CN208310158U - Construction protection crosshead - Google Patents

Construction protection crosshead Download PDF

Info

Publication number
CN208310158U
CN208310158U CN201820417370.9U CN201820417370U CN208310158U CN 208310158 U CN208310158 U CN 208310158U CN 201820417370 U CN201820417370 U CN 201820417370U CN 208310158 U CN208310158 U CN 208310158U
Authority
CN
China
Prior art keywords
bottom plate
crosshead
frame
protection
vertical bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820417370.9U
Other languages
Chinese (zh)
Inventor
岳军政
杨志凯
张迎松
张凯华
李泽政
孙天智
樊兆鹏
张厚起
单鑫
杨继波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201820417370.9U priority Critical patent/CN208310158U/en
Application granted granted Critical
Publication of CN208310158U publication Critical patent/CN208310158U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of construction protection crosshead, and frame is set on the column jacket of floor, and the construction protection crosshead includes operation bottom plate, the first frame, the second frame and protection side panel.The operation bottom plate is configured to U-shaped structure and is set around outside the column jacket, and the U-shaped structure of the operation bottom plate is open towards the inside of the floor space;First frame includes several intervals and the first vertical bar for being vertically arranged at the operation bottom plate U-shaped structure outer side edges;Second frame includes several intervals and the second vertical bar for being vertically arranged at the operation bottom plate U-shaped structure inner side edge;The protection side panel is set between the interval of each first vertical bar.The utility model operates bottom plate by design U-shaped and the first frame, the second frame and protection side panel is arranged on operation bottom plate, solves the problems, such as that prior art safety tears flexibility open with peace and cannot enjoy a double blessing, effectively guarantees the stability of construction protection crosshead.

Description

Construction protection crosshead
Technical field
The utility model relates to technical field of building construction, relate in particular to a kind of construction protection crosshead.
Background technique
In construction, the exterior frame column of super high-rise building is usually the structure type of stiffened column, is taken applying man-hour requirement It sets up defences and protects outrigger, guarantee that construction personnel has the operating platform of assembling reinforcement, supporting module.To solve this problem, traditional construction There are two types of methods, and 1. set up the outer protective frame of overhanging, and it is flexible and convenient to overhang outer protective frame, but overhangs outer protective frame according to bursting tube Reason regulation, each scaffolding height are not greater than 20 meters, take and tear heavy workload open, and in use, and safety is insufficient;2. adopting With all steel climbing frame, all steel climbing frame is had a safety feature, and circulation material expense is few, but all steel climbing frame is more heavy, is not suitable with Need to synchronize the architectural appearance neatly risen.
Utility model content
In view of the foregoing, the utility model provides a kind of construction protection crosshead, by design U-shaped operate bottom plate and The first frame, the second frame and protection side panel are set on operation bottom plate, solves prior art safety and peace tears flexibility open The technical issues of cannot enjoying a double blessing, effectively guarantees the stability of entire construction protection crosshead.
To achieve the above object, the technical scheme adopted by the utility model is that: provide a kind of construction protection crosshead, frame is set In on the column jacket of floor, the floor includes top plate and bottom plate and that the floor formed is defined by the top plate and the bottom plate is empty Between, the column jacket is set to the marginal position of the floor space, and the both ends of the column jacket are separately connected the top plate and described Bottom plate, the construction protection crosshead include: operation bottom plate, the first frame, the second frame and protection side panel.The operation bottom plate It is configured to U-shaped structure, the operation bottom plate is set around outside the column jacket, and the U-shaped structure of the operation bottom plate is open towards institute State the inside of floor space;First frame includes several the first vertical bars for being spaced and being vertically arranged, and each described first is perpendicular Each first vertical bar is arranged with U-shaped structure along the U-shaped structure outer side edges setting of the operation bottom plate in bar;Described Two frames include several the second vertical bars for being spaced and being vertically arranged, U-shaped knot of each second vertical bar along the operation bottom plate The setting of structure inner side edge, is arranged each second vertical bar with U-shaped structure;The protection side panel is set to each first vertical bar Interval between, and the two sides of the protection side panel are separately connected two neighboring first vertical bar, under the protection side panel Portion is connect with the operation bottom plate;The operation bottom plate, first frame, second frame and the protection side panel define Formation operation space.
The utility model construction protection crosshead further improvement lies in that, the construction protection crosshead include three operation Bottom plate, the three operations bottom plate are respectively arranged on the upper, middle and lower of the floor space.
The further improvement of the utility model construction protection crosshead is that the construction protection crosshead further includes branch Strut, the support rod are set between the operation bottom plate and first frame, and the described in the support rod interconnection One vertical bar.
The utility model construction protection crosshead further improvement lies in that, several ventilations are offered in the protection side panel Hole.
The utility model construction protection crosshead further improvement lies in that, crossbeam is equipped with below the top plate of the floor, Connecting rod is connected with below the crossbeam, the both ends of the connecting rod can be slided respectively along the length direction of second vertical bar Ground is connect with two neighboring second vertical bar.
The further improvement of the utility model construction protection crosshead is that the both ends of the connecting rod are respectively equipped with the One sleeve, the first sleeve can slidably be connect with second vertical bar, and the first sleeve can by fixing bolt with Second vertical bar is fixedly connected.
The further improvement of the utility model construction protection crosshead is that the middle part of the connecting rod can slidably be set There are two second sleeve, described two second sleeves are respectively arranged on the opposite sides of the crossbeam, and each second sleeve point Not Tong Guo fixing piece connect with the crossbeam.
The further improvement of the utility model construction protection crosshead is, described in the top connection of the second sleeve Fixing piece, the fixing piece are configured to L-shaped structure, and the lower of the second sleeve can be solid by fixing bolt and the connecting rod Fixed connection.
The utility model construction protection crosshead further improvement lies in that, the lower end of first frame and the floor The bottom plate on be respectively equipped with auricle, the auricle and the auricle on the bottom plate of first frame lower end pass through Fastener is fixedly connected.
The utility model construction protection crosshead further improvement lies in that, the upper end of the construction protection crosshead is equipped with Hanging ring.
The utility model due to use above technical scheme, make it have it is following the utility model has the advantages that
(1) by the way that the lower end of construction protection crosshead to be fixed on floor bottom plate, by the upper end of construction protection crosshead It is fixed on the crossbeam below floor roof, solves the technical issues of prior art safety and flexibility cannot enjoy a double blessing, have Effect ground guarantees the stability of entire construction protection crosshead.
(2) by the way that multiple operation bottom plates are arranged, so that the different height in column jacket forms that can to carry artificial operation empty Between.
(3) with the protection side panel of ventilation hole, the protective action to worker is had effectively achieved, worker is avoided to fall, simultaneously Ventilation hole can effectively reduce windage.
(4) by being respectively equipped with auricle on the lower end of the first frame and the bottom plate of floor, and two auricle connections are tight Gu realizing the fixation of construction protection crosshead lower end.
(5) first sleeve is respectively set by the both ends in connecting rod, so that this construction protection crosshead adapts to difference Layer it is high;By the way that second sleeve is arranged at the middle part of connecting rod, to adapt to the crossbeam of different wide sections.
(6) upper end of construction protection crosshead is equipped with hanging ring, and construction protection crosshead uses after one layer of upper use Construction protection crosshead is hoisted to upper one layer by hanging ring by tower crane, reusable.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of the utility model.
Fig. 2 is the schematic cross-sectional view of the Section A-A in Fig. 1.
Fig. 3 is the attachment structure schematic diagram of the utility model construction protection crosshead and crossbeam.
Drawing reference numeral explanation:
First frame 10;First vertical bar 11;Second frame 20;Second vertical bar 21;Operate bottom plate 30;Protection side panel 40;It is logical Air holes 41;Floor 50;Top plate 51;Bottom plate 52;Floor space 53;Crossbeam 54;Connecting rod 60;First sleeve 61;Second sleeve 62; Fixing piece 63;Support rod 70;Auricle 71;Fastener 72;Hanging ring 73;Column jacket 80;Oblique fulcrum bar 90.
Specific embodiment
For the benefit of to the understanding of the utility model, it is illustrated with reference to the accompanying drawings and embodiments.
It please refers to Fig.1 to Fig.3, the utility model provides a kind of construction protection crosshead, and frame is set on the column jacket of floor, institute It states floor 50 to include top plate 51, bottom plate 52 and define the floor space 53 formed by top plate 51 and bottom plate 52, column jacket 80 is set to The marginal position of floor space 53, and the both ends of column jacket 80 are separately connected top plate 51 and bottom plate 52, the construction protection crosshead It include: operation bottom plate 30, the first frame 10, the second frame 20 and protection side panel 40.Wherein:
As shown in Fig. 2, the operation bottom plate 30 is configured to U-shaped structure, operation bottom plate 30 is set around outside column jacket 80, such as Fig. 1 With shown in Fig. 2, the U-shaped structure of operation bottom plate 30 is open towards the inside of floor space 53.Preferably, as shown in Figure 1, described apply Work fence operation frame includes three operation bottom plates 30, three operation bottom plates 30 be respectively arranged on the top of floor space 53, middle part and under Portion.By the way that multiple operation bottom plates 30 are arranged, so that the different height in column jacket 80 forms and can carry artificial operating space.
In a preferred embodiment of the utility model, checkered steel plate production is can be used in operation bottom plate 30, so that operation Bottom plate 30 has anti-skidding effect, and but it is not limited to this, can be adjusted according to practice of construction situation.
As depicted in figs. 1 and 2, first frame 10 includes several the first vertical bars 11 for being spaced and being vertically arranged, respectively Each first vertical bar 11 is arranged with U-shaped structure along the U-shaped structure outer side edges setting of operation bottom plate 30 in first vertical bar 11.It is excellent Selection of land, the construction protection crosshead further include support rod 70, and support rod 70 is set between operation bottom plate 30 and the first frame 10, And 70 the first vertical bar of interconnection 11 of support rod.
As depicted in figs. 1 and 2, second frame 20 includes several the second vertical bars 21 for being spaced and being vertically arranged, respectively Second vertical bar 21 sets each second vertical bar 21 with U-shaped structure arrangement along the U-shaped structure inner side edge setting of operation bottom plate 30 It sets.
In a preferred embodiment of the utility model, as shown in Figure 1, the construction protection crosshead further includes tiltedly propping up Bar 90, oblique fulcrum bar 90 is set between two neighboring first vertical bar 11 or oblique fulcrum bar 90 is set between two neighboring second vertical bar 21, The stability of the construction protection crosshead is enhanced, but it is not limited to this, can be adjusted according to practice of construction situation.
As shown in Figure 1, the protection side panel 40 is set between the interval of each first vertical bar 21, and the two sides of protection side panel 40 It is separately connected two neighboring first vertical bar 21, the lower part of protection side panel 40 is connect with operation bottom plate 30.Preferably, protection side panel 40 On offer several ventilation holes 41.Protection side panel 40 with ventilation hole 41, has effectively achieved the protective action to worker, avoids Worker falls, while ventilation hole 41 can effectively reduce windage.
Further, as shown in figures 1 and 3, crossbeam 54, the lower section of crossbeam 54 are equipped with below the top plate 51 of the floor 50 Be connected with connecting rod 60, the both ends of connecting rod 60 respectively can along the second vertical bar 21 length direction slidably with two neighboring second Vertical bar 21 connects.Specifically, the both ends of connecting rod 60 are respectively equipped with first sleeve 61, and first sleeve 61 can be slidably perpendicular with second Bar 21 connects, and first sleeve 61 can be fixedly connected by fixing bolt with the second vertical bar 21, so that this construction protection crosshead It is high to adapt to different layers.Preferably, the middle part of connecting rod 60 can slidably be set there are two second sleeve 62, two second sleeves Points 56 are not set to the opposite sides of crossbeam 54, and each second sleeve 62 passes through fixing piece 63 respectively and connect with crossbeam 54, to adapt to Different wide section of crossbeams 54.Further, the top connection fixture 63 of second sleeve 62, fixing piece 63 are configured to L shape knot Structure, the lower of second sleeve 62 can be fixedly connected by fixing bolt with connecting rod 60.
Preferably, as depicted in figs. 1 and 2, being respectively equipped on the lower end of first frame 10 and the bottom plate 52 of floor 50 The auricle 71 of auricle 71,10 lower end of the first frame is fixedly connected with the auricle 71 on bottom plate 52 by fastener 72.By two ears The connection fastening of piece 71, realizes the fixation of construction protection crosshead lower end.Preferably, the upper end of the construction protection crosshead is also Equipped with hanging ring 73, construction protection crosshead is operated construction protection by hanging ring 73 using tower crane after one layer of upper use Frame is hoisted to one layer, reusable.
Combine accompanying drawings and embodiments that the utility model is described in detail above, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, certain details in embodiment should not be constituted to this reality With novel restriction, the utility model will be using the range that the appended claims define as the protection scope of the utility model.

Claims (10)

1. a kind of construction protection crosshead, frame is set on the column jacket of floor, and the floor includes top plate and bottom plate and by the top Plate and the bottom plate define the floor space to be formed, and the column jacket is set to the marginal position of the floor space, and the column jacket Both ends be separately connected the top plate and the bottom plate, which is characterized in that the construction protection crosshead includes:
Bottom plate is operated, the operation bottom plate is configured to U-shaped structure, and the operation bottom plate is set around outside the column jacket, and the behaviour The U-shaped structure for making bottom plate is open towards the inside of the floor space;
First frame, first frame include several the first vertical bars for being spaced and being vertically arranged, each first vertical bar edge The U-shaped structure outer side edges setting of the operation bottom plate, is arranged each first vertical bar with U-shaped structure;
Second frame, second frame include several the second vertical bars for being spaced and being vertically arranged, each second vertical bar edge The U-shaped structure inner side edge setting of the operation bottom plate, is arranged each second vertical bar with U-shaped structure;
Protection side panel, the protection side panel are set between the interval of each first vertical bar, and the two sides of the protection side panel point Two neighboring first vertical bar is not connected, and the lower part of the protection side panel is connect with the operation bottom plate;
The operation bottom plate, first frame, second frame and the protection side panel define formation operation space.
2. construction protection crosshead according to claim 1, which is characterized in that the construction protection crosshead includes three behaviour Make bottom plate, the three operations bottom plate is respectively arranged on the upper, middle and lower of the floor space.
3. construction protection crosshead according to claim 1 or claim 2, which is characterized in that the construction protection crosshead further includes Support rod, the support rod are set between the operation bottom plate and first frame, and described in the support rod interconnection First vertical bar.
4. construction protection crosshead according to claim 1, which is characterized in that offered in the protection side panel several logical Air holes.
5. construction protection crosshead according to claim 1, which is characterized in that be equipped with cross below the top plate of the floor Beam is connected with connecting rod below the crossbeam, and the both ends of the connecting rod respectively can be along the length direction of second vertical bar Slidably it is connect with two neighboring second vertical bar.
6. construction protection crosshead according to claim 5, which is characterized in that the both ends of the connecting rod are respectively equipped with One sleeve, the first sleeve can slidably be connect with second vertical bar, and the first sleeve can by fixing bolt with Second vertical bar is fixedly connected.
7. construction protection crosshead according to claim 5 or 6, which is characterized in that the middle part of the connecting rod can be slided Ground is set there are two second sleeve, and described two second sleeves are respectively arranged on the opposite sides of the crossbeam, and each described second set Cylinder is connect by fixing piece with the crossbeam respectively.
8. construction protection crosshead according to claim 7, which is characterized in that described in the top connection of the second sleeve Fixing piece, the fixing piece are configured to L-shaped structure, and the lower of the second sleeve can be solid by fixing bolt and the connecting rod Fixed connection.
9. construction protection crosshead according to claim 1, which is characterized in that the lower end and the building of first frame Auricle is respectively equipped on the bottom plate of layer, the auricle of first frame lower end and the auricle on the bottom plate lead to Fastener is crossed to be fixedly connected.
10. construction protection crosshead according to claim 1, which is characterized in that the upper end of the construction protection crosshead Equipped with hanging ring.
CN201820417370.9U 2018-03-27 2018-03-27 Construction protection crosshead Expired - Fee Related CN208310158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820417370.9U CN208310158U (en) 2018-03-27 2018-03-27 Construction protection crosshead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820417370.9U CN208310158U (en) 2018-03-27 2018-03-27 Construction protection crosshead

Publications (1)

Publication Number Publication Date
CN208310158U true CN208310158U (en) 2019-01-01

Family

ID=64721661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820417370.9U Expired - Fee Related CN208310158U (en) 2018-03-27 2018-03-27 Construction protection crosshead

Country Status (1)

Country Link
CN (1) CN208310158U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590149A (en) * 2018-03-27 2018-09-28 中国建筑第八工程局有限公司 Construction protection crosshead

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590149A (en) * 2018-03-27 2018-09-28 中国建筑第八工程局有限公司 Construction protection crosshead
CN108590149B (en) * 2018-03-27 2023-11-21 中国建筑第八工程局有限公司 Construction protection operation frame

Similar Documents

Publication Publication Date Title
CN103912008B (en) Unilateral formwork structure and construction method thereof
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN204126230U (en) Assembly scaffold unit
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN102635226B (en) Flexible hanging self-expansion operating platform and construction method
CN208310158U (en) Construction protection crosshead
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN205100531U (en) Lift scaffold support body assembly
CN205954482U (en) Construction structures of " people " style of calligraphy cable tower entablature support
CN108396657A (en) High pier bridge pier shaft reinforcing bar binding operation protective frame
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN205330202U (en) Take out post span wire reinforced structure
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN208734045U (en) Monoblock type mould bases for Super High fission conjoined composite structure
CN108590149A (en) Construction protection crosshead
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN204282788U (en) Shaping type scaffold can be assembled
CN205475709U (en) A scalable stores pylon for high -rise, super high -rise building jacking platform
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN103643790B (en) It is applicable to the self-crawling type operating platform of colossal column
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
CN207228604U (en) A kind of unilateral suspension type aerial movement steel platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

CF01 Termination of patent right due to non-payment of annual fee