CN108331335A - A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support - Google Patents
A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support Download PDFInfo
- Publication number
- CN108331335A CN108331335A CN201810083944.8A CN201810083944A CN108331335A CN 108331335 A CN108331335 A CN 108331335A CN 201810083944 A CN201810083944 A CN 201810083944A CN 108331335 A CN108331335 A CN 108331335A
- Authority
- CN
- China
- Prior art keywords
- climbing
- tripod
- steel
- hydraulic
- wood composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
- E04G11/24—Construction of lifting jacks or climbing rods for sliding forms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of pre-splicing separation type hydraulics of steel and wood composite from climbing support, it is characterised in that:Including template system, hydraulic climbing system and frame body system;Hydraulic climbing frame can integrally climb, also can list Pin climb, stability of climbing is good;It is easy to operate, it is safe, a large amount of working hours and material can be saved;Climbing support once after assembling, until top is not landed, saves construction site, and reduce the damage of damaging of template, particularly panel;Comprehensive operating platform is provided, unit in charge of construction is not necessarily to set up operating platform and waste material and labour again;Structure construction error is small, and correction is simple, and construction error can be eliminated successively;Climbing speed is fast, can improve engineering construction speed;For template from climbing, it is secondary to substantially reduce hanging for tower crane for original place cleaning;Change the pawl direction of Commutating box, realizes the power and energy for promoting climbing frame or guide rail;When often climbing a terraced shelves, oil cylinder is voluntarily adjusted, and ensures while the frame body to climb synchronizes.
Description
Technical field
The present invention relates to building engineering field more particularly to a kind of pre-splicing separation type hydraulics of steel and wood composite from climbing support.
Background technology
High building steel reinforced concrete combination frame -- concrete core barrel structure system is the main of modernization high-rise building
Structure type, using hydraulic pressure from the frame body template construction that climbs be ensure high building Core Walls Structure speed of application and quality best method it
One, it is used by more and more units in charge of construction.
For high-rise, Super High full-situ shear wall structure cylinder, elevator shaft, industry and the vertical cylinder of municipal structures
Construction need using a kind of efficient hydraulic pressure from climbing support.
Invention content
The technical problem to be solved in the present invention is to provide a kind of pre-splicing separation type hydraulics of steel and wood composite from climbing support, can solve
Certainly general hydraulic pressure is complicated from the frame body template frame that climbs, the slow problem of climbing speed.
In order to solve the above technical problems, the technical scheme is that:A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing
Frame is risen, innovative point is:Including template system, hydraulic climbing system and frame body system;
The template system includes panel, perpendicular rib, cross rib and suspension hook;The perpendicular rib is wooden H-beam and has several mutually equal
Row setting, the cross rib have several and pass through perpendicular to perpendicular rib in the same side of perpendicular rib along in the orientation of cross rib
Connection is grabbed connected;The panel is laid on the another side of perpendicular rib;The suspension hook is arranged in the end of perpendicular rib;
The frame body system include fastener inserts, load-bearing tripod and after move truss;The load-bearing tripod includes tripod cross
Beam, triangle rod standing and tripod diagonal brace, the tripod crossbeam are vertically connected with triangle rod standing;The triangle rod standing
Top side is provided with crossbeam gib head, and the bottom end side of the triangle rod standing is provided with attached wall support;Cross on the tripod
Beam gib head is connected in fastener inserts;Being horizontally disposed on the tripod crossbeam has main landing beam, is arranged on the main landing beam
There are main landing slab, one end that rear moving device and rear moving device are provided on the main landing slab to be connected with template system;After described
It moves truss to be arranged on main landing slab, truss platform plate is moved after being equipped on rear shifting truss;
The hydraulic climbing system includes oil cylinder, Commutating box, lifting rail, hydraulic control box and hydraulic control box hanger;It is described
Hydraulic control box hanger is of an L-shaped structure, and hydraulic control box hanger is mounted on the tripod crossbeam of load-bearing tripod and triangle erects
On bar;The hydraulic control box is mounted on hydraulic control hanger;The lifting rail is vertically mounted on fastener inserts
Between;The Commutating box is arranged vertically at the both ends of oil cylinder, and the Commutating box on oil cylinder top is connected with crossbeam gib head, oil cylinder
The Commutating box of bottom end coordinates with lifting rail.
Further, the fastener inserts include climbing cone, attached wall plate, stressed bolt and double embedded part hanging seats;It is described to climb cone in advance
It is embedded in wall, the attached wall plate is connected by stressed bolt with cone is climbed, and double embedded part hanging seats are connected with attached wall plate.
Further, several bracing pieces are provided in the triangle upright bar of the load-bearing tripod.
Further, it moves on truss to be provided with after described and safeguards steel pipe or safeguard net.
Further, rear move between truss and fastener inserts is connected with wind resistance hawser.
The advantage of the invention is that:
1)Hydraulic climbing frame can integrally climb in the present invention, also can list Pin climb, stability of climbing is good;It is easy to operate, safety
Height can save a large amount of working hours and material;Climbing support once after assembling, until top is not landed, saves construction site, and subtract
The damage of damaging of template, particularly panel is lacked;Hydraulic climbing process is more steady, synchronous, safe.
2)Comprehensive operating platform is provided in the present invention, unit in charge of construction is not necessarily to set up operating platform and waste material again
Material and labour;Structure construction error is small, and correction is simple, and construction error can be eliminated successively;Climbing speed is fast, can improve engineering
Speed of application;For template from climbing, it is secondary to substantially reduce hanging for tower crane for original place cleaning;Commutating box is progress power biography between climbing frame and guide rail
The important component passed changes the pawl direction of Commutating box, realizes the power and energy for promoting climbing frame or guide rail;Often climbing a terraced shelves
When, oil cylinder is voluntarily adjusted, and ensures while the frame body to climb synchronizes.
Description of the drawings
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from climbing support overall structure figure.
Fig. 2 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from climbing support template system structure chart.
Fig. 3 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from climbing support frame body system construction drawing.
Fig. 4 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from climbing support fastener inserts explosive view.
Fig. 5 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from climbing support fastener inserts assembled view.
Fig. 6 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from the heavy duty tripod installation diagram of climbing support.
Fig. 7 is a kind of pre-splicing separation type hydraulic of steel and wood composite of the present invention from the hydraulic climbing system construction drawing of climbing support.
Specific implementation mode
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this
It is bright to be limited among the embodiment described range.
The pre-splicing separation type hydraulic of a kind of steel and wood composite as shown in Figures 1 to 7 is from climbing support, including template system 1, hydraulic pressure
Climbing system 2 and frame body system 3.
Template system 1 includes panel 11, perpendicular rib 12, cross rib 13 and suspension hook 14;The perpendicular rib 12 is wooden H-beam and has
Several are disposed in parallel relation to one another, the cross rib 13 have several and along in the orientation of cross rib 13 in the same side of perpendicular rib
Grabbed by connection perpendicular to perpendicular rib 12 connected in face;The panel 11 is laid on the another side of perpendicular rib 12;The suspension hook 14 is arranged
In the end of perpendicular rib 12.
Frame body system 2 includes fastener inserts 21, load-bearing tripod 22 and rear shifting truss 23;The load-bearing tripod 22 includes
Tripod crossbeam 221, triangle rod standing 222 and tripod diagonal brace 223, the tripod crossbeam 221 hang down with triangle rod standing 222
It is straight to be connected;The top side of the triangle rod standing 222 is provided with crossbeam gib head 224, the bottom end side of the triangle rod standing 222
While being provided with attached wall support 225;Crossbeam gib head 224 on the tripod is connected in fastener inserts 21;The tripod crossbeam
Being horizontally disposed on 221 has main landing beam 24, and main landing slab is provided on the main landing beam 24, is provided on the main landing slab
One end of moving device 25 and rear moving device 25 is connected with template system 1 afterwards;Truss 23 is moved after described to be arranged on main landing slab, after
It moves on truss 23 and moves truss platform plate after being equipped with.
Hydraulic climbing system 3 includes oil cylinder 31, Commutating box 32, lifting rail 33, hydraulic control box 34 and hydraulic control box
Hanger 35;34 hanger of the hydraulic control box is of an L-shaped structure, and hydraulic control box hanger 35 is mounted on the triangle of load-bearing tripod 22
On frame crossbeam 221 and triangle rod standing 222;The hydraulic control box 34 is mounted on hydraulic control hanger 35;Described climb is led
Rail 33 is vertically mounted between fastener inserts 21;The Commutating box 32 is arranged vertically at the both ends of oil cylinder 31,
The Commutating box 32 on 31 top of oil cylinder is connected with crossbeam gib head 224, and Commutating box 32 and the lifting rail 33 of 31 bottom end of oil cylinder coordinate.
Fastener inserts 21 include climbing cone 211, attached wall plate 212, stressed bolt 213 and double embedded part hanging seats 214;It is described to climb cone
211 are embedded in wall, and the attached wall plate 212 211 is connected by stressed bolt 213 with cone is climbed, double embedded part hanging seats 214 and
Attached wall plate 212 is connected.
It is provided with several bracing pieces 226 in the triangle upright bar 222 of load-bearing tripod 22.
It moves on truss 23 to be provided with afterwards and safeguards steel pipe.
It moves afterwards between truss 23 and fastener inserts 21 and is connected with wind resistance hawser.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation
Merely illustrating the principles of the invention described in book, without departing from the spirit and scope of the present invention, the present invention also has
Various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention
It is defined by the appending claims and its equivalent thereof.
Claims (5)
1. a kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support, it is characterised in that:Including template system, hydraulic climbing system
With frame body system;
The template system includes panel, perpendicular rib, cross rib and suspension hook;The perpendicular rib is wooden H-beam and has several mutually equal
Row setting, the cross rib have several and pass through perpendicular to perpendicular rib in the same side of perpendicular rib along in the orientation of cross rib
Connection is grabbed connected;The panel is laid on the another side of perpendicular rib;The suspension hook is arranged in the end of perpendicular rib;
The frame body system include fastener inserts, load-bearing tripod and after move truss;The load-bearing tripod includes tripod cross
Beam, triangle rod standing and tripod diagonal brace, the tripod crossbeam are vertically connected with triangle rod standing;The triangle rod standing
Top side is provided with crossbeam gib head, and the bottom end side of the triangle rod standing is provided with attached wall support;Cross on the tripod
Beam gib head is connected in fastener inserts;Being horizontally disposed on the tripod crossbeam has main landing beam, is arranged on the main landing beam
There is main landing slab, rear moving device is provided on the main landing slab;Truss is moved after described to be arranged on main landing slab and move dress afterwards
The one end set is connected with template system, and truss platform plate is moved after being equipped on rear shifting truss;
The hydraulic climbing system includes oil cylinder, Commutating box, lifting rail, hydraulic control box and hydraulic control box hanger;It is described
Hydraulic control box hanger is of an L-shaped structure, and hydraulic control box hanger is mounted on the tripod crossbeam of load-bearing tripod and triangle erects
On bar;The hydraulic control box is mounted on hydraulic control hanger;The lifting rail is vertically mounted on fastener inserts
Between;The Commutating box is arranged vertically at the both ends of oil cylinder, and the Commutating box on oil cylinder top is connected with crossbeam gib head, oil cylinder
The Commutating box of bottom end coordinates with lifting rail.
2. the pre-splicing separation type hydraulic of a kind of steel and wood composite according to claim 1 is from climbing support, it is characterised in that:It is described pre-
Embedded component includes climbing cone, attached wall plate, stressed bolt and double embedded part hanging seats;The cone of climbing is embedded in wall, and the attached wall plate is logical
It crosses stressed bolt and is connected with cone is climbed, double embedded part hanging seats are connected with attached wall plate.
3. the pre-splicing separation type hydraulic of a kind of steel and wood composite according to claim 1 is from climbing support, it is characterised in that:It is described to hold
It is provided with several bracing pieces in the triangle upright bar of weight tripod.
4. the pre-splicing separation type hydraulic of a kind of steel and wood composite according to claim 1 is from climbing support, it is characterised in that:After described
It moves on truss to be provided with and safeguards steel pipe or safeguard net.
5. the pre-splicing separation type hydraulic of a kind of steel and wood composite according to claim 1 is from climbing support, it is characterised in that:After described
It moves between truss and fastener inserts and is connected with wind resistance hawser.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810083944.8A CN108331335A (en) | 2018-01-29 | 2018-01-29 | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810083944.8A CN108331335A (en) | 2018-01-29 | 2018-01-29 | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331335A true CN108331335A (en) | 2018-07-27 |
Family
ID=62926052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810083944.8A Pending CN108331335A (en) | 2018-01-29 | 2018-01-29 | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331335A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952192A (en) * | 2018-09-29 | 2018-12-07 | 中建四局第建筑工程有限公司 | A kind of concrete works moisture-keeping maintaining device and method |
US20220307276A1 (en) * | 2016-04-08 | 2022-09-29 | Peri Se | Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure |
CN115961781A (en) * | 2023-02-17 | 2023-04-14 | 中国水利水电第三工程局有限公司 | Rapid disassembly and assembly method for cantilever template |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2908673Y (en) * | 2006-06-29 | 2007-06-06 | 北京卓良模板有限公司 | Building shuttering |
CN202023360U (en) * | 2011-04-15 | 2011-11-02 | 江苏中原建设集团有限公司 | Hydraulic climbing die plate for building construction |
CN202850484U (en) * | 2012-05-02 | 2013-04-03 | 江苏长安建设集团有限公司 | Safety mechanism for building construction climbing template |
CN105401717A (en) * | 2015-12-14 | 2016-03-16 | 中交一公局第三工程有限公司 | Novel climbing formwork frame body |
-
2018
- 2018-01-29 CN CN201810083944.8A patent/CN108331335A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2908673Y (en) * | 2006-06-29 | 2007-06-06 | 北京卓良模板有限公司 | Building shuttering |
CN202023360U (en) * | 2011-04-15 | 2011-11-02 | 江苏中原建设集团有限公司 | Hydraulic climbing die plate for building construction |
CN202850484U (en) * | 2012-05-02 | 2013-04-03 | 江苏长安建设集团有限公司 | Safety mechanism for building construction climbing template |
CN105401717A (en) * | 2015-12-14 | 2016-03-16 | 中交一公局第三工程有限公司 | Novel climbing formwork frame body |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220307276A1 (en) * | 2016-04-08 | 2022-09-29 | Peri Se | Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure |
CN108952192A (en) * | 2018-09-29 | 2018-12-07 | 中建四局第建筑工程有限公司 | A kind of concrete works moisture-keeping maintaining device and method |
CN115961781A (en) * | 2023-02-17 | 2023-04-14 | 中国水利水电第三工程局有限公司 | Rapid disassembly and assembly method for cantilever template |
CN115961781B (en) * | 2023-02-17 | 2024-05-03 | 中国水利水电第三工程局有限公司 | Quick dismounting method for cantilever template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN109184190B (en) | Climbing and bearing integrated beam type hydraulic climbing platform and mounting method thereof | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN111255217A (en) | Elevator shaft shaping operation platform and operation method thereof | |
CN106400691A (en) | Integrated construction process for anti-collision wall formwork | |
CN110258352A (en) | The steel reinforced concrete combined bridge construction method that two bridgings are done | |
CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
CN210002931U (en) | tool type protection system for telescopic adjustment of construction of super high-rise outer frame column | |
CN213836318U (en) | Bridge floor wet joint hangs mould structure | |
CN206233120U (en) | Folding shape steel web continuous box girder jenny mould bases cantilever structure | |
CN108590171A (en) | A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs | |
CN105952129A (en) | Elevator shaft combined type integral lifting operating platform and construction method thereof | |
CN113235904B (en) | Circulating mutual climbing lifting column and using method thereof | |
CN214573768U (en) | Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN107059654A (en) | The compound overlength Hanging basket on front support of single cable plane and its installation method | |
CN202081639U (en) | Steel truss tool type supporting structure for concrete framework industrial building templates | |
CN207633773U (en) | A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system | |
CN106522542A (en) | Single-station hydraulic formwork climbing system and climbing method thereof | |
CN206800201U (en) | The compound Hanging basket on front support of single cable plane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180727 |
|
RJ01 | Rejection of invention patent application after publication |