CN107806236A - A kind of adjustable construction scaffold and its installation method - Google Patents
A kind of adjustable construction scaffold and its installation method Download PDFInfo
- Publication number
- CN107806236A CN107806236A CN201710980217.7A CN201710980217A CN107806236A CN 107806236 A CN107806236 A CN 107806236A CN 201710980217 A CN201710980217 A CN 201710980217A CN 107806236 A CN107806236 A CN 107806236A
- Authority
- CN
- China
- Prior art keywords
- mounting
- thread post
- engaged
- post
- spacing hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 title claims abstract description 12
- 230000000712 assembly Effects 0.000 claims abstract description 4
- 238000000429 assembly Methods 0.000 claims abstract description 4
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 229930183489 erectone Natural products 0.000 claims 1
- 238000012856 packing Methods 0.000 claims 1
- 239000002689 soil Substances 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
The invention discloses two mounting assemblies of a kind of adjustable construction scaffold, including symmetrical distribution, it is connected between two mounting assembly tops by pedal, two connection stocks is symmetrically installed between two mounting assembly bottoms;Mounting assembly includes front and rear two symmetrical mounting kits, is slidably fitted with supporting slider between two mounting kit tops, is connected between two mounting kit bottoms by connecting quarter butt;The present invention also provides a kind of adjustable construction scaffold installation method, is sequentially completed mounting kit, mounting assembly in order, connects the installation of stock, pedal with putting.The present invention passes through scientific and reasonable structure design, it is simple in construction, it is cheap, can be according to actual condition demand, adjust scaffold in real time uses height, when greatly improving the operating efficiency of construction, and being constructed in soil, quick rotation can be carried out by the cone-shaped plug on fastener to fix, and ensured that staff's is safe to use.
Description
Technical field
The invention belongs to the realm of building construction, more particularly to a kind of adjustable construction scaffold and its installation side
Method.
Background technology
Scaffold is to ensure workbench that each work progress is smoothed out and set up.Position by setting up is divided into outer
Scaffold, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It is divided into by structural form vertical
Rod-type scaffold, bridge scaffold, door-type scaffold, swinging scaffold, suspended scaffold, choose formula scaffold, climb formula pin hand
Frame.Traditional scaffold installation is complicated, and height adjusts difficulty, can not adapt to various complex working conditions, one is brought to construction
Fixed puzzlement.
The content of the invention
It is an object of the invention to overcome problem above existing for prior art, there is provided a kind of adjustable construction pin
Hand cradle and its installation method, it can arbitrarily adjust the use condition for using height, meeting various operating modes.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
A kind of adjustable construction scaffold, include two mounting assemblies of symmetrical distribution, two installation groups
Part is connected between top by pedal, and two connection stocks are symmetrically installed between two mounting assembly bottoms;
The mounting assembly includes front and rear two symmetrical mounting kits, and peace is slided between two mounting kit tops
Equipped with supporting slider, it is connected between two mounting kit bottoms by connecting quarter butt;
The mounting kit includes mounting bracket, and mounting bracket top is slidably fitted with sliding support, sliding support and peace
Shelve and be fixedly linked by keeper between top;Mounting bracket bottom is sequentially installed with foot pad, fastener, internal thread from bottom to top
Cylinder, connector;
The mounting bracket includes front and rear two symmetrical mounting rods, is fixed between two mounting rod bottoms by bottom bar
It is connected;Mounting rod inboard, upright is provided with guide chute, and mounting rod the week side of boss is vertically evenly equipped with the first of some left and right insertions
Spacing hole;One of mounting rod bottom is provided with screw rod vertically;Sliding support includes spacing draw runner, spacing draw runner front and back end pair
Claim to be provided with the guide runner being engaged with guide chute, spacing draw runner by-level is provided with the second spacing hole;Keeper includes fixed
Position bar, positioning strip front and back end are vertically provided with the first limited post for being engaged with the first spacing hole, positioning strip intermediate vertical be provided with
The second limited post that second spacing hole is engaged;
The foot pad includes the thread bush being threadedly coupled with screw rod, and thread bush bottom level is provided with rubber blanket, rubber
Pad edge performer's circumferential direction is evenly equipped with the 3rd spacing hole;Fastener includes the pressure ring being slidably mounted on screw rod, pressure ring bottom sides
Edge is along the circumferential direction evenly equipped with the tapered plug corresponding with the 3rd spacing hole;Internal thread cylinder is threadedly coupled with screw rod, interior
Thread barrel bottom contacts with pressure ring to be connected;Connector includes adapter sleeve, and adapter sleeve the week side of boss is vertically respectively equipped with plus thread post and anti-
Threaded post, the angle between plus thread post and left-hand thread post are 90 degree;
Described connection quarter butt one end is provided with the first plus thread hole that plus thread post is engaged, the connection quarter butt other end be provided with
The first left-hand thread hole that left-hand thread post is engaged, connection stock one end are provided with the second plus thread hole that plus thread post is engaged, even
The extension bar other end is provided with the second left-hand thread hole being engaged with left-hand thread post;Supporting slider both ends are arranged with to be slided with mounting rod
The dynamic sliding sleeve coordinated;
The pedal left and right ends are arranged with the arc buckle being connected with supporting slider overlap joint.
Further, spring is installed, spring top contacts with pressure ring bottom to be connected, spring bottom on the outside of the tapered plug
Portion contacts with rubber blanket to be connected, and avoids fastener from causing tapered plug to be connect through the 3rd spacing hole with ground under gravity
Touch.
Further, the internal thread cylinder the week side of boss is along the circumferential direction evenly equipped with wave groove, improves the rotation of internal thread cylinder the week side of boss
Turn frictional force.
Further, the tapered plug the week side of boss is provided with annular slot, is fixed among the 3rd spacing hole and annular slot
The O-ring seal being engaged, tapered plug is avoided to depart from ground.
The present invention also provides a kind of adjustable construction scaffold installation method, the described method comprises the following steps:
Step 1:Connector is installed to screw tip first, then rotation installation internal thread cylinder, until internal thread cylinder top
End is in contact with connector, then fastener is slidably mounted on screw rod, finally screws foot pad;
Step 2:Then sliding support is slidably mounted on mounting rod and installation is fixed by keeper, from
And the installation for completing mounting kit prepares;
Step 3:Take symmetrically placed before and after two mounting kits, supporting slider is slidably mounted to the installation of mounting kit
On bar;
Step 4:Connection quarter butt both ends are connected with the plus thread post and left-hand thread post of front and rear connector respectively, then twisted
Tightly, the installation for completing mounting assembly prepares;
Step 5:Connection stock both ends are connected with the plus thread post and left-hand thread post of left and right mounting assembly respectively, then
Tighten, and pedal is placed on supporting slider.
The beneficial effects of the invention are as follows:
The present invention is simple in construction by scientific and reasonable structure design, cheap, can according to actual condition demand,
Adjust scaffold in real time uses height, can when greatly improving the operating efficiency of construction, and being constructed in soil
Quick rotation is carried out by the cone-shaped plug on fastener to fix, and has ensured that staff's is safe to use.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair
Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the partial structural diagram of the present invention;
Fig. 3 is the partial structural diagram of the present invention;
Fig. 4 is the partial structurtes explosive view of the present invention;
Fig. 5 is the partial structurtes explosive view of the present invention;
Fig. 6 is the partial structural diagram of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained all other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
In the description of the invention, it is to be understood that term " perforate ", " on ", " under ", " thickness ", " top ", " in ",
Indicating position or the position relationship such as " length ", " interior ", " surrounding ", it is for only for ease of the description present invention and simplifies description, without
It is that the component of instruction or hint meaning or element must have specific orientation, with specific azimuth configuration and operation, therefore not
It is understood that as limitation of the present invention.
A kind of adjustable construction scaffold as shown in Figure 1, include two mounting assemblies of symmetrical distribution
1, it is connected by pedal 3 between two tops of mounting assembly 1, two connections is symmetrically installed between two bottoms of mounting assembly 1
Stock 2.
As shown in Fig. 2 mounting assembly 1 includes front and rear two symmetrical mounting kits 11, two mounting kits 11 push up
Supporting slider 12 is slidably fitted between end, is connected between two bottoms of mounting kit 11 by connecting quarter butt 13.
As shown in figure 3, mounting kit 11 includes mounting bracket 111, the top of mounting bracket 111 is slidably fitted with sliding support
116, it is fixedly linked between sliding support 116 and the top of mounting bracket 111 by keeper 117;The bottom of mounting bracket 111 from lower and
On be sequentially installed with foot pad 112, fastener 113, internal thread cylinder 114, connector 115.
As shown in figure 4, mounting bracket 111 includes front and rear two symmetrical mounting rods 1111, two bottoms of mounting rod 1111
It is fixedly linked between end by bottom bar 1112;The inboard, upright of mounting rod 1111 is provided with guide chute 1115, the week side of boss of mounting rod 1111
Vertically it is evenly equipped with the first spacing hole 1114 of some left and right insertions;One of bottom of mounting rod 1111 is provided with spiral shell vertically
Bar 1113;Sliding support 116 includes spacing draw runner 1161, and the spacing front and back end of draw runner 1161 is arranged with and guide chute 1115
The guide runner 1162 being engaged, the spacing by-level of draw runner 1161 are provided with the second spacing hole 1163;Keeper 117 includes positioning
Bar 1171, the front and back end of positioning strip 1171 are vertically provided with the first limited post 1172 being engaged with the first spacing hole 1114, positioning strip
1171 intermediate verticals are provided with the second limited post 1173 being engaged with the second spacing hole 1163.
As shown in figure 5, foot pad 112 includes the thread bush 1121 being threadedly coupled with screw rod 1113, the bottom of thread bush 1121
Portion's level is provided with rubber blanket 1122, and the edge performer's circumferential direction of rubber blanket 1122 is evenly equipped with the 3rd spacing hole 1123;Fastener 113 wraps
The pressure ring 1131 being slidably mounted on screw rod 1113 is included, the bottom margin of pressure ring 1131 is along the circumferential direction evenly equipped with and the 3rd spacing hole
1123 corresponding tapered plugs 1132;Internal thread cylinder 114 is threadedly coupled with screw rod 1113, the bottom of internal thread cylinder 114 with
The contact of pressure ring 1131 is connected;Connector 115 includes adapter sleeve 1151, and the week side of boss of adapter sleeve 1151 is vertically respectively equipped with plus thread post
1152 and left-hand thread post 1153, the angle between plus thread post 1152 and left-hand thread post 1153 be 90 degree;Outside tapered plug 1132
Side is provided with spring, and spring top contacts with the bottom of pressure ring 1131 to be connected, and spring bottom contacts with rubber blanket 1122 to be connected, and avoids
Fastener 113 causes tapered plug 1132 to be contacted through the 3rd spacing hole 1123 with ground under gravity;Internal thread cylinder 114
The week side of boss is along the circumferential direction evenly equipped with wave groove, improves the rotating friction force of the week side of boss of internal thread cylinder 114;The tapered the week side of boss of plug 1132 is set
There is annular slot, the O-ring seal being engaged with annular slot is fixed among the 3rd spacing hole 1123, avoid tapered plug
1132 depart from ground.
Connection quarter butt 13 one end is provided with the first plus thread hole that plus thread post 1152 is engaged, and the connection other end of quarter butt 13 is set
Have the first left-hand thread hole being engaged with left-hand thread post 1153, connection stock 2 one end be provided with that plus thread post 1152 is engaged the
Two plus thread holes, connection stock 2 other end are provided with the second left-hand thread hole being engaged with left-hand thread post 1153;12 liang of supporting slider
End is arranged with the sliding sleeve being slidably matched with mounting rod 1111;Slided as shown in fig. 6, the left and right ends of pedal 3 are arranged with support
The connected arc buckle 31 of the overlap joint of bar 12.
The present invention also provides a kind of adjustable construction scaffold installation method, and method comprises the following steps:
Step 1:Connector 115 is installed to the top of screw rod 1113 first, then rotation installation internal thread cylinder 114, until
The top of internal thread cylinder 114 is in contact with connector 115, then fastener 113 is slidably mounted on screw rod 1113, finally screws pin
Pad 112;
Step 2:Then sliding support 116 is slidably mounted on mounting rod 1111 and consolidated by keeper 117
Dingan County fills, and prepares so as to complete the installation of mounting kit 11;
Step 3:Take symmetrically placed before and after two mounting kits 11, supporting slider 12 is slidably mounted to mounting kit 11
Mounting rod 1111 on;
Step 4:The both ends of the quarter butt 13 plus thread post 1152 and left-hand thread post with front and rear connector 115 respectively will be connected
1153 are connected, and then tighten, and the installation for completing mounting assembly 1 prepares;
Step 5:The both ends of the stock 2 plus thread post 1152 and left-hand thread post 1153 with left and right mounting assembly 1 respectively will be connected
It is connected, then tightens, and pedal 3 is placed on supporting slider 12.
In use, according to actual use demand, adjust the position of sliding support 116 and carried out soon by keeper 117
Speed is fixed, when being constructed on soil, fastener 113 is pressed down against by rotating female screw cylinder 114, so that tapered
Plug 1132 inserts soil and is fixed.
The present invention is simple in construction by scientific and reasonable structure design, cheap, can according to actual condition demand,
Adjust scaffold in real time uses height, can when greatly improving the operating efficiency of construction, and being constructed in soil
Quick rotation is carried out by the cone-shaped plug on fastener to fix, and has ensured that staff's is safe to use.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
At least one implementation of the present invention is contained in reference to specific features, structure, material or the feature that the embodiment or example describe
In example or example.In this manual, identical embodiment or example are not necessarily referring to the schematic representation of above-mentioned term.
Moreover, specific features, structure, material or the feature of description can close in any one or more embodiments or example
Suitable mode combines.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.
Claims (5)
- A kind of 1. adjustable construction scaffold, it is characterised in that:Two mounting assemblies including symmetrical distribution (1), it is connected between two mounting assembly (1) tops by pedal (3), is symmetrically installed between two mounting assembly (1) bottoms Two connection stocks (2);The mounting assembly (1) includes front and rear two symmetrical mounting kits (11), two mounting kit (11) tops it Between be slidably fitted with supporting slider (12), be connected between two mounting kit (11) bottoms by connecting quarter butt (13);The mounting kit (11) includes mounting bracket (111), and mounting bracket (111) top is slidably fitted with sliding support (116), It is fixedly linked between sliding support (116) and mounting bracket (111) top by keeper (117);Mounting bracket (111) bottom is certainly Foot pad (112), fastener (113), internal thread cylinder (114), connector (115) are sequentially installed with down;The mounting bracket (111) includes front and rear two symmetrical mounting rods (1111), two mounting rod (1111) bottoms it Between be fixedly linked by bottom bar (1112);Mounting rod (1111) inboard, upright is provided with guide chute (1115), mounting rod (1111) The week side of boss is vertically evenly equipped with the first spacing hole (1114) of some left and right insertions;Erect one of mounting rod (1111) bottom Directly it is provided with screw rod (1113);Sliding support (116) includes spacing draw runner (1161), and spacing draw runner (1161) front and back end is symmetrically set There is the guide runner (1162) being engaged with guide chute (1115), spacing draw runner (1161) by-level is provided with the second spacing hole (1163);Keeper (117) includes positioning strip (1171), and positioning strip (1171) front and back end is vertically provided with and the first spacing hole (1114) the first limited post (1172) being engaged, positioning strip (1171) intermediate vertical is provided with to match with the second spacing hole (1163) The second limited post (1173) closed;The foot pad (112) includes the thread bush (1121) being threadedly coupled with screw rod (1113), thread bush (1121) bottom Level is provided with rubber blanket (1122), and rubber blanket (1122) edge performer's circumferential direction is evenly equipped with the 3rd spacing hole (1123);Fastener (113) pressure ring (1131) being slidably mounted on screw rod (1113) is included, pressure ring (1131) bottom margin is along the circumferential direction uniform There is the tapered plug (1132) corresponding with the 3rd spacing hole (1123);Internal thread cylinder (114) carries out screw thread with screw rod (1113) Connection, internal thread cylinder (114) bottom contacts with pressure ring (1131) to be connected;Connector (115) includes adapter sleeve (1151), adapter sleeve (1151) the week side of boss is vertically respectively equipped with plus thread post (1152) and left-hand thread post (1153), plus thread post (1152) and left-hand thread post (1153) angle between is 90 degree;Described connection quarter butt (13) one end is provided with the first plus thread hole that plus thread post (1152) is engaged, and connection quarter butt (13) is another One end is provided with the first left-hand thread hole being engaged with left-hand thread post (1153), and connection stock (2) one end is provided with plus thread post (1152) the second plus thread hole being engaged, connection stock (2) other end are provided with second be engaged with left-hand thread post (1153) Left-hand thread hole;Supporting slider (12) both ends are arranged with the sliding sleeve being slidably matched with mounting rod (1111);Pedal (3) left and right ends are arranged with the arc buckle (31) being connected with supporting slider (12) overlap joint.
- A kind of 2. adjustable construction scaffold according to claim 1, it is characterised in that:The tapered plug (1132) outside is provided with spring, and spring top contacts with pressure ring (1131) bottom to be connected, spring bottom and rubber blanket (1122) Contact is connected.
- A kind of 3. adjustable construction scaffold according to claim 1, it is characterised in that:The internal thread cylinder (114) the week side of boss is along the circumferential direction evenly equipped with wave groove.
- A kind of 4. adjustable construction scaffold according to claim 1, it is characterised in that:The tapered plug (1132) the week side of boss is provided with annular slot, and the ring packing being engaged with annular slot is fixed among the 3rd spacing hole (1123) Circle.
- A kind of 5. adjustable construction scaffold installation method according to claim 1, it is characterised in that:The side Method comprises the following steps:Step 1:Connector (115) is installed to screw rod (1113) top first, then rotation installation internal thread cylinder (114), directly It is in contact to internal thread cylinder (114) top with connector (115), then fastener (113) is slidably mounted on screw rod (1113), Finally screw foot pad (112);Step 2:Then sliding support (116) is slidably mounted on mounting rod (1111) and carried out by keeper (117) It is fixedly mounted, prepares so as to complete the installation of mounting kit (11);Step 3:Take symmetrically placed before and after two mounting kits (11), supporting slider (12) is slidably mounted to mounting kit (11) on mounting rod (1111);Step 4:Quarter butt (13) both ends plus thread post (1152) and left-hand thread post with front and rear connector (115) respectively will be connected (1153) it is connected, then tightens, the installation for completing mounting assembly (1) prepares;Step 5:Stock (2) both ends plus thread post (1152) and left-hand thread post with left and right mounting assembly (1) respectively will be connected (1153) it is connected, then tightens, and pedal (3) is placed on supporting slider (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710980217.7A CN107806236A (en) | 2017-10-19 | 2017-10-19 | A kind of adjustable construction scaffold and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710980217.7A CN107806236A (en) | 2017-10-19 | 2017-10-19 | A kind of adjustable construction scaffold and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107806236A true CN107806236A (en) | 2018-03-16 |
Family
ID=61592858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710980217.7A Pending CN107806236A (en) | 2017-10-19 | 2017-10-19 | A kind of adjustable construction scaffold and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107806236A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502218A (en) * | 2020-05-06 | 2020-08-07 | 深圳市骏龙达建筑工程有限公司 | Construction frame |
CN111764615A (en) * | 2019-04-01 | 2020-10-13 | 中国石油天然气股份有限公司 | Scaffold |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWM261095U (en) * | 2004-06-17 | 2005-04-11 | Ching-Po Wang | Post rod and assembly structure for shelf |
CN202823448U (en) * | 2012-10-11 | 2013-03-27 | 青岛市市立医院 | Test tube bracket |
CN104389416A (en) * | 2014-12-11 | 2015-03-04 | 韩翼 | Decoration scaffold with fixed piles |
CN204475813U (en) * | 2015-03-06 | 2015-07-15 | 孙素宾 | A kind of building operations height adjustable scaffold |
CN204590551U (en) * | 2015-04-14 | 2015-08-26 | 张春丽 | A kind of portable height-adjustable door-type scaffold |
CN204804299U (en) * | 2015-07-03 | 2015-11-25 | 上海绿地建设(集团)有限公司 | Scaffold for construction |
CN204876610U (en) * | 2015-06-24 | 2015-12-16 | 叶玲玲 | Protector that construction was used convenient to installation |
CN205424336U (en) * | 2016-03-16 | 2016-08-03 | 中山市宜高机电科技有限公司 | Height -adjustable festival and general liquid crystal TV cradle who takes protect function |
CN206262002U (en) * | 2016-12-13 | 2017-06-20 | 温州市人民医院 | Hemiplegic patient's waist buttocks exercising apparatus |
CN206448504U (en) * | 2017-02-13 | 2017-08-29 | 广西建工集团第二建筑工程有限责任公司 | It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction |
CN206873887U (en) * | 2017-10-19 | 2018-01-12 | 安徽建诚国际经济技术合作有限公司 | A kind of adjustable construction scaffold |
-
2017
- 2017-10-19 CN CN201710980217.7A patent/CN107806236A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWM261095U (en) * | 2004-06-17 | 2005-04-11 | Ching-Po Wang | Post rod and assembly structure for shelf |
CN202823448U (en) * | 2012-10-11 | 2013-03-27 | 青岛市市立医院 | Test tube bracket |
CN104389416A (en) * | 2014-12-11 | 2015-03-04 | 韩翼 | Decoration scaffold with fixed piles |
CN204475813U (en) * | 2015-03-06 | 2015-07-15 | 孙素宾 | A kind of building operations height adjustable scaffold |
CN204590551U (en) * | 2015-04-14 | 2015-08-26 | 张春丽 | A kind of portable height-adjustable door-type scaffold |
CN204876610U (en) * | 2015-06-24 | 2015-12-16 | 叶玲玲 | Protector that construction was used convenient to installation |
CN204804299U (en) * | 2015-07-03 | 2015-11-25 | 上海绿地建设(集团)有限公司 | Scaffold for construction |
CN205424336U (en) * | 2016-03-16 | 2016-08-03 | 中山市宜高机电科技有限公司 | Height -adjustable festival and general liquid crystal TV cradle who takes protect function |
CN206262002U (en) * | 2016-12-13 | 2017-06-20 | 温州市人民医院 | Hemiplegic patient's waist buttocks exercising apparatus |
CN206448504U (en) * | 2017-02-13 | 2017-08-29 | 广西建工集团第二建筑工程有限责任公司 | It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction |
CN206873887U (en) * | 2017-10-19 | 2018-01-12 | 安徽建诚国际经济技术合作有限公司 | A kind of adjustable construction scaffold |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764615A (en) * | 2019-04-01 | 2020-10-13 | 中国石油天然气股份有限公司 | Scaffold |
CN111502218A (en) * | 2020-05-06 | 2020-08-07 | 深圳市骏龙达建筑工程有限公司 | Construction frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206873887U (en) | A kind of adjustable construction scaffold | |
CN107806236A (en) | A kind of adjustable construction scaffold and its installation method | |
CN210119372U (en) | Geotome is used in engineering reconnaissance | |
CN210253976U (en) | Bending device of renewable reinforcing steel bar | |
CN205258513U (en) | Adjustable rocking arm rotation angle's device | |
CN205666541U (en) | Survey arc combination tool that hangs down on transmission line shaft tower | |
CN206151623U (en) | First fixing device of mouse of extraction mouse cerebrospinal fluid | |
CN220960659U (en) | Portable soil sample collection system | |
CN208780498U (en) | A kind of agriculture and forestry exploitation different depth soil sampler simultaneously | |
CN209855818U (en) | Adjustable underground works supports bow member longitudinal connection device | |
CN209094868U (en) | Symmetrical lug plate holes proper alignment positioning apparatus is adjusted in a kind of multipurpose | |
CN207092525U (en) | A kind of easy-to-mount scaffold for building | |
CN209799363U (en) | Steel pipe stand top holds in palm | |
CN209954585U (en) | Core barrel press-in device | |
CN105932633A (en) | Pay-off pulley | |
CN204361603U (en) | A kind of network engineering adjustable cable crane span structure | |
CN208584671U (en) | A kind of ceramic tile hole making drill | |
TW202024449A (en) | Crossbar structure of construction frame | |
CN206753974U (en) | A kind of improved vertical water pump coupler | |
CN206822362U (en) | A kind of portable drawing reading stand | |
CN205477393U (en) | A support frame that is arranged in hand -hole rig at drilling process drilling rod | |
CN205555929U (en) | Lifting device for construction | |
CN208777764U (en) | It is a kind of for building the guiding device of chimney demolition scaffold | |
CN212191868U (en) | Herringbone post welding stent | |
CN207771012U (en) | A device is opened at a kind of bolt scene |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20231208 |