CN107327111A - A kind of dried hanging hang structure and finishing systems - Google Patents

A kind of dried hanging hang structure and finishing systems Download PDF

Info

Publication number
CN107327111A
CN107327111A CN201710768381.1A CN201710768381A CN107327111A CN 107327111 A CN107327111 A CN 107327111A CN 201710768381 A CN201710768381 A CN 201710768381A CN 107327111 A CN107327111 A CN 107327111A
Authority
CN
China
Prior art keywords
keel
fastener
hanging
plate
decoration panel
Prior art date
Application number
CN201710768381.1A
Other languages
Chinese (zh)
Inventor
张承杰
周洁
张奇
曹陆兴
李坤泉
许波
谈磊
边疆
蔺明松
胡鹏
黄光远
袁野
韦洋
和东烁
张永鹏
魏扶苏
俞鑫伟
侯申飞
杨勇
Original Assignee
苏州金螳螂建筑装饰股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 苏州金螳螂建筑装饰股份有限公司 filed Critical 苏州金螳螂建筑装饰股份有限公司
Priority to CN201710768381.1A priority Critical patent/CN107327111A/en
Publication of CN107327111A publication Critical patent/CN107327111A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements

Abstract

The present invention relates to building field, a kind of dried hanging hang structure and finishing systems are disclosed.Dried hanging hang structure includes at least one the first keel, at least one the second keel, the hanging fastener for the connecting portion that is fixedly connected with the first keel and metope and for being connected the second keel and decoration panel.First keel are connected to wall by connecting portion;Second keel are removably attachable to the first keel by the second fastener, and hanging fastener, which is fixed on, to be needed after decoration panel to be mounted, are connected to the second keel, complete hanging for decoration panel.Such structure can allow staff at the scene composite assembly, improve installation effectiveness, saved substantial amounts of man power and material positioned, basic unit make, hanging strip fire prevention brushing processing, cost of labor reduction.And the structure is also convenient for the dismounting of decoration panel, the destruction to decoration panel or dried hanging hang structure is smaller;When in part, decoration panel is damaged, it is convenient for changing.

Description

A kind of dried hanging hang structure and finishing systems
Technical field
The present invention relates to building field, in particular to a kind of dried hanging hang structure and finishing systems.
Background technology
At present in building decoration construction field, finished veneer plate is installed and generally requires field fabrication lightgage steel joist basic unit, Because the flatness requirement to concrete wall surface and lightgage steel joist basic unit is larger, manufacturing process is comparatively laborious.And once adorn Panel is adjusted or dismantled to moulded with being difficult to after lightgage steel joist installation.
The content of the invention
It is an object of the invention to provide a kind of dried hanging hang structure, it is easy to the combination of staff to install, improves facing Decorative model fabrication and installation efficiency, and it is easy to the replacing of decoration panel.
Another object of the present invention is to provide a kind of finishing systems, its is easy to assembly, and installation effectiveness is high, is easy to decoration panel Replacing.
What embodiments of the invention were realized in:
A kind of dried hanging hang structure, for being fixed on metope and hanging decoration panel, dried hanging hang structure has what is be fixedly connected with metope First side and the second side for hanging decoration panel;Dried hanging hang structure includes at least one the first keel, at least one and first The second keel that keel interlock, for the connecting portion that is fixedly connected with the first keel and metope and for be connected the second keel with The hanging fastener of decoration panel, the first keel, the second keel are strip;
First keel are relative to the second keel close to the first side, and the first keel are detachable by the first fastener and connecting portion Ground is connected;Second keel are removably attachable to side of first keel towards the second side by the second fastener.
In an embodiment of the present invention, the connecting portion of above-mentioned dried hanging hang structure includes at least one pair of corner brace, and corner brace includes For the first installing plate for being posted and fixed with metope and perpendicular to the first installing plate to the of direction extension where the second side Two installing plates, affiliated the second installing plate with a pair of two corner braces is arranged at intervals and forms installing space, the first spine sections It is arranged in installing space, the first keel and the second installing plate for being located at itself both sides of the first keel are removable by the first fastener Connect with unloading.
In an embodiment of the present invention, there is the first mounting hole, first on the second installing plate of above-mentioned dried hanging hang structure Fastener is bolt, and the first fastener is through affiliated same a pair two the first mounting holes and the first keel, to realize first Fixation of the keel relative to connecting portion;First mounting hole is bar hole.
In an embodiment of the present invention, the first keel of above-mentioned dried hanging hang structure are hollow structure, section of the first keel Face is the rectangle that side has opening, and the first keel have side the first side of direction of opening.
In an embodiment of the present invention, the second keel of above-mentioned dried hanging hang structure include the first plate body and the second plate body, First plate body is attached at the first keel and is fixed on side of first keel towards the second side by the second fastener;Second plate body It is connected with the first plate body, and to the second side to extension, hanging fastener is connected with the second plate body.
In an embodiment of the present invention, the second plate body of above-mentioned dried hanging hang structure is provided with limiting section, and limiting section is relative In the junction of hanging fastener and the second plate body close to the second side, to limit hanging fastener to the second side to displacement.
In an embodiment of the present invention, the first keel of above-mentioned dried hanging hang structure, material bag used in the second keel Include metal;Second keel are additionally provided with the buffer part for being contacted with decoration panel, and buffer part is flexible.
In an embodiment of the present invention, one end of the hanging fastener of above-mentioned dried hanging hang structure is used to fix with decoration panel and connected Connect, the other end of hanging fastener is connected with the second keel, dried hanging hang structure includes multiple hanging fasteners, the other end of at least part hanging fastener It is detachably connected by the 3rd fastener and the second keel.
In an embodiment of the present invention, above-mentioned dried hanging hang structure includes at least two the second keel, each keel of bar second It is arranged at intervals on the length direction of the first keel;It is arranged in along along the first keel length direction on the second keel of least significant end, At least part hanging fastener is detachably connected by the 3rd fastener and the second keel.
A kind of finishing systems, finishing systems include above-mentioned dried hanging hang structure and decoration panel, and decoration panel and hanging fastener are towards the The side of two sides is connected.
The beneficial effect of the embodiment of the present invention is:
Second side of the dried hanging hang structure with the first side being fixedly connected with metope and for hanging decoration panel;Dried hanging hang structure At least one the second keel for being staggered including at least one the first keel, with the first keel, for by the first keel and wall The connecting portion that face is fixedly connected and the hanging fastener for connecting the second keel and decoration panel.First keel are relative to the second keel Close to the first side, the first keel are detachably connected by the first fastener and connecting portion;Second keel pass through the second fastener It is removably attachable to side of first keel towards the second side.Such structure can allow staff's group at the scene Be merged dress, improve facing decorative model fabrication and installation efficiency, saved substantial amounts of man power and material positioned, basic unit's system Make, hanging strip fire prevention brushing is handled, cost of labor reduction.And decoration panel can be successively installed on the second keel by hanging fastener, The dismounting of decoration panel is also convenient for, the destruction to decoration panel or dried hanging hang structure is smaller;When in part, decoration panel is damaged, it is convenient for changing.
Finishing systems provided in an embodiment of the present invention include above-mentioned dried hanging hang structure and the decoration panel being connected with hanging fastener. Therefore also there is above-mentioned beneficial effect.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the structural representation at the visual angle of dried hanging hang structure first in the embodiment of the present invention;
Fig. 2 is the structural representation at the visual angle of dried hanging hang structure second in the embodiment of the present invention;
Fig. 3 is the structural representation of corner brace in the embodiment of the present invention;
Fig. 4 is the structural representation of finishing systems in the embodiment of the present invention.
Icon:100- dried hanging hang structures;The sides of 102- first;The sides of 104- second;110- connecting portions;111- corner braces;112- first Installing plate;The installing plates of 113- second;The mounting holes of 114- first;The fasteners of 115- first;The keel of 120- first;The dragons of 130- second Bone;The plate bodys of 131- first;The plate bodys of 132- second;The fasteners of 133- second;134- limiting sections;135- buffer parts;140- hanging fasteners; The fasteners of 142- the 3rd;200- finishing systems;210- decoration panels.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
, it is necessary to explanation, term " on ", " under ", " vertical ", " level ", " interior " in the description of the embodiment of the present invention Orientation or position relationship Deng instruction are that, based on orientation shown in the drawings or position relationship, or the invention product is used when using The orientation or position relationship often put, are for only for ease of the description present invention and simplify description, rather than indicate or imply and be signified Device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the present invention Limitation.In addition, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it is not intended that indicating or implying phase To importance.
In addition, the term such as term " level ", " vertical " is not offered as requiring part abswolute level or pendency, but can be slightly Low dip.It is not that the expression structure must be complete as " level " only refers to its direction with respect to more level for " vertical " Full level, but can be slightly tilted.
In the description of the embodiment of the present invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in embodiments of the present invention.
Embodiment
Fig. 1 is the structural representation at the visual angle of dried hanging hang structure 100 first in the embodiment of the present invention;Fig. 2 is the embodiment of the present invention The structural representation at the middle visual angle of dried hanging hang structure 100 second.Referring to Fig.1 and 2, the present embodiment provides a kind of dried hanging hang structure 100, It is used to be fixed on metope and hangs decoration panel 210 (see Fig. 4), and dried hanging hang structure 100 has to be fixedly connected with metope (not shown) The first side 102 and the second side 104 for hanging decoration panel 210.In the present embodiment, dried hanging hang structure 100 includes a plurality of The first keel 120 for vertically extending, a plurality of the second horizontally extending keel 130, for by the first keel 120 The connecting portion 110 being fixedly connected with metope and the hanging fastener 140 for being connected the second keel 130 and decoration panel 210, the first dragon Bone 120, the second keel 130 are strip and are staggered and (two the first keel 120 and two the second keel are only shown in figure 130).In the present embodiment, the first keel 120 are vertically arranged, horizontally disposed the second keel 130 are in order to which structure is with more stable Property, in other embodiments of the invention, the first keel 120, the second keel 130 can be obliquely installed, without being limited to Vertically or horizontally.First keel 120, the quantity of the second keel 130 can need to be increased and decreased according to scene.The present invention other Embodiment is used to set the metope of dried hanging hang structure 100 can also be horizontal ground, in the case, the first keel 120 and the Two keel 130 have no the requirement of " vertical " or " level ", only need to ensure interlaced.
In the present embodiment, the first keel 120 are relative to the second keel 130 close to the first side 102, and the first keel 120 lead to Cross the first fastener 115 and connecting portion 110 is detachably connected;Second keel 130 are removably connected by the second fastener 133 The first keel 120 are connected to towards the side of the second side 104.
Fig. 3 is the structural representation of corner brace 111 in the embodiment of the present invention.Fig. 1 to Fig. 3 is referred to, in the present embodiment, even Socket part 110 is including some to corner brace 111, and corner brace 111 includes the first installing plate 112 for being posted and fixed with metope and hung down Straight the second installing plate 113 extended in the first installing plate 112 to the place direction of the second side 104, therefore corner brace 111 forms " L " type. Mirror image is arranged at intervals affiliated two same a pair corner braces 111 in the horizontal direction, is formed between the second installing plate 113 and is installed empty Between, the part of the first keel 120 is arranged in installing space, and is clamped by two corner braces 111.First keel 120 are with being located at itself Second installing plate 113 of both sides is detachably connected by the first fastener 115.
In the present embodiment, there is the bar hole for being conveniently fixed on metope, the first installing plate 112 on the first installing plate 112 It can be fixed on by fasteners such as swell fixtures on metope, bar hole causes the first installing plate 112 relative to screw (or bolt Deng other fasteners) there is certain displacement space, staff facilitates the position of adjustment corner brace 111 preferably to spell when mounted Fill dried hanging hang structure 100.
In the present embodiment, when mirror image is arranged at smooth metope to the corner brace 111 for belonging to a pair together in the horizontal direction, two Individual second installing plate 113 should be at parallel relative state and form installing space, have first to install on the second installing plate 113 Hole 114, the first fastener 115 is bolt, the first fastener 115 through affiliated two the first mounting holes 114 with a pair and First keel 120, to realize fixation of first keel 120 relative to connecting portion 110.In the present embodiment, the first mounting hole 114 For bar hole, its length direction extends perpendicular to the first installing plate 112 to the second side 104 of dried hanging hang structure 100.It should be understood that In the present embodiment, the first mounting hole 114 is that bar hole is that staff adjusts the first keel 120 when mounted for convenience Position so that the second keel 130 can install more smooth, in other embodiments, the shape of the first mounting hole 114 is not only limited In bar hole or circular hole;In other embodiments, the first fastener 115 can also be rivet, dovetail screw etc. other Fastener, in the case, the structure of the second installing plate 113 can be modified.Every first keel 120 are by least one pair of angle Code 111 is fixed, and the quantity of corner brace 111 is increased and decreased according to actual conditions.
In the present embodiment, the first keel 120 are hollow structure, to facilitate the first fastener 115 to run through the first keel 120.In detail, the section of the first keel 120 is the rectangle that side has opening, and the first keel 120 have the side court of opening To the first side 102.It should be understood that in the present embodiment, it is to facilitate two corner braces 111 dragon of clamping first jointly that profile, which is set to rectangle, Bone 120, in other embodiments of the invention, the sections of the first keel 120 can also for triangle, circle, it is trapezoidal or other The shapes such as polygon.
In the present embodiment, the second keel 130 include be strip slab construction the first plate body 131 and the second plate body 132, the first plate body 131 is attached at the first keel 120 and is fixed on the first keel 120 towards second by the second fastener 133 The side of side 104, the first plate body 131 is therefore in perpendicular, and its length direction keeps level.Second plate body 132 along first The top edge of plate body 131 is set, and is extended to the direction of the second side 104, and the second plate body 132 keeps level.In the present embodiment In, the set location of the second plate body 132 is not limited only in the top edge of the first plate body 131 or the first plate body 131 Portion;It need not keep level, can slightly tilt, and the second plate body 132 may also be with the cambered plate with radian.In the present embodiment In, the second fastener 133 is bolt, and in other embodiments, the second fastener 133 may also be with rivet, dovetail screw etc..
In the present embodiment, the second plate body 132 of dried hanging hang structure 100 is provided with limiting section 134, and limiting section 134 is also bar Shape tabular.Limiting section 134 is arranged at the second plate body 132 towards the edge of the second side 104, and perpendicular to the second plate body 132, it is spacing Therefore the place plane of portion 134 has certain intervals between the place plane of the first plate body 131, and limiting section 134 is also therefore with first The space that can be inserted for hanging fastener 140 is formd between keel 120.Limiting section 134 is relative to the plate body of hanging fastener 140 and second 132 junction is close to the second side 104, to limit hanging fastener 140 to the direction displacement of the second side 104.
Main material used in first keel 120, the second keel 130 includes rigid metal, such as stainless steel, aluminium are closed Gold etc., to provide preferable support performance.The lower edge of first plate body 131 is provided with one to the second side 104 protrusion to be had The buffer part 135 of elasticity, length direction of the buffer part 135 along the second keel 130 is set.Decoration panel 210 hangs on the second keel When on 130, while being contacted with buffer part 135, it is to avoid the damage that rigid contact is brought.In the present embodiment, buffer part 135 is by rubber Glue is made, in other embodiments, the material of buffer part 135 can also be expanded material etc. other there is the material of shock-absorbing capacity Material.
In the present embodiment, hanging fastener 140 have Z-shaped configuration, two plates at its two ends be parallel to each other and perpendicular to There is interval on the direction of limiting section 134.One end of hanging fastener 140 is used to be fixedly connected with decoration panel 210, hanging fastener 140 The other end is inserted into the gap between the keel 120 of limiting section 134 and first, and is contacted with the second plate body 132.In other implementations In example, the structure of hanging fastener 140 can be changed, and can be " L " shape, should be defined by that can hang on the second keel 130.
Dried hanging hang structure 100 includes multiple hanging fasteners 140, and the other end of at least part hanging fastener 140 passes through the 3rd fastener 142 is detachably connected with the second keel 130.In the present embodiment, the second keel of each bar 130 of dried hanging hang structure 100 are in height It is arranged at intervals on direction;The hanging fastener 140 being connected with the second keel 130 of top side passes through the 3rd fastener 142 and second Second plate body 132 of keel 130 is detachably connected.In detail, the 3rd fastener 142 can be screw, in its of the present invention In his embodiment, or rivet, bolt etc..
It should be understood that in the present invention, the hanging fastener 140 positioned at the top passes through the 3rd fastener 142 and the second keel 130 Fastening, and the hanging fastener 140 in non-the top is only to hang on the second keel 130, it is such that set-up mode can make peace The decoration panel 210 of the top installed pushes down following decoration panel 210, make lower section decoration panel 210 will not be lifted up and from Second keel 130 come off, and only fix the hanging fastener 140 of the top and can consolidate all decoration panels 210, save fastening Part, also improves installation effectiveness, reduces labour cost.In the present embodiment, the 3rd fastener 142 is bolt, it should be appreciated that at it In his embodiment, the 3rd fastener 142 can be screw, rivet etc..
Fig. 4 is the structural representation of finishing systems 200 in the embodiment of the present invention.Fig. 4 is refer to, the present embodiment also provides one Finishing systems 200 are planted, finishing systems 200 include above-mentioned dried hanging hang structure 100 and multiple decoration panels for being arranged at dried hanging hang structure 100 210, decoration panel 210 is connected with hanging fastener 140 towards the side of the second side 104.It should be appreciated that the decoration panel of the embodiment of the present invention 210 should do wide in range understanding, and it can be fire-proof plate, can for decorated wall surface decorative panel or be demonstrated Wooden boards, such as timber floor, door-plate etc., the similar various sheet materials that can be hung assembly should belong to the present embodiment and retouch In the range of the decoration panel 210 stated.
The installation method of finishing systems 200 is:
The corner brace 111 as connecting portion 110 first is installed in metope, the position of corner brace 111 is adjusted;By the first vertical keel In the installing space formed between 120 insertion corner braces 111, the flatness of each first keel 120 is adjusted, and consolidated by through bolt It is fixed;Second keel 130 of horizontal direction are installed close to the side of the second side 104 in the first keel 120, and pass through the second fastener 133 fastenings;Hanging fastener 140 is set on decoration panel 210, and multiple decoration panels 210 are hung on the successively by hanging fastener 140 Second plate body 132 of two keel 130, from bottom to up, adjacent upper finish plate 210 pushes down the decoration panel of lower section to erection sequence 210, making the decoration panel 210 of lower section will not be lifted up and be come off from the second keel 130;The decorations of the top in short transverse The hanging fastener 140 of panel 210 is fastenedly connected by the 3rd fastener 142 with corresponding second keel 130, so all decoration panels 210 all by because the decoration panel 210 of the top is fixed and is consolidated and is connected to dried hanging hang structure 100.
In summary, dried hanging hang structure of the invention is with the first side being fixedly connected with metope and for hanging decoration panel The second side;Dried hanging hang structure includes at least one the first keel, at least one the second keel, for the first keel and metope to be consolidated Surely the connecting portion connected and the hanging fastener for connecting the second keel and decoration panel.First keel, the second keel are staggered. First keel are relative to the second keel close to the first side, and the first keel are detachably connected by the first fastener and connecting portion; Second keel are removably attachable to side of first keel towards the second side by the second fastener.Such structure can make Staff can at the scene composite assembly, improve facing decorative model fabrication and installation efficiency, saved substantial amounts of manpower Positioned with material resources, basic unit makes, hanging strip fire prevention brushing processing, cost of labor reduction.And decoration panel can pass through hanging fastener It is installed on successively on the second keel, is also convenient for the dismounting of decoration panel, the destruction to decoration panel or dried hanging hang structure is smaller;Adornd in part During panel breakage, it is convenient for changing.Finishing systems provided in an embodiment of the present invention include above-mentioned dried hanging hang structure and and hanging fastener The decoration panel of connection.Therefore with above-mentioned beneficial effect.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of dried hanging hang structure, for being fixed on metope and hanging decoration panel, it is characterised in that the dried hanging hang structure has and institute State the first side that metope is fixedly connected and the second side for hanging the decoration panel;The dried hanging hang structure includes at least one First keel, at least one the second keel interlocked with first keel, for first keel and the metope to be consolidated Surely the connecting portion connected and the hanging fastener for connecting second keel and the decoration panel, it is first keel, described Second keel are strip;
First keel relative to second keel close to first side, first keel by the first fastener with The connecting portion is detachably connected;Second keel are removably attachable to the first keel court by the second fastener To the side of second side.
2. dried hanging hang structure according to claim 1, it is characterised in that the connecting portion includes at least one pair of corner brace, described Corner brace includes being used for the first installing plate for being posted and fixed with the metope and perpendicular to first installing plate to described the Second installing plate of direction extension where two sides, affiliated the second installing plate with a pair of two corner braces is arranged at intervals and shape Into installing space, first spine sections are arranged in the installing space, and first keel are with being located at the described first dragon Second installing plate of bone itself both sides is detachably connected by first fastener.
3. dried hanging hang structure according to claim 2, it is characterised in that there is the first mounting hole on second installing plate, First fastener is bolt, and first fastener is through affiliated same a pair two the first mounting holes and described first Keel, to realize fixation of first keel relative to the connecting portion;First mounting hole is bar hole.
4. dried hanging hang structure according to claim 1, it is characterised in that first keel are hollow structure, described first The section of keel is that side has the rectangle of opening, and first keel have the side of the opening towards first side.
5. dried hanging hang structure according to claim 1, it is characterised in that second keel include the first plate body and the second plate Body, first plate body is attached at first keel and is fixed on first keel towards institute by second fastener State the side of the second side;Second plate body is connected with first plate body, and to second side to extension, it is described to buckle Part is connected with second plate body.
6. dried hanging hang structure according to claim 5, it is characterised in that second plate body is provided with limiting section, the limit Position portion relative to the hanging fastener and second plate body junction close to second side, to limit the hanging fastener to institute The second side is stated to displacement.
7. dried hanging hang structure according to claim 1, it is characterised in that first keel, second keel are used Material include metal;Second keel are additionally provided with the buffer part for being contacted with the decoration panel, the buffer part tool It is flexible.
8. dried hanging hang structure according to claim 1, it is characterised in that one end of the hanging fastener is used for and the decoration panel It is fixedly connected, the other end of the hanging fastener is connected with second keel, the dried hanging hang structure includes multiple hanging fasteners, The other end of at least partly described hanging fastener is detachably connected by the 3rd fastener and second keel.
9. dried hanging hang structure according to claim 8, it is characterised in that the dried hanging hang structure includes at least two described second Keel, the second keel described in each bar are arranged at intervals on the length direction of first keel;Along along the first keel length direction It is arranged on second keel of least significant end, at least partly described hanging fastener passes through the 3rd fastener and the described second dragon Bone is detachably connected.
10. a kind of finishing systems, it is characterised in that the finishing systems include dry as claimed in any one of claims 1-9 wherein Hanging hang structure and decoration panel, the decoration panel are connected with the hanging fastener towards the side of second side.
CN201710768381.1A 2017-08-31 2017-08-31 A kind of dried hanging hang structure and finishing systems CN107327111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710768381.1A CN107327111A (en) 2017-08-31 2017-08-31 A kind of dried hanging hang structure and finishing systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710768381.1A CN107327111A (en) 2017-08-31 2017-08-31 A kind of dried hanging hang structure and finishing systems

Publications (1)

Publication Number Publication Date
CN107327111A true CN107327111A (en) 2017-11-07

Family

ID=60204722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710768381.1A CN107327111A (en) 2017-08-31 2017-08-31 A kind of dried hanging hang structure and finishing systems

Country Status (1)

Country Link
CN (1) CN107327111A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184123A (en) * 2018-08-03 2019-01-11 上海宝冶建筑装饰有限公司 A kind of metope decoration panel dry hanging construction installation method
CN110295717A (en) * 2019-06-25 2019-10-01 何艳 A kind of dried hanging method of marble slab
CN110341367A (en) * 2019-07-11 2019-10-18 杭州元创新型材料科技有限公司 A kind of cladding plaque production technology of backing strip

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184123A (en) * 2018-08-03 2019-01-11 上海宝冶建筑装饰有限公司 A kind of metope decoration panel dry hanging construction installation method
CN110295717A (en) * 2019-06-25 2019-10-01 何艳 A kind of dried hanging method of marble slab
CN110341367A (en) * 2019-07-11 2019-10-18 杭州元创新型材料科技有限公司 A kind of cladding plaque production technology of backing strip

Similar Documents

Publication Publication Date Title
WO1999042680A1 (en) Panel structure
CN206667652U (en) Closing in integral piece is fixed in wallboard dry-hang bottom
US20100300021A1 (en) Profile for the facade of a multi-storey building and a multi-storey building with such a facade
ES2145630T3 (en) Screenable scaffolding for facades.
CN202202558U (en) Girder-riding weight basket hanging mechanism arranged on high-rise roof frame girder
US20030208973A1 (en) Free-standing panel wall system
KR20130045711A (en) Indoor decorative curtain wall construction unit
EP3084096B1 (en) Plastic panel and structures using the same
KR20070009265A (en) Cladding panel installation structure using putting brackets up
CN103774749A (en) Large-span prestressed concrete F plate frame structure system
CN201521101U (en) Safety scaffold
US8186479B2 (en) Roof scaffolding system
WO2021057016A1 (en) Easy-to-install elevator frame
BG98178A (en) Shield-type formwork
SE522864C2 (en) Procedure for installing a set of roof panels
CN205399846U (en) Curved surface roof is prevent wind and is kept off snow device
CN200985580Y (en) Panel horizontal inserted type suspended ceiling
JP3746299B2 (en) Curtain wall with hanging glass panels
CN206320918U (en) Air conditioner support for multi-storey building
KR101465504B1 (en) System for outer wall of building
CN109723180A (en) A kind of assembled ceiling structure and its installation method
CN2660025Y (en) Boatswain's chair
KR100725379B1 (en) System for construting climbing wall
CN104929297A (en) Combined type ceiling hanging part and wood veneer ceiling installing process
CN208122075U (en) Top hangs drop level furred ceiling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination