CN106930531A - A kind of pull-up manomelia is encorbelmented the construction method of heavy frame - Google Patents

A kind of pull-up manomelia is encorbelmented the construction method of heavy frame Download PDF

Info

Publication number
CN106930531A
CN106930531A CN201710305684.XA CN201710305684A CN106930531A CN 106930531 A CN106930531 A CN 106930531A CN 201710305684 A CN201710305684 A CN 201710305684A CN 106930531 A CN106930531 A CN 106930531A
Authority
CN
China
Prior art keywords
manomelia
construction method
pull
encorbelmented
heavy frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710305684.XA
Other languages
Chinese (zh)
Inventor
隋海涛
刘嘉
隋海龙
杨涛
孙春娥
孟丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch filed Critical Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority to CN201710305684.XA priority Critical patent/CN106930531A/en
Publication of CN106930531A publication Critical patent/CN106930531A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

Encorbelmented the invention provides a kind of pull-up manomelia the construction method of heavy frame, comprising:Bolt hole is reserved when constructure body structure is in concreting, manomelia overhanging type steel is connected with constructure body structure using high-strength bolt, set up scaffold, hang up safety net, gaily decorated basket screw rod off-load, monitoring and maintenance during use are installed.Cause that heavy frame is mounted and dismounted using construction method of the invention more convenient, it is easy to construction, small is destroyed to building structure, building is not influenceed to build up the personnel at position or passing through for construction material transport, and there is provided a stress system for stabilization, improve stability, efficiency of construction and the safety coefficient of structure.

Description

A kind of pull-up manomelia is encorbelmented the construction method of heavy frame
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of pull-up manomelia is encorbelmented the construction method of heavy frame.
Background technology
In building field, with the fast development of building trade, high-rise, high-rise building is more and more.Built existing Build in construction, the heavy frame for carrying scaffold all coordinates to realize by Cantilever Beams and vertical rod.One end of Cantilever Beams is by anchor Gu it is on flooring and deeply indoor long, therefore destruction is produced to structure, also have impact on follow-up construction.In addition, each vertical A bar portion position piece cantilever steel girder of arrangement, particularly in stairs port and the rotation angle position of building, especially seems crisscross, shadow Ring these personnel for having built up position of building or that construction material is transported is current, there is potential safety hazard, in installation and removal Aspect is wasted time and energy, it is necessary to coordinated using tower crane, have impact on the efficiency and safety coefficient of construction.
The content of the invention
For the problem that prior art is present, encorbelmented it is an object of the invention to provide a kind of improved pull-up manomelia and held The construction method of power frame, it is more convenient that the construction method causes that heavy frame is mounted and dismounted, and is easy to construction, and building structure is destroyed It is small, do not influence building to build up the personnel at position or that construction material is transported is current, and receiving there is provided stabilization Power system, improves stability, efficiency of construction and the safety coefficient of structure.
To achieve the above object, the encorbelment construction method of heavy frame of pull-up manomelia of the invention is comprised the following steps:
1. bolt hole is reserved when constructure body structure is in concreting;
2. manomelia overhanging type steel is connected with constructure body structure using high-strength bolt;
3. scaffold is set up;
4. safety net is hanged up;
5. gaily decorated basket screw rod off-load is installed;
6. monitoring and maintenance during use.
Further, after 1. step reserves bolt hole, it is embedded in reserved bolt hole using coating steel pipe.
Further, before 2. step is implemented, also comprising step a:Manomelia overhanging type steel and steel plate are welded, Yi Jibu Rapid b:Bolt hole is made on steel plate.
Further, before 5. step is implemented, also comprising step c:Make gaily decorated basket screw rod.
Further, it is 2 bolts hole of making on steel plate in step b, bolt hole is slotted eye, 2 bolts hole Center spacing is 110mm, and the bore edges of each bolt hole are apart from the bolt hole of the distance between side of steel plate at least Size.
Further, gaily decorated basket screw rod includes 2 shanks of bolt, 3 reinforcing bars and 2 high-strength nuts, and 3 reinforcing bars are evenly distributed on On the excircle of high-strength nut, 2 shanks of bolt coordinate with 2 high-strength nuts respectively.
Further, the two ends of gaily decorated basket screw rod are welded with otic placode respectively, and welding uses the welding side of positive and negative 4 groove weldings Method.
Further, the inclination angle on gaily decorated basket screw rod and ground is in the range of 45 ° -65 °.
Further, high-strength bolt is tightened using double nut.
Further, construction method is applied to the special-shaped part of building.
Pull-up manomelia of the invention encorbelment heavy frame construction method it is simple, easy to operate, shorten construction period, there is provided One triangular shaped stable stress system, meets the construction demand of structural stability, and exhausted big in heavy frame Parts thereof can be removed in time after building structure is poured and finished, and repeated and utilized, and save material, reduce cost.
Brief description of the drawings
The present invention is made below in conjunction with the accompanying drawings further describe and illustrate.
Fig. 1 is that the pull-up manomelia for special-shaped part of first-selection implementation method of the invention is encorbelmented the schematic diagram of heavy frame.
Fig. 2 is that the encorbelment manomelia overhanging type steel inner end of heavy frame of pull-up manomelia is welded with the schematic diagram of steel plate in Fig. 1.
Fig. 3 is the left view of the manomelia overhanging type steel inner end in Fig. 2.
Fig. 4 is the schematic diagram that manomelia overhanging type steel inner end is fixed on constructure body structure.
Fig. 5 is the schematic diagram of gaily decorated basket screw rod.
Fig. 6 is the profile of the line A-A along Fig. 5.
Fig. 7 is the schematic diagram that the gaily decorated basket screw rod upper end in Fig. 5 is fixed in agent structure.
Fig. 8 is the schematic diagram that gaily decorated basket screw rod upper end in Fig. 5 is welded with otic placode.
Fig. 9 is the profile of the line B-B along Fig. 8.
Figure 10 is the schematic diagram that gaily decorated basket screw rod lower end in Fig. 5 is welded with otic placode.
Figure 11 is that the encorbelment manomelia overhanging type steel outer end of heavy frame of pull-up manomelia is welded with the signal of otic placode in Fig. 1 Figure.
Specific embodiment
As shown in figure 1, the pull-up manomelia of present invention first-selection implementation method is encorbelmented, heavy frame 100 is mainly encorbelmented comprising manomelia Shaped steel 1, steel plate 2, gaily decorated basket screw rod 3 and high-strength bolt 4.Pull-up manomelia heavy frame 100 of encorbelmenting passes through multiple high-strength bolts 4 and fixes To the agent structure 10 of building.
The pull-up manomelia of first-selection implementation method of the invention is encorbelmented the construction method of heavy frame, is comprised the following steps:
1. bolt hole is reserved when constructure body structure is in concreting;
2. manomelia overhanging type steel and steel plate are welded;
3. bolt hole is made on steel plate;
4. manomelia overhanging type steel is connected with agent structure using high-strength bolt;
5. scaffold is set up;
6. safety net is hanged up;
7. gaily decorated basket screw rod is made;
8. gaily decorated basket screw rod off-load is installed;
9. monitoring and maintenance during use.
Wherein step 2., 3., 7. in the component that is related to can in advance be got ready before construction, directly make in practice of construction With that is,:Manomelia overhanging type steel and steel plate are welded before construction, and bolt hole is made on steel plate, by gaily decorated basket spiral shell before construction Bar is made.
Below in conjunction with the accompanying drawings to above-mentioned construction method the step of, is described in detail.
Reserved bolt hole:
Before concreting, strictly audited by architectural working drawing and structural working drawing, using electronic composition Mode reserve bolt hole.Multiple bolt holes 11 are reserved with agent structure 10, for coordinating with high-strength bolt 4.Bolt hole 11 should be more slightly bigger than the diameter of high-strength bolt 4, and holding of being reserved using the steel pipes of Φ 25 in formwork and tried one's best is with layer hole to be provided center On a horizontal line.The coating steel pipe 12 of suitable diameter is embedded with bolt hole 11, template face is exposed at the two ends of coating steel pipe 12 It is no less than 50mm.After concrete placings are finished, coating steel pipe 12 can in time be removed, reused, therefore saved material, reduced Cost.In addition, coating steel pipe antirust, erosion-resisting effect, it can ensure in whole construction period, and coating steel pipe will not be by Rainwater etc. corrodes, to reach the purpose of recycling.
Manomelia overhanging type steel and steel plate are welded:
Specifically, as shown in Figure 1, 2, manomelia overhanging type steel 1 has inner end 1a and outer end 1b.Here, inner end 1a Refer to the one end connected near agent structure 10 and agent structure 10, outer end 1b refers to away from agent structure 10 and inner end 1a relative one end.As shown in Figure 2,3, the inner end 1a of manomelia overhanging type steel 1 and steel plate 2 company of fixation by way of welding Connect, outer end 1b is welded with otic placode 5.Ultrasonic testing is used to the inspection welded in the present invention.
Manomelia overhanging type steel 1 selects more than 16# I-steel, depth of section to be not less than 160mm.Steel plate 2 selects 12*200* 180 specifications.
Bolt hole is made on steel plate:
As shown in Figure 2,3,2 bolts hole 20 are provided with steel plate 2, bolt hole 20 is slotted eye, so, high-strength bolt 4 There is certain displacement in bolt hole 20, convenient construction personnel adjust the position of high-strength bolt 4.2 bolts hole 20 are located at together On one horizontal line, the centre distance of holes is 110mm.The bore edges of each bolt hole 20 are between the side of steel plate 2 At least one size of bolt hole of distance, can so ensure that steel plate 2 has enough intensity.A spiral shell is provided with otic placode 5 Keyhole 50.The diameter of bolt hole 20,50 is essentially identical with the diameter in reserved bolt hole 11.
Manomelia overhanging type steel is connected with agent structure using high-strength bolt:
As shown in figure 4, manomelia overhanging type steel 1 is connected in agent structure 10 by 2 high-strength bolts 4.2 high-strength bolts 4 are each passed through the bolt hole 11 in 2 bolts hole 20 and agent structure 10 on steel plate 2, then are tightened with double nut 7, so that Manomelia overhanging type steel 1 is fixed in agent structure 10.Here it is mutually locked using double nut, the effect of dual fail-safe is served, Prevent high-strength bolt 4 from loosening.High-strength bolt 4 uses M20,8.8 grades of high-strength bolts, bolt exposed length to be no less than 10mm.
Set up scaffold, hang up safety net:
Pull-up manomelia encorbelments heavy frame 100 also comprising scaffold 6 and safety net.Overhanging scaffold erection step pitch 1.8m, Vertical rod advance is not more than 1.5m, transfer 0.8m.Manomelia overhanging type steel 1 is set according to vertical rod advance, can in external corner and other positions 16# I-steel binding beam is laid on main Cantilever Beams uniformly to be laid to ensure vertical rod.Consider frame body safe and subsequent decorations Lines easy construction determines in scaffold vertical rod away from main wall spacing (not being preferably greater than 300mm).The outside often walked in builder's jack is equal If guardrail spacing 600mm high, i.e., often step sets twice.Railing and foot guard plate all should ride upon the inner side of outer vertical rod.Every section of builder's jack By floor in outrigger every layer of shield of all setting up defences between vertical rod and main body, protection is isolated into:Horizontal cross bar Inner chooses plus one layer of level peace The soft isolation (being located between interior vertical rod and wall) of the whole network.In shaped steel overhang layer and each intermediate floor chosen (i.e. three layer one sets) Completely 12 thick red templates of paving do hard isolation closing, and remaining often walks laying steel basketry piece.Foot guard plate is located at shaped steel overhang layer and each chooses Intermediate floor (i.e. three layer sets), the foot guard plate thick red template constructs of 12mm, 200mm high, the blue white paint of brush.Pacify in builder's jack outside The whole network is totally-enclosed, and string bag bottom is chosen with white, and material selection green is dust-proof, noise isolating fire retardant safety net.When suspension scaffold cantilever beam is set up, Must be provided with choosing net under operating surface.During using steel basketry scaffold board, vertical equity bar is fixed on transverse horizontal bar using right-angle coupler On.When vertical rod transfer is less than or equal to 800mm, the vertical equity steel pipe for often walking snapping on transverse horizontal bar should not be less than 3;When When vertical rod transfer is more than 800mm, the vertical equity steel pipe for often walking snapping on transverse horizontal bar is no less than 4.Outside suspension scaffold Facade bridging should continuously be set from bottom to top, per pass bridging width be no less than 4 across and no more than 7 across, and be no less than The inclination angle on 6m, brace and ground should be between 45 °~65 °.Wall-connecting piece uses two steps three across setting, using embedded steel tube on beam Form.Steel pipe specifications and models should meet calculating and code requirement.
Make gaily decorated basket screw rod:
As shown in Figure 5,6, gaily decorated basket screw rod 3 includes 2 shanks of bolt, 31,3 reinforcing bars 32, and 2 high-strength nuts 33.3 Reinforcing bar 32 is evenly distributed on the excircle of high-strength nut 33, and 2 shanks of bolt 31 coordinate with 2 high-strength nuts 33 respectively, and Stretch out from 2 high-strength nuts 33 respectively.Shank of bolt 31 uses A20 stay bolt bars, reinforcing bar 32 to use A14 reinforcing bars, high-strength spiral shell Female 33 use M50 nuts.
Gaily decorated basket screw rod off-load is installed:
As illustrated in figures 7-11, two free ends of shank of bolt 31 of gaily decorated basket screw rod 3 are welded with otic placode 34,35 respectively, and Positive and negative 4 groove weldings are used, this welding method has the advantage of uniform force.Bolt hole is formed respectively on otic placode 34,35 34a、35a.High-strength bolt 4 is placed through the bolt hole 34a on the otic placode 34 of the upper end of gaily decorated basket screw rod 3, and in agent structure 10 Bolt hole 11, then tightened using double nut 7, so as to the upper end of gaily decorated basket screw rod 3 is fixed in agent structure 10.High-strength bolt 4 are placed through the bolt hole 35a on the otic placode 35 of the lower end of gaily decorated basket screw rod 3, and positioned at the U of the outer end 1b of manomelia overhanging type steel 1 The upper bolt hole 50 of shape otic placode 5, then tightened using double nut 7, so as to the lower end of gaily decorated basket screw rod 3 be fixed with manomelia overhanging type steel 1 Connection.
As shown in figure 1, the upper and lower end of gaily decorated basket screw rod 3 is connected with agent structure 10 and manomelia overhanging type steel 1 respectively.The gaily decorated basket In screw rod 3 and the in the vertical direction of manomelia overhanging type steel 1 are generally aligned in the same plane, that is, gaily decorated basket screw rod 3, the and of manomelia overhanging type steel 1 The three of agent structure 10 constitutes a triangle, thus formed stabilization by Force system, improve the stability of structure. The inclination angle on the formation hypotenuse of gaily decorated basket screw rod 3, the hypotenuse and ground is in the range of 45 ° -65 °.
Monitoring and maintenance during use:
Encorbelmented after heavy frame sets up and finish in pull-up manomelia, organize management and the Party A's acceptance(check) can to throw by project management department Enter to use, Inspection and maintenance often should be carried out to support body in use.Check points for attention:Under general state, it is allowed to have Two operation layers are constructed simultaneously, and every layer of maximum construction loads is 3.0KN/m2.Support body must not overload and use, and must not use concentration lotus Carry.Support body can only be used as crosshead, must not be used as formwork-support.Answer emphasis to check that overhang layer each node is connected, shaped steel with Steel plate weld has free from flaw, and whether shaped steel loosens with agent structure junction bolt, and gaily decorated basket screw rod is connected with shaped steel and main body Whether place's bolt loosens, and whether double nut lacks.Inspection and maintenance is formulated special messenger and is responsible for, and at least checks once weekly, is formed written Process inspection record, pinpoints the problems and safeguard in time, rectification.
The encorbelment construction method of heavy frame of pull-up manomelia of the invention is mainly used in the special-shaped part of building, and this is different Shape position is, for example, the rotation angle position of building, stairs port etc..The interior space of special-shaped part is limited, and workmen can pass through The position.Traditional heavy frame, its shaped steel stretches into indoor more long, on the one hand to use shaped steel more long, on the other hand, destroys The interior space, hamper workmen and pass through;And construction method of the invention by shaped steel without stretching into interior, it is only necessary to use manomelia Shaped steel, manomelia shaped steel here eliminates 1.25 times of part of encorbelmenting for the shaped steel used in conventional art The anchorage part of length, and manomelia shaped steel of the invention is fixed on constructure body structure by high-strength bolt and gaily decorated basket screw rod On, therefore the destruction to building structure is reduced, the interior space is saved, and be easy to construct, improve efficiency of construction, meet The requirement of the energy-conserving and environment-protective that country advocates.
In addition, construction method of the invention saves material compared with conventional construction method, the duration is shortened, and drop Low cost.
Above-mentioned specific embodiment is only described to the preferred embodiment of the present invention, and not to guarantor of the invention Shield scope is defined.On the premise of design concept of the present invention and scope is not departed from, one of ordinary skill in the art According to word description provided by the present invention, accompanying drawing is to the various modifications done by technical scheme, replacement and improves, Protection category of the invention all should be belonged to.Protection scope of the present invention is determined by claim.

Claims (10)

1. a kind of pull-up manomelia is encorbelmented the construction method of heavy frame, it is characterised in that comprised the following steps:
1. bolt hole is reserved when constructure body structure is in concreting;
2. manomelia overhanging type steel is connected with constructure body structure using high-strength bolt;
3. scaffold is set up;
4. safety net is hanged up;
5. gaily decorated basket screw rod off-load is installed;
6. monitoring and maintenance during use.
2. pull-up manomelia as claimed in claim 1 is encorbelmented the construction method of heavy frame, it is characterised in that in the step 1. Behind reserved bolt hole, it is embedded in reserved bolt hole using coating steel pipe.
3. pull-up manomelia as claimed in claim 1 is encorbelmented the construction method of heavy frame, it is characterised in that in the step 2. Before implementation, also comprising step a:Manomelia overhanging type steel and steel plate are welded, and step b:Bolt hole is made on steel plate.
4. pull-up manomelia as claimed in claim 1 is encorbelmented the construction method of heavy frame, it is characterised in that in the step 5. Before implementation, also comprising step c:Make gaily decorated basket screw rod.
5. pull-up manomelia as claimed in claim 3 is encorbelmented the construction method of heavy frame, it is characterised in that the step b is 2 bolts hole are made on steel plate, the bolt hole is slotted eye, and 2 center spacing of bolt hole are 110mm, each spiral shell The bore edges of keyhole are at least a size for bolt hole apart from the distance between side of steel plate.
6. pull-up manomelia as claimed in claim 4 is encorbelmented the construction method of heavy frame, it is characterised in that the gaily decorated basket screw rod Comprising 2 shanks of bolt, 3 reinforcing bars and 2 high-strength nuts, 3 reinforcing bars are evenly distributed on the excircle of high-strength nut, 2 spiral shells Tightening latch coordinates with 2 high-strength nuts respectively.
7. pull-up manomelia as claimed in claim 6 is encorbelmented the construction method of heavy frame, it is characterised in that the gaily decorated basket screw rod Two ends respectively with otic placode weld, it is described welding using positive and negative 4 groove weldings welding method.
8. pull-up manomelia as claimed in claim 1 is encorbelmented the construction method of heavy frame, it is characterised in that the gaily decorated basket screw rod With the inclination angle on ground in the range of 45 ° -65 °.
9. pull-up manomelia as claimed in claim 1 is encorbelmented the construction method of heavy frame, it is characterised in that the high-strength bolt Tightened using double nut.
10. the pull-up manomelia as any one of claim 1-8 is encorbelmented the construction method of heavy frame, it is characterised in that The construction method is applied to the special-shaped part of building.
CN201710305684.XA 2017-05-03 2017-05-03 A kind of pull-up manomelia is encorbelmented the construction method of heavy frame Pending CN106930531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710305684.XA CN106930531A (en) 2017-05-03 2017-05-03 A kind of pull-up manomelia is encorbelmented the construction method of heavy frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710305684.XA CN106930531A (en) 2017-05-03 2017-05-03 A kind of pull-up manomelia is encorbelmented the construction method of heavy frame

Publications (1)

Publication Number Publication Date
CN106930531A true CN106930531A (en) 2017-07-07

Family

ID=59429821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710305684.XA Pending CN106930531A (en) 2017-05-03 2017-05-03 A kind of pull-up manomelia is encorbelmented the construction method of heavy frame

Country Status (1)

Country Link
CN (1) CN106930531A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331325A (en) * 2018-02-08 2018-07-27 中国二十冶集团有限公司 Builder's jack constructing device and method
CN109372239A (en) * 2018-10-30 2019-02-22 中国建筑第四工程局有限公司 A kind of basket type builder's jack
CN109555300A (en) * 2018-12-27 2019-04-02 上海建工二建集团有限公司 Overhanging scaffold
CN109853933A (en) * 2018-12-19 2019-06-07 中国建筑第四工程局有限公司 A kind of basket type builder's jack and its construction method
CN111764621A (en) * 2020-07-09 2020-10-13 王进 Overhanging scaffold and construction method
CN113916652A (en) * 2021-08-31 2022-01-11 中国建筑第四工程局有限公司 Test device and test method for detecting cantilever-bearing steel beam of scaffold

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201546435U (en) * 2009-11-11 2010-08-11 龙信建设集团有限公司 Bolted stayed cantilever scaffold

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201546435U (en) * 2009-11-11 2010-08-11 龙信建设集团有限公司 Bolted stayed cantilever scaffold

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331325A (en) * 2018-02-08 2018-07-27 中国二十冶集团有限公司 Builder's jack constructing device and method
CN109372239A (en) * 2018-10-30 2019-02-22 中国建筑第四工程局有限公司 A kind of basket type builder's jack
CN109853933A (en) * 2018-12-19 2019-06-07 中国建筑第四工程局有限公司 A kind of basket type builder's jack and its construction method
CN109555300A (en) * 2018-12-27 2019-04-02 上海建工二建集团有限公司 Overhanging scaffold
CN111764621A (en) * 2020-07-09 2020-10-13 王进 Overhanging scaffold and construction method
CN113916652A (en) * 2021-08-31 2022-01-11 中国建筑第四工程局有限公司 Test device and test method for detecting cantilever-bearing steel beam of scaffold

Similar Documents

Publication Publication Date Title
CN106930531A (en) A kind of pull-up manomelia is encorbelmented the construction method of heavy frame
CN206722378U (en) A kind of pull-up manomelia is encorbelmented heavy frame
CN105908960A (en) Construction rack for construction of high and large space
CN204163364U (en) A kind of elevator shaft formwork and operation steel platform
CN111472530A (en) Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof
CN108590147A (en) Assembling the shaped steel suspension scaffolding and its construction method
CN103993666A (en) Improved supporting system construction method suitable for large overhung outer floating plate roof
CN110821159A (en) Steel-structure large-span adjustable floor support plate supporting structure and construction method thereof
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN204626966U (en) A kind of deformation joint formwork erection device
CN203795842U (en) Ring-buckling and direct-inserting type steel pipe support
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN206722377U (en) A kind of external scaffolding drawknot node structure
CN104164889A (en) Demountable tower crane foundation
CN117862719A (en) Square pile foundation reinforcement cage manufacturing and installing construction method and equipment
CN117145043A (en) Assembled type corridor, corridor end connection structure and construction method
CN211447712U (en) I-shaped steel beam overhanging scaffold for open caisson
CN212743447U (en) Reinforced structure that building structure is firm anti collapsing
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN111608376B (en) Comprehensive construction method for shaping component
CN114059656A (en) Large-span suspension type steel reinforced concrete multi-layer combined corridor integrated construction method
CN211341606U (en) Operating platform for structural light well part
CN204098519U (en) Do not register one's residence balcony rapid reinforcement structure in old community
CN112227690A (en) Clamping plate type outer frame-free construction platform for prefabricated building and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Meng Lijuan

Inventor after: Liu Jia

Inventor after: Sui Hailong

Inventor after: Yang Tao

Inventor after: Sun Chune

Inventor after: Sui Haitao

Inventor after: Xia Jinxia

Inventor after: Tian Xiao

Inventor before: Sui Haitao

Inventor before: Liu Jia

Inventor before: Sui Hailong

Inventor before: Yang Tao

Inventor before: Sun Chune

Inventor before: Meng Lijuan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180111

Address after: 450003, Henan, Zhengzhou Jinshui District Garden Road West, agricultural road south 6, 1 units, 22, 2207

Applicant after: The Second Construction Company Of China Construction Second Engineering Bureau

Address before: 210000 Jiangsu city of Nanjing Province along the Yangtze River Industrial Development Zone geguan Road No. 815

Applicant before: China Construction two Bureau Second Construction Engineering Co., Ltd. Huadong branch

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170707