CN102758520A - First level of scaffold during freezing and thawing period of soil body and building method - Google Patents

First level of scaffold during freezing and thawing period of soil body and building method Download PDF

Info

Publication number
CN102758520A
CN102758520A CN2012102436444A CN201210243644A CN102758520A CN 102758520 A CN102758520 A CN 102758520A CN 2012102436444 A CN2012102436444 A CN 2012102436444A CN 201210243644 A CN201210243644 A CN 201210243644A CN 102758520 A CN102758520 A CN 102758520A
Authority
CN
China
Prior art keywords
bar
floor
vertical rod
soil body
springboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102436444A
Other languages
Chinese (zh)
Other versions
CN102758520B (en
Inventor
吕立军
刘双权
马云
鄢峰
黄占成
薛有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN201210243644.4A priority Critical patent/CN102758520B/en
Publication of CN102758520A publication Critical patent/CN102758520A/en
Application granted granted Critical
Publication of CN102758520B publication Critical patent/CN102758520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Ladders (AREA)

Abstract

The invention discloses a first level of a support scaffold during the freezing and thawing period of a soil body and a building method. The first level of the scaffold comprises a horizontal rod and more than two vertical rods which are fixedly crossed with the horizontal rod; a wood springboard is arranged between the two vertical rods; a bottom horizontal rod is fixed at the lower end of one side of each vertical rod; and a wood wedge is arranged between the bottom horizontal rod and the wood springboard. The building method comprises the following steps of: building the horizontal rod and the vertical rods on the backfilled soil body according to the convention; constructing a platform reinforcing steel bar project and a template project; paving the wood springboard in a gap between the two vertical rods, wherein the wood springboard and the vertical rods are tightly arranged; arranging the bottom horizontal rod on one side of each of the vertical rod; fixing the bottom horizontal rod and the vertical rods in a connection way of double fasteners; plugging the wood wedge into the middle of the outer side of the fixed bottom horizontal rod and the wood springboard; and arranging the top head on the outer side of the wood wedge, wherein the top head nails a steel nail on the wood springboard and is used for preventing the wood wedge from moving.

Description

First floor scaffold and erection method between a kind of soil body thawing period
Technical field
The present invention relates to a kind of construction techniques, especially relate to the erection method of first floor support scaffolding between a kind of soil body thawing period.
Background technology
In the construction work, the support scaffolding construction is a large amount of to be existed, and the scaffold building method is basic identical.But for setting up of first floor scaffold, common way is the wood springboard in the vertical rod lower berth in the prior art, sets up vertical rod and cross bar then, sets up sweep the floor bar and bridging at last.But because first floor scaffold bottom is the soil body, between soil body thawing period, for traditional erection method, still scaffold upright rod sinking situation can often occur, more serious meeting causes the scaffold cave-in accident.
Summary of the invention
The technical problem that the present invention will solve is to overcome above-mentioned deficiency of the prior art; Provide a kind of scaffold that solves owing to the scaffold sinking problem that soil body freeze thawing causes, prevent first floor support scaffolding structure and erection method between a kind of soil body thawing period of generation of scaffold cave-in accident.
The technical scheme of scaffold of the present invention is: comprise horizon bar and intersect the vertical rod more than 2 that fixedly installs with horizon bar; Be provided with wooden springboard between the said vertical rod; The bottom of said vertical rod one side is fixed with the bar of sweeping the floor, and said sweeping the floor is provided with timber wedge between bar and the wooden springboard.
First floor scaffold building method between a kind of soil body thawing period of the present invention comprises the steps:
The first step. the soil body in backfill is set up horizon bar, vertical rod aspect conventional;
Second step was carried out the construction of platform reinforced bar engineering and form work engineering;
The 3rd step was laid wooden springboard between the vertical rod space, said wooden springboard and vertical rod are closely to be provided with;
The 4th step is then at a side setting of the vertical rod bar of sweeping the floor, the company that pair fasteners are adopted in said sweep the floor bar and vertical rod
The mode of connecing is fixed;
Fill in timber wedge between the outside of the 5th bar of sweeping the floor of step after fixing and the wooden springboard;
The 6th step, moved in order to prevent timber wedge for steel nail is followed closely on wooden springboard said top in timber wedge arranged outside top.
The height that the bar of sweeping the floor in the said step 4 is provided with is in wooden springboard epithelium position.
The invention has the beneficial effects as follows:
1. when setting up scaffold horizon bar, vertical rod, need not to fill up springboard below the vertical rod, the bar of sweeping the floor wouldn't be established; Upper brace reinforced bar engineering and form work engineering normal construction, its load is less during owing to platform reinforced bar engineering, template construction, and the scaffold settling amount is minimum; Can ignore, wait to build the top concrete before, between scaffold, lay wooden springboard; Establish the bar of sweeping the floor then, the bar of sweeping the floor is close to wooden springboard as far as possible, will shift to an earlier date ready-made timber wedge at last and fill in wooden springboard and sweep the floor between the bar; The top is done with steel nail respectively in the timber wedge outside, moves in order to prevent timber wedge.Therefore, the method is taked the springboard of scaffold and the bar of sweeping the floor is being built preceding setting, does not have influence so construction period soil body freeze thawing is carried final scaffold.
2. the enforcement of this method is become vertical rod and is swept the floor the common bearing load of bar by the vertical rod bearing load of former prior art.
3. method is simple, can use in the building field large-scale popularization.
Description of drawings
Fig. 1 is the work progress flow chart.
Fig. 2 builds forward foot in a step hand to put up the type design sketch.
Fig. 3 is Fig. 2 scaffold position of joints structure for amplifying sketch map.
Reference numeral: 1 horizon bar, 2 vertical rods, 3 wooden springboards 4 bar 5 timber wedges of sweeping the floor
The specific embodiment
In order further to understand the present invention, specify the structure and the embodiment of technical scheme of the present invention below in conjunction with accompanying drawing:
In conjunction with Fig. 1, Fig. 2, shown in Figure 3; First floor scaffold comprises horizon bar 1 and intersects the vertical rod more than 22 that fixedly installs with horizon bar 1 between soil body thawing period of the present invention; Be provided with wooden springboard 3 between the said vertical rod 2; The bottom of said vertical rod 2 one sides is fixed with the bar 4 of sweeping the floor, and said sweeping the floor is provided with timber wedge 4 between bar 4 and the wooden springboard 3.
First floor scaffold building method step is between a kind of soil body thawing period of the present invention: at first. the soil body in backfill is set up horizon bar, vertical rod aspect conventional; It is scaffold; Because of the scaffold upper load that horizon bar, vertical rod constitute less, therefore little to the influence between soil body thawing period.After having set up horizon bar, vertical rod, can normally carry out the construction of platform reinforced bar engineering and form work engineering; Wooden springboard is laid in space between vertical rod and vertical rod then, requires wooden springboard and vertical rod close as far as possible during laying, promptly closely is provided with; Then in a side of vertical rod root, the horizontally set bar of sweeping the floor, the height that the said bar of sweeping the floor is provided with should be in wooden springboard epithelium position, and the fixed form of its sweep the floor bar and vertical rod then adopts the connected mode of pair fasteners to fix; After fixing, between the outside of the bar of sweeping the floor and wooden springboard, the top is set, timber wedge is promptly filled in described top, with steel nail timber wedge is followed closely on wooden springboard then, moves in order to prevent timber wedge.
The present invention is because sweep the floor bar and wooden springboard are provided with facing when building, and in whole construction course, soil body freeze thawing is minimum to the scaffold influence, so prevented the scaffold sinking effectively.

Claims (3)

1. first floor scaffold building structure between a soil body thawing period; Comprise horizon bar and intersect the vertical rod more than 2 that fixedly installs with horizon bar; It is characterized in that; Be provided with wooden springboard between the said vertical rod, the bottom of said vertical rod one side is fixed with the bar of sweeping the floor, and said sweeping the floor is provided with timber wedge between bar and the wooden springboard.
2. first floor scaffold building method between a soil body thawing period is characterized in that, comprises the steps:
The first step. the soil body in backfill is set up horizon bar, vertical rod aspect conventional;
Second step was carried out the construction of platform reinforced bar engineering and form work engineering;
The 3rd step was laid wooden springboard between the vertical rod space, said wooden springboard and vertical rod are closely to be provided with;
The 4th step, the said bar of sweeping the floor adopted the connected mode of pair fasteners to fix with vertical rod then at a side setting of the vertical rod bar of sweeping the floor;
Fill in timber wedge between the outside of the 5th bar of sweeping the floor of step after fixing and the wooden springboard;
The 6th step, moved in order to prevent timber wedge for steel nail is followed closely on wooden springboard said top in timber wedge arranged outside top.
3. first floor scaffold building method between a kind of soil body thawing period according to claim 2 is characterized in that, the height that the bar of sweeping the floor in the said step 4 is provided with is in wooden springboard epithelium position.
CN201210243644.4A 2012-07-13 2012-07-13 First level of scaffold during freezing and thawing period of soil body and building method Active CN102758520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210243644.4A CN102758520B (en) 2012-07-13 2012-07-13 First level of scaffold during freezing and thawing period of soil body and building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210243644.4A CN102758520B (en) 2012-07-13 2012-07-13 First level of scaffold during freezing and thawing period of soil body and building method

Publications (2)

Publication Number Publication Date
CN102758520A true CN102758520A (en) 2012-10-31
CN102758520B CN102758520B (en) 2015-03-11

Family

ID=47053150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210243644.4A Active CN102758520B (en) 2012-07-13 2012-07-13 First level of scaffold during freezing and thawing period of soil body and building method

Country Status (1)

Country Link
CN (1) CN102758520B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715043A (en) * 2016-01-29 2016-06-29 中国建筑第八工程局有限公司 Formwork reinforcement system and construction method for high-formwork-support small-angle fair-faced slope
CN106013750A (en) * 2016-07-07 2016-10-12 山东枣建建设集团有限公司 Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3818083A (en) * 1968-11-04 1974-06-18 Hambro Structural Systems Ltd Building method
US5022490A (en) * 1990-02-06 1991-06-11 Bil-Jax, Inc. Safety base for scaffolding
RU2143533C1 (en) * 1994-11-11 1999-12-27 Краузе-Верк Гмбх Унд Ко. Кг Work platform for construction scaffolding
CN201802060U (en) * 2010-09-14 2011-04-20 营口城华架体制造有限公司 Novel scaffold
CN202081639U (en) * 2011-05-25 2011-12-21 中油吉林化建工程有限公司 Steel truss tool type supporting structure for concrete framework industrial building templates

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3818083A (en) * 1968-11-04 1974-06-18 Hambro Structural Systems Ltd Building method
US5022490A (en) * 1990-02-06 1991-06-11 Bil-Jax, Inc. Safety base for scaffolding
RU2143533C1 (en) * 1994-11-11 1999-12-27 Краузе-Верк Гмбх Унд Ко. Кг Work platform for construction scaffolding
CN201802060U (en) * 2010-09-14 2011-04-20 营口城华架体制造有限公司 Novel scaffold
CN202081639U (en) * 2011-05-25 2011-12-21 中油吉林化建工程有限公司 Steel truss tool type supporting structure for concrete framework industrial building templates

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
喻琪: "脚手架及其防护", 《建筑安全》 *
安渊: "高层建筑双排双立杆脚手架设计", 《内蒙古科技与经济》 *
翟羽飞: "扣件式钢管脚手架基础、连墙件搭设常见问题及预防对策", 《建筑安全》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715043A (en) * 2016-01-29 2016-06-29 中国建筑第八工程局有限公司 Formwork reinforcement system and construction method for high-formwork-support small-angle fair-faced slope
CN106013750A (en) * 2016-07-07 2016-10-12 山东枣建建设集团有限公司 Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof

Also Published As

Publication number Publication date
CN102758520B (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN111411993A (en) Large-section tunnel supporting system penetrating through huge karst cave hall and construction method
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN103437567A (en) Method for supporting existing building underground added storey through original pile foundations
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN207229131U (en) A kind of precipitous broken formation tunnel portal section supporting construction
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN104878835A (en) Strip-shaped foundation house rear basement structure
CN105133856A (en) Method for integrally displacing building by utilizing assembly trailer
CN102864796B (en) Construction spreading foundation adaptive to filled ground settlement and construction method
CN112854813A (en) Profile steel tray structure for ancient building translation and underpinning method
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN103726613A (en) Novel fabricated concrete column
CN110593080A (en) Inter-support trestle system combined with inner support system and construction method
CN107761759B (en) L-shaped concrete retaining wall
CN204690763U (en) Long side slope protection concrete continuous fast pouring drawing-die system
CN102758520B (en) First level of scaffold during freezing and thawing period of soil body and building method
CN205839721U (en) A kind of novel offshore platform
CN203702164U (en) Subsurface excavation tunnel top bracing device adopting lifting jacks for movable support
CN211646413U (en) Modular lattice steel frame shotcrete anchor supporting construction
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN103669976A (en) Ancient pagoda correction
CN203755171U (en) Bridge back-pulling bearing construction support
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 300301 Dongli District, flawless Street Jintang Highway Bridge No. ten

Patentee after: MCC TIANGONG GROUP TIANJIN CO., LTD.

Address before: 300301 Dongli District, Tianjin, Tianjin twenty Metallurgical Construction Co., Ltd.

Patentee before: Tianjin MCC20 Construction Co., Ltd.