CN211341686U - A hanging basket support system - Google Patents

A hanging basket support system Download PDF

Info

Publication number
CN211341686U
CN211341686U CN201922081082.8U CN201922081082U CN211341686U CN 211341686 U CN211341686 U CN 211341686U CN 201922081082 U CN201922081082 U CN 201922081082U CN 211341686 U CN211341686 U CN 211341686U
Authority
CN
China
Prior art keywords
fixed
hanging basket
frame
front beam
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922081082.8U
Other languages
Chinese (zh)
Inventor
王红成
徐志强
孙士东
周亮
梁涛
岳子淞
赵传海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Decoration Engineering Co Ltd filed Critical China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority to CN201922081082.8U priority Critical patent/CN211341686U/en
Application granted granted Critical
Publication of CN211341686U publication Critical patent/CN211341686U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a hanging flower basket mounting system contains: the support comprises a framework fixed on the curtain wall steel frame, a front beam, a winch, a lower inclined strut, a connecting rod, hanging baskets and a limiting rope, wherein one end of the front beam is fixed at the middle part of an upper beam of the framework, the winch is fixed at the bottom of the head of the other end of the front beam, the lower inclined strut is fixed at the middle part of a lower beam of the framework, the two ends of the lower inclined strut are fixed on the front beam of the two supports, the hanging baskets are hung at the two sides of the winch of the two supports respectively, and the limiting rope is vertically fixed between the connecting rod and the ground. The utility model provides a hanging flower basket mounting system satisfies construction hanging flower basket, material transportation hanging flower basket cooperation construction simultaneously, has solved the restriction that the construction hanging flower basket bore to and avoided the workman to descend the construction hanging flower basket to the link that ground transportation material comes the construction again after the material is used up when workman's construction, realize people, material separation transportation, reach the purpose of quick construction.

Description

一种吊篮支架系统A hanging basket support system

技术领域technical field

本实用新型涉及一种吊篮支架系统,特别涉及一种安装在幕墙钢架上的吊篮支架系统。The utility model relates to a hanging basket support system, in particular to a hanging basket support system installed on a curtain wall steel frame.

背景技术Background technique

石材外幕墙被广泛应用于大型商场、高端写字楼、高端住宅建筑等大型建筑中,具有多种优良特性,能达到很好的装饰效果。吊篮是建筑工程高空作业的建筑机械,通常可用于幕墙安装或外墙清洗,能够替代传统脚手架,可减轻劳动强度,提高工作效率,并能够重复使用的新型高处作业设备。同时,建筑吊篮的使用已经逐渐成为一种趋势,在高层多层高建筑的外墙施工、幕墙安装、保温施工和维修清洗外墙等高出作业中得到广泛认可,同时可用于大型罐体、桥梁和大坝等工程的作业。随着建筑行业的高速发展,高端建筑的工期要求越来越短,施工吊篮承载的受限以及施工规范限制,常规吊篮不允许作为材料运输装置,而若采用室内材料运输,运输工序复杂,人力成本高,效率低,涉及无窗幕墙更难运输,因而迫急需研发出适用于各种大型建筑外幕墙的物料垂直运输提升装置。Stone exterior curtain wall is widely used in large shopping malls, high-end office buildings, high-end residential buildings and other large buildings. It has a variety of excellent characteristics and can achieve good decorative effects. The hanging basket is a construction machine for high-altitude operations in construction projects. It can usually be used for curtain wall installation or exterior wall cleaning. It can replace traditional scaffolding, reduce labor intensity, improve work efficiency, and can be reused. New high-altitude operation equipment. At the same time, the use of building baskets has gradually become a trend, and has been widely recognized in high-rise operations such as exterior wall construction, curtain wall installation, thermal insulation construction, and maintenance and cleaning of exterior walls of high-rise and multi-storey buildings, and can also be used for large tanks. , bridges and dams and other projects. With the rapid development of the construction industry, the construction period requirements of high-end buildings are getting shorter and shorter, and the carrying capacity of the construction gondola is limited and the construction specification is restricted. Conventional gondolas are not allowed to be used as material transportation devices. , the labor cost is high, the efficiency is low, and the windowless curtain wall is more difficult to transport. Therefore, it is urgent to develop a vertical transportation and lifting device suitable for the outer curtain wall of various large buildings.

实用新型内容Utility model content

本实用新型是为了解决上述问题而进行的,目的在于提供一种安装在幕墙钢架上的吊篮支架系统,利用石材外幕墙钢龙骨系统,在钢龙骨上架设爬升式电动吊篮及吊架,并利用卷扬机提升限位线上的吊篮,将石材材料运到指定工作区域,满足施工吊篮、物料运输吊篮配合同时施工,解决了施工吊篮承载的限制,以及在工人施工时避免了工人在物料用完后要把施工吊篮下降到地面运输物料再来施工的环节,实现人、料分离运输,达到快速施工的目的。The utility model is designed to solve the above problems, and the purpose is to provide a hanging basket support system installed on the steel frame of the curtain wall, which utilizes the steel keel system of the outer curtain wall of the stone material to erect a climbing-type electric hanging basket and a hanger on the steel keel. , and use the hoist to lift the hanging basket on the limit line to transport the stone material to the designated work area, so as to meet the construction of the construction hanging basket and the material transportation hanging basket at the same time, solve the limitation of the construction hanging basket, and avoid the construction of the construction hanging basket. After the materials are used up, the workers have to lower the construction basket to the ground to transport the materials before construction, so as to realize the separation and transportation of people and materials, and achieve the purpose of rapid construction.

为实现上述目的,本实用新型提出一种吊篮支架系统,具有这样的特征,包含:对称固定在幕墙钢架上的两个支架,每个支架包括固定在所述幕墙钢架上的框架,一端固定在所述框架的上梁中部的前梁,固定在所述前梁另一端头部底下的卷扬机,以及两端分别固定在所述前梁上和所述框架的下梁中部的下斜撑,两端分别固定在所述两个支架的所述前梁上的连接杆,两侧分别吊挂在所述两个支架的所述卷扬机上的吊篮,以及垂直固定在所述连接杆和地面之间的限位绳。In order to achieve the above purpose, the utility model proposes a hanging basket support system, which has the following characteristics, including: two supports symmetrically fixed on the curtain wall steel frame, each support includes a frame fixed on the curtain wall steel frame, A front beam with one end fixed on the middle of the upper beam of the frame, a hoist fixed under the head of the other end of the front beam, and a downward slope with both ends fixed on the front beam and the middle of the lower beam of the frame respectively support, connecting rods with both ends respectively fixed on the front beams of the two brackets, hanging baskets hanging on the hoists of the two brackets on both sides respectively, and vertically fixed on the connecting rods and the limit rope between the ground.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,还具有固定在所述吊篮上的固定件,所述限位绳在所述固定件中上下穿过。In addition, the hanging basket support system proposed by the present invention also has the feature of having a fixing piece fixed on the hanging basket, and the limiting rope passes up and down in the fixing piece.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述固定件为双滑轮,所述限位绳在两个滑轮中上下穿过。In addition, the hanging basket support system proposed by the present invention also has the feature that the fixing member is a double pulley, and the limit rope passes through the two pulleys up and down.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述支架还包括加固所述前梁的上斜杆,所述上斜杆的一端固定在所述前梁头部,另一端由斜杆固定构件固定在所述幕墙钢架上。In addition, the hanging basket support system proposed by the present invention also has the feature that the support further comprises an up-inclined rod for reinforcing the front beam, and one end of the up-inclined rod is fixed on the head of the front beam, The other end is fixed on the curtain wall steel frame by the inclined rod fixing member.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述支架还包括加固所述上斜杆的立柱,所述立柱的一端固定在所述前梁上,另一端固定在所述上斜杆上。In addition, the hanging basket support system proposed by the present invention also has the feature that the support further includes a column for reinforcing the upward inclined rod, one end of the column is fixed on the front beam, and the other end is fixed on the front beam. on the incline bar.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述支架还包括第一数量个限位角码,分别固定在所述框架的上梁和下梁上。In addition, the hanging basket support system proposed by the present invention also has the feature that the support further includes a first number of limit angle codes, which are respectively fixed on the upper beam and the lower beam of the frame.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述支架还包括两根交叉固定在所述框架内部的框架斜撑。In addition, the hanging basket support system proposed by the present invention also has the feature that the support further includes two frame diagonal braces which are fixed in the inside of the frame crosswise.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述斜杆固定构件通过角钢螺栓固定在所述幕墙钢架上。In addition, the hanging basket support system proposed by the present invention also has the feature that the diagonal rod fixing member is fixed on the curtain wall steel frame through angle steel bolts.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述上斜杆的一端与所述卷扬机叠加固定在所述前梁上。In addition, the hanging basket support system proposed by the present invention also has the feature that one end of the upward inclined rod and the hoist are superimposed and fixed on the front beam.

另外,本实用新型提出的吊篮支架系统中,还具有这样的特征,所述吊篮两侧具有上拉式轨道门,以及安装在轨道上的限位卡件。In addition, the hanging basket support system proposed by the present invention also has the feature that the two sides of the hanging basket are provided with pull-up rail doors and limit clips installed on the rails.

实用新型作用和效果Utility model function and effect

本实用新型所涉及的吊篮支架系统,具有对称安装在幕墙钢架上的两个支架,再通过钢桁架组合结构与吊篮连接固定,利用定向滑轮配置卷扬机完成吊篮的电动升降。在每个支架的框架上,通过两端分别固定在所述前梁上和所述框架的下梁中部的下斜撑,一端固定在所述前梁上,另一端由斜杆固定构件固定在所述幕墙钢架上的上斜杆,以及一端固定在所述前梁上,另一端固定在所述上斜杆上的立柱,与所述前梁形成数个三角支架结构,来对用于吊起作业平台的前梁起加固作用。同时,还采用限位角码进一步加固所述框架与幕墙钢架的连接,并通过增加框架内部交叉固定的框架斜撑来加固所述框架。为避免吊篮在运作过程中受风力影响产生大幅度晃动导致石材磕碰,在吊篮背面设置两道钢丝绳限位线,再通过双滑轮与吊篮相对固定,吊篮沿着限位绳进行上下移动,确保吊篮上升时的晃动幅度最小,将石材材料运到指定工作区域,随运随用,实现人、料分离运输,节省人工,提高效率,以达到快速施工的目的。本实用新型的吊篮支架系统现场安装便利,操作方法简洁,材料垂直运输效率高。吊篮支架系统方便安拆,可根据施工位置移动。The hanging basket bracket system of the utility model has two brackets symmetrically installed on the curtain wall steel frame, which are connected and fixed with the hanging basket through the steel truss composite structure, and the electric lifting and lowering of the hanging basket is completed by using a directional pulley to configure a hoist. On the frame of each bracket, one end is fixed on the front beam, and the other end is fixed on the front beam, and the other end is fixed on the front beam and the other end is fixed on the front beam and the middle of the lower beam of the frame. The upward inclined rod on the curtain wall steel frame and the upright column with one end fixed on the front beam and the other end fixed on the upward inclined rod form several triangular bracket structures with the front beam to be used for Lift the front beam of the work platform for reinforcement. At the same time, the connection between the frame and the steel frame of the curtain wall is further strengthened by means of a limit angle code, and the frame is strengthened by adding cross-fixed frame diagonal braces inside the frame. In order to avoid the large swing of the hanging basket due to the influence of wind during operation, which may cause the stone to bump, two wire rope limit lines are set on the back of the hanging basket, and then fixed relative to the hanging basket through double pulleys, and the hanging basket moves up and down along the limit rope. Move, ensure the minimum shaking when the hanging basket rises, transport the stone material to the designated work area, and use it as it is transported, realize the separation and transportation of people and materials, save labor, improve efficiency, and achieve the purpose of rapid construction. The hanging basket support system of the utility model has the advantages of convenient on-site installation, simple operation method and high vertical transportation efficiency of materials. The hanging basket support system is easy to install and disassemble, and can be moved according to the construction position.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图示出的结构获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained based on the structures shown in these drawings without any creative effort.

图1是本实用新型在实施例中的吊篮支架系统的支架局部结构示意图一。FIG. 1 is a schematic diagram 1 of a partial structure of a bracket of a hanging basket bracket system in an embodiment of the present invention.

图2是本实用新型在实施例中的吊篮支架系统的支架局部结构示意图二。FIG. 2 is a second partial structural schematic diagram of the bracket of the hanging basket bracket system in the embodiment of the present invention.

图3是本实用新型在实施例中的吊篮支架系统的吊篮结构示意图。3 is a schematic view of the structure of the hanging basket of the hanging basket support system in the embodiment of the present invention.

图4是本实用新型在实施例中的吊篮支架系统的吊篮局部结构示意图。4 is a schematic diagram of a partial structure of a hanging basket of a hanging basket support system in an embodiment of the present invention.

图5是本实用新型在实施例中的吊篮支架系统的使用状态示意图。FIG. 5 is a schematic diagram of the use state of the hanging basket support system in the embodiment of the present invention.

本实用新型目的的实现、功能特点及优点将结合实施例,参照附图做进一步说明。The realization, functional characteristics and advantages of the purpose of the present utility model will be further described with reference to the accompanying drawings in conjunction with the embodiments.

具体实施方式Detailed ways

以下参照附图及实施例对本实用新型所涉及的一种吊篮支架系统作详细的描述。以下结合附图对本实用新型的原理和特征进行描述,所举实例只用于解释本实用新型,并非用于限定本实用新型的范围。The following is a detailed description of a hanging basket support system according to the present invention with reference to the accompanying drawings and embodiments. The principles and features of the present invention will be described below with reference to the accompanying drawings, and the examples are only used to explain the present invention, and are not intended to limit the scope of the present invention.

图1是本实用新型在实施例中的吊篮支架系统的支架局部结构示意图一。FIG. 1 is a schematic diagram 1 of a partial structure of a bracket of a hanging basket bracket system in an embodiment of the present invention.

图2是本实用新型在实施例中的吊篮支架系统的支架局部结构示意图二。FIG. 2 is a second partial structural schematic diagram of the bracket of the hanging basket bracket system in the embodiment of the present invention.

如图1-图2所示,本实用新型提出一种吊篮支架系统,包含:左右对称安装的两个支架,在每个所述支架中,包括安装在幕墙钢架上的框架1,框架1具有上梁11和下梁12。在一些实施例中,根据干挂石材钢结构横向角钢的纵向间距设计所述支架,所述框架1可采用50*50*4mm镀锌方通焊接而成。用于吊挂作业平台的前梁3的一端固定在所述框架1的上梁11中部。所述前梁3可以通过焊接与所述框架1的上梁中部相固定。在一些实施例中,所述前梁3的一端通过焊接固定在框架1的上梁11中部。此外,所述前梁3的另一端上还具有固定在头部底下的卷扬机5,用于搭载吊篮14。所述卷扬机5可通过螺栓固定在所述前梁3上。前梁末端处还可预留几个相隔一定间距的螺栓孔,便于吊篮14进出位调整。在一些实施例中,可没间距50mm在所述前梁头部设计出4个卷扬机调节孔。所述卷扬机5和遥控器配套使用,通过遥控器可控制卷扬机5升降所述吊篮14。As shown in Fig. 1-Fig. 2, the present utility model proposes a hanging basket support system, comprising: two supports installed symmetrically on the left and right, in each of the supports, including a frame 1 installed on the curtain wall steel frame, the frame 1 has an upper beam 11 and a lower beam 12. In some embodiments, the bracket is designed according to the longitudinal spacing of the horizontal angle steel of the dry-hanging stone steel structure, and the frame 1 can be welded by 50*50*4mm galvanized square pass. One end of the front beam 3 for hanging the work platform is fixed in the middle of the upper beam 11 of the frame 1 . The front beam 3 can be fixed to the middle of the upper beam of the frame 1 by welding. In some embodiments, one end of the front beam 3 is fixed to the middle of the upper beam 11 of the frame 1 by welding. In addition, the other end of the front beam 3 also has a hoist 5 fixed under the head for carrying the gondola 14 . The hoist 5 can be fixed on the front beam 3 by bolts. At the end of the front beam, several bolt holes at a certain interval can be reserved to facilitate the adjustment of the in-and-out position of the hanging basket 14 . In some embodiments, four hoist adjustment holes may be designed at the head of the front beam with a spacing of 50 mm. The hoist 5 is used together with a remote controller, and the hoist 5 can be controlled to lift and lower the basket 14 through the remote controller.

根据实际使用情况,上述前梁3可选取适当的长度。在一些实施例中,采用50*50*4mm镀锌方通焊接前梁3,前梁3长度可选取为1400mm,前梁3与钢架的竖向方通角度为90°。另外,为了加固所述前梁3与框架1的连接,前梁3与框架1的连接处可采用前梁角码9进行焊接固定。通常而言,可选用三个所述前梁角码9对所述前梁3进行三面满焊。在一些实施例中,前梁3与框架1的连接处采用三个4mm厚镀锌角码进行焊接固定并三面满焊。According to the actual use situation, the above-mentioned front beam 3 can choose an appropriate length. In some embodiments, the front beam 3 is welded with a 50*50*4mm galvanized square pass, the length of the front beam 3 can be selected as 1400mm, and the vertical pass angle between the front beam 3 and the steel frame is 90°. In addition, in order to strengthen the connection between the front beam 3 and the frame 1 , the connection between the front beam 3 and the frame 1 can be welded and fixed by using the front beam angle code 9 . Generally speaking, three front beam angle yards 9 can be selected to perform full welding on three sides of the front beam 3 . In some embodiments, the connection between the front beam 3 and the frame 1 is welded and fixed by using three 4mm thick galvanized corner codes and fully welded on three sides.

另外,所述前梁3与所述框架1相对斜下方向安装,即所述前梁3与所述框架1的竖向方通之间呈一定角度,角度可以为60°。在一些实施例中,所述前梁3与框架1的竖向方通间的角度为60°。In addition, the front beam 3 and the frame 1 are installed in an oblique downward direction, that is, a certain angle is formed between the front beam 3 and the vertical direction of the frame 1, and the angle may be 60°. In some embodiments, the angle between the front beam 3 and the vertical direction of the frame 1 is 60°.

另外,本实用新型提出的吊篮支架系统中,还包括第一数量个限位角码2,分别固定在所述框架1的上梁11和下梁12上。为了平衡所述框架1的受力,通常而言,所述第一数量个限位角码2可分别平均分布在所述框架1的上梁11和下梁12上。所述第一数量个限位角码2可优选为4个。在一些实施例中,框架1上梁11和下梁12上各分别对称焊接两个4mm厚镀锌角码扣挂在框架1钢结构的横向角钢上。在上述的角码底部开螺栓孔,从而利用钢结构横向角钢预留栓接干挂件的栓孔21进行限位固定。In addition, the hanging basket support system proposed by the present invention also includes a first number of limiting angle codes 2 , which are respectively fixed on the upper beam 11 and the lower beam 12 of the frame 1 . In order to balance the force of the frame 1 , generally speaking, the first number of limit angle codes 2 can be evenly distributed on the upper beam 11 and the lower beam 12 of the frame 1 respectively. The first number of limit angle codes 2 may preferably be four. In some embodiments, the upper beam 11 and the lower beam 12 of the frame 1 are respectively symmetrically welded with two 4mm thick galvanized corner buckles and hung on the transverse angle steel of the steel structure of the frame 1 . Bolt holes are opened at the bottom of the above-mentioned corner code, so that the bolt holes 21 for bolting the dry hanger are reserved by the horizontal angle steel of the steel structure for limit fixing.

如图2所示的吊篮支架系统的局部结构示意图,在本实用新型中,为了能够让所述前梁3承挂吊篮14,所述吊篮支架系统的每个支架中,还具有用于支撑所述前梁3的下斜撑4。所述下斜撑4的一端通过焊接固定在所述前梁3上。具体而言,在一些实施例中,所述框架1上可采用50*50*4mm镀锌方通与所述下斜撑4的一端焊接连接,而所述下斜撑4的另一端则通过焊接或螺纹等方式固定在所述框架1的下梁12中部。从而,所述下斜撑4、所述前梁3和所述框架1可形成稳固的三角支架结构,确保所述吊篮支架系统可以稳定承重。As shown in FIG. 2 is a schematic diagram of the partial structure of the hanging basket support system, in the present invention, in order to allow the front beam 3 to support the hanging basket 14, each support of the hanging basket support system also has a It is used to support the lower diagonal brace 4 of the front beam 3 . One end of the lower diagonal brace 4 is fixed on the front beam 3 by welding. Specifically, in some embodiments, a 50*50*4mm galvanized square pass can be used on the frame 1 to be welded to one end of the lower diagonal brace 4, and the other end of the lower diagonal brace 4 is connected by welding It is fixed in the middle of the lower beam 12 of the frame 1 by welding or screwing. Therefore, the lower diagonal brace 4, the front beam 3 and the frame 1 can form a stable triangular support structure, ensuring that the hanging basket support system can stably bear the load.

另外,本实用新型提出的吊篮支架系统中,为了进一步加固所述前梁3,还包括上斜杆6,所述上斜杆6的一端通过螺栓固定在所述前梁3上,优选的,所述上斜杆6的一端与所述卷扬机5可以一同固定在所述前梁3的头部,另一端则通过斜杆固定构件10固定在所述幕墙钢架上。在一些实施例中,所述上斜杆6的一端与所述卷扬机5可以通过栓接件51和螺栓叠加固定在所述前梁上。在本实用新型的吊篮支架系统中,所述斜杆固定构件10可通过角钢螺栓固定在所述幕墙钢架上。所述的斜杆固定构件10可以为一个U型凹槽。在一些实施例中,所述斜杆固定构件10为一个U型凹槽,所述前梁3的一端嵌入在所述U型凹槽中,并通过螺栓与所述U型凹槽连接固定。所述的U型凹槽则通过角钢螺栓固定在所述幕墙钢架上。In addition, in the hanging basket support system proposed by the present invention, in order to further strengthen the front beam 3, it also includes an up-inclined rod 6, one end of the up-inclined rod 6 is fixed on the front beam 3 by bolts, preferably One end of the upper inclined rod 6 and the hoist 5 can be fixed on the head of the front beam 3 together, and the other end is fixed on the curtain wall steel frame through the inclined rod fixing member 10 . In some embodiments, one end of the upward inclined rod 6 and the hoisting machine 5 can be superimposed and fixed on the front beam by a bolt 51 and a bolt. In the hanging basket support system of the present invention, the diagonal rod fixing member 10 can be fixed on the curtain wall steel frame by angle steel bolts. The diagonal rod fixing member 10 may be a U-shaped groove. In some embodiments, the diagonal rod fixing member 10 is a U-shaped groove, one end of the front beam 3 is embedded in the U-shaped groove, and is connected and fixed with the U-shaped groove by bolts. The U-shaped groove is fixed on the curtain wall steel frame by angle steel bolts.

另外,本实用新型提出的吊篮支架系统中,为了能进一步加固每个支架的承重,还包括用于加固所述上斜杆6的立柱7,所述立柱7的一端可通过焊接或螺纹等方式固定在所述前梁3上,另一端则通过焊接或采用螺纹固定的方式安装固定在所述上斜杆6上。在一些实施例中,所述立柱7通过螺纹与所述上斜杆6的一端相固定。立柱7在所述前梁3上与所述框架1上梁11连接处的距离可以为100mm。在一些实施例中,卷扬机5和上斜杆6安装在前梁3的端头处,前梁3末端起始位置100mm处设置栓接固定的立柱7。所述立柱7的安装方向可与所述框架整体所处的平面相平行。在一些实施例中,所述前梁3的头部与所述立柱7之间的角度为120°。In addition, in the hanging basket support system proposed by the present invention, in order to further strengthen the load-bearing of each support, it also includes a column 7 for strengthening the upward inclined rod 6, and one end of the column 7 can be welded or screwed. It is fixed on the front beam 3 in a way, and the other end is fixed on the upper inclined rod 6 by welding or screwing. In some embodiments, the upright post 7 is fixed with one end of the upward inclined rod 6 through threads. The distance between the connection between the upright column 7 on the front beam 3 and the upper beam 11 of the frame 1 may be 100 mm. In some embodiments, the hoist 5 and the upward inclined rod 6 are installed at the end of the front beam 3 , and a bolted and fixed column 7 is provided at the starting position of the end of the front beam 3 100 mm. The installation direction of the upright column 7 may be parallel to the plane on which the whole frame is located. In some embodiments, the angle between the head of the front beam 3 and the column 7 is 120°.

另外,本实用新型提出的吊篮支架系统中,为了防止框架1骨架变形,还包括两根交叉固定在所述框架1内部的框架斜撑8。两根框架斜撑8与所述框架1的固定方式可以为焊接。所述框架斜撑8之间的固定方式可以为焊接。更具体而言,所述的框架斜撑8可在钢架内部采用方通焊接交叉以加强支撑。In addition, in the hanging basket support system proposed by the present invention, in order to prevent the deformation of the frame 1 , it also includes two frame diagonal braces 8 that are cross-fixed inside the frame 1 . The two frame diagonal braces 8 and the frame 1 can be fixed by welding. The fixing method between the frame braces 8 can be welding. More specifically, the frame bracing 8 can be crossed by square-pass welding inside the steel frame to strengthen the support.

图3是本实用新型在实施例中的吊篮支架系统的吊篮结构示意图。3 is a schematic view of the structure of the hanging basket of the hanging basket support system in the embodiment of the present invention.

图4是本实用新型在实施例中的吊篮支架系统的吊篮局部结构示意图。4 is a schematic diagram of a partial structure of a hanging basket of a hanging basket support system in an embodiment of the present invention.

图5是本实用新型在实施例中的吊篮支架系统的使用状态示意图。FIG. 5 is a schematic diagram of the use state of the hanging basket support system in the embodiment of the present invention.

如图3-5所示,所述吊篮支架系统中还包括两端分别固定在所述两个支架的所述前梁上的连接杆13,两侧分别吊挂在所述两个支架的所述卷扬机5上的吊篮14,以及垂直固定在所述连接杆13和地面之间的限位绳15。As shown in Figures 3-5, the hanging basket support system further includes connecting rods 13 whose ends are respectively fixed on the front beams of the two supports, and the two sides are respectively hung on the two supports. The hanging basket 14 on the hoist 5 and the limit rope 15 vertically fixed between the connecting rod 13 and the ground.

上述的吊篮14可采用方通焊接而成各个面,再采用螺栓将各个面栓接组成吊篮框架。在一些实施例中,吊篮14采用40*40*3镀锌方通按面焊接而成,形成面后采用螺栓多各个面栓接组成吊篮框架,吊篮14主体尺寸1200*600*1200mm,两侧框高1800mm。另外,为了便于工人从吊篮14侧面搬运物料,所述吊篮14的两侧可完全打开的侧门或者上拉式轨道门,并通过安装在轨道上的限位卡件来卡住上拉式轨道门。在一些实施例中,在所述吊篮14两侧安装上拉式轨道门141。上拉式轨道门141采用20*40*2mm镀锌方通焊接门扇框架,门扇框架内侧焊金属网片,并在门扇框外两侧上下端设置滑轮,便于门扇滑动开启;再采用1.5mm不锈钢板折内尺寸20*23mmU型轨道焊接在两侧门框上,安装轨道门,并在门框1700mm高处设置门扇开启限位卡件。另外,为了保证轨道门141不下坠,可在轨道门的门扇上设置钢丝绳,钢丝绳末端吊挂门扇重量相等的铁坠使门扇开启时不下坠。The above-mentioned hanging basket 14 can be welded with square pass to form each surface, and then bolts are used to connect each surface to form the hanging basket frame. In some embodiments, the hanging basket 14 is made of 40*40*3 galvanized squares welded by surface, and after the surface is formed, bolts are used to bolt multiple surfaces to form the hanging basket frame, and the main body size of the hanging basket 14 is 1200*600*1200mm , the frame height on both sides is 1800mm. In addition, in order to facilitate the workers to carry materials from the side of the gondola 14, the two sides of the gondola 14 can be fully opened with side doors or pull-up rail doors, and the pull-up type is clamped by the limit clips installed on the rails. track door. In some embodiments, pull-up track doors 141 are installed on both sides of the gondola 14 . Pull-up track door 141 adopts 20*40*2mm galvanized square pass welded door frame, metal mesh is welded on the inner side of the door frame, and pulleys are set on the upper and lower ends of the outer sides of the door frame to facilitate the sliding opening of the door; 1.5mm stainless steel is used again. The inner size of the plate fold is 20*23mm U-shaped track is welded on the door frames on both sides, the track door is installed, and the door leaf opening limit clip is set at a height of 1700mm on the door frame. In addition, in order to ensure that the track door 141 does not fall, a steel wire rope can be arranged on the door leaf of the track door, and the end of the steel wire rope hangs an iron pendant of the same weight as the door leaf so that the door leaf does not fall when it is opened.

另外,上述的限位绳15是为了保证所述吊篮14在运送材料的升降过程中保持稳定,避免与幕墙钢架产生碰撞,引起安全隐患而设置。所述的限位绳15可以是均匀排布的两根或多根,垂直固定在所述连接杆13和地面之间,上端可与所述连接杆13吊挂固定,下端则固定在地面上。混凝土地面上可固定有钩环膨胀螺丝151,所述限位钢丝绳15的下端则钩挂固定在所述钩环膨胀螺丝151上。如果地面不是混凝土,则需在混凝土结构上固定出一个有效的支点。In addition, the above-mentioned limit rope 15 is provided to ensure that the hanging basket 14 remains stable during the lifting and lowering process of conveying materials, and avoids collision with the steel frame of the curtain wall, which may cause potential safety hazards. The limit ropes 15 can be two or more evenly arranged, vertically fixed between the connecting rod 13 and the ground, the upper end can be hung and fixed with the connecting rod 13, and the lower end is fixed on the ground. . A shackle expansion screw 151 can be fixed on the concrete floor, and the lower end of the limit wire rope 15 is hooked and fixed on the shackle expansion screw 151 . If the ground is not concrete, an effective fulcrum must be fixed to the concrete structure.

另外,所述吊篮支架系统中,还具有固定在所述吊篮14上的固定件16,所述限位绳在所述固定件16中上下穿过。所述固定件可以为双滑轮16,所述限位绳15从两个滑轮161中上下穿过,始终处于所述吊篮14的背面。在所述吊篮14的升降过程中,通过双滑轮16中的限位绳的作用,始终保持所述吊篮14在升降过程中保持稳定和减小晃动幅度。In addition, in the hanging basket support system, there is also a fixing member 16 fixed on the hanging basket 14 , and the limiting rope passes through the fixing member 16 up and down. The fixing member may be double pulleys 16 , and the limiting rope 15 passes through the two pulleys 161 up and down, and is always on the back of the hanging basket 14 . During the lifting and lowering process of the suspended basket 14, through the action of the limiting ropes in the double pulleys 16, the suspended basket 14 is always kept stable and the shaking amplitude is reduced during the lifting and lowering process.

本实用新型的吊篮支架系统中,所述支架用L型角钢及螺丝螺母系统固定于外幕墙横向钢龙骨上,再通过钢桁架组合结构与吊篮14连接固定,利用定向滑轮配置卷扬机5完成吊篮14的电动升降。为避免吊篮14在运作过程中受风力影响产生大幅度晃动导致石材磕碰,在吊篮14背面设置两道钢丝绳限位线,再通过双滑轮16与吊篮14相对固定,确保吊篮14上升时的晃动幅度最小。钢丝绳限位线15上端固定于吊架结构横向连接角钢上,下端钢丝绳打锁扣钩挂于与地面连接的钢制挂钩151上。所述吊篮支架系统拆除移位时,可先将吊篮14降至地面上,拆下吊篮14和钢丝绳限位线15,再进行支架结构拆除。拆除支架结构,首先要拆下横向连接角钢,再拆下与外幕墙横向龙骨连接的L型角钢,通过人工搬运至新的位置重新安装,安装好支架结构后,再安装横向连接角钢,安装钢丝绳限位线15,安装吊篮14,试运行无误后再投入使用。In the hanging basket support system of the present invention, the support is fixed on the horizontal steel keel of the outer curtain wall by L-shaped angle steel and screw nut system, and then connected and fixed with the hanging basket 14 through the steel truss composite structure, and the hoist 5 is configured by using the directional pulley. Electric lift of the gondola 14. In order to prevent the gondola 14 from being greatly shaken by the wind during operation, which may cause the stone to bump, two wire rope limit lines are set on the back of the gondola 14, and then the gondola 14 is relatively fixed by the double pulleys 16 to ensure that the gondola 14 rises. The shaking is minimal. The upper end of the wire rope limit line 15 is fixed on the horizontal connection angle steel of the hanger structure, and the lower end of the wire rope is hooked on the steel hook 151 connected to the ground. When the hanging basket support system is removed and displaced, the hanging basket 14 can be lowered to the ground first, the hanging basket 14 and the wire rope limit line 15 can be removed, and then the support structure can be removed. To dismantle the support structure, first remove the horizontal connection angle steel, then remove the L-shaped angle steel connected to the lateral keel of the outer curtain wall, and manually transport it to a new location for re-installation. After the support structure is installed, install the horizontal connection angle steel and install the steel wire rope. Limit line 15, install the hanging basket 14, and put it into use after the trial run is correct.

实施例的作用与效果Action and effect of the embodiment

根据本实施例所涉及的吊篮支架系统,具有对称安装在幕墙钢架上的两个支架,再通过钢桁架组合结构与吊篮连接固定,利用定向滑轮配置卷扬机完成吊篮的电动升降。在每个支架的框架上,通过两端分别固定在所述前梁上和所述框架的下梁中部的下斜撑,一端固定在所述前梁上,另一端由斜杆固定构件固定在所述幕墙钢架上的上斜杆,以及一端固定在所述前梁上,另一端固定在所述上斜杆上的立柱,与所述前梁形成数个三角支架结构,来对用于吊起作业平台的前梁起加固作用。同时,还采用限位角码进一步加固所述框架与幕墙钢架的连接,并通过增加框架内部交叉固定的框架斜撑来加固所述框架。为避免吊篮在运作过程中受风力影响产生大幅度晃动导致石材磕碰,在吊篮背面设置两道钢丝绳限位线,再通过双滑轮与吊篮相对固定,吊篮沿着限位绳进行上下移动,确保吊篮上升时的晃动幅度最小,将石材材料运到指定工作区域,随运随用,实现人、料分离运输,节省人工,提高效率,以达到快速施工的目的。本实用新型的吊篮支架系统现场安装便利,操作方法简洁,材料垂直运输效率高。吊篮支架系统方便安拆,可根据施工位置移动。According to the hanging basket bracket system involved in this embodiment, there are two brackets symmetrically installed on the curtain wall steel frame, and then connected and fixed to the hanging basket through the steel truss composite structure, and the directional pulley is used to configure the hoist to complete the electric lifting and lowering of the hanging basket. On the frame of each bracket, one end is fixed on the front beam, and the other end is fixed on the front beam, and the other end is fixed on the front beam and the other end is fixed on the front beam and the middle of the lower beam of the frame. The upward inclined rod on the curtain wall steel frame and the upright column with one end fixed on the front beam and the other end fixed on the upward inclined rod form several triangular bracket structures with the front beam to be used for Lift the front beam of the work platform for reinforcement. At the same time, the connection between the frame and the steel frame of the curtain wall is further strengthened by means of a limit angle code, and the frame is strengthened by adding cross-fixed frame diagonal braces inside the frame. In order to avoid the large swing of the hanging basket due to the influence of wind during operation, which may cause the stone to bump, two wire rope limit lines are set on the back of the hanging basket, and then fixed relative to the hanging basket through double pulleys, and the hanging basket moves up and down along the limit rope. Move, ensure the minimum shaking when the hanging basket rises, transport the stone material to the designated work area, and use it as it is transported, realize the separation and transportation of people and materials, save labor, improve efficiency, and achieve the purpose of rapid construction. The hanging basket support system of the utility model is convenient for on-site installation, simple in operation method and high in vertical transportation efficiency of materials. The hanging basket support system is easy to install and disassemble, and can be moved according to the construction position.

上述实施方式为本实用新型的优选案例,并不用来限制本实用新型的保护范围。The above-mentioned embodiments are preferred cases of the present invention, and are not intended to limit the protection scope of the present invention.

上述本实用新型实施例序号仅仅为了描述,不代表实施例的优劣。The above-mentioned serial numbers of the embodiments of the present invention are only for description, and do not represent the advantages or disadvantages of the embodiments.

以上仅为本实用新型的优选实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above are only the preferred embodiments of the present utility model, and are not intended to limit the scope of the present utility model patent. Any equivalent structure or equivalent process transformation made by using the contents of the present utility model description and accompanying drawings, or directly or indirectly applied to other related The technical field of the present invention is similarly included in the scope of patent protection of the present invention.

Claims (10)

1.一种吊篮支架系统,其特征在于,包含:1. a hanging basket support system, is characterized in that, comprises: 对称固定在幕墙钢架上的两个支架,每个支架包括固定在所述幕墙钢架上的框架,一端固定在所述框架的上梁中部的前梁,固定在所述前梁另一端头部底下的卷扬机,以及两端分别固定在所述前梁上和所述框架的下梁中部的下斜撑,Two brackets symmetrically fixed on the curtain wall steel frame, each bracket includes a frame fixed on the curtain wall steel frame, one end is fixed on the front beam in the middle of the upper beam of the frame, and the other end of the front beam is fixed the hoist at the bottom of the frame, and the lower diagonal braces whose ends are respectively fixed on the front beam and the middle of the lower beam of the frame, 两端分别固定在所述两个支架的所述前梁上的连接杆,the connecting rods whose ends are respectively fixed on the front beams of the two brackets, 两侧分别吊挂在所述两个支架的所述卷扬机上的吊篮,hanging baskets on both sides of the hoist of the two brackets, respectively, 以及垂直固定在所述连接杆和地面之间的限位绳。and a limit rope vertically fixed between the connecting rod and the ground. 2.根据权利要求1所述的吊篮支架系统,其特征在于,还具有固定在所述吊篮上的固定件,所述限位绳在所述固定件中上下穿过。2 . The hanging basket support system according to claim 1 , further comprising a fixing member fixed on the hanging basket, and the limiting rope is passed up and down in the fixing member. 3 . 3.根据权利要求2所述的吊篮支架系统,其特征在于,所述固定件为双滑轮,所述限位绳在两个滑轮中上下穿过。3 . The hanging basket support system according to claim 2 , wherein the fixing member is a double pulley, and the limit rope passes through the two pulleys up and down. 4 . 4.根据权利要求1所述的吊篮支架系统,其特征在于,所述支架还包括加固所述前梁的上斜杆,所述上斜杆的一端固定在所述前梁头部,另一端由斜杆固定构件固定在所述幕墙钢架上。4 . The hanging basket support system according to claim 1 , wherein the support further comprises an up-inclined rod for reinforcing the front beam, one end of the up-inclined rod is fixed on the head of the front beam, and the other side is fixed on the head of the front beam. 5 . One end is fixed on the curtain wall steel frame by a diagonal rod fixing member. 5.根据权利要求4所述的吊篮支架系统,其特征在于,所述支架还包括加固所述上斜杆的立柱,所述立柱的一端固定在所述前梁上,另一端固定在所述上斜杆上。5 . The hanging basket support system according to claim 4 , wherein the support further comprises a column for reinforcing the upward inclined rod, one end of the column is fixed on the front beam, and the other end is fixed on the front beam. 6 . on the upward slope. 6.根据权利要求5所述的吊篮支架系统,其特征在于,所述支架还包括第一数量个限位角码,分别固定在所述框架的上梁和下梁上。6 . The hanging basket support system according to claim 5 , wherein the support further comprises a first number of limit angle codes, which are respectively fixed on the upper beam and the lower beam of the frame. 7 . 7.根据权利要求6所述的吊篮支架系统,其特征在于,所述支架还包括两根交叉固定在所述框架内部的框架斜撑。7 . The hanging basket support system according to claim 6 , wherein the support further comprises two frame diagonal braces which are fixed in the inside of the frame crosswise. 8 . 8.根据权利要求7所述的吊篮支架系统,其特征在于,所述斜杆固定构件通过角钢螺栓固定在所述幕墙钢架上。8 . The hanging basket support system according to claim 7 , wherein the diagonal rod fixing member is fixed on the curtain wall steel frame by angle steel bolts. 9 . 9.根据权利要求4所述的吊篮支架系统,其特征在于,所述上斜杆的一端与所述卷扬机通过栓接件和螺栓叠加固定在所述前梁上。9 . The hanging basket support system according to claim 4 , wherein one end of the upward inclined rod and the hoist are superimposed and fixed on the front beam through bolts and bolts. 10 . 10.根据权利要求1所述的吊篮支架系统,其特征在于,所述吊篮两侧具有上拉式轨道门,以及安装在轨道上的限位卡件。10 . The hanging basket support system according to claim 1 , wherein the two sides of the hanging basket are provided with pull-up rail doors and limit clips installed on the rails. 11 .
CN201922081082.8U 2019-11-27 2019-11-27 A hanging basket support system Expired - Fee Related CN211341686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922081082.8U CN211341686U (en) 2019-11-27 2019-11-27 A hanging basket support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922081082.8U CN211341686U (en) 2019-11-27 2019-11-27 A hanging basket support system

Publications (1)

Publication Number Publication Date
CN211341686U true CN211341686U (en) 2020-08-25

Family

ID=72136679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922081082.8U Expired - Fee Related CN211341686U (en) 2019-11-27 2019-11-27 A hanging basket support system

Country Status (1)

Country Link
CN (1) CN211341686U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748139A (en) * 2019-11-27 2020-02-04 中建八局装饰工程有限公司 Hanging basket support system
CN112727052A (en) * 2021-01-05 2021-04-30 上海建工一建集团有限公司 Horizontal moving hanging basket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748139A (en) * 2019-11-27 2020-02-04 中建八局装饰工程有限公司 Hanging basket support system
CN112727052A (en) * 2021-01-05 2021-04-30 上海建工一建集团有限公司 Horizontal moving hanging basket

Similar Documents

Publication Publication Date Title
CN110748139A (en) Hanging basket support system
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN105888230B (en) A kind of lowering or hoisting gear and its construction method for building curtain wall construction
CN209277521U (en) A kind of builder's jack support construction
CN212176541U (en) Light-duty high-efficient construction that can have enough to meet need makes building equipment
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN206467994U (en) A kind of novel hanging basket support
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN206581577U (en) Using housing construction builder's jack
CN206346500U (en) Compact simplified arm extending type straddle truck
CN218881677U (en) Vertical surface protection device for steel structure building construction
CN210316599U (en) A curtain wall annular track for roof frame beams
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN201908447U (en) Lift-type horizontal safety net
CN107268971B (en) A double self-elevating external climbing frame of a super high-rise building and its application method
CN205171979U (en) Integrated form all steel lift platform
CN108483212A (en) Cladding glass installation self-control electric hoist hanger system and its hanging method
CN205242982U (en) Platform is used in construction of building outer wall
CN210529487U (en) Bridge and box-shaped bridge inspection device with flange plates
CN108483190A (en) A kind of intelligence aluminum alloy mould plate conveying device and its operating method
CN220014395U (en) Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping
CN218912287U (en) Hydraulic self-climbing spreader device in super high-rise hoistway
CN202209051U (en) Discharging platform for high-rise building construction
CN215331380U (en) Rail type suspension platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

CF01 Termination of patent right due to non-payment of annual fee