CN206562264U - A kind of hanging device for transport outside high-rise building - Google Patents
A kind of hanging device for transport outside high-rise building Download PDFInfo
- Publication number
- CN206562264U CN206562264U CN201720256343.3U CN201720256343U CN206562264U CN 206562264 U CN206562264 U CN 206562264U CN 201720256343 U CN201720256343 U CN 201720256343U CN 206562264 U CN206562264 U CN 206562264U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- mast
- luffing
- hoist
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型提供一种用于超高层建筑外部运输的吊装设备,包括成对设置的桅杆提升装置,所述桅杆提升装置包括固定桅杆、变幅桅杆、桅杆底座、吊装连接装置、变幅调节葫芦、室内牵引葫芦和卷扬机;安装好吊装设备,启动卷扬机将重物吊装至作业楼层且高出地面,拉动变幅调节葫芦的手链条,使变幅桅杆向室内方向旋转变幅且带动重物向室内移动,待其重心转移至室内后再与室内牵引葫芦固连,拉动室内牵引葫芦的手链条并将重物完全转移至室内,卸下起重吊装绳,通过搬运小坦克将重物运输到作业楼层的其他位置。所述吊装设备结构简单,可满足不同高度楼层和不同尺寸设备的吊装需求,尤其是在室外场地狭小的工况下,节约成本,加快施工进度。
The utility model provides a hoisting device for external transportation of a super high-rise building, which includes mast lifting devices arranged in pairs, and the mast lifting device includes a fixed mast, a luffing mast, a mast base, a hoisting connection device, and a luffing adjustment hoist , Indoor traction hoist and hoist; After installing the hoisting equipment, start the hoist to hoist the heavy object to the working floor and above the ground, pull the bracelet chain of the luffing adjustment hoist, so that the luffing mast rotates to the indoor direction and drives the heavy object to Indoor movement, after its center of gravity is transferred to the room, it will be fixedly connected with the indoor traction hoist, pull the bracelet chain of the indoor traction hoist and completely transfer the heavy objects to the room, remove the lifting rope, and transport the heavy objects to the Other locations on the operating floor. The hoisting equipment has a simple structure, which can meet the hoisting requirements of different height floors and different sizes of equipment, especially in the narrow outdoor working conditions, saving costs and speeding up the construction progress.
Description
技术领域technical field
本实用新型涉及高层建筑吊装技术领域,具体地,涉及一种用于超高层建筑外部运输的吊装设备。The utility model relates to the technical field of high-rise building hoisting, in particular to a hoisting device used for external transportation of super high-rise buildings.
背景技术Background technique
为了提升城市土地使用率、节约利用城市土地资源,城市建筑逐渐偏向高层、超高层建筑发展。对于此类建筑,施工过程中需运送的材料设备众多,产生的建筑垃圾也多,因此对输运的效率和便捷性提出了较高要求,以避免在施工高峰期出现大量材料积压而导致窝工的情况,从而拖慢施工进度;而且高层、超高层建筑大多设有设备层,其内安装的机电设备重量重且数量多,给运输工作带来了巨大的挑战。In order to improve the utilization rate of urban land and save the use of urban land resources, urban buildings are gradually developing towards high-rise and super high-rise buildings. For this kind of buildings, there are many materials and equipment to be transported during the construction process, and a lot of construction waste is generated. In addition, most high-rise and super high-rise buildings have equipment floors, and the electromechanical equipment installed in them is heavy and large in number, which brings huge challenges to transportation.
传统方法是依赖建筑总承包方在建筑物内部建立公共的运输通道,或在外部搭建塔吊等吊装设备;但前者受限于建筑物本身的结构设计以及施工成本,总承包方通常不会考虑大型设备的运输需求,而后者也存在场地限制的缺陷,因此上述方法只能用于解决普通建筑用材的运输问题,而不适用于对设备层大型机电设备的运输。The traditional method is to rely on the construction general contractor to build a public transportation channel inside the building, or build hoisting equipment such as tower cranes outside; but the former is limited by the structural design and construction cost of the building itself, and the general contractor usually does not consider large-scale The transportation needs of equipment, and the latter also has the defect of site limitation, so the above method can only be used to solve the transportation problem of ordinary building materials, and is not suitable for the transportation of large electromechanical equipment on the equipment layer.
另一方面,随着城市的“扩容”,对老城区现有建筑的升级改造也在不断进行,工程品质的提升带来了机电系统的更新换代,对于小型设备材料可利用永久电梯进行运输,而大型设备的垂直运输已经是施工人员不得不面对一个的现实难题;而且老城区的巷道狭窄、规划零散,也并不适合搭建大型吊装设备。On the other hand, with the "expansion" of the city, the upgrading and transformation of existing buildings in the old city is also ongoing. The improvement of engineering quality has brought about the upgrading of the electromechanical system. For small equipment and materials, permanent elevators can be used for transportation. The vertical transportation of large-scale equipment is already a practical problem that construction personnel have to face; and the narrow lanes and scattered planning of the old city are not suitable for building large-scale hoisting equipment.
中国专利201310487539公开了一种吊装装置,其包括主桅杆、副杆、变幅、滑移灵机巢和一手拉葫芦,所述滑移灵机巢套设于所述主桅杆上,并能沿所述主桅杆滑动,所述手拉葫芦固定于所述主桅杆的一端并通过绳索与所述滑移灵机巢连接,所述副杆的一端与所述滑移灵机巢铰接,所述变幅将所述副杆的另一端与主桅杆的一端连接;通过该装置达到扩大吊装范围的目的,以解决现有吊装装置无法在狭窄场地施展操作的问题。Chinese patent 201310487539 discloses a hoisting device, which includes a main mast, an auxiliary mast, a luffing machine, a sliding machine nest and a chain block. The sliding machine nest is sleeved on the main mast and can be moved along the The main mast slides, the chain hoist is fixed at one end of the main mast and is connected with the sliding motor nest through a rope, one end of the auxiliary rod is hinged with the sliding motor nest, and the luffing will The other end of the auxiliary rod is connected with one end of the main mast; the purpose of expanding the hoisting range is achieved through this device, so as to solve the problem that the existing hoisting device cannot be operated in a narrow place.
上述专利虽然解决了场地限制的问题,但是当设备被垂直运输到作业楼层后,还需要将其安全、稳妥地转移至室内,而且吊装装置本身的结构固定不变,对于不同层高建筑的普适性不好,同时其主桅杆、副杆和主吊系统的受力点较少,装置整体的稳固性有待改进。鉴于以上考虑,现有的吊装方式已不能满足使用要求,必须寻找突破口,研究出一款安全、高效、实用性强的高层建筑吊装设备。Although the above-mentioned patent solves the problem of site limitation, after the equipment is vertically transported to the operation floor, it needs to be safely and securely transferred indoors, and the structure of the hoisting device itself is fixed, which is suitable for general use in buildings with different storeys. The adaptability is not good, and at the same time, the stress points of the main mast, auxiliary mast and main hoist system are few, and the overall stability of the device needs to be improved. In view of the above considerations, the existing hoisting methods can no longer meet the requirements of use, and a breakthrough must be found to develop a safe, efficient, and practical high-rise building hoisting equipment.
实用新型内容Utility model content
本实用新型的目的在于提供一种结构稳固、适用性好、吊装能力强、可将设备直接吊装至室内的高层建筑吊装设备,以解决背景技术中提出的问题。The purpose of the utility model is to provide a high-rise building hoisting equipment with stable structure, good applicability and strong hoisting ability, which can directly hoist the equipment indoors, so as to solve the problems raised in the background technology.
为实现上述目的,本实用新型提供了一种用于超高层建筑外部运输的吊装设备,包括成对设置的桅杆提升装置,所述桅杆提升装置包括固定桅杆、变幅桅杆、桅杆底座、吊装连接装置、变幅调节葫芦、室内牵引葫芦和卷扬机;In order to achieve the above purpose, the utility model provides a hoisting device for external transportation of super high-rise buildings, including mast lifting devices arranged in pairs, and the mast lifting devices include a fixed mast, a luffing mast, a mast base, a hoisting connection devices, luffing hoists, indoor traction hoists and winches;
所述桅杆底座固定设置在作业楼层的近边缘地面上,所述固定桅杆竖直设置且其底端与桅杆底座固定连接而顶端与作业楼层的顶梁或顶板固定连接,所述变幅桅杆设置于固定桅杆的外侧且其底端与桅杆底座铰接而顶端为自由端,在所述变幅桅杆的上端设置有吊装耳板和变幅耳板,在所述固定桅杆的上端固定设置有变幅滑轮;所述变幅调节葫芦的一端固定连接在桅杆底座上而另一端穿过变幅滑轮并与变幅耳板固定连接,所述室内牵引葫芦的一端固定连接在作业楼层的顶梁或顶板上而另一端悬空或与起重吊装绳固定连接;所述吊装连接装置包括吊装定滑轮、吊装动滑轮以及用于连接二者的吊装钢丝绳,所述吊装定滑轮与吊装耳板固定连接,所述吊装钢丝绳的一端从吊装定滑轮处穿出并穿过设置在桅杆底座上的导向起重地轮与设置在室内的卷扬机联动设置。The mast base is fixedly arranged on the ground near the edge of the operation floor, the fixed mast is vertically arranged and its bottom end is fixedly connected with the mast base and the top end is fixedly connected with the top beam or top plate of the operation floor, and the luffing mast is set On the outside of the fixed mast, the bottom end is hinged with the mast base and the top end is a free end. The hoisting lug and the luffing lug are arranged on the upper end of the luffing mast, and the luffing lug is fixed on the upper end of the fixed mast. Pulley; one end of the luffing hoist is fixedly connected to the base of the mast and the other end passes through the luffing pulley and is fixedly connected to the luffing ear plate, and one end of the indoor traction hoist is fixedly connected to the top beam or top plate of the working floor and the other end is suspended in the air or fixedly connected with the hoisting rope; the hoisting connection device includes a hoisting fixed pulley, a hoisting movable pulley and a hoisting wire rope for connecting the two, the hoisting fixed pulley is fixedly connected with the hoisting ear plate, the One end of the hoisting wire rope passes through the hoisting fixed pulley and passes through the guide lifting ground wheel arranged on the base of the mast to be arranged in linkage with the winch arranged in the room.
优选地,两个吊装动滑轮通过钢丝绳分别连接吊装扁担的两端,且在所述吊装扁担上连接有用于起吊重物的起重吊装绳。Preferably, the two hoisting movable pulleys are respectively connected to both ends of the hoisting shoulder pole through steel wire ropes, and a hoisting hoisting rope for lifting heavy objects is connected to the hoisting pole.
优选地,所述固定桅杆、变幅桅杆和吊装扁担由两段或两段以上的钢管组成,在每段钢管的端部设置有法兰接头,以便于对吊装设备进行运输及现场组装;组装设备时选用合适长度的钢管,以满足不同高度作业楼层的安装要求以及不同尺寸重物的运输要求。Preferably, the fixed mast, the luffing mast and the hoisting pole are composed of two or more sections of steel pipes, and flange joints are provided at the ends of each section of steel pipes to facilitate transportation and on-site assembly of the hoisting equipment; Steel pipes of appropriate length are selected for equipment to meet the installation requirements of different heights of operation floors and the transportation requirements of heavy objects of different sizes.
优选地,在所述变幅桅杆的上端还设置有多个防晃耳板,其中相对设置于两个变幅桅杆内侧的防晃耳板通过钢丝绳固定连接,而设置于两个变幅桅杆外侧的防晃耳板通过钢丝绳分别与位于其斜后方的结构框架柱固定连接,有效防止了变幅桅杆在吊装重物时发生左右晃动。Preferably, a plurality of anti-sway lugs are also provided on the upper end of the luffing mast, wherein the anti-sway lugs arranged on the inner sides of the two luffing masts are fixedly connected by steel wires, and are arranged on the outer sides of the two luffing masts. The anti-sway lugs are fixedly connected to the structural frame columns at the oblique rear through steel wire ropes, which effectively prevents the luffing mast from shaking from side to side when hoisting heavy objects.
优选地,在所述固定桅杆的上端还设置有用于连接协力钢丝绳的协力耳板,该协力钢丝绳的另一端与位于固定桅杆后方的墙柱或墙面固定连接,以减小变幅桅杆变幅时的拉力对固定桅杆所产生的弯矩。Preferably, the upper end of the fixed mast is also provided with a cooperating ear plate for connecting the cooperating wire rope, and the other end of the cooperating wire rope is fixedly connected to the wall post or wall behind the fixed mast to reduce the amplitude of the luffing mast. Bending moment produced by the tension on the fixed mast.
优选地,在所述卷扬机与导向起重地轮间设置有用于穿过吊装钢丝绳的导向地轮。Preferably, a guide ground wheel for passing the hoisting wire rope is provided between the winch and the guide hoisting ground wheel.
优选地,两个卷扬机邻近设置,方便人员操作以实现两个吊装动滑轮的同步动作,从而确保重物在吊装时的平衡。Preferably, the two winches are arranged adjacent to each other, which is convenient for personnel to operate to realize the synchronous action of the two hoisting movable pulleys, thereby ensuring the balance of the heavy objects during hoisting.
本实用新型提供的技术方案具有如下有益效果:The technical solution provided by the utility model has the following beneficial effects:
1、所述吊装设备结构简单且吊装能力强,其对场地要求低,特别适用于建筑物室外场地狭窄工况下的大型设备吊装作业,相比大型汽车吊、大型塔吊成本节约率达50%以上,同时也避免了传统吊杆只能设置在屋顶等空旷场地的弊端,不会影响到其他工序的施工。1. The hoisting equipment has a simple structure and strong hoisting capacity, and has low site requirements. It is especially suitable for large-scale equipment hoisting operations in narrow outdoor sites of buildings. Compared with large-scale truck cranes and large-scale tower cranes, the cost saving rate reaches 50%. The above also avoids the drawbacks of traditional suspenders that can only be installed on open spaces such as roofs, and will not affect the construction of other processes.
2、所述吊装设备采用进行预制加工并预留法兰接头,以便于运输和现场快速组装,并适用于不同层高建筑的吊装工作以及不同外形尺寸的设备吊装,可重复使用,大大节约了成本且便于推广。2. The hoisting equipment is prefabricated and flange joints are reserved to facilitate transportation and quick assembly on site, and is suitable for hoisting work of buildings with different heights and equipment hoisting of different dimensions, and can be reused, greatly saving low cost and easy to promote.
3、所述吊装设备通过设置成对的桅杆提升装置,提升了吊装能力和吊装稳定性,防止出现晃动而损坏设备或撞坏建筑构件,所述吊装设备还通过设置协力耳板、防晃耳板以及导向起重地轮等结构对桅杆进行多重加固,安全保障率高。3. The hoisting equipment improves hoisting capacity and hoisting stability by setting a pair of mast lifting devices, preventing shaking from damaging equipment or crashing building components. Multiple reinforcements are carried out on the mast with structures such as plates and guide lifting wheels, and the safety guarantee rate is high.
4、所述吊装设备直接安装在作业楼层内,且其操作也基本在作业楼层内完成,信号沟通效率高,提高了作业效率,保障了设备的平稳吊装,避免因沟通不及时产生安全事故。4. The hoisting equipment is directly installed on the operation floor, and its operation is basically completed on the operation floor. The signal communication efficiency is high, which improves the operation efficiency, ensures the smooth hoisting of the equipment, and avoids safety accidents caused by untimely communication.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图,其中:In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention , for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without creative work, wherein:
图1是本实用新型优选实施例的结构示意图(正面视角);Fig. 1 is a schematic structural view (front view) of a preferred embodiment of the present utility model;
图2是图1所示实施例的结构示意图(侧面视角);Fig. 2 is a schematic structural view (side view) of the embodiment shown in Fig. 1;
图3是图1所示实施例的结构示意图(俯视视角);Fig. 3 is a schematic structural view (top view angle) of the embodiment shown in Fig. 1;
图4是图1所示实施例中桅杆底座的结构示意图(俯视视角);Fig. 4 is a schematic structural view (top view angle) of the mast base in the embodiment shown in Fig. 1;
图5是图1所示实施例将重物移动至室内的工作示意图;Fig. 5 is a working schematic diagram of the embodiment shown in Fig. 1 moving heavy objects to the room;
图中:1固定桅杆,2变幅桅杆,3桅杆底座,4吊装连接装置,5变幅调节葫芦,6室内牵引葫芦,7卷扬机,8吊装扁担,9导向地轮;11协力耳板,12变幅滑轮;21吊装耳板,22变幅耳板,23防晃耳板;31底座框架,32铰接耳板,33固定桅杆连接法兰,34变幅调节葫芦连接挂件,35导向起重地轮;41吊装定滑轮,42吊装动滑轮,43吊装钢丝绳。In the figure: 1 fixed mast, 2 luffing mast, 3 mast base, 4 hoisting connection device, 5 luffing adjustment hoist, 6 indoor traction hoist, 7 hoist, 8 hoisting shoulder pole, 9 guide ground wheel; 11 cooperation ear plate, 12 Luffing pulley; 21 hoisting lug, 22 luffing lug, 23 anti-sway lug; 31 base frame, 32 hinged lug, 33 fixed mast connection flange, 34 luffing adjustment hoist connection pendant, 35 guide lifting wheel ; 41 hoisting fixed pulley, 42 hoisting movable pulley, 43 hoisting wire rope.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
参见图1-5,一种用于超高层建筑外部运输的吊装设备,包括成对设置的桅杆提升装置,所述桅杆提升装置包括固定桅杆1、变幅桅杆2、桅杆底座3、吊装连接装置4、变幅调节葫芦5、室内牵引葫芦6和卷扬机7。Referring to Figures 1-5, a hoisting device for external transportation of a super high-rise building includes a mast lifting device arranged in pairs, and the mast lifting device includes a fixed mast 1, a luffing mast 2, a mast base 3, and a hoisting connection device 4. Luffing hoist 5, indoor traction hoist 6 and hoist 7.
所述桅杆底座3固定设置在作业楼层的近边缘地面上,且其主体是由型钢焊接而成的底座框架31,在所述底座框架31上设置有用于连接固定桅杆1的固定桅杆连接法兰33、用于连接变幅桅杆2的铰接耳板32、用于连接变幅调节葫芦5一端的变幅调节葫芦连接挂件34、以及导向起重地轮35。The mast base 3 is fixedly arranged on the ground near the edge of the working floor, and its main body is a base frame 31 welded by section steel, and a fixed mast connection flange for connecting the fixed mast 1 is arranged on the base frame 31 33. The hinged ear plate 32 for connecting the luffing mast 2, the luffing adjustment hoist connection pendant 34 for connecting one end of the luffing adjustment hoist 5, and the guide lifting ground wheel 35.
所述固定桅杆1竖直设置且其底端与桅杆底座3固定连接,而在其顶端设置有固连的固定盘,且所述固定盘通过膨胀螺栓与作业楼层的顶梁或顶板固定连接;在所述固定桅杆1的上端还设置有变幅滑轮12以及用于连接协力钢丝绳的协力耳板11,且该协力钢丝绳的另一端与位于固定桅杆1后方的墙柱或墙面固定连接,以减小变幅桅杆变幅时的拉力对固定桅杆所产生的弯矩。The fixed mast 1 is vertically arranged and its bottom end is fixedly connected with the mast base 3, and a fixed fixed plate is arranged on its top end, and the fixed plate is fixedly connected with the top beam or top plate of the working floor through expansion bolts; The upper end of the fixed mast 1 is also provided with a luffing pulley 12 and a cooperating ear plate 11 for connecting the cooperating wire rope, and the other end of the cooperating steel wire rope is fixedly connected with the wall post or wall at the rear of the fixed mast 1, so as to Reduce the bending moment generated by the pulling force on the fixed mast when the luffing mast is luffing.
所述变幅桅杆2设置于固定桅杆1的外侧且其底端与桅杆底座3铰接而顶端为自由端,在所述变幅桅杆2的自由端设置有吊装耳板21、变幅耳板22和防晃耳板23,其中相对设置于两个变幅桅杆内侧的防晃耳板通过钢丝绳固定连接,而设置于两个变幅桅杆外侧的防晃耳板通过钢丝绳分别与位于其斜后方的结构框架柱固定连接,有效防止了变幅桅杆在吊装重物时发生左右晃动。The luffing mast 2 is arranged on the outside of the fixed mast 1 and its bottom end is hinged with the mast base 3 and the top is a free end. The free end of the luffing mast 2 is provided with a hoisting lug 21 and a luffing lug 22 and anti-sway ear plates 23, wherein the anti-sway ear plates arranged on the inner sides of the two luffing masts are fixedly connected by steel wires, and the anti-sway ear plates arranged on the outer sides of the two luffing masts are respectively connected with the anti-sway ear plates located obliquely behind them through steel wire ropes. The structural frame columns are fixedly connected, which effectively prevents the luffing mast from shaking left and right when lifting heavy objects.
所述吊装连接装置4包括吊装定滑轮41、吊装动滑轮42以及用于连接二者的吊装钢丝绳43,所述吊装定滑轮41与吊装耳板21固定连接,所述吊装钢丝绳43的一端从吊装定滑轮41处穿出并穿过设置在桅杆底座3上的导向起重地轮35与设置在室内的卷扬机7联动设置。两个吊装动滑轮42通过钢丝绳分别连接吊装扁担8的两端,且在所述吊装扁担8上连接有用于起吊重物的起重吊装绳。The hoisting connecting device 4 includes a hoisting fixed pulley 41, a hoisting movable pulley 42 and a hoisting wire rope 43 for connecting the two, the hoisting fixed pulley 41 is fixedly connected with the hoisting ear plate 21, and one end of the hoisting wire rope 43 is connected from the hoisting fixed pulley The pulley 41 goes out and passes through the guide lifting wheel 35 arranged on the mast base 3 to be arranged in linkage with the winch 7 arranged in the room. The two hoisting movable pulleys 42 are respectively connected to the two ends of the hoisting pole 8 through steel wire ropes, and a hoisting hoisting rope for lifting heavy objects is connected to the hoisting pole 8 .
所述变幅调节葫芦5的一端固定连接在桅杆底座3上而另一端穿过变幅滑轮12并与变幅耳板22固定连接;所述室内牵引葫芦6的一端连接在作业楼层顶梁或顶板上的预埋挂钩上而另一端悬空或与起重吊装绳固定连接。One end of the luffing hoist 5 is fixedly connected to the mast base 3 and the other end passes through the luffing pulley 12 and is fixedly connected to the luffing ear plate 22; one end of the indoor traction hoist 6 is connected to the top beam or The other end is suspended in the air or fixedly connected with the hoisting rope on the embedded hook on the roof.
在本实施例中,所述固定桅杆1、变幅桅杆2和吊装扁担8由两段或两段以上的钢管组成,在每段钢管的端部设置有法兰接头,以便于对吊装设备进行运输及现场组装;组装设备时选用合适长度的钢管,以满足不同高度作业楼层的安装要求以及不同尺寸重物的运输要求。所有构件间均采用螺栓连接,现场安装不需要进行焊接作业,操作方便快捷,可重复利用。In this embodiment, the fixed mast 1, the luffing mast 2 and the hoisting pole 8 are composed of two or more sections of steel pipes, and flange joints are provided at the ends of each section of steel pipes to facilitate the installation of the hoisting equipment. Transportation and on-site assembly; steel pipes of appropriate length are selected when assembling equipment to meet the installation requirements of different heights of operation floors and the transportation requirements of different sizes of heavy objects. All components are connected by bolts, no welding work is required for on-site installation, the operation is convenient and fast, and it can be reused.
在本实施例中,在所述卷扬机7与导向起重地轮35间设置有用于穿过吊装钢丝绳43的导向地轮9,以便于对吊装钢丝绳43的导向及更好地受力。In this embodiment, a guide ground wheel 9 for passing the hoisting wire rope 43 is provided between the hoist 7 and the hoisting ground wheel 35, so as to guide the hoisting wire rope 43 and better bear force.
在本实施例中,在固定桅杆1和变幅桅杆2上端的四周还可设置备用耳板,以延长吊装设备的使用寿命,也便于根据施工现场的需要增加钢丝绳的数量。In this embodiment, spare lugs can also be provided around the upper ends of the fixed mast 1 and the luffing mast 2 to prolong the service life of the hoisting equipment and facilitate the increase of the number of wire ropes according to the needs of the construction site.
在本实施例中,两个卷扬机7邻近设置,方便人员操作和沟通,以便于实现两个吊装动滑轮42的同步动作,从而确保重物在吊装时的左右平衡。In this embodiment, the two winches 7 are arranged adjacent to each other, which is convenient for personnel to operate and communicate, so as to realize the synchronous action of the two hoisting movable pulleys 42, thereby ensuring the left-right balance of the heavy object during hoisting.
所述吊装设备的工作过程如下:The working process of the hoisting equipment is as follows:
1)组装吊装设备并将其固定安装在作业楼层的近边缘位置处;1) Assemble the hoisting equipment and fix it near the edge of the working floor;
2)将起重吊装绳固定连接在重物上,启动卷扬机7并保证两个吊装动滑轮42同步动作;2) Fix the hoisting rope to the heavy object, start the winch 7 and ensure that the two hoisting movable pulleys 42 move synchronously;
3)在吊装钢丝绳43的带动下,重物随着吊装动滑轮42不断上升,直至重物到达作业楼层且整体高于作业楼层的地面;3) Driven by the hoisting wire rope 43, the heavy object continues to rise along with the hoisting movable pulley 42 until the heavy object reaches the working floor and is higher than the ground of the working floor as a whole;
4)拉动变幅调节葫芦5的手链条,使变幅桅杆2围绕其底部铰接点向室内方向旋转变幅,进而带动连接在其顶端的重物向室内方向移动;4) Pull the bracelet chain of the luffing adjustment hoist 5, so that the luffing mast 2 rotates and luffs around its bottom hinge point toward the indoor direction, and then drives the weight connected to its top to move toward the indoor direction;
5)待重物的重心转移至室内后,将室内牵引葫芦6的底端挂钩与重物上的起重吊装绳固定连接,并在室内设置好搬运小坦克;5) After the center of gravity of the heavy object is transferred to the room, the bottom hook of the indoor traction hoist 6 is fixedly connected to the lifting rope on the heavy object, and a small tank is installed indoors to carry it;
6)拉动室内牵引葫芦6的手链条,使重物继续向室内方向移动,直至其全部进入室内并位于搬运小坦克的上方;6) Pull the bracelet chain of the indoor traction hoist 6, so that the heavy objects continue to move indoors until all of them enter the room and are located above the small tank;
7)卸下起重吊装绳,使重物下落至搬运小坦克上,通过搬运小坦克将重物运输到作业楼层的其他位置;7) Unload the hoisting rope, drop the heavy objects onto the small transport tank, and transport the heavy objects to other positions on the operation floor through the small transport tank;
8)反向拉动变幅调节葫芦5的手链条,使变幅桅杆2围绕其底部铰接点向室外方向旋转变幅,反向启动卷扬机7,开始对下一批重物进行吊装运输并重复上述步骤。8) Pull the bracelet chain of the luffing adjustment hoist 5 in the reverse direction, so that the luffing mast 2 rotates in the outdoor direction around the hinge point at the bottom, starts the hoist 7 in the reverse direction, and starts to lift and transport the next batch of heavy objects and repeat the above steps. step.
以上所述仅为本实用新型的优选实施例,并非因此限制本实用新型的专利保护范围,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。在本实用新型的精神和原则之内,凡是利用本实用新型说明书及附图内容所作的任何改进或等同替换,直接或间接运用在其它相关的技术领域,均应包括在本实用新型的专利保护范围内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the patent protection scope of the utility model. For those skilled in the art, the utility model can have various modifications and changes. Within the spirit and principle of the utility model, any improvement or equivalent replacement made by using the specification and drawings of the utility model, which is directly or indirectly used in other related technical fields, shall be included in the patent protection of the utility model. within range.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720256343.3U CN206562264U (en) | 2017-03-16 | 2017-03-16 | A kind of hanging device for transport outside high-rise building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720256343.3U CN206562264U (en) | 2017-03-16 | 2017-03-16 | A kind of hanging device for transport outside high-rise building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206562264U true CN206562264U (en) | 2017-10-17 |
Family
ID=60032826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720256343.3U Withdrawn - After Issue CN206562264U (en) | 2017-03-16 | 2017-03-16 | A kind of hanging device for transport outside high-rise building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206562264U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106698208A (en) * | 2017-03-16 | 2017-05-24 | 中建五局工业设备安装有限公司 | Hoisting equipment and hoisting method for external transportation of super high-rise building |
CN111877762A (en) * | 2020-07-01 | 2020-11-03 | 上海建工集团股份有限公司 | Movable automatic installation tool system for precast concrete wallboard |
CN112049297A (en) * | 2020-09-27 | 2020-12-08 | 四川皇家蓝卡铝业有限公司 | Energy-saving inclined plane glass curtain wall |
CN115123981A (en) * | 2022-06-29 | 2022-09-30 | 三一汽车制造有限公司 | Working bucket assembly and working machine |
-
2017
- 2017-03-16 CN CN201720256343.3U patent/CN206562264U/en not_active Withdrawn - After Issue
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106698208A (en) * | 2017-03-16 | 2017-05-24 | 中建五局工业设备安装有限公司 | Hoisting equipment and hoisting method for external transportation of super high-rise building |
CN111877762A (en) * | 2020-07-01 | 2020-11-03 | 上海建工集团股份有限公司 | Movable automatic installation tool system for precast concrete wallboard |
CN112049297A (en) * | 2020-09-27 | 2020-12-08 | 四川皇家蓝卡铝业有限公司 | Energy-saving inclined plane glass curtain wall |
CN112049297B (en) * | 2020-09-27 | 2021-07-20 | 四川皇家蓝卡铝业有限公司 | Energy-saving inclined plane glass curtain wall |
CN115123981A (en) * | 2022-06-29 | 2022-09-30 | 三一汽车制造有限公司 | Working bucket assembly and working machine |
CN115123981B (en) * | 2022-06-29 | 2023-05-23 | 三一汽车制造有限公司 | Working bucket assembly and working machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
CN205387439U (en) | Mast hoisting accessory | |
CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN204899238U (en) | Unitized curtain wall plate hoist device | |
CN109081247A (en) | A kind of hanging method of vestibule large-span steel girder | |
CN205688774U (en) | A kind of electric bridge scaffold | |
CN110670879A (en) | High-rise hoisting method for large equipment | |
CN109881590A (en) | Bridge steel box girder aerial work platform and construction method | |
CN107842246A (en) | A kind of chimney steel beam hydraulic lifting high-altitude integral slipping hanging apparatus and method | |
CN111502293A (en) | Method and system for hoisting single peripheral component of assembly type building | |
CN208071235U (en) | A kind of bearing and lifting system of steel truss frame integral hoisting | |
CN113175222B (en) | Method for installing embedded prefabricated external wall panel component | |
CN116853963B (en) | A hoisting device and hoisting method for main beam of cable-stayed bridge | |
CN103982046A (en) | Lifting and installation method of buckling restrained braces | |
CN219031629U (en) | Lifting equipment for indoor plate installation | |
CN216515179U (en) | Movable trolley for mounting and dismounting bridge guardrail template | |
CN110453689A (en) | Circular foundation pit lining wall formwork construction system and construction method | |
CN209957241U (en) | a steel hanger | |
CN115467507A (en) | A construction hanging basket and working method for reinforcing hyperbolic structures | |
CN206917297U (en) | A kind of large-span steel girder upper air installing system in place | |
CN107344698A (en) | A special high-altitude crane | |
CN104860212B (en) | A kind of micro lifter | |
CN109138398B (en) | Assembled suspension steel platform and construction method thereof | |
CN208122299U (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20171017 Effective date of abandoning: 20181002 |
|
AV01 | Patent right actively abandoned |