CN104963495A - Suspension hanging basket for installation of roof surface bottom layer color plate - Google Patents
Suspension hanging basket for installation of roof surface bottom layer color plate Download PDFInfo
- Publication number
- CN104963495A CN104963495A CN201510306087.XA CN201510306087A CN104963495A CN 104963495 A CN104963495 A CN 104963495A CN 201510306087 A CN201510306087 A CN 201510306087A CN 104963495 A CN104963495 A CN 104963495A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- wire rope
- steel
- steel wire
- pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 11
- 238000009434 installation Methods 0.000 title abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 42
- 239000010959 steel Substances 0.000 claims abstract description 42
- 238000010276 construction Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 description 6
- 229920000742 Cotton Polymers 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004321 preservation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000010287 polarization Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003760 hair shine Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a suspension hanging basket for installation of a roof surface bottom layer color plate. The suspension hanging basket comprises a steel beam and a purline, wherein a first steel wire rope and a second steel wire rope are respectively fixed on the steel beam on two ends of the purline; the first steel wire rope is connected with a third steel wire rope via a first lever hoist; the second steel wire rope is connected with the third wire steel rope via a second lever hoist; and the third steel wire rope is connected with the hanging basket via a pulley. The hanging basket can be flexibly placed according to construction side conditions; the hanging basket can be clamped via a self-clamp device, so hanging basket stability can be enhanced; and the hanging basket can be accurately positioned via a hanging hook.
Description
Technical field
The present invention relates to a kind of hanging basket, particularly a kind of hanging basket installing roofing bottom colored steel, belongs to technical field of building construction.
Background technology
Steel-structure factory building is due to attractive in appearance, durable, that cost is low, the construction period is short advantage, being more and more widely used in engineering construction, in order to reduce the temperature in factory building, increasing the aesthetic property in factory building, the roofing of factory building is often designed to double-deck colored steel, centre is heat-preservation cotton, spreads one deck color steel and be exposed above roof purline, and opposing wind rain shines, one deck colored steel is inhaled below roof purline, hold heat-preservation cotton, can play purposes attractive in appearance, middle heat-preservation cotton plays insulation effect again; Carried out furred ceiling just as to factory building, roofing steel truss is covered by bottom colored steel, and indoor at factory building, a purlin be can't see from the bottom up by whole factory building, succinct, elegant in appearance.
The installation of the bottom colored steel below roof purline is comparatively complicated and dangerous, and normal construction method is built a framework construction exactly, setting up to roofing, providing an operating platform installation roofing bottom colored steel colored steel to constructor by frame by there being facility floor.One method sets up overall shelf, roofing bottom colored steel is installed at constructor station on the top of the shelf, construct in this way, although the efficiency of installing the period is high, but its shortcoming is taken, tears shelf open costly, affect the construction of next procedure, need to coordinate mutually with multiple working procedure, the cycle of whole construction works is long; Another kind method sets up moveable shelf, one piece of bottom colored steel is installed, a mobile shelf, installing bottom layer colored steel and these two operations of mobile shelf ceaselessly overlapping, until the installation of bottom colored steel, constructor is upper and lower continually, safety does not ensure, although this method saves the circulation material of large quantities of shelfs and takes, tears expense open, inefficiency, also produce interference with other operation, the construction period is long.Sometimes due to the obstruction of above ground structure, cannot shelf be moved, directly have influence on completing of whole engineering.
Summary of the invention
The technical problem to be solved in the present invention overcomes existing defect, provides a kind of hanging basket installing roofing bottom colored steel, not only convenient mobile; And the height of hanging basket can be controlled, effectively can solve the problem in background technology.
In order to solve the problems of the technologies described above, the invention provides following technical scheme:
A kind of hanging basket installing roofing bottom colored steel of the present invention, comprise girder steel and be arranged on the wingceltis bar on girder steel, the girder steel at described wingceltis bar two ends is fixed with the first wire rope and the second wire rope respectively, described first wire rope connects the 3rd wire rope by the first lever hoist, described second wire rope connects the 3rd wire rope by the second lever hoist, and described 3rd wire rope connects hanging basket by moveable roller.
As a preferred technical solution of the present invention, the 3rd wire rope of described hanging basket both sides is provided with adjustment suspension hook.
As a preferred technical solution of the present invention, described 3rd wire rope and pulley are 3-5 and described pulley side is provided with from gripping mechanism.
As a preferred technical solution of the present invention, described hanging basket forms by bottom bar and by the guard rail rod that diagonal brace connects, and described bottom bar is provided with sheer pole, and described sheer pole is equipped with plank; Described guard rail rod is provided with cross tube.
The beneficial effect that compared with prior art the present invention reaches is: a kind of hanging basket installing roofing bottom colored steel, according to the needs of job site, can regulate the position of hanging basket flexibly, and by from gripping mechanism clamping, to strengthen the stability of hanging basket; And can by the accurate polarization of adjustment suspension hook raising to hanging basket.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for manual, together with embodiments of the present invention for explaining the present invention, is not construed as limiting the invention.
In the accompanying drawings:
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is barrel structure schematic diagram of the present invention;
Number in the figure: 1, wingceltis bar; 2, girder steel; 3, the first wire rope; 4, the second wire rope; 5, the first Lever Blocks; 6, the second lever hoist; 7, hanging basket; 8, pulley; 9, from gripping mechanism; 10, suspension hook is adjusted; 11, guard rail rod; 12, cross tube; 13, bottom bar; 14, sheer pole; 15, plank; 16, diagonal brace; 17, the 3rd wire rope.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
Embodiment: as shown in Figure 1, a kind of hanging basket installing roofing bottom colored steel of the present invention, comprise girder steel 2 and be arranged on the wingceltis bar 1 on girder steel 2, the girder steel 2 at described wingceltis bar 1 two ends is fixed with respectively the first wire rope 3 and the second wire rope 4, described first wire rope 3 connects the 3rd wire rope 17 by the first lever hoist 5, described second wire rope 4 connects the 3rd wire rope 17 by the second lever hoist 6, and described 3rd wire rope 17 is flexibly connected hanging basket 7 by pulley 8.
Further, the 3rd wire rope 17 of described hanging basket 7 both sides is provided with adjustment suspension hook 10.The degree of disturbance of the 3rd wire rope 17 self can be effectively reduced by adjustment suspension hook 10.Described 3rd wire rope 17 and pulley 8 are 3-5 and described pulley 8 side is provided with from gripping mechanism 9.Hanging basket 7 is installed multiple pulley 8, and by the 3rd wire rope 17 through pulley 8.
Described hanging basket 7 forms by bottom bar 13 and by the guard rail rod 11 that diagonal brace 16 connects, and described bottom bar 13 is provided with sheer pole 14, and described sheer pole 14 is equipped with plank 15; Described guard rail rod 11 is provided with cross tube 12.Hanging basket 7 surrounding arranges guard rail rod 11, ensures the safety of construction worker.
The present invention is flexibly connected hanging basket 7 by many wire rope, by two lever hoists, hanging basket 7 is raised to suitable height, and by clamping hanging basket from gripping mechanism 9, is then reduced the degree of disturbance of wire rope by adjustment suspension hook 10.
A kind of hanging basket installing roofing bottom colored steel of the present invention, according to the needs of job site, can regulate the position of hanging basket 7 flexibly, and by clamping from gripping mechanism 9, to strengthen the stability of hanging basket 7; And accurate polarization to hanging basket 7 can be improved by adjustment suspension hook 10.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (4)
1. one kind the hanging basket of roofing bottom colored steel is installed, it is characterized in that, comprise girder steel (2) and be arranged on the wingceltis bar (1) on girder steel (2), the girder steel (2) at described wingceltis bar (1) two ends is fixed with the first wire rope (3) and the second wire rope (4) respectively, described first wire rope (3) connects the 3rd wire rope (17) by the first lever hoist (5), described second wire rope (4) connects the 3rd wire rope (17) by the second lever hoist (6), described 3rd wire rope (17) is flexibly connected hanging basket (7) by pulley (8).
2. a kind of hanging basket installing roofing bottom colored steel according to claim 1, is characterized in that, the 3rd wire rope (17) of described hanging basket (7) both sides is provided with adjustment suspension hook (10).
3. a kind of hanging basket installing roofing bottom colored steel according to claim 2, it is characterized in that, described 3rd wire rope (17) and pulley (8) for 3-5 and described pulley (8) side be provided with from gripping mechanism (9).
4. a kind of hanging basket installing roofing bottom colored steel according to claim 2, it is characterized in that, described hanging basket (7) forms by bottom bar (13) and by the guard rail rod (11) that diagonal brace (16) connects, described bottom bar (13) is provided with sheer pole (14), described sheer pole (14) is equipped with plank (15); Described guard rail rod (11) is provided with cross tube (12).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510306087.XA CN104963495B (en) | 2015-06-05 | 2015-06-05 | A kind of hanging basket for installing roofing bottom colored steel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510306087.XA CN104963495B (en) | 2015-06-05 | 2015-06-05 | A kind of hanging basket for installing roofing bottom colored steel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104963495A true CN104963495A (en) | 2015-10-07 |
| CN104963495B CN104963495B (en) | 2017-07-14 |
Family
ID=54217560
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510306087.XA Active CN104963495B (en) | 2015-06-05 | 2015-06-05 | A kind of hanging basket for installing roofing bottom colored steel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104963495B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106115573A (en) * | 2016-08-19 | 2016-11-16 | 中国化学工程第三建设有限公司 | The installation equipment of factory roof coloured silk steel inner panel and installation method |
| CN106812295A (en) * | 2017-02-09 | 2017-06-09 | 成都启立辰智科技有限公司 | A kind of construction hanging basket |
| CN106836109A (en) * | 2017-03-14 | 2017-06-13 | 辽宁华三建设工程技术有限公司 | A kind of hanging building foot guard repairing treatment suspension platform device |
| CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10104247C1 (en) * | 2001-01-31 | 2002-07-25 | Asg Aluminium Systeme Gmbh | Traversing installation, used for working on building facades, comprises an endless drive element with a specified minimum value of its total wrap angle on the traction disks |
| CN101892736A (en) * | 2010-08-10 | 2010-11-24 | 中建三局东方装饰设计工程有限公司 | High altitude moving hanging basket construction method |
| CN102433985A (en) * | 2011-10-15 | 2012-05-02 | 于学恭 | Quick construction hanging bracket for outer wall of large storage tank |
| CN202767494U (en) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | Hanging basket for high-altitude roof inner plate construction |
| EP2677095A2 (en) * | 2012-06-21 | 2013-12-25 | GESTA Gesellschaft für Stahlrohrgerüste mit beschränkter Haftung | Access system for overhanging or convex curved walls |
| CN203530851U (en) * | 2013-10-16 | 2014-04-09 | 中国十七冶集团有限公司 | Basket device for combined basket working vehicle |
| CN203701560U (en) * | 2013-12-31 | 2014-07-09 | 森特士兴集团股份有限公司 | Suspension hanging basket for high-altitude roofing inner plate construction |
-
2015
- 2015-06-05 CN CN201510306087.XA patent/CN104963495B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10104247C1 (en) * | 2001-01-31 | 2002-07-25 | Asg Aluminium Systeme Gmbh | Traversing installation, used for working on building facades, comprises an endless drive element with a specified minimum value of its total wrap angle on the traction disks |
| CN101892736A (en) * | 2010-08-10 | 2010-11-24 | 中建三局东方装饰设计工程有限公司 | High altitude moving hanging basket construction method |
| CN102433985A (en) * | 2011-10-15 | 2012-05-02 | 于学恭 | Quick construction hanging bracket for outer wall of large storage tank |
| EP2677095A2 (en) * | 2012-06-21 | 2013-12-25 | GESTA Gesellschaft für Stahlrohrgerüste mit beschränkter Haftung | Access system for overhanging or convex curved walls |
| CN202767494U (en) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | Hanging basket for high-altitude roof inner plate construction |
| CN203530851U (en) * | 2013-10-16 | 2014-04-09 | 中国十七冶集团有限公司 | Basket device for combined basket working vehicle |
| CN203701560U (en) * | 2013-12-31 | 2014-07-09 | 森特士兴集团股份有限公司 | Suspension hanging basket for high-altitude roofing inner plate construction |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106115573A (en) * | 2016-08-19 | 2016-11-16 | 中国化学工程第三建设有限公司 | The installation equipment of factory roof coloured silk steel inner panel and installation method |
| CN106812295A (en) * | 2017-02-09 | 2017-06-09 | 成都启立辰智科技有限公司 | A kind of construction hanging basket |
| CN106836109A (en) * | 2017-03-14 | 2017-06-13 | 辽宁华三建设工程技术有限公司 | A kind of hanging building foot guard repairing treatment suspension platform device |
| CN106836109B (en) * | 2017-03-14 | 2022-07-05 | 辽宁华三建设工程技术有限公司 | Suspended platform device for protecting, repairing and processing bottom of suspended building |
| CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104963495B (en) | 2017-07-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105604334B (en) | A kind of rapid constructing method for large span steel truss integral installation | |
| CN106013419B (en) | Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method | |
| CN103711323B (en) | Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing | |
| CN106065661A (en) | Large span unsettled steel corridor construction engineering method | |
| CN105484502B (en) | A kind of industrial premises steel structural roof purlin and support bar combined installation method | |
| CN105822072A (en) | Hoisting construction structure and method for air corridor ceiling | |
| CN105625645B (en) | Suspension type steel structure lighting skylight construction method | |
| CN104963495A (en) | Suspension hanging basket for installation of roof surface bottom layer color plate | |
| CN102979313A (en) | High-altitude lifting construction method for overweight steel truss of transferring layer | |
| CN104763109A (en) | Quick construction method for pressed bottom tile of large-span steel structure factory building roof | |
| CN202626841U (en) | Concrete device for wrapping main arch by hanging method | |
| CN102691269A (en) | Movable hanging basket with main arch and concrete outside | |
| CN103912128B (en) | The construction method of high-altitude disjunctor steel truss | |
| CN106013453B (en) | Long-span Cantilever transfinites structure construction engineering method | |
| CN206233851U (en) | Walking type wall color steel plate hanging ladder for installation | |
| CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
| CN206636168U (en) | Overhanging type scaffold system | |
| CN102116085B (en) | Construction method of outpacking structure of steel pipe column with asymmetric steel hanging structure and scaffold | |
| CN205369044U (en) | Integration prestressing force stretch -draw frame construction | |
| CN209384613U (en) | A kind of soft platform for steel structure installation of daylighting roof | |
| CN208578156U (en) | Fast assembling-disassembling can plug-type heat preservation steel structure | |
| CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
| CN203257070U (en) | Slippage frame operating platform for gallery daylighting roof curtain wall installation | |
| CN103206077B (en) | Structure for steel structure roof inner slab installation foot hand cradle | |
| CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |