CN202081639U - Steel truss tool type supporting structure for concrete framework industrial building templates - Google Patents
Steel truss tool type supporting structure for concrete framework industrial building templates Download PDFInfo
- Publication number
- CN202081639U CN202081639U CN2011201689827U CN201120168982U CN202081639U CN 202081639 U CN202081639 U CN 202081639U CN 2011201689827 U CN2011201689827 U CN 2011201689827U CN 201120168982 U CN201120168982 U CN 201120168982U CN 202081639 U CN202081639 U CN 202081639U
- Authority
- CN
- China
- Prior art keywords
- support
- truss
- ground
- tool type
- steel truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 13
- 239000010959 steel Substances 0.000 title claims abstract description 13
- 239000004567 concrete Substances 0.000 title claims abstract description 9
- 239000000463 material Substances 0.000 abstract description 5
- 230000002411 adverse Effects 0.000 abstract 1
- 238000009415 formwork Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A steel truss tool type supporting structure for concrete framework industrial building templates is characterized in that a secondary truss support is arranged on a top chord node of a main truss; a main truss support is arranged on a support headframe node; and a support mast support is arranged on a bearing platform foundation. In the utility model, as support headframe upright posts are arranged on the surface of the bearing platform foundation, the problem of foundation bearing capacity is avoided, and drop waist of the beam caused by support subsidence is fundamentally avoided; as the main truss can be assembled on the ground and then be hoisted in place through a tower crane, the efficiency is greatly improved; the steel truss in tool type assembly can be used repeatedly to save material, and especially for structures with big storey height, massive scaffold pipes or batten supports are saved, so that rather considerable economic benefits are achieved; as a plurality of operations are conducted on the ground, adverse factors of work high above the ground are reduced; and besides safety nets can be hung fully below the truss, thereby providing insurance for dropping at the high place and reducing the safety risk.
Description
Technical field
The utility model relates to a kind of supporting form of concrete frame industrial premises form bracing system construction.
Background technology
Construct the at present template supporting form of concrete frame of Building Trade in China mainly contains: steel pipe scaffold supports, i.e. the support of main framework beam slab is the support system that constitutes with steel pipe scaffold; Wood supports: promptly the support of main framework beam slab is the support system that constitutes with flitch or rod; Tool-typed formwork: mainly be to fly modular form, generally be used for high-rise residential houses more.The problem of support system existence at present is as follows:
1, Question of Ground Bearing Capacity
The first floor of general concrete frame all is a backfill, maximum load capacity 10kn/m
2, press scaffold standard and template rules, when the ground under the rack rod is checked, take advantage of 0.4 coefficient, so bearing capacity of foundation soil only can be by 4kn/m
2Consider, this is still by the up-to-standard consideration of backfill, the general industry concrete frame is very big from the load that vertical rod descends, therefore need to fill up the sizable rigidity backing plate of area under the vertical rod, the scene is difficult to meet the demands, template supports depression and causes the excessive situation of Vierendeel girder amount of deflection to happen occasionally, and does not have good measure to prevent.
2, steel pipe scaffold technological problems
Steel pipe scaffold also exists in the construction of several problems and is difficult to hold: the one, when the cross bar load-bearing,, just can not use when big beam section because the fastener maximum can be born the load of 800kg, and significant limitation is arranged; The 2nd, fastener manual operations during scaffold building, stubborn tightness can't check that certain risk is arranged.
3, material consumption is more long in time limit
No matter the material that consumes of steel scaffold support system or wooden support system is very big, especially at the bigger framework of floor height, needs material many, and what take is long in time limit.
The utility model content
The purpose of this utility model provide a kind of safely, save time, economic, easy-operating steel truss tool-typed formwork braced structures.
For achieving the above object, the utility model provides a kind of steel truss tool-type concrete frame industrial premises template braced structures, it is characterized in that: the jack truss bearing is on main couple winds up node, and the main couple bearing is supporting on the derrick node, supports mast support on the cushion cap basis.
Therefore the utility model does not exist Question of Ground Bearing Capacity owing to support the derrick column at the cushion cap surface of base, has fundamentally stopped to support " waist collapses " of the beam that sinks to causing; Because main couple can be right in the ground group, tower crane hoisted in position then, effect significantly improves; Because steel truss is that the tool-type group is right, can be repeatedly used, save material, especially the big structure of floor height has been saved a large amount of scaffold tube or flitch and has been supported, and appreciable economic benefit is arranged; Because Ground Operation is many, reduced the unfavorable factor of work high above the ground, can completely hang safety net under the truss in addition, high falling is played safety guarantee, reduced security risk.
Description of drawings
Fig. 1 is the arrangement figure of primary and secondary truss;
Fig. 2 is the sectional view along A-A line among Fig. 1;
Fig. 3 is the sectional view along B-B line among Fig. 1.
The specific embodiment
With reference to Fig. 1, Fig. 2, at first according to the length and width on factory building span and cushion cap basis 4, regulate 3,2 of primary and secondary truss and set up the span size, basic with cushion cap again for holding the power face, set up and support derrick 5, primary and secondary truss 3,2.Jack truss 2 bearings are on main couple 3 winds up node, and main couple 3 bearings are supporting on derrick 5 nodes, support mast support on cushion cap basis 4.So stressed transmission can guarantee that braced structures do not sink, and utilizes adjustable bolt 9 to regulate the absolute altitude of main couples, so that satisfy the Vierendeel girder formwork.The top mark height of support derrick column and the main couple lower edge absolute altitude discrepancy in elevation are less than 400mm.(it is 400mm that adjustable bolt can be adjusted spacing).Adjustable bolt is installed to support derrick column top, and adjusts absolute altitude on request.The plan-position of jack truss determines, is as the criterion with the plan-position of secondary beam, and each Pin jack truss of both sides, a secondary beam center, spacing is not more than 1.2 meters.Special big secondary beam can be considered with three Pin jack truss.Satisfying under the above-mentioned requirements prerequisite, the jack truss bearing is as far as possible near the main couple node that winds up.Jack truss is tied up its bearing on the main couple node with No. 8 iron wires with tower crane list product lifting, back in place.Per pass primary and secondary beam 7,6 both sides respectively are provided with a truss structure (according to load, 3 truss structures also can be arranged in parallel in Vierendeel girder bottom and Vierendeel girder both sides), and the spacing of per pass girder both sides main couple is identical with the width that supports the derrick column.Support derrick 5 and industrial premises framework reinforced concrete post 1 usefulness scaffold 8 are fixing, increase the stability that supports derrick.
With reference to Fig. 3, after supporting derrick and primary and secondary truss and setting up,, increase resistance to overturning supporting between derrick with scaffold building overturning or slip resistance analysis support system, backfill will be rammed and be filled out and lay backing plate 10 under the scaffold upright rod, prevents to sink.
Claims (1)
1. steel truss tool-type concrete frame industrial premises template braced structures is characterized in that: the jack truss bearing is on main couple winds up node, and the main couple bearing is supporting on the derrick node, supports mast support on the cushion cap basis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201689827U CN202081639U (en) | 2011-05-25 | 2011-05-25 | Steel truss tool type supporting structure for concrete framework industrial building templates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201689827U CN202081639U (en) | 2011-05-25 | 2011-05-25 | Steel truss tool type supporting structure for concrete framework industrial building templates |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202081639U true CN202081639U (en) | 2011-12-21 |
Family
ID=45342275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201689827U Expired - Lifetime CN202081639U (en) | 2011-05-25 | 2011-05-25 | Steel truss tool type supporting structure for concrete framework industrial building templates |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202081639U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296806A (en) * | 2011-05-25 | 2011-12-28 | 中油吉林化建工程有限公司 | Industrial plant template support structure for steel truss tool type concrete framework |
CN102758520A (en) * | 2012-07-13 | 2012-10-31 | 天津二十冶建设有限公司 | First level of scaffold during freezing and thawing period of soil body and building method |
-
2011
- 2011-05-25 CN CN2011201689827U patent/CN202081639U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296806A (en) * | 2011-05-25 | 2011-12-28 | 中油吉林化建工程有限公司 | Industrial plant template support structure for steel truss tool type concrete framework |
CN102758520A (en) * | 2012-07-13 | 2012-10-31 | 天津二十冶建设有限公司 | First level of scaffold during freezing and thawing period of soil body and building method |
CN102758520B (en) * | 2012-07-13 | 2015-03-11 | 天津二十冶建设有限公司 | First level of scaffold during freezing and thawing period of soil body and building method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022142999A1 (en) | Hoisting device for bridge water surface pile tie beam and construction method therefor | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN211447708U (en) | Super high-rise building construction elevator feeding platform support system that encorbelments | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN210764005U (en) | Walking type small electric elevator suitable for transferring materials between floors by reverse construction method | |
CN202081639U (en) | Steel truss tool type supporting structure for concrete framework industrial building templates | |
CN102094524B (en) | Construction method of high-altitude large-span beam-slab template steel support system | |
CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
CN208168317U (en) | A kind of lower extension platform of high-altitude construction | |
CN212866793U (en) | Assembled construction elevator stops layer platform | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN202090577U (en) | Template supporting construction platform for lift wells in high-rise buildings | |
CN205777531U (en) | Floor slab construction beam string shuttering supporting equipment | |
CN101694127A (en) | Formwork support system for steel frame structure cast-in-place concrete floorslabs | |
CN201158932Y (en) | Self-chucking platform especially for high-rise building elevator shaft formwork supports | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN102296806A (en) | Industrial plant template support structure for steel truss tool type concrete framework | |
CN201915614U (en) | Integral electric climbing frame suitable for shear wall structure | |
CN205955165U (en) | Elevator shaft operation platform | |
CN109441088B (en) | Steel structure operation platform for super high-rise building core tube construction | |
CN204754150U (en) | Disc type node scaffolding | |
CN211057829U (en) | Fixed maintenance platform of formula relief well is encorbelmented to counter weight antitorque type | |
CN209742334U (en) | Steel structure corridor bottom curtain wall construction platform | |
CN113605659A (en) | Elevator shaft tool type safe operation platform and construction method thereof | |
CN201053199Y (en) | Large template pylon |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20111221 |