CN205476399U - Install scaffold on steel construction - Google Patents
Install scaffold on steel construction Download PDFInfo
- Publication number
- CN205476399U CN205476399U CN201620217954.2U CN201620217954U CN205476399U CN 205476399 U CN205476399 U CN 205476399U CN 201620217954 U CN201620217954 U CN 201620217954U CN 205476399 U CN205476399 U CN 205476399U
- Authority
- CN
- China
- Prior art keywords
- steel construction
- scaffold
- steel
- construction
- cross bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 92
- 239000010959 steel Substances 0.000 title claims abstract description 92
- 238000010276 construction Methods 0.000 title claims abstract description 91
- 230000001681 protective effect Effects 0.000 claims description 11
- 239000007787 solid Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 2
- 230000008878 coupling Effects 0.000 abstract 1
- 238000010168 coupling process Methods 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides an install scaffold on steel construction, include: operation platform, protection frame, erect in operation platform, and bearing structure, support in between operation platform and the steel construction, bearing structure includes: transversely be fixed in steel construction and relative many dead levers that set up, will the dead lever is fixed in the U type splint on the steel construction, the bottom of U type splint is equipped with the confession the first perforation that the dead lever was worn to establish, a lateral part of U type splint is equipped with and supplies the bolt to wear to establish fixed second perforation, and the rigid coupling in the dead lever with support piece between the operation platform. Through the splintage of U type on the building steel structure of required construction, operation platform is last to be equipped with the protection frame, increases the security of workman's construction, makes the utility model relates to an it is strong that install scaffold on steel construction has all transsexuals, easily the installation with dismantle, repeatedly usable accords with green construction theory and resources conservation.
Description
Technical field
This utility model relates to building engineering field, particularly relates to a kind of construction being installed on steel construction
Frame.
Background technology
Along with a series of encouragement of China and the appearance in succession supporting development energy-saving building measure, steel construction
Engineering is increasingly paid attention to by market, and particularly industrial building, civilian high-rise building is tied with new-type bridge
The fields such as structure, structural steelwork obtains market especially and warmly pursues.But during steel construction on-site consolidation,
Most operations are high-rise working, have the biggest danger.Therefore, how to carry out eminence to make
The security protection of industry personnel becomes an emphasis of Construction of Steel Structure safety management.Existing structural steelwork
In the suspension type cage that commonly uses be not easy to personnel and move in the scope of operation, in the transfer of each setting and enter
Bigger potential safety hazard is there is also during going out cage.The crosshead that this patent uses and protective equipment one
Change be fixed on steel construction self component, after setting up scaffold board formed have protective equipment operation put down
Platform, substantially increases working security and work efficiency.Meanwhile, this patent guard rail is same
Standardised configuration, has low cost, revolving feature strong, convenient to assemble and disassemble, by engineering practice,
Receive good effect.
Utility model content
In view of the foregoing, it would be desirable to provide a kind of when heavy construction is constructed, be arranged on steel construction
The operation platform gone up and be easily installed and dismantle is to facilitate the construction of skyscraper.
For achieving the above object, this utility model adopts the technical scheme that:
A kind of scaffold being installed on steel construction, including: operating platform;Protective frame, is set up in institute
State operating platform;And supporting construction, it is supported between described operating platform and steel construction, described
Support structure includes: be fastened transversely to described steel construction and the many fixing bars being oppositely arranged;By described solid
The U-shaped clamping plate that fixed pole is fixed on steel construction, the bottom of described U-shaped clamping plate is provided with for described fixing
The first perforation that bar wears, a sidepiece of described U-shaped clamping plate is provided with and wears fixing second wear for bolt
Hole;And it is fixed in the support member between described fixing bar and described operating platform.
The beneficial effects of the utility model are, on the one hand, operating platform of the present utility model connects to be had
Supporting construction, and by U-shaped Boards wall on the construction steel structure of required construction;Another
Aspect, operating platform is provided with protective frame, increases the safety of workman's construction so that this utility model
A kind of scaffold being installed on steel construction have revolving by force, it is easy to install and dismantle, repeatable make
With, meet green construction theory and resources conservation.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described behaviour
Include as platform: the many cross bars being oppositely arranged;And it is layed in the sole on described cross bar.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described foot
The mode using steel wire lashing between plate and described cross bar is fixed together;Or weld on described cross bar
Limited location muscle, forms frame-type structure between described limit rib and described cross bar, described sole is fixing to be plugged
In described frame-type structure.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described anti-
Retaining frame includes the vertical fender rod being vertically welded on described cross bar two ends, and is connected to adjacent described
Horizontal fender rod between vertical fender rod.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described perpendicular
Being provided with clamping part to fender rod, described horizontal fender rod is provided with the portion of plugging, described in the portion of plugging be inserted in institute
State clamping part.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described
Support member includes: be vertically connected to the perpendicular support between described fixing bar and described cross bar;And oblique company
It is connected on the bearing diagonal between described fixing bar and described cross bar.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described anti-
Enclose in retaining frame and be provided with steel wire rope.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described U
The described second perforation inwall of type clamping plate is provided with screw thread.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described U
The nut fixing for described bolt it is circumscribed with at described second perforation of type clamping plate.
Further improvement is that of a kind of scaffold being installed on steel construction of this utility model, described steel
Structure includes steel I-beam, and described fixing bar passes through described U-shaped Boards wall in described steel I-beam
Top flange plate.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of scaffold being installed on steel construction of this utility model.
Fig. 2 is the front view of a kind of scaffold being installed on steel construction of this utility model.
Fig. 3 is the U-shaped clamp region signal of a kind of scaffold being installed on steel construction of this utility model
Figure.
Detailed description of the invention
For the benefit of the understanding to structure of the present utility model, says below in conjunction with drawings and Examples
Bright.
Refer to Fig. 1, Fig. 1 and show a kind of scaffold being installed on steel construction of this utility model
Structural representation.This utility model provides a kind of scaffold being installed on steel construction, it is intended to Yu Xie
Certainly during large-scale steel structure construction, the scaffold peace of workman's construction tears the inconvenient peace existed with construction open
Full hidden danger.For reaching above-mentioned purpose, a kind of scaffold being installed on steel construction of this utility model includes:
Operating platform 1;Protective frame 2, is set up in described operating platform 1;And supporting construction 3, even
Being connected to described operating platform 1 and be supported on steel construction 4, supporting construction 3 includes: be oppositely arranged
Fixing bar 31;The U-shaped clamping plate 33 that fixing bar 31 is fixed on steel construction 4, the end of U-shaped clamping plate
Portion is provided with the first perforation 331 worn for fixing bar 31, and the sidepiece of U-shaped clamping plate 33 is provided with for bolt
The second fixing perforation 332;And it is fixed in the support member 32 on fixing bar 31.
Hereinafter said modules is described in detail:
The operating platform 1 used in construction, also wants foot while structural strength to be met is big
Enough is light, the installation of convenient construction personnel.As it is shown in figure 1, operating platform 1 includes being oppositely arranged
Cross bar 11, and be layed in the sole 12 on the cross bar 11 being oppositely arranged, it is preferable that cross bar 11
For square steel tube, sole 12 is plank.As shown in Figure 1, cross bar 11 is provided with limit rib 13, limit
Forming a frame-type structure between position muscle 13 and cross bar 11, sole 12 plugs and is fixed on frame-type knot
In structure, the connected mode of sole 12 and cross bar 11 is in addition to described by Fig. 1, and sole 12 also may be used
Directly it is fixed on the cross bar 11 being oppositely arranged in the way of by wire binding.
Refer to Fig. 2, Fig. 2 and show a kind of scaffold being installed on steel construction of this utility model
Front view, in order to reduce potential safety hazard when workmen constructs on operating platform 1, operating platform
The 1 added protective frame 2 that is provided with, protective frame 2 includes the vertical fender rod being vertically welded in cross bar 11 two ends
21, vertical fender rod is provided with clamping part 211;And be connected between adjacent vertical fender rod 21
Horizontal fender rod 22, horizontal fender rod 22 is provided with the portion of plugging 221.Preferably, vertically protect
It is relatively light that bar 21 and horizontal fender rod 22 are quality, and the steel pipe that intensity is bigger plugs portion 221
For being welded on the reinforcing bar on vertical fender rod 22 straight down.Vertical fender rod 21 and horizontal fender rod
The effect of 22 is to prevent workmen from dropping to outside operating platform 1, so, vertical fender rod 21
Height and the demand of length organization of human body to be met of horizontal fender rod 22, through multiple authentication,
Protection height is optimal for 1.2m.
In order to further improve safety, convenient construction personnel construct, and reduce potential safety hazard, anti-
Retaining frame 2 be all around provided with steel wire rope 23, steel wire rope 23 colligation is on vertical fender rod 21, except this
Outside, it is also possible to WELD NUTS on vertical fender rod 21 again, facilitate the colligation of steel wire rope 23 and enclosing to set,
Technical staff should be as limit.In order to meet human design, steel wire rope 23 is apart from operating platform 1
Height should be about the waist of average person, height be about 70cm be optimal.
A kind of scaffold being installed on steel construction of this utility model is to be installed on large-scale by operating platform 1
On the steel construction of building, as it is shown in figure 1, operating platform 1 is fixed on steel construction by supporting construction 3
On 4.Supporting construction includes;The fixing bar 31 being oppositely arranged;It is fixed on described fixing bar 31
Support member 32;The U-shaped clamping plate 33 that described fixing bar 31 is fixed on steel construction 4, it is preferable that
U-shaped clamping plate 33 use U-shaped steel plate.
It is preferred that steel construction 4 includes steel I-beam, the flange plate of steel I-beam leads to fixing bar 31
Cross U-shaped clamping plate 33 to be fixed together.
Refer to Fig. 3, Fig. 3 and show a kind of scaffold being installed on steel construction of this utility model
U-shaped clamp region schematic diagram.Wear as it is shown on figure 3, the bottom of U-shaped clamping plate 33 is provided with for fixing bar
If the first perforation 331, the sidepiece of U-shaped clamping plate 33 is provided with second perforation 332 fixing for bolt,
The inwall of the second perforation 332 is provided with screw thread, is spirally connected for bolt fixing, and U-shaped clamping plate 33 sandwiched lives steel
Structural fin listrium 4 and fixing bar 31 so that U-shaped clamping plate 33, steel construction 4, fixing bar 31 pass through
The extruding of bolt forms a stable structure.It is preferred that the second perforation 332 of U-shaped clamping plate 33
Place's connection has a nut 333 so that bolt is through nut 333 and the second perforation 332, the most solid
It is scheduled on U-shaped clamping plate 33, when conveniently tightening screw rod, fixing bar 31 is applied pressure.
Support member 32 act as support operating platform 1, and make operating platform 1 be connected to support knot
Structure 3, then and be fixed on steel construction 4, support member 32 include vertically being welded on fixing bar 31 and
The perpendicular support being connected on operating platform 1;And according to triangle, there is the principle of stability and arrange
Oblique be connected to fixing bearing diagonal between bar 31 and operating platform 1.Preferably, perpendicular support and
Bearing diagonal uses relatively light, the steel pipe that intensity is bigger.
For convenience of describing, in the case of being now I-steel for steel construction, this utility model one is installed
The practical operation of the scaffold on steel construction is:
According to practice of construction place, after making this utility model, this utility model is placed on required
Carry out, on the I-steel flange plate constructed, making U-shaped clamping plate according to the thickness of I-steel flange plate
33, by fixing bar 31 through the first perforation 331 of U-shaped clamping plate 33, and allow U-shaped clamping plate 33
Both sides are resisted against on flange plate and the fixing bar 31 of I-steel 4 respectively, are then using bolt precession
Second perforation 332 so that bolt forms a pressure to I-steel 4 and fixing bar 31 so that U
Type clamping plate 33 sandwiched lives I-steel flange plate and fixing bar 31, forms a stable structure, thus
Play fixation, by that analogy, make in the same way fixing bar 31 to be carried out with steel construction 4
Many places are fixed.
The beneficial effects of the utility model are, on the one hand, operating platform of the present utility model connects to be had
Supporting construction, and by U-shaped Boards wall on the construction steel structure of required construction;On the other hand,
Operating platform is provided with protective frame, increases the safety of workman's construction so that this utility model one is pacified
The scaffold being loaded on steel construction have revolving by force, it is easy to install and dismantle, reusable, symbol
Close green construction theory and resources conservation.
Above in association with accompanying drawing embodiment, this utility model is described in detail, common skill in this area
This utility model can be made multiple change by art personnel according to the above description.Thus, do not violating this reality
On the premise of novel claim objective, some details in embodiment should not be constituted this practicality
Novel restriction, this utility model by the scope that defines using appended claims as protection domain.
Claims (10)
1. the scaffold being installed on steel construction, it is characterised in that including:
Operating platform;
Protective frame, is set up in described operating platform;And
Supporting construction, is supported between described operating platform and steel construction, and described supporting construction includes:
It is fastened transversely to described steel construction and the many fixing bars being oppositely arranged;Described fixing bar is fixed on steel
U-shaped clamping plate in structure, the bottom of described U-shaped clamping plate is provided with first worn for described fixing bar
Perforation, a sidepiece of described U-shaped clamping plate is provided with and wears the second fixing perforation for bolt;And it is affixed
Support member between described fixing bar and described operating platform.
The scaffold being installed on steel construction the most according to claim 1, it is characterised in that:
Described operating platform includes: the many cross bars being oppositely arranged;And it is layed in the sole on described cross bar.
The scaffold being installed on steel construction the most according to claim 2, it is characterised in that:
The mode using steel wire lashing between described sole and described cross bar is fixed together;Or described cross bar
On be welded with limit rib, form frame-type structure between described limit rib and described cross bar, described sole is solid
Surely described frame-type structure it is inserted in.
The scaffold being installed on steel construction the most according to claim 2, it is characterised in that:
Described protective frame includes the vertical fender rod being vertically welded on described cross bar two ends, and is connected to phase
Horizontal fender rod between adjacent described vertical fender rod.
The scaffold being installed on steel construction the most according to claim 4, it is characterised in that:
Described vertical fender rod is provided with clamping part, and described horizontal fender rod is provided with the portion of plugging, described in the portion of plugging insert
It is located at described clamping part.
The scaffold being installed on steel construction the most according to claim 2, it is characterised in that:
Described support member includes: be vertically connected to the perpendicular support between described fixing bar and described cross bar;And
The oblique bearing diagonal being connected between described fixing bar and described cross bar.
The scaffold being installed on steel construction the most according to claim 1, it is characterised in that:
Enclose in described protective frame and be provided with steel wire rope.
The scaffold being installed on steel construction the most according to claim 1, it is characterised in that:
The described second perforation inwall of described U-shaped clamping plate is provided with screw thread.
The scaffold being installed on steel construction the most according to claim 1, it is characterised in that:
The nut fixing for described bolt it is circumscribed with at described second perforation of described U-shaped clamping plate.
The scaffold being installed on steel construction the most according to claim 1, it is characterised in that:
Described steel construction includes steel I-beam, and described fixing bar passes through described U-shaped Boards wall in described I-shaped
The top flange plate of girder steel.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620217954.2U CN205476399U (en) | 2016-03-22 | 2016-03-22 | Install scaffold on steel construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620217954.2U CN205476399U (en) | 2016-03-22 | 2016-03-22 | Install scaffold on steel construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205476399U true CN205476399U (en) | 2016-08-17 |
Family
ID=56654619
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620217954.2U Expired - Fee Related CN205476399U (en) | 2016-03-22 | 2016-03-22 | Install scaffold on steel construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205476399U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107035125A (en) * | 2017-04-25 | 2017-08-11 | 无锡市龙海杰机械制造有限公司 | The multi-layer scaffold of multiple protective frame reinforcement protection is installed |
| CN113530190A (en) * | 2021-07-19 | 2021-10-22 | 江苏太平洋精锻科技股份有限公司 | Steel construction roofing bottom plate construction platform |
-
2016
- 2016-03-22 CN CN201620217954.2U patent/CN205476399U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107035125A (en) * | 2017-04-25 | 2017-08-11 | 无锡市龙海杰机械制造有限公司 | The multi-layer scaffold of multiple protective frame reinforcement protection is installed |
| CN113530190A (en) * | 2021-07-19 | 2021-10-22 | 江苏太平洋精锻科技股份有限公司 | Steel construction roofing bottom plate construction platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204040435U (en) | High-altitude steel structure welding Hanging Basket | |
| CN103206074A (en) | Elevator shaft template construction method, platform and support | |
| CN208502205U (en) | The high mobile operation platform of big layer | |
| CN215564668U (en) | Safety belt hangs mobile device | |
| CN205476399U (en) | Install scaffold on steel construction | |
| CN102979297B (en) | Suspension type ladder well operation platform mechanism and construction method thereof | |
| CN205063316U (en) | Device for connecting scaffold and door and window entrance to a cave | |
| CN201714103U (en) | Continuously recyclable edge protection structure | |
| CN204092878U (en) | A safety belt suspension device that is convenient for quick erection | |
| CN103195235A (en) | Design and calculation for detachable steel plate type steel fixture | |
| CN203334643U (en) | Tower crane standard knot and structural steel combination high-altitude large-span operation frame device | |
| CN202706507U (en) | Scaffold tool type wall connecting piece resisting high air pressure | |
| CN201802060U (en) | Novel scaffold | |
| CN204038917U (en) | Detachable external hanging type operating platform | |
| CN105926915B (en) | Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude | |
| CN204627012U (en) | A protection canopy that encorbelments of instrument formula for having outer scaffold frame building | |
| CN205277014U (en) | Guard railing for building construction | |
| CN104389415A (en) | Scaffold | |
| CN205590111U (en) | Construction elevator attaches wall structure | |
| CN203569905U (en) | Novel safety protection structure for decoration | |
| CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
| CN203961323U (en) | Quick lap joint formula guard system | |
| CN212336694U (en) | Connecting device for embedded steel pipe and scaffold cross rod | |
| CN211736289U (en) | Operation platform | |
| CN206693590U (en) | A kind of Quick-mounting aluminium alloy scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 |