CN201506699U - Electric lifting bridge rack for construction - Google Patents
Electric lifting bridge rack for construction Download PDFInfo
- Publication number
- CN201506699U CN201506699U CN2009202229274U CN200920222927U CN201506699U CN 201506699 U CN201506699 U CN 201506699U CN 2009202229274 U CN2009202229274 U CN 2009202229274U CN 200920222927 U CN200920222927 U CN 200920222927U CN 201506699 U CN201506699 U CN 201506699U
- Authority
- CN
- China
- Prior art keywords
- span structure
- crane span
- construction
- base
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to construction work equipment, in particular to an electric lifting bridge rack for construction, which is characterized in that a base is included; an upright column is fixed on the base; a bridge rack cross beam is mounted on the upright column; and a motor driver device, a safety guardrail and a gang plank are arranged on the bridge rack cross beam. The utility model is designed aiming at defects in traditional construction scaffold and hanging basket, and has the characteristics of convenient installation, automatic lifting, flexible movement, simple operation and the like. The electric lifting bridge rack has the advantages of fast installation, automatic lifting, compact structure, aesthetic appearance, safety and fastness and extensive applicability, can be widely used in decoration and construction of buildings with various heights and other aloftwork, and can provide operators a safe and comfortable construction platform.
Description
Technical field
The utility model relates to construction implement, especially refers to a kind of electronic construction lifting crane span structure.
Background technology
Exterior wall finishing such as be used for curtain wall for high rise building, coating at present, build by laying bricks or stones.Preparation of construction mainly be to utilize fastener that steel pipe locking link is formed, do the scaffold of external wall construction with it because fastener is many, fastening wasting time and energy, labor strength height, but it is not high to set up efficient.Occurred some assembly scaffolds and hanging basket thus and be used for the outer finishing of skyscraper, compared original full set in brickwork scaffold, efficient increases, but has thereupon brought a lot of safety hazard, and falling accident happens occasionally.
The utility model content
This novel construction crane span structure is hand framves such as a kind of instead of steel, bamboo and wood pin, is used for the liftable support body of high-altitude construction, exterior wall finishing such as be particularly useful for curtain wall, coating, build by laying bricks or stones.Also can be used for other aloft work, exterior wall renovation, curtain wall cleaning and maintenance etc.
For achieving the above object, solution of the present utility model is: a kind of electronic construction lifting crane span structure is characterized in that: comprise base, be installed with column on the base, erection bridge crossbeam on the column, the crane span structure crossbeam is provided with motor driver, safety guide rail and foot plank;
Described base is provided with five supporting legs, and five supporting legs have four to be positioned over around the base, and one is placed on the base center;
Four wheels also is housed on the described base;
Also has a yielding rubber bumper on the described base.
This novel construction crane span structure designs at the deficiency of traditional construction scaffolding and hanging basket just, have easy for installation, can automatic lifting, move flexibly characteristics such as simple to operate.The electric up-down crane span structure has and installs fast, can automatic lifting, compact conformation, good looking appearance, safety firmly, applicability is wide, can be widely used in decoration construction and other aloft work of various height buildings.The operation platform of safety and comfort is provided for the operator.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the structural representation of the utility model base.
The specific embodiment
In order to make those skilled in the art person understand the present invention program better, the present invention is described in further detail below in conjunction with drawings and embodiments.
Shown in Fig. 1-2, a kind of electronic construction lifting crane span structure is characterized in that: comprise base 1, be installed with column 2 on the base 1, erection bridge crossbeam 3 on the column 2, crane span structure crossbeam 3 are provided with motor driver 31, safety guide rail 32 and foot plank 33; Described base 1 is provided with 11, five supporting legs 11 of five supporting legs has four to be positioned over around the base 1, and one is placed on base 1 center; On the described base 1 four wheels 12 is housed also; Also has a yielding rubber bumper 13 on the described base 1.
Before using the electric crane span structure, must be earlier by technical professional's scheme of designing and constructing, adjust load and each position stressing conditions of climbing frame, load and stressing conditions during checking computations are constructed.When building the electric up-down crane span structure, should organize special construction team and service technician, build in strict accordance with working specification and arrangement and method for construction.The extreme length that the electric up-down crane span structure uses twin columns to reach is 30.10m.The most often when only using single column reach 9.8 meters, certainly when do not need also can be by not installing some member when so long.The maximum load capacity of electronic crane span structure more its length is relevant, at installation phase, must think about required length of crane span structure and cooresponding with it bearing capacity.
Using its bearing area of electric up-down crane span structure must be the plane, as skyscraper podium is arranged, and can set up on the podium top board, but must do reinforcement measure.First segment column and motor driver just are installed on the base.Must carefully regulate the adjustable support leg at center when laying base, main stress point is concentrated on the centre leg, main its stabilization of all the other four supporting legs.Erection bridge crossbeam on column must begin to install electronic crane span structure at bottommost then, and approximately overhead 1.8m when crossbeam is installed, wants symmetry installation simultaneously in the column both sides, prevents that column from tilting.After treating that the crane span structure crossbeam installs, erection bridge stair on base can be spread foot plank then on the crane span structure crossbeam, and guardrail is installed by edge.Face width of electronic construction crane span structure itself is 1.3m, if the crane span structure width can consider to use telescopic girder on the crane span structure crossbeam to increase its width, the maximum tensible 0.95m of telescopic girder inadequately.If because of there being protrusion to make the crane span structure inboard when the wall distance surpasses 300mm on the wall, guardrail must be installed in the crane span structure inboard.Guardrail is inserted in the hole of telescopic girder, tightens with bolt.Can install the upper strata column additional then on the first segment column, column does not have the interval 6 meters the attached wall point must be arranged, and by attached wall frame and expansion bolt column is connected together with external wall.
Must note the symmetry installation in the electric up-down crane span structure installation process, can switch on behind the support body after to be installed the finishing and do trail run, check whether each parts of crane span structure and electric switch be normal.Do in strict accordance with the various operating sequences that this handbook requires.The electric up-down crane span structure can only be used to promote workmen and a small amount of material, can not be with using it for anything else.The electric up-down crane span structure has only under the on even keel and could use.Have only personnel could operate electronic crane span structure through training.Electronic construction lifting crane span structure is by base, column, and the crane span structure crossbeam, motor driver, safety guide rail, foot plank, crane span structure stair are formed.
Be a kind of lifting machinery by gear, rack driven, the very electric and machine security system of failure-free is arranged, it can raise voluntarily along with the rising of building, and crane span structure can extend or shorten as required.Electronic construction lifting crane span structure install, need not prefabricated basis when using, only need remove part column and attached wall when mobile, change operating location easily by the wheel of bottom.
The chassis that each crane span structure base all has a lead frame to make is used to disperse column to pass the load of coming by five supporting legs on the chassis.Five supporting legs have four to be positioned over around the crane span structure base, and one is placed on crane span structure base center, can make total more stable like this.Wherein Wai Ce four extensible supporting legs should be opened under the situation that single-column uses as far as possible, and the stability of the electronic crane span structure of single-column can be better like this.Four wheels also is housed on the base, can under the situation that need not break the construction crane span structure fully, moves on-site.In addition, on the crane span structure base, also have a yielding rubber bumper, in the time of can reducing the construction crane span structure and descend to the impact of base.
Column is the triangle lattice that is welded by square steel tube, tooth bar, reinforcing bar etc., and the height of standard knot is 1.5m, and vertical direction reaches specified altitude assignment by the high strength bolt connection of M20 * 80.Column is divided into standard column and spacing column, and spacing column is mainly used in bottommost and top.When the micro-switch on the actuator touches limiting stopper on the spacing column, stop automatically, prevent actuator collision base or run off column and cause danger.
The crane span structure crossbeam is the basis of forming construction lifting crane span structure driving surface, and it is the triangle lattice frame that is welded by three square steel tubes.Form by 1.5m and two kinds of different sizes of 1.0m, connect by bearing pin between them and form different length.
Motor driver is the engine installation of construction lifting crane span structure, can do vertical motion along column by the rotation of two electrical motors.Electrical motor has from brake gear, can be stuck on column actuator when outage.Electrical motor moves on the tooth bar of column by wheel word.
In addition, independently centrifugal anti-fall device has been installed all on each actuator, can under unexpected situation, have been embraced column when electronic crane span structure quickens to descend, prevented that electronic crane span structure from continuing down to fall.Each actuator is all led by 15 track adjusting wheels, steadily moves along column.Various sensors have been installed, auto-stop under dangerous situation on the actuator.Guardrail is the setting framework of welding, and sleeve is on the crane span structure crossbeam.Guardrail height 1.2m, the bottom is provided with foot guard plate.Length is divided two kinds, and is corresponding with the length of crane span structure crossbeam.
Foot plank is the shaping tool formula foot plank that punching sheet steel and steel frame are welded, and installs rapid, simple, firm.
The crane span structure stair are the tool-type stair that are welded, and are installed on the electric up-down crane span structure base, are the walking passages of electronic crane span structure up and down.
Though described the present invention by embodiment, those of ordinary skills know, the present invention has many distortion and variation and do not break away from spirit of the present invention, wish that appended claim comprises these distortion and variation and do not break away from spirit of the present invention.
Claims (4)
1. electronic construction lifting crane span structure is characterized in that: comprises base, is installed with column on the base, and erection bridge crossbeam on the column, the crane span structure crossbeam is provided with motor driver, safety guide rail and foot plank.
2. electronic construction lifting crane span structure as claimed in claim 1, it is characterized in that: described base is provided with five supporting legs, and five supporting legs have four to be positioned over around the base, and one is placed on the base center.
3. electronic construction lifting crane span structure as claimed in claim 1 is characterized in that: four wheels also is housed on the described base.
4. electronic construction lifting crane span structure as claimed in claim 1 is characterized in that: also have a yielding rubber bumper on the described base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202229274U CN201506699U (en) | 2009-09-25 | 2009-09-25 | Electric lifting bridge rack for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202229274U CN201506699U (en) | 2009-09-25 | 2009-09-25 | Electric lifting bridge rack for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201506699U true CN201506699U (en) | 2010-06-16 |
Family
ID=42467827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202229274U Expired - Fee Related CN201506699U (en) | 2009-09-25 | 2009-09-25 | Electric lifting bridge rack for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201506699U (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337782A (en) * | 2010-07-27 | 2012-02-01 | 北京星河模板脚手架工程有限公司 | Lift system for constructing truss platform on top of tall and large space and construction method for lift system |
CN102359282A (en) * | 2011-10-23 | 2012-02-22 | 陈永兴 | Wall building and painting device |
CN103382766A (en) * | 2013-07-30 | 2013-11-06 | 北京星河模板脚手架工程有限公司 | Electric construction platform |
CN103466504A (en) * | 2013-10-12 | 2013-12-25 | 江苏耀捷建设工程有限公司 | Novel lifting frame |
CN103741939A (en) * | 2013-12-25 | 2014-04-23 | 山东省建筑科学研究院 | Climbing type building construction operating platform on outer portion of building and installing method |
CN103979383A (en) * | 2014-04-29 | 2014-08-13 | 山东腾飞建设机械工程有限公司 | Multi-layer lifting platform for building construction |
CN104060810A (en) * | 2014-06-23 | 2014-09-24 | 北京星河模板脚手架工程有限公司 | Novel attached electric construction platform and mounting method for same |
CN105908960A (en) * | 2016-06-23 | 2016-08-31 | 宁波工程学院 | Construction rack for construction of high and large space |
CN106276549A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-stage two-layer single-column lifting working platform |
CN106276552A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-stage two-layer twin columns lifting working platform |
CN106276551A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-layer twin columns lifting working platform |
CN106276550A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-layer single-column lifting working platform |
CN107090983A (en) * | 2016-02-18 | 2017-08-25 | 左红 | The equipment that builds a house and its assemble method |
CN107191014A (en) * | 2017-05-09 | 2017-09-22 | 宁波洽丰休闲用品有限公司 | A kind of stage canopy |
CN112942797A (en) * | 2021-02-01 | 2021-06-11 | 上海金茂建筑装饰有限公司 | Construction platform installation method |
WO2024045333A1 (en) * | 2022-08-31 | 2024-03-07 | 中建三局科创产业发展有限公司 | Double-layer multifunctional combined guide frame climbing type working platform |
WO2024045332A1 (en) * | 2022-08-31 | 2024-03-07 | 中建三局科创产业发展有限公司 | Modular assembled guide frame climbing type working platform |
-
2009
- 2009-09-25 CN CN2009202229274U patent/CN201506699U/en not_active Expired - Fee Related
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337782B (en) * | 2010-07-27 | 2013-08-07 | 北京星河模板脚手架工程有限公司 | Lift system for constructing truss platform on top of tall and large space |
CN102337782A (en) * | 2010-07-27 | 2012-02-01 | 北京星河模板脚手架工程有限公司 | Lift system for constructing truss platform on top of tall and large space and construction method for lift system |
CN102359282A (en) * | 2011-10-23 | 2012-02-22 | 陈永兴 | Wall building and painting device |
CN103382766A (en) * | 2013-07-30 | 2013-11-06 | 北京星河模板脚手架工程有限公司 | Electric construction platform |
CN103466504A (en) * | 2013-10-12 | 2013-12-25 | 江苏耀捷建设工程有限公司 | Novel lifting frame |
CN103741939B (en) * | 2013-12-25 | 2015-10-21 | 山东省建筑科学研究院 | The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method |
CN103741939A (en) * | 2013-12-25 | 2014-04-23 | 山东省建筑科学研究院 | Climbing type building construction operating platform on outer portion of building and installing method |
CN103979383A (en) * | 2014-04-29 | 2014-08-13 | 山东腾飞建设机械工程有限公司 | Multi-layer lifting platform for building construction |
CN104060810B (en) * | 2014-06-23 | 2016-09-07 | 北京星河模板脚手架工程有限公司 | A kind of novel attached electric operation platform and installation method thereof |
CN104060810A (en) * | 2014-06-23 | 2014-09-24 | 北京星河模板脚手架工程有限公司 | Novel attached electric construction platform and mounting method for same |
CN106276549A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-stage two-layer single-column lifting working platform |
CN106276552A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-stage two-layer twin columns lifting working platform |
CN106276551A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-layer twin columns lifting working platform |
CN106276550A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-layer single-column lifting working platform |
CN107090983A (en) * | 2016-02-18 | 2017-08-25 | 左红 | The equipment that builds a house and its assemble method |
CN105908960A (en) * | 2016-06-23 | 2016-08-31 | 宁波工程学院 | Construction rack for construction of high and large space |
CN105908960B (en) * | 2016-06-23 | 2018-02-23 | 宁波工程学院 | Scaffold for large space construction |
CN107191014A (en) * | 2017-05-09 | 2017-09-22 | 宁波洽丰休闲用品有限公司 | A kind of stage canopy |
CN112942797A (en) * | 2021-02-01 | 2021-06-11 | 上海金茂建筑装饰有限公司 | Construction platform installation method |
WO2024045333A1 (en) * | 2022-08-31 | 2024-03-07 | 中建三局科创产业发展有限公司 | Double-layer multifunctional combined guide frame climbing type working platform |
WO2024045332A1 (en) * | 2022-08-31 | 2024-03-07 | 中建三局科创产业发展有限公司 | Modular assembled guide frame climbing type working platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201506699U (en) | Electric lifting bridge rack for construction | |
KR101654483B1 (en) | The building is equipped with safety scaffold equipment | |
CN211524016U (en) | Double-working-surface guide frame climbing type working platform and system | |
RU2011141929A (en) | MOBILE MODULAR SCAFFOLDING SYSTEM FOR CONSTRUCTION WORKS AND METHOD OF ITS INSTALLATION | |
GB2529470A (en) | Climbing screen support | |
KR20070005533A (en) | Gang form | |
CN101215928B (en) | Attached lifting scaffold trolley type inclining-proof device and method of use thereof | |
CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
CN205822747U (en) | Architectural engineering scaffold | |
CN102733586A (en) | Scaffold cart | |
CN213418443U (en) | Self-climbing type elevator shaft operation platform | |
KR200415037Y1 (en) | Gang Form Level Adjusting Apparatus for Guide Climbing System | |
CN209568688U (en) | A kind of elevating construction platform | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
EP2518239A1 (en) | A climbing head for hoisting a self-climbing protection system for construction works in buildings | |
JP3950800B2 (en) | Suspension scaffold | |
CN216196742U (en) | A wallboard installation device for position is striden to height | |
CN110005182A (en) | A kind of expanded type construction of lift well operation protective platform | |
CN205976412U (en) | Integrated platform of encorbelmenting of boundary beam formwork protection | |
KR100901016B1 (en) | Safety bracket to external wall scaffolding for a structure | |
CN111155754B (en) | Automatic elevator shaft jacking platform and using method thereof | |
CN210888010U (en) | Construction handling frame | |
CN206091253U (en) | Be suitable for irregular space's simple and easy steel bracket platform | |
CN207863427U (en) | T-beam scaffold | |
JPH0755777B2 (en) | Elevator installation method and installation work floor equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Beijing Galaxy Scaffolding & Formwork Engineering Co., Ltd. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Beijing Galaxy Scaffolding & Formwork Engineering Co., Ltd. Document name: Notification of Termination of Patent Right |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100616 Termination date: 20180925 |