CN206800201U - The compound Hanging basket on front support of single cable plane - Google Patents

The compound Hanging basket on front support of single cable plane Download PDF

Info

Publication number
CN206800201U
CN206800201U CN201720437982.XU CN201720437982U CN206800201U CN 206800201 U CN206800201 U CN 206800201U CN 201720437982 U CN201720437982 U CN 201720437982U CN 206800201 U CN206800201 U CN 206800201U
Authority
CN
China
Prior art keywords
hanging basket
front support
longeron
truss
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720437982.XU
Other languages
Chinese (zh)
Inventor
李光均
李晓宇
王永明
汤善田
龙亮
刘琳
王丁
王丁一
李鹏波
童伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201720437982.XU priority Critical patent/CN206800201U/en
Application granted granted Critical
Publication of CN206800201U publication Critical patent/CN206800201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of compound Hanging basket on front support of single cable plane, it is characterized in that:Four English trusses are set in bridge floor, it is in vertical rigid support to provide one as cradle bottom bearing platform in the preceding suspension rod of the two panels lateralis truss in outside using office, and auxiliary bears the load of Hanging basket on front support bottom bearing platform, safeguards Hanging Basket lateral stability;The haulage gear of suspended basket is used as using interjacent two panels middle triangle truss;To adapt to the needs of end bay Cast-in-Situ Segment and closure segment construction, the arc head top surfaces of Hanging Basket guy rope longeron are arranged to flat board;The utility model is as platform, and on platform that cradle assembly is integral using girder 0#~1# blocks support and trestle, and Hanging Basket is integrally then lifted at into design position using the jack on bridge floor and anchored.The utility model makes clear and definite single cable plane Hanging basket on front support structure stress, sound construction, Hanging Basket installation method reasonable, can not only ensure project progress, moreover it is possible to effectively reduce construction cost.

Description

The compound Hanging basket on front support of single cable plane
Technical field
The compound Hanging basket on front support of single cable plane is the utility model is related to, is more specifically that a kind of stress is more complicated, Hanging Basket Lateral stability control difficulty is big and the construction method of Hanging basket on front support is installed on navigation channel.
Background technology
Domestic and international traditional " c-type " hangs most of leg formula Hanging basket on front support for double rope faces prestressed concrete oblique pull at present Bridge construction, the Hanging Basket bearing platform rigidity of the form is big, and lateral stability is good, and no top English truss aids in stress.It is but right In the single plane cable stayed bridge that girder wing plate is very thin and cantilever is larger, girder wing plate when hanging leg formula Hanging basket on front support using " c-type " Structure self-strength can not meet stress needs, can not set extension leg, Hanging basket on front support lateral stability control difficulty is big, need to adopt Taking special design to construct prevents Hanging Basket direction across bridge unstability;Also it is difficult to hang leg by c-type in terms of the stability of the traveling of Hanging Basket Solve.The first conventional way of guy rope longeron front end arc of Hanging basket on front support is designed as " bending upwards type ", but in maximum cantilever section During section construction, arc is first and inclined cable power conversion device easily mutually conflicts with end bay Cast-in-Situ Segment, is unfavorable for site operation control System.
In the prior art, the conventional installation methods for single plane cable stayed bridge Hanging basket on front support are to set up to face below bridge location When workbench, on temporary working platform by Hanging basket on front support install it is integral after using bridge floor jack lifted by the way of it is complete Into the assembly of Hanging Basket, but this mode for individually setting up temporary working platform will cause huge waste.
Utility model content
The utility model is to avoid the weak point present in above-mentioned prior art, there is provided before one kind can ensure single cable plane Fulcrum Hanging Basket lateral stability, ensure construction safety and quality, reduce construction cost, and the single cable plane that can shorten the construction used time is answered Mould assembly Hanging basket on front support.
The utility model solves technical problem and adopted the following technical scheme that:
The compound Hanging basket on front support of the utility model single cable plane is structurally characterized in that:In bridge floor, four English trusses are set, One is provided using office as cradle bottom bearing platform in the preceding suspension rod of the two panels lateralis truss in outside to prop up in vertical rigidity Point, auxiliary bear the load of Hanging basket on front support bottom bearing platform, safeguard Hanging Basket lateral stability;With in interjacent two panels Between haulage gear of the English truss as suspended basket;To adapt to the needs of end bay Cast-in-Situ Segment and closure segment construction, Hanging Basket guy rope The arc head top surfaces of longeron are arranged to flat board.
The design feature of the compound Hanging basket on front support of the utility model single cable plane is lain also in:The Hanging Basket guy rope longeron is set altogether Two panels, Hanging Basket guy rope longeron are the monoblock type box-structures being welded using steel plate, and setting the length of Hanging Basket guy rope longeron expires The installation requirement of sufficient suspended basket and suspension cable.
The design feature of the compound Hanging basket on front support of the utility model single cable plane is lain also in:In the rear suspension of box beam bottom plate Walking dolly, the walking dolly are to be arranged on the central track of Hanging Basket guy rope longeron as traveling slideway;Among two panels Suspender belt is set respectively on the lower boom of English truss, the suspender belt is attached with Hanging Basket guy rope longeron using bearing pin, Hanging Basket Bottom bearing platform is suspended in below English truss, and the top of suspender belt sets piston shoes, utilizes piston shoes and two panels middle triangle truss Lower boom be connected;Thrusting slip jack is set in the front end of two panels middle triangle truss, utilizes the thrusting slip thousand Jin top drawing piston shoes, so as to drive cradle bottom bearing platform integrally to move forward.
Compared with the prior art, the utility model has the beneficial effect that:
1st, the utility model successfully solves single rope on the triangular truss structure in the compound Hanging basket on front support of single cable plane The big technical barrier of face cable-stayed bridge Hanging basket on front support lateral stability control difficulty, while it is used as suspended basket by the use of English truss Draw-gear, it is rational in infrastructure, safe and reliable, so simplify construction, shorten the duration, reduce cost.
2nd, the utility model is suited measures to local conditions, Hanging Basket makes full use of girder 0# blocks, the support and main girder construction of girder 1# blocks Trestle is as platform for lining, and the installation method integrally lifted by jack solves the Hanging Basket on river course and installs difficulty in place Topic, reduces the security risk of overlength large-scale component upper air installing installation, while also ensure that the quality of Hanging basket on front support installation.
3rd, the compound Hanging basket on front support guy rope longeron front end arc head top surfaces improvement of single cable plane is arranged in the utility model Slab construction, the first arch section of arc is down translated, avoid to effect Hanging Basket arc head and stay cable force converting means Put the problem with Cast-in-Situ Segment interference.
Brief description of the drawings
Fig. 1 is the utility model facade structures schematic diagram;
Fig. 2 is cross-sectional configuration schematic diagram in the utility model;
Fig. 3 is the schematic cross-sectional view of the support of the utility model middle girder 0# blocks~girder 1# blocks;
Fig. 4 is Hanging Basket installation process schematic diagram in the utility model.
Label in figure:1 lateralis truss, 2 middle triangle truss, 3 Hanging Basket guy rope longerons, 4a bowl fastening type steel pipe feet hands Frame, 4b falseworks, 5 main girder construction trestles, 6 suspension cables, 7 walking dollies, 8 suspender belts, 9 piston shoes, 10 thrusting slip jack, before 11 Suspension rod, 12 cradle bottom bearing platforms, 13 girder 0# blocks, 14 girder 1# blocks, 15 traveling slideways.
Embodiment
Referring to Fig. 1 and Fig. 2, the structure type of the compound Hanging basket on front support of single cable plane is in the present embodiment:Set in bridge floor Four English trusses, carried with preceding suspension rod 11 of the office in the two panels lateralis truss 1 in outside for cradle bottom bearing platform 12 It is in vertical rigid support for one, auxiliary bears the load of Hanging basket on front support bottom bearing platform, safeguards Hanging Basket lateral stability; The haulage gear of suspended basket is used as using interjacent two panels middle triangle truss 2;To adapt to end bay Cast-in-Situ Segment and closure segment The needs of construction, the arc head top surfaces of Hanging Basket guy rope longeron 3 change into what is be horizontal by " bending upwards type " in traditional structure Slab construction, when this form can effectively prevent that maximum cantilever section and closure segment from constructing, first formed with Cast-in-Situ Segment of arc disturbs.
In specific implementation, Hanging Basket guy rope longeron 3 sets two panels altogether, Hanging Basket guy rope longeron 3 be welded using steel plate it is whole Body formula box-structure, the length of Hanging Basket guy rope longeron 3 is set to meet the installation requirement of suspended basket and suspension cable 6.
As shown in figure 1, in the rear suspension walking dolly 7 of box beam bottom plate, walking dolly 7 is indulged with being arranged on Hanging Basket guy rope The central track of beam 3 is traveling slideway 15, to ensure the stability of the compound Hanging basket on front support traveling of single cable plane, in twice Straining beam is welded between Hanging Basket guy rope longeron 3 and forms overall structure, traveling slideway is arranged on the top surface of straining beam.
Suspender belt 8 is set respectively on the lower boom of two panels middle triangle truss 2, suspender belt 8 and Hanging Basket guy rope longeron 3 are used Bearing pin is attached, and cradle bottom bearing platform 12 is suspended in the lower section of English truss, and the top of suspender belt 8 sets piston shoes 9, utilized Piston shoes 9 are connected with the lower boom of two panels middle triangle truss 2;In the front end of two panels middle triangle truss 2, thrusting slip is set Jack 10, piston shoes 9 are pulled using thrusting slip jack 10, so as to drive cradle bottom bearing platform 12 overall to reach It is dynamic.
The installation method of the compound Hanging basket on front support of single cable plane is in the present embodiment:
Girder 0# blocks 13 and girder 1# blocks 14 are constructed using support cast-in-place, and the support of girder 0# blocks 13 and girder 1# blocks 14 is Using the modular support being made up of bowl fastening type steel pipe scaffold 4a and falsework 4b, falsework 4b top surface absolute altitude and main girder construction stack The top surface absolute altitude of bridge 5 flushes, and falsework 4b is linked to be entirety with existing main girder construction trestle 5;First with bowl fastening type steel pipe feet hand Frame 4a completes the cast-in-place construction of girder 0# blocks 13 and girder 1# blocks 14, and completes the installation of suspension cable 6;Then remove bowl fastening type steel Pin hand cradle 4a, the integral assembling of Hanging Basket is completed on main girder construction trestle 5 and falsework 4b, recycle thousand be arranged on bridge floor Hanging Basket is overall increased to design attitude and implements anchoring by jin top.
The compound Hanging basket on front support of single cable plane is installed according to the following procedure in the present embodiment:
Step 1, as shown in Figure 3 and Figure 4, sets up modular support in the lower section of girder 0# blocks 13 and girder 1# blocks 14 first It is the combination being made up of bowl fastening type steel pipe scaffold 4a and falsework 4b for girder 0# blocks 13 and the cast-in-place construction of girder 1# blocks 14 Formula support, falsework 4b top surface absolute altitude flush with the top mark height of existing main girder construction trestle 5, falsework 4b and main girder construction trestle 5 are linked to be entirety;Bowl fastening type steel pipe feet is removed after the cast-in-place completion of girder 0# blocks 13 and girder 1# blocks 14, suspension cable 6 install Hand cradle 4a.
Step 2, as shown in figure 4, because Hanging Basket guy rope 3 length of longeron are big, weight is big, lifting distance is remote, need to be applied in girder A large automobile crane burst is set to be lifted into the underface of design bridge location on work trestle 5;Lifted in Hanging Basket guy rope longeron 3 to setting After counting immediately below bridge location, lower section is smooth and firm using shaped steel and steel plate pad, finally as the tower crane used in main girder construction by horizontal stroke Welding is linked to be entirety between binder burst is lifted into twice Hanging Basket guy rope longeron 3.
Step 3, hung by kart or tower crane lifting external mold type steel skeleton, and by external mold type steel skeleton and Hanging Basket guy rope Longeron 3 carries out pin joint, hangs successively to lift bed die and external mold to welding on cradle bottom bearing platform using kart and is linked to be It is overall;Finally set four jack that cradle bottom bearing platform is promoted into designed elevation on bridge floor.
It is step 4, on main girder construction trestle 5 that the English truss burst of Hanging Basket is assembled first, then utilize truck crane will English truss burst is lifted to bridge floor and is linked to be entirety, and remaining parts of Hanging Basket are all mounted to using tower crane lifting.

Claims (3)

1. the compound Hanging basket on front support of single cable plane, it is characterized in that:Four English trusses are set in bridge floor, with office the two of outside The preceding suspension rod (11) of piece lateralis truss (1) is that cradle bottom bearing platform (12) offer one is in vertical rigid support, auxiliary The load for bearing Hanging basket on front support bottom bearing platform (12) is helped, safeguards Hanging Basket lateral stability;With in interjacent two panels Between haulage gear of the English truss (2) as suspended basket;To adapt to the needs of end bay Cast-in-Situ Segment and closure segment construction, Hanging Basket is led The arc head top surfaces of rope longeron (3) are arranged to flat board.
2. the compound Hanging basket on front support of single cable plane according to claim 1, it is characterized in that:The Hanging Basket guy rope longeron (3) Two panels is set altogether, and Hanging Basket guy rope longeron (3) is the monoblock type box-structure being welded using steel plate, sets Hanging Basket guy rope longeron (3) length meets the installation requirement of suspended basket and suspension cable (6).
3. the compound Hanging basket on front support of single cable plane according to claim 1, it is characterized in that:In the rear suspension of box beam bottom plate Walking dolly (7), the walking dolly (7) are to be arranged on the central track of Hanging Basket guy rope longeron (3) as traveling slideway (15);Suspender belt (8) is set respectively on the lower boom of two panels middle triangle truss (2), the suspender belt (8) is indulged with Hanging Basket guy rope Beam (3) is attached using bearing pin, and cradle bottom bearing platform (12) is suspended in below English truss, and the top of suspender belt (8) is set Piston shoes (9) are put, are connected using piston shoes (9) with the lower boom of two panels middle triangle truss (2);In two panels middle triangle truss (2) front end sets thrusting slip jack (10), piston shoes (9) is pulled using the thrusting slip jack (10), so as to band Dynamic cradle bottom bearing platform (12) integrally moves forward.
CN201720437982.XU 2017-04-25 2017-04-25 The compound Hanging basket on front support of single cable plane Active CN206800201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720437982.XU CN206800201U (en) 2017-04-25 2017-04-25 The compound Hanging basket on front support of single cable plane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720437982.XU CN206800201U (en) 2017-04-25 2017-04-25 The compound Hanging basket on front support of single cable plane

Publications (1)

Publication Number Publication Date
CN206800201U true CN206800201U (en) 2017-12-26

Family

ID=60733612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720437982.XU Active CN206800201U (en) 2017-04-25 2017-04-25 The compound Hanging basket on front support of single cable plane

Country Status (1)

Country Link
CN (1) CN206800201U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059654A (en) * 2017-04-25 2017-08-18 中铁上海工程局集团有限公司 The compound overlength Hanging basket on front support of single cable plane and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059654A (en) * 2017-04-25 2017-08-18 中铁上海工程局集团有限公司 The compound overlength Hanging basket on front support of single cable plane and its installation method

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN201411900Y (en) Hydraulic die lifter for chimneys
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN101566005B (en) Chimney hydraulic mould lifting device
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN207268073U (en) Novel flexible formwork bearing frame
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN112696013B (en) Integral self-disassembling type beam bottom supporting device
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN210508440U (en) Turnover lifting device for single-piece large-span steel truss
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier

Legal Events

Date Code Title Description
GR01 Patent grant