Scaffold external corner net frame mounting part and external corner net frame mounting structure
Technical Field
The utility model relates to a net frame installation technique of scaffold frame, in particular to scaffold frame external corner net frame installed part, and external corner net frame mounting structure who uses thereof.
Background
The lifting scaffold is a scaffold which is erected on a high-rise building or a decoration construction site for facilitating the operation of workers and solving the problems of vertical and horizontal transportation, can be applied to the construction protection of high-rise and super-high-rise building buildings with various design types and high-rise buildings with consistent appearances, is suitable for the construction of complex appearances such as cast-in-place shear walls, frames, circular-arc balconies, raising boards and the like, and particularly is an attached lifting scaffold which is erected along the outer surface of a building structure and is a novel scaffold technology rapidly developed at the beginning of the century, changes high-altitude operation into low-altitude operation and changes suspended operation into internal operation of a frame body.
In order to make constructor operation safety, can install safe net piece in scaffold frame periphery, current net piece generally with scaffold frame fixed coordination, the installation is complicated, especially the net piece installation of scaffold frame corner is more troublesome, the scaffold frame corner divide into again: external corners (outward convex configuration) and external corners (inward concave configuration). And the scaffold is not suitable for reuse after being disassembled, so that the problems of high cost, low efficiency and the like are caused. In addition, high altitude construction also has higher requirement to the installation fixed of net piece, not only requires the installation firm, also requires simple to operate, swift simultaneously.
Therefore, the inventor researches and develops a series of mounting pieces which are convenient to mount and can be repeatedly used aiming at various defects that the existing mesh piece is inconvenient to mount and fix and the like, and the mounting pieces comprise mounting pieces applied to corners of the scaffold and mounting pieces applied to corners of the scaffold.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame external corner net frame installed part and external corner net frame mounting structure who uses thereof can make things convenient for the net piece net frame of scaffold frame external corner to install fast fixed.
In order to achieve the above object, the solution of the present invention is:
the utility model provides a scaffold frame external corner net frame installed part, the main part cross-section is L shape, and L shape main part has the diaphragm that supplies scaffold frame external corner department both sides net piece net frame to fix and supplies the riser that scaffold frame external corner department one side horizontal pole is fixed, forms the assembly area of scaffold frame horizontal pole between diaphragm and the riser, and the outer end and the below of diaphragm respectively have a sleeve pipe and supply the round pin post to alternate, realize with the help of sleeve pipe and round pin post cooperation that the net piece net frame of scaffold frame external corner both sides is fixed.
The transverse plate and the vertical plate of the L-shaped main body are perpendicular to each other.
The outer end of the transverse plate forms a sleeve protruding into the assembly area.
And a sleeve is fixed below the transverse plate through welding.
The vertical plates are provided with through holes, and the vertical plates are fixed on the cross rods at the external corners of the scaffold by means of bolts on the cross rods at the external corners of the scaffold.
The utility model provides a scaffold frame external corner net frame mounting structure, the riser of above-mentioned installed part is fixed on a horizontal pole of scaffold frame external corner department with the help of the bolt, a plurality of net frames that are equipped with the net piece are on a parallel with the diaphragm and the riser of installed part respectively, and the net frame is in the upper and lower position installation cotter pipe of external corner department and the alignment of the sleeve pipe of diaphragm outer end and below, a round pin post of respectively planting in the sleeve pipe of diaphragm outer end and below, at least upper end or the lower extreme of each round pin post is planted in the cotter pipe of a net piece net frame, make the net piece net frame of external corner both sides connected simultaneously of an installed part, realize the installation of external corner net frame and fix, the round.
The pin is radially inserted on the pin column, the pin is positioned between the sleeve of the mounting part and the pin pipe of the screen frame, one end of the pin is inserted into the pin column, and the other end of the pin is propped against the middle of the sleeve and the pin pipe, so that the pin column is fixed in the corresponding sleeve and the pin pipe.
The upper end and the lower end of each pin column in the two sleeves of the transverse plate are respectively inserted into the pin tube of one mesh screen frame, so that each pin column is connected with the upper mesh screen frame and the lower mesh screen frame, and the whole mounting part is connected with the upper mesh screen frame and the lower mesh screen frame on two sides of the external corner.
After the scheme is adopted, the utility model discloses an installed part respectively has a sleeve pipe in the both sides that correspond the scaffold frame external corner on the diaphragm, and the frame of net of external corner both sides can be conveniently, installed fast to a round pin post of equipment in every sleeve pipe, can install four adjacent net piece frames from top to bottom at most, can realize installing the external corner frame fast, and it is also very convenient, swift to dismantle.
The present invention will be further explained with reference to the drawings and examples.
Drawings
Fig. 1 is a perspective view of the mounting member of the present invention;
fig. 2 is a schematic perspective view of the screen frame mounting structure of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 2;
fig. 4 is a plan view of the screen frame mounting structure of the present invention;
fig. 5 is a partially enlarged view of fig. 4.
Description of the reference symbols
The mounting piece 10, the transverse plate 11, the vertical plate 12, the sleeve 13, the mounting area 14 and the through hole 15;
cross bar 20, bolt 21;
pin 30, pin 31;
a net frame 40, a net sheet 41 and a pin pipe 42.
Detailed Description
As shown in fig. 1 to 5, the utility model discloses a scaffold external corner net frame installed part 10, the main part cross-section is L shape, L shape main part has diaphragm 11 and riser 12, diaphragm 11 supplies scaffold external corner department both sides net piece net frame 40 fixed, riser 12 supplies scaffold external corner department (to the evagination position) one side horizontal pole 20 fixed, form assembly area 14 of scaffold horizontal pole 20 between diaphragm 11 and the riser 12, assembly area 14 can hold the bolt 21 of assembly horizontal pole 20, diaphragm 11's outer end and below respectively have a sleeve pipe 13, sleeve pipe 13 supplies round pin post 30 to alternate, realize the net piece net frame 40 of scaffold external corner both sides fixed with the help of sleeve pipe 13 and the cooperation of round pin post 30.
In general, the scaffold external corner is a right angle, and accordingly, the transverse plate 11 and the vertical plate 12 of the L-shaped body are perpendicular to each other.
In order to more conveniently assemble, the utility model discloses an optimal design is: the outer end of the transverse plate 11 forms a sleeve 13 protruding into the assembly area 14; a sleeve 13 is fixed below the transverse plate 11 by welding. Therefore, the assembly process is not hindered and interfered, and the operation is more convenient.
In order to facilitate the assembly of the mounting members 10 to the scaffold rails 20, the risers 12 are provided with through holes 15, and the risers 12 can be fixed to a rail 20 at the scaffold corner by means of bolts 21 on the rail 20 at the scaffold corner passing through the through holes 15.
The utility model also discloses a scaffold external corner net frame mounting structure, be the concrete application of above-mentioned installed part 10 on the scaffold, the riser 12 of installed part 10 is fixed on a horizontal pole 20 of scaffold external corner department with the help of bolt 21, a plurality of net frame 40 that are equipped with net piece 41 are on a parallel with diaphragm 11 and riser 12 of installed part 10 respectively, and the net frame 40 is in the upper and lower position installation cotter pipe 42 of external corner department, cotter pipe 42 aligns with diaphragm 11 outer end or sleeve pipe 13 of below respectively, respectively plant a round pin post 30 in diaphragm 11 outer end and the sleeve pipe 13 of below, each round pin post 30 is planted in the cotter pipe 42 of a net piece net frame 40 upper end or lower extreme at least, make the net piece 40 of external corner both sides connected simultaneously of an installed part 10, realize that the installation of external corner net frame is fixed. If the upper ends and the lower ends of the pin columns 30 in the two sleeves 13 of the transverse plate 11 are respectively inserted into the pin pipes 42 of one mesh screen frame 40, each pin column 30 is connected with the upper mesh screen frame 40 and the lower mesh screen frame 40, at the moment, the whole mounting part 10 can be connected with the upper mesh screen frame 40 and the lower mesh screen frame 40 on two sides of the external corner together, the purpose of quickly assembling the external corner screen frames 40 is achieved, and the assembly and the disassembly are very convenient and quick. The pin 30 is also provided with a pin 31 for limiting the axial movement of the pin 30, the pin 31 is used for ensuring the effective assembly of the sleeve 13 and the pin tube 42, the specific structure and installation position of the pin 31 can be shown as but not limited to the drawing, the pin 31 is radially inserted on the pin 30, the pin 31 is positioned between the sleeve 13 of the installation part 10 and the pin tube 42 of the net frame 40, one end of the pin 31 is inserted into the pin 30, and the other end is abutted against the middle of the sleeve 13 and the pin tube 42, so that the pin 30 is fixed in the corresponding sleeve 13 and the pin tube 42, and the pin 30 cannot be pulled out of the sleeve 13.
The above description is only an example of the present invention and is not intended as a limitation. It should be noted that, after reading this description, the skilled in the art may make modifications as required without inventive contribution, but only protected by the patent laws within the scope of the claims of the present invention.