CN204804299U - Scaffold for construction - Google Patents

Scaffold for construction Download PDF

Info

Publication number
CN204804299U
CN204804299U CN201520468468.3U CN201520468468U CN204804299U CN 204804299 U CN204804299 U CN 204804299U CN 201520468468 U CN201520468468 U CN 201520468468U CN 204804299 U CN204804299 U CN 204804299U
Authority
CN
China
Prior art keywords
supporting rod
vertical supporting
support
montant
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520468468.3U
Other languages
Chinese (zh)
Inventor
李宪民
陆金晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Greenland Construction Group Co Ltd filed Critical Shanghai Greenland Construction Group Co Ltd
Priority to CN201520468468.3U priority Critical patent/CN204804299U/en
Application granted granted Critical
Publication of CN204804299U publication Critical patent/CN204804299U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a scaffold for construction, including the support body body, the bearing plate, the support body body is including the support frame of arranging both sides in, connect the crossbar, the support frame is including the flexible montant that supports of the push button of arranging both ends in, support the horizontal pole, the flexible montant that supports includes that the second supports the montant, first support montant, it connects respectively in the first support montant upper portion in both ends to support the horizontal pole both ends, the bearing plate is placed on the horizontal pole is supported to both sides, the outside firm pipe that has the jack that extends in first support montant upper portion, form accommodation space between firm pipe and the first support montant, supporting the horizontal pole both ends and extending the sleeve portion that has the through -hole dorsad, support on the horizontal pole both ends locate first support montant through sleeve portion cover, threaded connection has two abutment sleeve on the first support montant, and the sleeve is deployed between two abutment sleeve. The utility model discloses be convenient for use two scaffold disjunctors in order to improve stability, the split independent utility of also being convenient for, the flexibility is strong, improve the positioning accuracy that the bearing plate used the height.

Description

A kind of building operations scaffold
Technical field
The utility model relates to building implements technical field, specifically relates to a kind of building operations scaffold.
Background technology
Often scaffold is used in the work progress of building site, between the adjacent scaffold of conventional flat, inconvenience is stable connects, and the bearing plate on support body uses height to be regulated by button type telescoping vertical supporting rod, it highly regulates span large, and inconvenience fine setting is to improve altitude location precision.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of building operations scaffold be convenient to improve adjacent scaffold stable connection, be convenient to finely tune raising positioning precision.
For solving the problems of the technologies described above, the utility model provides following technical scheme: a kind of building operations scaffold, comprise support body body, bearing plate, described support body body comprises the bracing frame being placed in both sides, for connecting the connection crossbar of supported on both sides frame, support frame as described above comprises the button type telescoping vertical supporting rod being placed in two ends, connect the support rail of two ends retractable support montant, described retractable support montant comprises the second vertical supporting rod, scalable the first vertical supporting rod be placed in the second vertical supporting rod, described support rail two ends are connected to vertical supporting rod top, two ends first, connection crossbar is connected with between adjacent first vertical supporting rod in both sides, be connected with between adjacent second vertical supporting rod in both sides and be also connected with connection crossbar, described bearing plate is positioned on supported on both sides cross bar, described first vertical supporting rod top stretches out with the firm pipe of jack, spatial accommodation is formed between described firm pipe and the first vertical supporting rod, described support rail two ends extend with the sleeve part with the corresponding through hole of the first vertical supporting rod dorsad, described support rail two ends are sheathed on the first vertical supporting rod respectively by sleeve part, described first vertical supporting rod has been threaded two abutment sleeves, described abutment sleeve is placed in spatial accommodation, and described sleeve part is placed between two abutment sleeves.
The scaffold that the utility model improves, its first vertical supporting rod is extended with firm pipe, when adjacent two scaffolds of level need to use side by side, firmly pipe is interior to utilize U-shaped connecting rod to insert adjacent two of two scaffolds, two scaffold disjunctors are convenient to use to improve stability, also be convenient to split independent use, flexibility is strong simultaneously; Simultaneously, the use height of bearing plate is utilizing button type telescoping vertical supporting rod to carry out on the basis of highly large tune, support rail is sheathed on the first vertical supporting rod by the sleeve part at two ends, be convenient to the use height of finely tuning support rail within the scope of continually varying height value, to improve its altitude location precision, after support rail use is highly determined, utilize the cooperation rotational fastener support rail of two abutment sleeves to guarantee positioning stablity.
Improve as to the one of technique scheme, described support rail bottom-hinged has flexible climbing ladder; When operation on scaffold climbed to by needs, stretch flexible climbing ladder slant setting to climb, after operation completes, the flexible climbing ladder of compression to collect, easy to use and flexible.
Improve as to the one of technique scheme, being provided with bottom described second vertical supporting rod can braking universal wheel, is convenient to scaffold displacement.
The beneficial effect that the utility model compared with prior art has is: the scaffold that the utility model improves, and is convenient to two scaffold disjunctors to use to improve stability, and be also convenient to split independent use, flexibility is strong simultaneously; The positioning precision that bearing plate uses height can be improved.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the structural representation of the utility model support rail;
Fig. 3 is the adjacent firm pipe matching relationship schematic diagram of adjacent two scaffolds side by side of the utility model.
Number in the figure is: 1-support body body, 11-retractable support montant, 111-first vertical supporting rod, 112-second vertical supporting rod, 12-support rail, 121-sleeve part, 13-connects crossbar, 2-bearing plate, 3-stretches climbing ladder, and 4-firmly manages, 5-abutment sleeve, 6-connecting rod, 7-spatial accommodation, 8-can braking universal wheel.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
In description of the present utility model, it will be appreciated that, term " longitudinal direction ", " transverse direction ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end ", " interior ", orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, it is only the utility model for convenience of description, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.
Known referring to figs. 1 through Fig. 3, a kind of building operations scaffold, comprise support body body 1, bearing plate 2, described support body body 1 comprises the bracing frame being placed in both sides, for connecting the connection crossbar 13 of supported on both sides frame, support frame as described above comprises the button type telescoping vertical supporting rod 11 being placed in two ends, connect the support rail 12 of two ends retractable support montant 11, described retractable support montant 11 comprises the second vertical supporting rod 112, scalable the first vertical supporting rod 111 be placed in the second vertical supporting rod 112, described support rail 12 two ends are connected to vertical supporting rod 111 top, two ends first, be connected with between adjacent first vertical supporting rod 111 in both sides and connect crossbar 13, be connected with between adjacent second vertical supporting rod 112 in both sides to be also connected with and connect crossbar 13, described bearing plate 2 is positioned on supported on both sides cross bar 12, described first vertical supporting rod 111 top stretches out with the firm pipe 4 of jack, spatial accommodation 7 is formed between described firm pipe 4 and the first vertical supporting rod 111, described support rail 12 two ends extend with the sleeve part 121 with the corresponding through hole of the first vertical supporting rod 111 dorsad, described support rail 12 two ends are sheathed on the first vertical supporting rod 111 respectively by sleeve part 121, described first vertical supporting rod 111 has been threaded two abutment sleeves 5, described abutment sleeve 5 is placed in spatial accommodation 7, and described sleeve part 121 is placed between two abutment sleeves 5.
The scaffold that the utility model improves, its first vertical supporting rod 111 is extended with firm pipe 4, when adjacent two scaffolds of level need to use side by side, U-shaped connecting rod 6 is utilized to insert in adjacent two the firm pipes 4 of two scaffolds, two scaffold disjunctors are convenient to use to improve stability, also be convenient to split independent use, flexibility is strong simultaneously; Simultaneously, the use height of bearing plate 2 is utilizing button type telescoping vertical supporting rod 11 to carry out on the basis of highly large tune, support rail 12 is sheathed on the first vertical supporting rod 111 by the sleeve part 121 at two ends, be convenient to the use height of finely tuning support rail 12 within the scope of continually varying height value, to improve its altitude location precision, after support rail 12 uses and highly determines, utilize the cooperation rotational fastener support rail 12 of two abutment sleeves 5 to guarantee positioning stablity.
With further reference to Fig. 1, described support rail 12 bottom-hinged has flexible climbing ladder 3; When operation on scaffold climbed to by needs, also slant setting is to climb for the flexible climbing ladder 3 that stretches, and after operation completes, compression stretches climbing ladder 3 to collect, easy to use and flexible.
With further reference to Fig. 1, being provided with bottom described second vertical supporting rod 112 can braking universal wheel 8, is convenient to scaffold displacement.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (3)

1. a building operations scaffold, comprise support body body, bearing plate, described support body body comprises the bracing frame being placed in both sides, for connecting the connection crossbar of supported on both sides frame, support frame as described above comprises the button type telescoping vertical supporting rod being placed in two ends, connect the support rail of two ends retractable support montant, described retractable support montant comprises the second vertical supporting rod, scalable the first vertical supporting rod be placed in the second vertical supporting rod, described support rail two ends are connected to vertical supporting rod top, two ends first, connection crossbar is connected with between adjacent first vertical supporting rod in both sides, be connected with between adjacent second vertical supporting rod in both sides and be also connected with connection crossbar, described bearing plate is positioned on supported on both sides cross bar, it is characterized in that: described first vertical supporting rod top stretches out with the firm pipe of jack, spatial accommodation is formed between described firm pipe and the first vertical supporting rod, described support rail two ends extend with the sleeve part with the corresponding through hole of the first vertical supporting rod dorsad, described support rail two ends are sheathed on the first vertical supporting rod respectively by sleeve part, described first vertical supporting rod has been threaded two abutment sleeves, described abutment sleeve is placed in spatial accommodation, and described sleeve part is placed between two abutment sleeves.
2. a kind of building operations scaffold according to claim 1, is characterized in that: described support rail bottom-hinged has flexible climbing ladder.
3. a kind of building operations scaffold according to claim 2, is characterized in that: being provided with bottom described second vertical supporting rod can braking universal wheel.
CN201520468468.3U 2015-07-03 2015-07-03 Scaffold for construction Active CN204804299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520468468.3U CN204804299U (en) 2015-07-03 2015-07-03 Scaffold for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520468468.3U CN204804299U (en) 2015-07-03 2015-07-03 Scaffold for construction

Publications (1)

Publication Number Publication Date
CN204804299U true CN204804299U (en) 2015-11-25

Family

ID=54589145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520468468.3U Active CN204804299U (en) 2015-07-03 2015-07-03 Scaffold for construction

Country Status (1)

Country Link
CN (1) CN204804299U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806236A (en) * 2017-10-19 2018-03-16 安徽建诚国际经济技术合作有限公司 A kind of adjustable construction scaffold and its installation method
CN114108998A (en) * 2021-11-05 2022-03-01 上海绿地建设(集团)有限公司 Construction frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806236A (en) * 2017-10-19 2018-03-16 安徽建诚国际经济技术合作有限公司 A kind of adjustable construction scaffold and its installation method
CN114108998A (en) * 2021-11-05 2022-03-01 上海绿地建设(集团)有限公司 Construction frame

Similar Documents

Publication Publication Date Title
CN205415567U (en) Surveying instrument places case
CN204804299U (en) Scaffold for construction
CN209621179U (en) A kind of safe and portable double ladder
CN202157739U (en) Tripodal extension ladder
CN204843050U (en) High altitude drilling equipment
CN207245243U (en) Prefabricated superimposed sheet vertical supporting device
CN207349740U (en) Novel tripod
CN203334642U (en) Movable scaffold with foldable truckles
CN202100000U (en) Adjustable bracket girder structure for building template
CN202485680U (en) Telescopic surveyor's pole
CN204001965U (en) Hexagon simple portable tent
CN207144797U (en) A kind of cat ladder for building
CN210217639U (en) Off tracking device is prevented with probing to engineering reconnaissance
CN205382873U (en) Bidirectional folding ladder
CN207750038U (en) A kind of folding ladder of construction
CN107143278A (en) A kind of cat ladder for building
CN206561741U (en) The drawing board of planar design specialty
CN205558236U (en) Link wall body scaffold frame
CN206158333U (en) Fast granny rag covering or awning on a car, boat, etc. of detaining slides in area
CN206784873U (en) A kind of adjustable scaffold
CN208251597U (en) A kind of scaffold device that convenience is fixedly connected with electric pole
CN204899322U (en) But upper end stationary mast mechanism
CN204571238U (en) Project building construction frame
CN204322054U (en) A kind of extensible intelligent fixture handcart
CN214144795U (en) Steel construction platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant