CN105822072B CN201610341776.9A CN201610341776A CN105822072B CN 105822072 B CN105822072 B CN 105822072B CN 201610341776 A CN201610341776 A CN 201610341776A CN 105822072 B CN105822072 B CN 105822072B
Authority
CN
China
Prior art keywords
unit plate
lifting
steel wire
fixed pulley
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610341776.9A
Other languages
Chinese (zh)
Other versions
CN105822072A (en
Inventor
杨榕榕
陈海峰
计国庆
陈国栋
杨加喜
谢云光
崔大江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xifei Century Door Window & Curtain Wall Engineering Co Ltd
Original Assignee
Beijing Xifei Century Door Window & Curtain Wall Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xifei Century Door Window & Curtain Wall Engineering Co Ltd filed Critical Beijing Xifei Century Door Window & Curtain Wall Engineering Co Ltd
Priority to CN201610341776.9A priority Critical patent/CN105822072B/en
Publication of CN105822072A publication Critical patent/CN105822072A/en
Application granted granted Critical
Publication of CN105822072B publication Critical patent/CN105822072B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/14Power transmissions between power sources and drums or barrels
    • B66D1/20Chain, belt, or friction drives, e.g. incorporating sheaves of fixed or variable ratio
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/60Rope, cable, or chain winding mechanisms; Capstans adapted for special purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of lifting construction structures of aerial vestibule furred ceiling, for the bottom external decoration of aerial vestibule agent structure, including unit plate, the top connection of unit plate makes the hoisting mechanism of the unit plate lifting, and the bottom connection of unit plate prevents the anti-wabbler mechanism that the unit plate waves around.Furred ceiling is processed as into unit plate by the present invention on ground, pass through the gap of the aerial vestibule floor of the steel wire penetrating of electrical hoist or steel construction, directly sling furred ceiling unit plate, it is located in aerial vestibule floor lower part predeterminated position, and it is fixed on furred ceiling position, unit plate is lifted by crane in place, the construction up to completing whole furred ceilings one by one by horizontal fragmentation.It eliminates full hall scaffold or rail mounted hangs the traditional construction technique of ship, hanging basket, installation of ceiling operation effectively is simplified, the construction period has been greatly shortened, Large-scale Hoisting equipment is not required, from the limitation of aerial vestibule height, construction economy benefit, progress and quality are greatly improved.

Description

The lifting construction structure and its construction method of aerial vestibule furred ceiling
Technical field
The present invention relates to aerial vestibule installation of ceiling fields, and in particular to a kind of construction is simple, construction period short aerial The lifting construction structure and its construction method of vestibule furred ceiling.
Background technology
As the continuous improvement of building function, architectural image become increasingly abundant, many architects like adjacent to build It builds monomer to connect, the aerial vestibule rich in fashion breath is formed, especially in large-scale commercial circle, school, hospital, sports building Etc. in crowded groups of building, aerial vestibule often becomes apt word added to clinch the point, both plays the role of relieving traffic congestion, but also as view Platform etc. is both one of landscape for also becoming building of vestibule in itself.
Furred ceiling curtain wall is generally set below aerial vestibule floor, and furred ceiling curtain wall is filled out using primary and secondary skeletal frame installation, heat preservation rock It fills, the designs such as the materials facing such as aluminum veneer or glass is fixed, since vestibule furred ceiling work surface area is bigger and all hanging, material Expect that vertical and horizontal transport difficulty is big, the principal element for being set to influence duration, quality and cost of mounting operation platform, pass The job platform of system generally hangs ship using full hall scaffold or rail mounted.
Full hall scaffold need to be set up from ground to hanging vestibule lower part, taken at regular intervals, gathered and set up support The scaffold of effect.Raft support method construction is a kind of long-term adopted method, applies the substantial amounts of falsework of man-hour requirement.Its Is Large-scale Hoisting equipment is not required in advantage, but working rack template consumption is big, long in time limit, is subject to antenna height, lotus It carries or the influence of the factor of cost, using being restricted.
Rail mounted, which hangs ship, needs the following hanging rail of vestibule floor in the air, then hangs ship with vestibule equal in width special It hangs on guide rail, job platform is moved horizontally to be formed, hanging rail and just need complicated rise hanging ship and hanging on guide rail Equipment and strict safety precautions are hung, this method is time-consuming and laborious, and security protection difficulty is big, and confined condition is more.
The content of the invention
The object of the present invention is to provide a kind of the lifting construction structures and its construction method of aerial vestibule furred ceiling, have construction Simply, the construction period is short, the lifting construction structure of the aerial vestibule furred ceiling of the advantages that Large-scale Hoisting equipment is not required.
The purpose of the present invention is be achieved through the following technical solutions:
A kind of lifting construction structure of aerial vestibule furred ceiling, for the bottom external decoration of aerial vestibule agent structure, including Unit plate, the top connection of the unit plate make the hoisting mechanism of the unit plate lifting, the bottom of the unit plate Portion's connection prevents the anti-wabbler mechanism that the unit plate waves around.
In preferred embodiments, the hoisting mechanism includes the lifting steel wire rope of the more connection unit plates, The lifting tie point being connected between the lifting steel wire rope and unit plate is evenly distributed on the unit plate, is made described In the air, the position that the lifting tie point is corresponded in the agent structure is equipped with for the lifting the horizontal lifting of unit plate The perforative cable-through hole of steel wire rope.
In preferred embodiments, the multiple hoist engines being fixed in the agent structure, the hoist engine are additionally provided with Drive the promotion and decline of the lifting steel wire rope.
In preferred embodiments, the vertical duction pulley blocks for bending downward the lifting steel wire rope, institute are additionally provided with Stating vertical duction pulley blocks includes vertical fixed pulley, the second shaft and vertical fixed pulley frame, and the vertical fixed pulley frame is hollow Structure, and be arranged on the cable-through hole, second shaft is horizontally set in the vertical fixed pulley frame, described vertical fixed Rotatable connection second shaft of pulley, makes the vertical fixed pulley rotate vertically.
In preferred embodiments, being additionally provided with makes the lifting steel wire rope horizontal buckling be horizontally diverted pulley blocks, institute It states and is horizontally diverted pulley blocks and includes being arranged on horizontal fixed pulley frame in the agent structure, be equipped in the horizontal fixed pulley frame The first rotating shaft being vertically arranged, the rotatable horizontal fixed pulley of connection of first rotating shaft, makes the horizontal rotation of the horizontal fixed pulley Turn.
In preferred embodiments, if intersect between two lifting steel wire ropes, this two intersections are hung Steel loading cord by be horizontally diverted the height that pulley blocks set different.
In preferred embodiments, the anti-wabbler mechanism includes the windproof cable for symmetrically connecting the unit plate bottom Rope, the quantity of the windproof hawser are no less than 2, and the ground surface end of the windproof hawser is equipped with manually drawing or hoist engine and leads It draws.
A kind of construction method for hanging of aerial vestibule furred ceiling, comprises the following steps:
A, setting-out and mark on the body construction with resting on the ground the corresponding cable-through hole position in lifting point of unit plate With the motion track of design lifting steel wire rope;
B, cable-through hole is cut on cable-through hole position, hoist engine, horizontal fixed pulley group and vertical fixed pulley group are installed, wherein Vertical fixed pulley group erection sequence is identical with the lifting sequence of unit plate, can after unit plate is installed in agent structure Dismounting and the corresponding vertical fixed pulley group of the unit plate, can save material, reduce construction cost, vertical by what is disassembled Fixed pulley group is installed on next cable-through hole for needing steel wire penetrating;
C, the lifting steel wire rope of hoisting mechanism through the cable-through hole and is connected into the lifting point;
D, the hoist engine is controlled to sling the unit plate 1-3m, windproof cable is respectively provided in the both sides of the unit plate Rope;
E, hoist engine is controlled to promote the lifting steel wire rope, while manually pulls the windproof hawser, until the unit Plate reaches agent structure;
F, will be fixed between unit plate and agent structure.
In preferred embodiments, the erection sequence of the unit plate be from a side end of the agent structure to End side is installed successively.
In preferred embodiments, if the length of the agent structure is more than 35 meters, the installation of the unit plate Order is, from the both side ends of the agent structure thereto between install.
Beneficial effects of the present invention are:
Furred ceiling is processed as into unit plate by the present invention on ground, passes through the aerial vestibule of the steel wire penetrating of electrical hoist Furred ceiling unit plate is directly sling in the gap of floor or steel construction, is located in aerial vestibule floor lower part predeterminated position, and fixed In furred ceiling position, unit plate is lifted by crane in place, the construction up to completing whole furred ceilings one by one by horizontal fragmentation.Eliminate full hall Scaffold or rail mounted hang the traditional construction technique of ship, hanging basket, effectively simplify installation of ceiling operation, have been greatly shortened and have applied Large-scale Hoisting equipment is not required in the work duration, from the limitation of aerial vestibule height, greatly improve construction economy benefit, into Degree and quality.
Description of the drawings
The present invention is described in further detail below according to attached drawing.
Fig. 1 is the overall structure figure of the lifting construction structure of the aerial vestibule furred ceiling described in the embodiment of the present invention;
Fig. 2 is the overlooking structure figure of the hoist engine distribution scheme 1 described in the embodiment of the present invention;
Fig. 3 is the overlooking structure figure of the hoist engine distribution scheme 2 described in the embodiment of the present invention;
Fig. 4 is that A-A is to sectional structure chart in Fig. 2, and state reaches agent structure 2 for unit plate 4 in figure;
Fig. 5 is that sectional structure chart, multiple unit plates have been mounted in figure based on state in structure 2 by A-A in Fig. 2 4;
Fig. 6 is the overall structure figure for being horizontally diverted pulley blocks 8 described in the embodiment of the present invention;
Fig. 7 is the overall structure figure of the vertical duction pulley blocks 14 described in the embodiment of the present invention.
In figure:
1st, single building;
2nd, agent structure;
3rd, steel wire rope is lifted;
4th, unit plate;
5th, windproof hawser;
6th, ground traction personnel;
7th, hoist engine;
8th, pulley blocks are horizontally diverted;
9th, horizontal fixed pulley frame;
10th, pillar;
11st, rope;
12nd, first rotating shaft;
13rd, horizontal fixed pulley;
14th, vertical duction pulley blocks;
15th, vertical fixed pulley;
16th, the second shaft;
17th, vertical fixed pulley frame;
18th, cable-through hole;
19th, tie point is lifted.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.The present invention implementation being usually described and illustrated herein in the accompanying drawings The component of example can configure to arrange and design with a variety of.Therefore, below to provide in the accompanying drawings the present invention reality The detailed description for applying example is not intended to limit the scope of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts Every other embodiment, belongs to the scope of protection of the invention.
The embodiment of the present invention is described below in detail, the example of embodiment is shown in the drawings, wherein identical from beginning to end Or similar label represents same or similar element or has the function of same or like element.It is retouched below with reference to attached drawing The embodiment stated is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
The present invention is further illustrated with specific embodiment below with reference to accompanying drawings.
As shown in Figure 1, a kind of lifting construction structure of aerial vestibule furred ceiling of the embodiment of the present invention, for single building The bottom external decoration of aerial vestibule agent structure 2 between 1, including unit plate 4, unit plate 4 is generally aluminium sheet metalloid Plate or glass, further illustrate specific embodiments of the present invention by taking aluminium sheet as an example below, and the top connection of unit plate 4 makes list The hoisting mechanism that first plate 4 lifts, the bottom of unit plate 4 connect the anti-wabbler mechanism that prevention unit plate 4 waves around.
As shown in Figure 4,5, hoisting mechanism includes the lifting steel wire rope 3 of four connection unit plates 4, lifting steel wire rope 3 with The lifting tie point 19 being connected between unit plate 4 is evenly distributed on unit plate 4, is lifted on 4 level of unit plate In the air, unit plate 4 is generally rectangular in shape, which is equally divided into four rectangular areas, each region Interior diagonal is lifting tie point 19, if unit plate 4 is excessive, can increase lifting steel wire rope 3 with lifting the number of tie point 19 Amount, to improve the stability of the promotion of unit plate 4.
The position of corresponding lifting tie point 19 is equipped with for lifting 3 perforative cable-through hole 18 of steel wire rope, root in agent structure 2 According to the position coordinates of lifting tie point 19, the defence line on the bottom plate of agent structure 2 marks hole position, and is hung in each unit plate 4 It being punched on 2 bottom plate of agent structure of point coordinates position, the diameter of cable-through hole 18 should be greater than 3 times of lifting 3 diameter of steel wire rope, so as to Lifting steel wire rope 3 passes through.
Lifting steel wire rope 3 is promoted and declined by hoist engine 7, and each steel wire rope 3 that lifts is controlled by a hoist engine 7 System, sets that there are four hoist engines 7 control four lifting steel wire ropes 3 respectively altogether, and the distribution of hoist engine 7 includes following two schemes, Specially:
Scheme 1, as shown in Fig. 2, being one group by two hoist engines 7, be separately positioned on the both sides of agent structure 2, left side Two hoist engines 7 control two lifting steel wire ropes 3 positioned at left side respectively, and two hoist engines 7 on right side are controlled respectively positioned at the right side Two lifting steel wire ropes 3 of side.
Scheme 2, as shown in figure 3, by the conditions such as place limited or in order to increase lifting steel wire rope 3 by being horizontally diverted pulley Stability, by four 7 centralized arrangements of hoist engine, but this kind of structure is present with the crossover phenomenon of lifting steel wire rope 3, it is necessary to by water Flat turn is separately mounted to different height to pulley blocks 8, to realize that lifting steel wire rope 3 is not interfere with each other.
The traction of guiding lifting steel wire rope 3 is horizontally diverted pulley blocks 8 and vertical duction pulley blocks 14, is specially:
As shown in fig. 6, being horizontally diverted pulley blocks 8 makes 3 horizontal buckling of lifting steel wire rope, being horizontally diverted pulley blocks 8 includes setting It puts the horizontal fixed pulley frame 9 in agent structure 2, is equipped with the first rotating shaft 12 being vertically arranged in horizontal fixed pulley frame 9, first turn The rotatable horizontal fixed pulley 13 of connection of axis 12, rotates horizontally horizontal fixed pulley 13, horizontal fixed pulley frame 9 is tied by rope 11 It ties up on the pillar 10 of agent structure 2 or is directly anchored to by fixing piece on the pillar 10, wherein being preferable over using rope The structure of 11 bindings, since the installation site of each unit plate 4 is different, lifting steel wire rope 3 is by being horizontally diverted pulley blocks 8 Front and rear two sections of angle can change, and the optimum fixation position of horizontal fixed pulley frame 9 can be in rotary moving along pillar 10, rope 11 Binding has automatic regulation function, and manual intervention is not required, will not cause the unnecessary duration.
As shown in fig. 7, vertical duction pulley blocks 14 include vertical fixed pulley 15, the second shaft 16 and vertical fixed pulley frame 17, vertical fixed pulley frame 17 is hollow structure, and is arranged on cable-through hole 18, and the second shaft 16 is horizontally set on vertical fixed pulley In frame 17, second shaft 16 of the vertical rotatable connection of fixed pulley 15 makes vertical fixed pulley 15 rotate vertically.
Anti- wabbler mechanism includes the windproof hawser 5 of symmetrical 4 bottom of connection unit plate, to avoid in lifting, wind-force, wind direction Possible collision in influence and plate lifting to lifting, the quantity of windproof hawser 5 are no less than 2, are separately positioned on cell board The both sides center of block 4, windproof hawser 5 are pulled by ground traction personnel 6 or pulled by hoist engine 7, and optimal scheme is setting 4 The windproof hawser 5 of item, on the ground by manually pulling, everyone pulls 2 windproof hawsers 5, makes four, the ground side of unit plate 4 To the pulling force for having windproof hawser 5 downward, can prevention unit plate 4 because both sides unbalance stress wave the phenomenon that.
A kind of construction method for hanging of aerial vestibule furred ceiling, comprises the following steps:
A, setting-out and mark on the body construction with resting on the ground the corresponding cable-through hole position in lifting point of unit plate With the motion track of design lifting steel wire rope.
B, cable-through hole is cut on cable-through hole position, hoist engine, horizontal fixed pulley group and vertical fixed pulley group are installed, wherein Vertical fixed pulley group erection sequence is identical with the lifting sequence of unit plate, can after unit plate is installed in agent structure Dismounting and the corresponding vertical fixed pulley group of the unit plate, can save material, reduce construction cost, vertical by what is disassembled Fixed pulley group is installed on next cable-through hole for needing steel wire penetrating.
C, the lifting steel wire rope of hoisting mechanism through the cable-through hole and is connected into the lifting point.
D, the hoist engine is controlled to sling the unit plate 1-3m, windproof cable is respectively provided in the both sides of the unit plate Rope.
E, hoist engine is controlled to promote the lifting steel wire rope, while manually pulls the windproof hawser, until the unit Plate reaches agent structure.
F, will be fixed between unit plate and agent structure.
The erection sequence of the unit plate is to be installed successively to end side from a side end of the agent structure; If the length of the agent structure is more than 35 meters, the erection sequence of the unit plate is, from the both sides of the agent structure End thereto between install.
Finally it should be noted that:Above-described embodiments are merely to illustrate the technical scheme rather than to it Limitation;Although the present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It can still modify to the technical solution recorded in previous embodiment or to which part or all technical characteristic into Row equivalent substitution;And these modifications or substitutions, the essence of appropriate technical solution is not made to depart from various embodiments of the present invention technical side The scope of case.

Claims (6)

1. a kind of lifting construction structure of aerial vestibule furred ceiling, for the bottom external decoration of aerial vestibule agent structure, feature It is:Including unit plate, the top connection of the unit plate makes the hoisting mechanism of the unit plate lifting, the unit The bottom connection of plate prevents the anti-wabbler mechanism that the unit plate waves around;
The hoisting mechanism includes the lifting steel wire rope of the more connection unit plates, the lifting steel wire rope and unit plate Between the lifting tie point that is connected be evenly distributed on the unit plate, make the horizontal lifting of the unit plate in the air, The position that the lifting tie point is corresponded in the agent structure is equipped with for the lifting perforative cable-through hole of steel wire rope;
Being additionally provided with makes the pulley blocks that are horizontally diverted of the lifting steel wire rope horizontal buckling, and the pulley blocks that are horizontally diverted include setting Horizontal fixed pulley frame in the agent structure, the horizontal fixed pulley frame is interior equipped with the first rotating shaft being vertically arranged, described The rotatable horizontal fixed pulley of connection of first rotating shaft, rotates horizontally the horizontal fixed pulley;
The vertical duction pulley blocks for bending downward the lifting steel wire rope are additionally provided with, the vertical duction pulley blocks include vertical Fixed pulley, the second shaft and vertical fixed pulley frame, the vertical fixed pulley frame is hollow structure, and is arranged on the cable-through hole On, second shaft is horizontally set in the vertical fixed pulley frame, the rotatable connection of vertical fixed pulley described the Two shafts make the vertical fixed pulley rotate vertically;
If between two lifting steel wire ropes when intersecting, this two intersections lift steel wire ropes by be horizontally diverted cunning The height that wheel group is set is different.
2. the lifting construction structure of aerial vestibule furred ceiling according to claim 1, it is characterised in that:It is additionally provided with and is fixed on institute State multiple hoist engines in agent structure, the promotion and decline of the hoist engine driving lifting steel wire rope.
3. the lifting construction structure of aerial vestibule furred ceiling according to claim 1, it is characterised in that:The anti-wabbler mechanism Windproof hawser including symmetrically connecting the unit plate bottom, the quantity of the windproof hawser are no less than 2, the windproof cable The ground surface end of rope is equipped with manually drawing or hoist engine drawing.
4. the construction method for hanging of aerial vestibule furred ceiling according to claim 1, which is characterized in that comprise the following steps:
A, on the body construction setting-out and mark with resting on the ground the corresponding cable-through hole position in lifting point of unit plate with setting The motion track of meter lifting steel wire rope;
B, cable-through hole, installation hoist engine, horizontal fixed pulley group and vertical fixed pulley group are cut on cable-through hole position;
C, the lifting steel wire rope of hoisting mechanism through the cable-through hole and is connected into the lifting point;
D, the hoist engine is controlled to sling the unit plate 1-3m, windproof hawser is respectively provided in the both sides of the unit plate;
E, hoist engine is controlled to promote the lifting steel wire rope, while manually pulls the windproof hawser, until the unit plate Reach agent structure;
F, will be fixed between unit plate and agent structure.
5. the construction method for hanging of aerial vestibule furred ceiling according to claim 4, it is characterised in that:The unit plate Erection sequence is to be installed successively to end side from a side end of the agent structure.
6. the construction method for hanging of aerial vestibule furred ceiling according to claim 4, it is characterised in that:If the agent structure Length when being more than 35 meters, the erection sequence of the unit plate is, from the both side ends of the agent structure thereto between pacify Dress.
CN201610341776.9A 2016-05-20 2016-05-20 The lifting construction structure and its construction method of aerial vestibule furred ceiling Active CN105822072B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610341776.9A CN105822072B (en) 2016-05-20 2016-05-20 The lifting construction structure and its construction method of aerial vestibule furred ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610341776.9A CN105822072B (en) 2016-05-20 2016-05-20 The lifting construction structure and its construction method of aerial vestibule furred ceiling

Publications (2)

Publication Number Publication Date
CN105822072A CN105822072A (en) 2016-08-03
CN105822072B true CN105822072B (en) 2018-05-18

Family

ID=56530397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610341776.9A Active CN105822072B (en) 2016-05-20 2016-05-20 The lifting construction structure and its construction method of aerial vestibule furred ceiling

Country Status (1)

Country Link
CN (1) CN105822072B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724691B (en) * 2017-09-22 2022-08-16 河北卓达建材研究院有限公司 Mobile building loading machine
CN108868047A (en) * 2018-06-01 2018-11-23 苏州金螳螂建筑装饰股份有限公司 A kind of wall top one GRG moulding adjustable systems
CN110130644A (en) * 2019-05-30 2019-08-16 中国二十冶集团有限公司 A kind of construction method of high-altitude steel structure bottom metal curtain wall
CN111764498B (en) * 2020-06-30 2021-06-15 上海建工四建集团有限公司 Emergency disposal equipment for integrally lifting air corridor among super-high group of towers and use method
CN111794512B (en) * 2020-07-18 2021-09-21 福建大华建设工程股份有限公司 Overhead layer ceiling construction method
CN112049432B (en) * 2020-09-16 2021-10-29 武汉建工集团股份有限公司 Fractal theory-based large-span steel frame structure combination construction method
CN112962853B (en) * 2021-02-21 2022-03-25 北京西飞世纪门窗幕墙工程有限责任公司 Connecting structure, mounting structure and mounting method of air corridor ceiling
CN113250434B (en) * 2021-06-24 2022-09-09 安徽长青建筑制品有限公司 Multifunctional composite scaffold system
CN115492387B (en) * 2022-09-15 2023-08-11 中建八局第一建设有限公司 Climbing form integrated material hoisting system and construction method thereof
CN116946873B (en) * 2023-06-20 2024-02-09 中铁建工集团有限公司 Hoisting device for unit plate and application method thereof
CN117387032B (en) * 2023-12-13 2024-02-23 上海艺嘉智慧科技集团有限公司 Curtain wall lamp installation construction device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074058A (en) * 1993-06-18 1995-01-10 Takenaka Komuten Co Ltd Method and equipment for lifting pc wall slab of multistoried building
JPH082872A (en) * 1994-06-22 1996-01-09 Ogusu Energ:Kk Hoisting tool for building panel
CN101224856A (en) * 2007-12-20 2008-07-23 中铁大桥局股份有限公司 Long-span load-carrying cable lifting machine and mounting method therefor
CN203359745U (en) * 2013-07-03 2013-12-25 中冶天工上海十三冶建设有限公司 Hot blast stove refractory vertical transport device
CN103912089A (en) * 2014-04-18 2014-07-09 中建八局第二建设有限公司 Construction method of lift ceiling of auditorium hall
CN205637628U (en) * 2016-05-20 2016-10-12 北京西飞世纪门窗幕墙工程有限责任公司 Hoist and mount construction structures of aerial vestibule furred ceiling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074058A (en) * 1993-06-18 1995-01-10 Takenaka Komuten Co Ltd Method and equipment for lifting pc wall slab of multistoried building
JPH082872A (en) * 1994-06-22 1996-01-09 Ogusu Energ:Kk Hoisting tool for building panel
CN101224856A (en) * 2007-12-20 2008-07-23 中铁大桥局股份有限公司 Long-span load-carrying cable lifting machine and mounting method therefor
CN203359745U (en) * 2013-07-03 2013-12-25 中冶天工上海十三冶建设有限公司 Hot blast stove refractory vertical transport device
CN103912089A (en) * 2014-04-18 2014-07-09 中建八局第二建设有限公司 Construction method of lift ceiling of auditorium hall
CN205637628U (en) * 2016-05-20 2016-10-12 北京西飞世纪门窗幕墙工程有限责任公司 Hoist and mount construction structures of aerial vestibule furred ceiling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
长沙南站高大空间弧形吊顶单元式安装技术;尹振宇;《施工技术》;20111031;第40卷(第351期);第4-5页,第12页 *

Also Published As

Publication number Publication date
CN105822072A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN105822072B (en) The lifting construction structure and its construction method of aerial vestibule furred ceiling
CN206521197U (en) A kind of adjustable balance hoisting beam
CN206722429U (en) A kind of roofing color corrugated sheet steel transportation system
CN107327111A (en) A kind of dried hanging hang structure and finishing systems
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN109653481A (en) A kind of hanging rail formula high-altitude operation platform and production method
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN205637628U (en) Hoist and mount construction structures of aerial vestibule furred ceiling
CN109440985A (en) Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN104963495B (en) A kind of hanging basket for installing roofing bottom colored steel
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN211341686U (en) Hanging basket support system
CN208648493U (en) A kind of no scaffold installation elevator operation platform device
CN203257106U (en) Multifunctional power-driven walking type walking system
CN107035037A (en) High building top layer curtain wall frame and its installation method
CN212359072U (en) Construction equipment of roofing of encorbelmenting
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
CN111305433B (en) Construction structure and construction method of roof steel structure platform inclined glass curtain wall
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN208310158U (en) Construction protection crosshead
JPH08260571A (en) Rotary lift-up construction method for dome roof
CN203878966U (en) Ascending and descending protecting screen of spine structure
CN220364263U (en) Suspension type lifting construction system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant