CN201802060U - Novel scaffold - Google Patents
Novel scaffold Download PDFInfo
- Publication number
- CN201802060U CN201802060U CN2010205271327U CN201020527132U CN201802060U CN 201802060 U CN201802060 U CN 201802060U CN 2010205271327 U CN2010205271327 U CN 2010205271327U CN 201020527132 U CN201020527132 U CN 201020527132U CN 201802060 U CN201802060 U CN 201802060U
- Authority
- CN
- China
- Prior art keywords
- handle
- hook
- socket
- pillar
- safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
A novel scaffold comprises supporting columns. The supporting columns are provided with sockets and wall coupling free fasteners, two ends of each cross draw bar are respectively mounted on the sockets on the supporting columns, two ends of each diagonal draw bar are provided with diagonal draw bar hooks, the diagonal draw bar hooks are mounted and fixed in the sockets via safety pins, two ends of an access board are connected with the cross draw bars via hooks and safety sliders, and two ends of stairs are respectively connected with the cross draw bars via hooks and safety sliders. The novel scaffold is reasonable in structure, firm in connection, durable in use and high in safety.
Description
Technical field:
The utility model relates to the scaffold that a kind of novel building operations is used.
Background technology:
At present the scaffold that uses in the building operations building site is transverse tube and vertical tube right-angled intersection mostly, is fixed together by fixing card connection then, and such connected mode time is normal, and becoming flexible will appear in the position of connection, has very big potential safety hazard; Springboard on the scaffold adopts common steel or plank to build, and ability to bear is not enough, of long duration danger will occur, and springboard and crossbeam do not have tie point; Often report also on TV and the newspaper that these years the accident that scaffold collapses appears in the job site, very big injures and deaths are all arranged at every turn.
Summary of the invention:
The purpose of this utility model provides a kind of new type scaffold, and it is rational in infrastructure, is connected firmly, and is durable in use, safe.
Technical scheme: new type scaffold, it comprises pillar; Described pillar is provided with socket and the connection wall freely blocks, and the two ends of horizontal handle are installed in respectively on the socket of pillar, and the two ends of slant handle are provided with the slant handle hook, and the slant handle hook is fixed in the socket by safety plug; The two ends of springboard are connected with horizontal handle with the insurance slide plate by hook, and the two ends of stair are connected with horizontal handle with the insurance slide plate by hook.
Described pillar is provided with and turns to dual card.
The beneficial effects of the utility model, new type scaffold, pillar is provided with socket, and the shape of socket is trapezoidal, and is wide at the top and narrow at the bottom; The two ends of horizontal handle are installed in respectively on the socket of pillar, and such connected mode makes that being connected of pillar and horizontal handle is firm more heavily more; The two ends of slant handle are provided with the hook of shaking hands up and down, and handle is hooked on the stanchion socket, safety plug is fixed in the socket again, makes support body finish the triangle point fixed body; The two ends of springboard are connected with horizontal handle with the insurance slide plate by hook, and such connection makes springboard be fixed on firmly on the horizontal handle, loosening phenomenon can not occur, better protection constructor; Stair are set, and convenient construction personnel walk about up and down; Setting turns to dual card, and it can build some platforms, stage, shelf or little corner temporarily, and can change the angle of pipe fitting; Adopt to connect the wall Connection Card that freely stretches, it can be connected and fixed by expansion bolt pre-buried on the body of wall and body of wall.
Description of drawings:
Fig. 1: be structural representation of the present utility model;
Fig. 2: be the left view of Fig. 1;
Fig. 3: be the A enlarged drawing.
The specific embodiment:
As Figure 1-3, a kind of new type scaffold, pillar 1 are provided with socket 3, turn to dual card 11 and connection wall freely to block 12, and the shape of socket 3 is trapezoidal, and is wide at the top and narrow at the bottom; The two ends of horizontal handle 2 are installed in respectively on the socket 3 of pillar 1, and the two ends of slant handle 5 are provided with slant handle hook 9, and slant handle hook 9 is fixed in the socket 3 by safety plug 10; The two ends of springboard 6 are connected with horizontal handle 2 with insurance slide plate 8 by hook 7, and the two ends of stair 4 are connected with horizontal handle 2 with insurance slide plate 8 by hook 7.
Claims (2)
1. new type scaffold, it comprises pillar; It is characterized in that: described pillar is provided with socket and the connection wall freely blocks, and the two ends of horizontal handle are installed in respectively on the socket of pillar, and the two ends of slant handle are provided with the slant handle hook, and the slant handle hook is fixed in the socket by safety plug; The two ends of springboard are connected with horizontal handle with the insurance slide plate by hook, and the two ends of stair are connected with horizontal handle with the insurance slide plate by hook.
2. new type scaffold according to claim 1 is characterized in that: described pillar is provided with and turns to dual card.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205271327U CN201802060U (en) | 2010-09-14 | 2010-09-14 | Novel scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205271327U CN201802060U (en) | 2010-09-14 | 2010-09-14 | Novel scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201802060U true CN201802060U (en) | 2011-04-20 |
Family
ID=43871568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205271327U Expired - Fee Related CN201802060U (en) | 2010-09-14 | 2010-09-14 | Novel scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201802060U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758520A (en) * | 2012-07-13 | 2012-10-31 | 天津二十冶建设有限公司 | First level of scaffold during freezing and thawing period of soil body and building method |
GB2508797A (en) * | 2012-10-05 | 2014-06-18 | Advant Ltd | Temporary staircase |
CN110761550A (en) * | 2019-10-31 | 2020-02-07 | 上海森大机械制造有限公司 | Flat socket support, scaffold and flat socket support machining process |
-
2010
- 2010-09-14 CN CN2010205271327U patent/CN201802060U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758520A (en) * | 2012-07-13 | 2012-10-31 | 天津二十冶建设有限公司 | First level of scaffold during freezing and thawing period of soil body and building method |
CN102758520B (en) * | 2012-07-13 | 2015-03-11 | 天津二十冶建设有限公司 | First level of scaffold during freezing and thawing period of soil body and building method |
GB2508797A (en) * | 2012-10-05 | 2014-06-18 | Advant Ltd | Temporary staircase |
GB2508797B (en) * | 2012-10-05 | 2018-02-07 | Advanté Ltd | Self contained staircase |
CN110761550A (en) * | 2019-10-31 | 2020-02-07 | 上海森大机械制造有限公司 | Flat socket support, scaffold and flat socket support machining process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203783102U (en) | Outward extending type movable scaffold | |
CN201802060U (en) | Novel scaffold | |
CN110700538A (en) | Building scaffold convenient to dismouting | |
CN208454342U (en) | A kind of safety of tower crane platform and standard knot install conjoined device | |
CN202866311U (en) | Construction stair protective barrier and veering connecting device | |
CN204876515U (en) | External construction handling frame | |
CN203834906U (en) | Triangular operation platform used for capital construction slope face | |
CN204826727U (en) | Reinforcing bar processing protection canopy that can dismantle, has enough to meet need | |
CN205476399U (en) | Install scaffold on steel construction | |
CN204940916U (en) | A kind of Super High Core Walls Structure emergency escape passage | |
CN204326565U (en) | Face frontier defense guardrail | |
CN204370828U (en) | Tool-type protective screening | |
CN204038917U (en) | Detachable external hanging type operating platform | |
CN203238934U (en) | Cross connector for all-round scaffold jack | |
CN201786013U (en) | Reusable anchor member for cantilever scaffold | |
CN205224571U (en) | Anchor of builder's jack | |
CN204531234U (en) | A kind of easy-to-mount tool type stairs | |
CN202187551U (en) | Stable supporting system for high girder template | |
CN211201374U (en) | Building construction rail guard | |
CN202707074U (en) | Lining trolley | |
CN203797592U (en) | Movable assembled type engineering lighting table | |
CN202745452U (en) | Mold support device using foundation slab to reserved rebars | |
CN220725771U (en) | A plurality of design operation frames of establishing on aluminium mould back of body is stupefied | |
CN210066500U (en) | Movable type inter-bridge safety channel for double-width bridge construction | |
CN202990384U (en) | Assembly platform capable being combined freely |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110420 Termination date: 20120914 |