- Prior art keywords
- scaffold
- support
- bar
- pressure
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000000078 claw Anatomy 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 238000005728 strengthening Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 16
- 238000000034 method Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000011900 installation process Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a scaffold which is mainly supported by a house. The scaffold is composed of a crab claw hanger 2, a bearing system 1 and a common external scaffold frame, wherein, the crab claw hanger 2 is installed in the middle of the external scaffold frame, and the bearing system 1 is installed at the lower end of the external scaffold frame. When the utility model is used, the crab claw hanger 2 is clamped on a window wall and the bearing system 1 is supported on the lower layer of the window wall. Owing to the hanging structure adopted by the utility model, the scaffold can be conveniently and quickly mounted and dismounted, and occpies little time of steels and cranes, so that the construction cost is greatly reduced. The utility model is used for structural construction as well as decorative construction. The utility model has low requirements for procedure and construction progress and is difficult to result in holding up the work.
Description
The utility model relates to the scaffold that is mainly supported by the house.
Scaffold is a requisite facility in the building operations.In traditional scaffold, have to take steel material very big, work efficiency is low, wind carries greatly, the high-altitude dismantling operation is dangerous, as the overall height scaffold; The construction precision that has requires height, has deviation then to influence safety and progress slightly, the dismounting trouble, and equipment investment is big, and the easy unstability of slide bar is as various hoisting scaffold; The scene mounting or dismounting workload that also has is bigger, and as spigot Frame and Suspension Frame, the frame of encorbelmenting, and it is long to take the crane time, all after the fixation, can take off the crane hook, or the like.
The purpose of this utility model provide a kind of simple in structure, mounting or dismounting are convenient rapidly, it is few to take steel and crane time, the suspended scaffold that cost is low.
The technical solution of the utility model is: a plurality of crab claws are housed at the middle part of common out-mould scaffold framework hang, pressure bearing system is equipped with in the bottom.
During use, crab claw is hung tag on the window wall, pressure bearing system then is supported on the window wall of low one deck.The constructor can go up one deck with scaffold by crane or cucurbit after this floor construction finishes, continue construction.
Describe structure of the present utility model and using method in detail below in conjunction with embodiment of the present utility model.
Fig. 1, the utility model embodiment lateral view,
Fig. 2, the pressure bearing system schematic diagram,
Fig. 3, crab claw is hung the part schematic diagram,
Fig. 4, the sufficient fixedly schematic diagram of card in the pressure-bearing boots are adjustable,
Fig. 5, inside and outside strut and pressure-bearing boots connection diagram,
Fig. 6, the lifting schematic diagram,
As shown in Figure 1, the out-mould scaffold framework is made of general part, comprises outer vertical rod 7, interior vertical rod 8, bridging 9, interior row's brace 10, the support 12 that prevents unstability outside the plane, hyphen bar 13, security guardrail 14, long transverse lever 15, safety screen 16, scaffold floor 17.Outside framework, also be surrounded by safety net 11.Whole construction out-mould scaffold frame size size can be decided according to concrete condition.The middle part of vertical rod is hinged with a plurality of crab claws extensions 2 in the out-mould scaffold framework, crab claw is hung 2 and is stuck on the window wall of the floor 5 of constructing, and pressure bearing system 1 is arranged at the bottom of out-mould scaffold framework.
Shown in Fig. 2,4,5, pressure bearing system 1 comprises pressure-bearing boots 1,1, adjustable interior card foot 1,2, wild card foot 1,4, internal overarm support 1,6, outer strut 1,7, internal overarm support block 1,5, outer strut block 1,14.All have through hole 1,12 on pressure-bearing boots 1,1 and the adjustable interior card foot 1,2, with wing nut 1,9, screw rod 1,13 and pad 1,11 can be fixed on the appropriate location with blocking foot 1,2 in adjustable, and the pressure-bearing boots are stuck on the window wall securely.Internal overarm support 1,6 and outer strut 1,7 all are the X shape to be installed, and an end is fixed on the framework of constructing, the other end support respectively internal overarm support stop block 1,5 and outside on the strut stop block 1,14.
The also hinged fenestrate wall strengthening support 1,3 in lower end of card foot 1,2 in adjustable.For firm outer strut 1,7, the firm bar 1,8 of outer support is housed on strut 1,7 crosspoints outside, the other end of this bar is fixed on the out-mould scaffold framework.Have link 1,15 to be connected with steel chain 1,16 between internal overarm support 1,6 and internal overarm support block, when making whole scaffold lifting, two parts can not break away from.
Another pith is that crab claw is hung part in the utility model, as shown in Figure 3.Crab claw hangs 2 by other bar 2,1 card of bolt on the wall.For the purpose of firm, the other bar 3 of available horizontal stroke, perpendicular other bar 18 and interim drag-line 4 are further fixing.Horizontal other bar 3 is inserted in crab claw and hangs in 2, and interpolation is erected other bar 18, and perpendicular other bar 18 upper ends are strained and fixed in interior vertical rod 8 with interim drag-line 4, prevent the horizontal unstability of out-mould scaffold framework upper.
Can use crane lifting during use.As shown in Figure 6, be after the first floor construction finishes, in the time of carrying out the upper strata construction, the installation process schematic diagram of hanging Lifting scaffold.Earlier with card foot 1 in adjustable in the pressure bearing system, 2, crab claw is hung the other bar 2 of bolt on 2,1 and interim drag-line 4 etc. unclamp, crane is upwards sling one section with hanging Lifting scaffold, make pressure bearing system 1, crab claw is hung 2 and is broken away from wall, crane outwards shifts out hanging Lifting scaffold then, be moved upward to upper floor again, then move inward, make pressure bearing system 1 and crab claw hang 2 be in wall directly over, crane puts down hanging Lifting scaffold then, pressure bearing system 1 and crab claw are hung 2 and are promptly blocked on the wall, with card foot 1 in adjustable, 2 and the other bar 2 of bolt, 1 tightens, and this moment, crane can be removed, further again fixed casement window wall strengthening support 1,3, horizontal other bar 3, perpendicular other bar 18, interim drag-line 4, the constructor can construct on scaffold floor 17.
The utility model has been removed pre-embedded bolt to the demanding trouble of construction precision, thereby mounting or dismounting are convenient, rapid.In whole building work progress from bottom to up, this hanging Lifting scaffold progressively promotes, reuse, and of the present utility model simple in structure, but the accessory tool has greatly reduced rolled steel dosage, and operating expenses descends greatly; In installation process, it is few to take the crane time.The utility model not only can be used for structure construction, also can be advantageously used in decoration construction.During construction, a plurality of hanging Lifting scaffolds can be arranged in a row with lap bars and unify, also lifting separately easily, less demanding to operation, construction speed, be difficult for causing the work holdup.Jacking equipment can be used crane, also available cucurbit, or both are used alternatingly.In addition, because the utility model height is certain,, make construction be subjected to weather effect less so can adopt safeguard procedures easily.
Claims (8)
1, hanging Lifting scaffold comprises the out-mould scaffold framework, it is characterized in that, the middle part of out-mould scaffold framework is equipped with a plurality of crab claws and is hung (2), and pressure bearing system (1) is equipped with in the bottom; Pressure bearing system (1) is made up of a plurality of pressure-bearing boots (1.1), adjustable interior card foot (1.2), wild card foot (1.4), internal overarm support (1.6), outer strut (1.7), one end of internal overarm support (1.6), outer strut (1.7) is fixed on the out-mould scaffold framework, the other end support of internal overarm support (1.6) is on the internal stop (1.5) of pressure-bearing boots (1.1), and the other end of outer strut (1.7) supports on the outer baffle block (1.14) on the pressure-bearing boots (1.1); On pressure-bearing boots (1.1) and the adjustable card foot (1.2) through hole (1.12) is arranged, adjustable interior card foot (1.2) is fixed with screw rod (1.13) and nut (1.9) by through hole (1.12).
2, hanging Lifting scaffold according to claim 1 is characterized in that cross-shaped installation between internal overarm support (1,16), cross-shaped installation between the outer strut (1,7).
3, hanging Lifting scaffold according to claim 2 is characterized in that between the interior vertical rod of the crosspoint of strut (1,7) outside and out-mould scaffold framework outer support firm bar (1,8) being installed.
4, extension worker Lifting scaffold according to claim 1 is characterized in that the adjustable interior card foot hinged fenestrate wall strengthening support in (1,2) lower end (1,3).
5, hanging Lifting scaffold according to claim 1 is characterized in that internal overarm support (1,6) support has link (1,15) on an end of internal stop (1,5), links to each other with steel chain (1,16) on the internal stop (1,5).
6, hanging Lifting scaffold according to claim 1 is characterized in that being inserted with horizontal other bar (3) and perpendicular other bar (18) on the crab claw extension 2, and extension rope (4) tension out-mould scaffold framework is arranged on the perpendicular other bar (18).
7, hanging Lifting scaffold according to claim 1 is characterized in that crab claw hangs on 2 the horizontal beam the other bar of bolt (2,1) is arranged.
8, hanging Lifting scaffold according to claim 1 is characterized in that crab claw extension 2 is hinged with the out-mould scaffold framework, and crab claw is hung 2 and can be horizontally rotated.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 94230996 CN2216104Y (en) | 1994-12-14 | 1994-12-14 | Hanging lift scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 94230996 CN2216104Y (en) | 1994-12-14 | 1994-12-14 | Hanging lift scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2216104Y true CN2216104Y (en) | 1995-12-27 |
Family
ID=33842961
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 94230996 Expired - Fee Related CN2216104Y (en) | 1994-12-14 | 1994-12-14 | Hanging lift scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2216104Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100376760C (en) * | 2004-08-13 | 2008-03-26 | 深圳市特辰科技有限公司 | Circulating automatic up-down scaffold |
| CN101597956B (en) * | 2008-06-06 | 2011-01-05 | 海洋石油工程股份有限公司 | Suspended scaffold |
| CN102777037A (en) * | 2011-05-13 | 2012-11-14 | 中国建筑第八工程局有限公司 | Simple and practical hoisting construction method of long-span steel girder |
| CN104863343A (en) * | 2015-06-02 | 2015-08-26 | 江苏南通二建集团有限公司 | Externally hung construction operation frame |
| CN107806238A (en) * | 2017-11-28 | 2018-03-16 | 中建局集团建设发展有限公司 | Construction of lift well hydraulic climbing protection system and its construction method |
-
1994
- 1994-12-14 CN CN 94230996 patent/CN2216104Y/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100376760C (en) * | 2004-08-13 | 2008-03-26 | 深圳市特辰科技有限公司 | Circulating automatic up-down scaffold |
| CN101597956B (en) * | 2008-06-06 | 2011-01-05 | 海洋石油工程股份有限公司 | Suspended scaffold |
| CN102777037A (en) * | 2011-05-13 | 2012-11-14 | 中国建筑第八工程局有限公司 | Simple and practical hoisting construction method of long-span steel girder |
| CN102777037B (en) * | 2011-05-13 | 2014-11-26 | 中国建筑第八工程局有限公司 | Simple and practical hoisting construction method of long-span steel girder |
| CN104863343A (en) * | 2015-06-02 | 2015-08-26 | 江苏南通二建集团有限公司 | Externally hung construction operation frame |
| CN104863343B (en) * | 2015-06-02 | 2017-05-31 | 江苏南通二建集团有限公司 | Plug-in constructing operation frame |
| CN107806238A (en) * | 2017-11-28 | 2018-03-16 | 中建局集团建设发展有限公司 | Construction of lift well hydraulic climbing protection system and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201598820U (en) | Single-point suspension external hanging rack | |
| CN109555257B (en) | Combined supporting and hanging rod type suspended ceiling and construction method | |
| CN106400691A (en) | Integrated construction process for anti-collision wall formwork | |
| CN213572943U (en) | A high-altitude working gondola with a high hanging bracket | |
| CN2216104Y (en) | Hanging lift scaffold | |
| CN208056596U (en) | A kind of Novel engineering exterior wall scaffold | |
| CN206844431U (en) | A kind of curtain wall construction support | |
| JP3950800B2 (en) | Suspension scaffold | |
| CN218843810U (en) | A light-duty all steel regularization protector that can promote for building face limit construction | |
| CN214302804U (en) | Double-layer hanging basket of riding horse type | |
| CN214899827U (en) | High-altitude outdoor cable terminal work platform | |
| CN211736308U (en) | Self-sliding hanging frame device for mounting steel structure factory building roof inner plate | |
| CN211369478U (en) | Door type structural hanging basket suspension structure mounting system | |
| CN2276046Y (en) | Divided multistage automatic climbing external scaffold | |
| CN211733663U (en) | Building hoisting device | |
| CN111997345B (en) | Lifting scaffold hangs hoist system upside down | |
| CN220746666U (en) | Adjustable highway limit for height frame | |
| CN223281681U (en) | An external hanging basket without counterweight | |
| CN219118715U (en) | Elevator well safety protection and operation platform integrated device | |
| CN2241727Y (en) | Outside scaffold capable of quick lifting for high-rise building | |
| CN112554080A (en) | Wall-mounted operation device suitable for prefabricated bridge and mounting method | |
| CN217203935U (en) | Trash rack pier template hoisting device | |
| CN222525815U (en) | A hanging basket device for equipment room on roof | |
| CN216974142U (en) | Non-standard hanging basket mounting structure | |
| CN223305384U (en) | Suspension platform and building machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |