction method of truss operating platform suitable for large space construction
CN109162470A (en) * 2018-09-18 2019-01-08 安徽伟宏钢结构集团股份有限公司 A kind of main couple adjustable safety channel
CN111155788A (en) * 2018-11-07 2020-05-15 上海川勤建筑工程有限公司 House building pushing truss dismantling method
CN111706053A (en) * 2020-07-02 2020-09-25 中国十七冶集团有限公司 Be used for construction machinery and construction synchronous elevation structure
TWI758780B (en) * 2020-07-14 2022-03-21 傅仰立 Lifting frame assembly steps and device
CN121006883A (en) * 2025-10-28 2025-11-25 山西一建集团有限公司 A protective device for pitched roof construction and its usage method
CN121006883B (en) * 2025-10-28 2026-01-23 山西一建集团有限公司 A protective device for pitched roof construction and its usage method

Also Published As

Publication number Publication date
CN105908960B (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN105908960B (en) Scaffold for large space construction
CN103669832B (en) A kind of standard type Bailey bracket assembled jacking formwork system
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN103422663B (en) Attached lift scaffold
CN114412158A (en) Aluminum alloy-steel combined attached lifting scaffold and mounting method thereof
CN102134833B (en) Construction method for hoisting and disassembling bailey truss
CN116065809B (en) A new cloud-based construction factory support system and its operation process
CN106869421A (en) Assembled staircase structure and installation method thereof
CN106639303B (en) Elevator dedicated hydraulic creeping formwork frame body
CN104278830A (en) Integral combined scaffold
CN219604807U (en) Assembled turnover wallboard installation operation frame
CN207749818U (en) A kind of suspension type hanging basket for anti-lift-slb construction
CN217508096U (en) Easily install electric power circuit modularization crossing structure
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN116902740A (en) Prefabricated T-beam template hoisting auxiliary device and use method
CN215331380U (en) Rail type suspension platform
CN216276814U (en) Building machine walkway plate connecting assembly
CN202866277U (en) Cast-in-place concrete slab door type non-landing support formwork system
CN115584845A (en) A new type of mobile scaffolding for construction and its application method
CN115807533A (en) Self-elevating tower crane channel device with shaped guide rail
CN211421793U (en) A shaped steel operating platform
CN112376947A (en) Support frame capable of being adjusted in lifting mode and using method thereof
CN219823484U (en) Attached tower crane pedestrian passageway
CN207392709U (en) A kind of ladder cage formula combined scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cheng Xiaomin

Inventor after: Cheng Zhijun

Inventor after: Ying Jianfang

Inventor after: Fan Hongchao

Inventor after: Wu Yueding

Inventor after: Dai Jiaoyan

Inventor after: Yu Youbin

Inventor before: Cheng Xiaomin

Inventor before: Cheng Zhijun

Inventor before: Ying Jianfang

Inventor before: Wu Yueding

Inventor before: Dai Jiaoyan

Inventor before: Yu Youbin

TA01 Transfer of patent application right

Effective date of registration: 20171107

Address after: 315016 Zhejiang Province, Ningbo city Haishu District cypress Road No. 89

Applicant after: Ningbo University of Technology

Applicant after: ZHEJIANG SENSHENG CONSTRUCTION Co.,Ltd.

Address before: 315016 Ningbo Ningbo Cuibai District Road No. 89

Applicant before: Ningbo University of Technology

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 315016 Zhejiang Province, Ningbo city Haishu District cypress Road No. 89

Co-patentee after: Baihe Shenghua Construction Technology Co.,Ltd.

Patentee after: Ningbo University of Technology

Address before: 315016 Zhejiang Province, Ningbo city Haishu District cypress Road No. 89

Co-patentee before: ZHEJIANG SENSHENG CONSTRUCTION Co.,Ltd.

Patentee before: Ningbo University of Technology

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223